GypLyner (walls) Metal framed wall lining system. GypLyner.

Similar documents
GypLyner UNIVERSAL Metal framed wall lining system

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

Staggered stud acoustic partition system

ShaftWall. Shaft and duct encasement system. ShaftWall.

The extra strong, extra durable, sound resistant system that you can direct fix to

Staggered stud acoustic partition system

Tiling Tiling

Issue date: 1st May Key changes since original publication (July 2005):

Quantity take-off details

Tiling. Capital Gate Hotel, Abu Dhabi - UAE

GypLyner universal. Internal wall insulation (IWI) installation guide

Tiling Tiling Finishes C08

Loadbearing timber joist floors

C05. S03. P02 P08 FireWall

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD

CO3. Steel encasements C03. Introduction - FireCase 01/12/2017 GypLyner encase 11/05/2017. Introduction Steel encasements

HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION GTEC MOISTURE AND VAPOUR BOARD WITH PLASTERBOARD

CO9. Sound absorbing solutions C09

SECTION D Masonry Wall Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications.

C05. S02. P02 P30 ShaftWall

C06. S02. P02 P22 CasoLine mf

Plaster systems. Plaster systems.

Knauf MF Suspended Ceilings

Thermal Laminate Board.

Container Installation Guide

Container Installation Guide

SECTION GYPSUM BOARD

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

Selecting partitions

AND ACCESSORIES FOR DRYWALL CONSTRUCTION

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

HOW TO: BOARD BATHROOMS, WET ROOMS & SHOWERS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

The GlasRoc Shaftliner Type X advantage...

WORK, REST AND PLAY ISOVER MAKES IT POSSIBLE.

Building Design Data

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Boards. Products - Boards.

June Non - Residential Refurbishment Internal lining walls

Fire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION GYPSUM BOARD SHAFT WALL ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES

STEEL STUD, TRIMS AND ACCESSORIES FOR DRYWALL CONSTRUCTION MONTREAL TORONTO CALGARY EDMONTON VANCOUVER THE STRENGTH WITHIN

SOUND INSULATION TESTING IN DWELLINGS

icore HR outperforms other building boards in many important ways including the following:

SECTION GYPSUM BOARD

PASSIVE FIRE PROTECTION PRODUCTS

TECHNICAL GUIDANCE XXXX 2015 EXXON QUESTION ANSWER. page 1 of 9

BENCHMARK Evolution Axis

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Shaftwall & Stairwell Systems Fire protection & sound isolation for shafts & stairwells

DriLyner rf. Internal wall insulation (IWI) installation guide

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

June Residential Refurbishment Separating walls

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: FUNDERMAX GMBH

For inhibiting the spread of fire and smoke in concealed spaces

GIB Quiet Clip GIB CBI March Features and Benefits

Backer Box INSTALLATION

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

ASSEMBLY INSTRUCTION TG 2002

F L O O R S A N D C E I L I N G S

V1/0715/AI/TDO1. KORE Loft. Insulated Flooring System Design Guide

Product Information Sheet

ESR-2894 Reissued April 2014 This report is subject to renewal April 1, 2016.

I-STUD Shaftwall System

USGBORAL.COM SYSTEMS+ INTRODUCTION OUTRWALL BRICK VENEER WALLS EXTERNAL WALLS INNOVATIVE SYSTEMS SOLUTIONS

Acoustic Design Criteria

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

exangle installation guide EXANGLE Finishing Sections

Benefits.

PITCHED ROOF SOLUTIONS

Isover Installation Guide

Shaftwall and Area Separation Wall Systems.

INDEX. S. No. Description Page No.

SECTION SOUND ISOLATION

Planning and installation instructions

GRP Flat Roofing Edge Trims

1. Interior gypsum wallboard. 2. Exterior gypsum board panels for ceilings and soffits. 3. Tile backing panels.

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

CASE STUDY OF THE SOUND REDUCTION OF VARIOUS RESIDENTIAL GLAZING TREATMENTS

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

Installation Guide and Safety Manual

Multi-layer Insulation Blanket for Walls

ONE SCHOOL STREET SEPTEMBER 18, 2008 GOWANDA, NEW YORK ARCH PROJECT NO

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063

INSTALLATION INSTRUCTIONS FOR WICANDERS HYDROCORK

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague,

OSB.COMFORT INSTALLATION GUIDE * 1 RECOMMENDED USE PANEL COMPOSITION

GYPSUM BOARD SECTION GYPSUM BOARD PART 1 - GENERAL

SSS009: Substrate Specification Sheet 9 - Render Board

3M CS-195+ Composite Sheet Product Description

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

Gold Bond BRAND Gypsum Sheathing

CEILING & WALL SYSTEMS

Transcription:

GypLyner GypLyner (walls) Metal framed wall lining system GypLyner is a cost-effective, virtually independent metal frame drylining system for lining walls. General purpose and suitable for all internal non-loadbearing applications. This system is compatible with, and uses common components of, GypLyner ceiling lining and GypLyner ENCASE steel encasement system. www.gypsum.ie 08

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie Key facts Corrects background irregularities Minimal connection to the structure Can satisfy National Building Regulations on thermal performance Can be used to upgrade the sound resistance and thermal insulation Versatile, general purpose lining Little or no background preparation needed Commonality of ceiling and wall lining components GypLyner Gypframe GL or GL9 Bracket Gypframe GL Lining Channel Gypframe GL8 Track 09

www.gypsum.ie GypWall GypLyner CLASSIC Components Gyproc board products Gyproc WallBoard, Thickness Width.5, 5mm 00mm Gypframe metal products Gypframe GL Lining Channel Gyproc SoundBloc Width 00mm Gypframe GL8 Track Gyproc DuraLine Thickness Width.5, 5mm 00mm Gypframe GL Bracket Length 95mm flat (max 75mm stand-off from wall) Gyproc Thermal laminate Width 00, 00mm Gypframe GL9 Bracket Length 95mm flat (max 5mm stand-off from wall) Gypframe GL Channel Connector For joining GL Lining Channels. Moisture resistant boards are specifed in intermittent wet use areas e.g. shower areas, bathrooms and kitchens. Also available in DUPLEX grades where a vapour check is required. 0

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie Gypframe metal products Gypframe 99 FC 50 Fixing Channel Gypframe GFS Fixing Strap Gypframe GFT Fixing 'T' Fixing and finishing products Gyproc Wafer Head Drywall Screws For metal-to-metal fixing up to 0.79mm thick Gypframe GL GypLyner Anchors For fixing Gypframe GL or GL9 Brackets to concrete / masonry Gyproc Drywall Screws For fixing boards to stud framing up to 0.79mm thick GypLyner

GypWall GypLyner CLASSIC Components Fixing and finishing products Gyproc Sealant Sealing air paths for optimum sound insulation. Fixing and finishing products Gyproc jointing materials For a seamless finish. www.gypsum.ie Gyproc edge beads Protecting and enhancing board edges. Gyproc Skimcoat, Gyproc Carlite Finish, Gyproc Board Finish, To provide a plaster skim finish. Gyproc Control Joint To accomodate structural movement. Moy Isover Insulation For enhanced acoustic and thermal performance.

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie Construction tips GypLyner Estimated construction time m / man hour - ready for finishing Depth of the cavity is determined by the fixing brackets. Allow a stand-off of 5mm - 75mm, plus the lining thickness, for a Gypframe GL Bracket and 5mm - 5mm, plus the lining thickness, for a Gypframe GL9 Bracket Keep the drylining cavity closed to prevent downgrading the thermal performance - where required apply a continuous band of Gyproc Compound or Gyproc Sealant to the perimeter of external walls, around service penetrations, openings, junctions and around the perimeter of suspended timber floors Brackets to be fixed at a maximum of 800mm vertical centres Use full height boards where possible - if joints are unavoidable, position them above suspended ceilings or below access floor level where possible Support horizontal joints with Gypframe GFS Fixing Strap, Gypframe 99FC50 Fixing Channel, or Gypframe GFT Fixing T (where specified). Form vertical cavity barriers, where specified, in long runs of lining

GypWall GypLyner CLASSIC Installation www.gypsum.ie Use a straight edge (e.g. Gypframe GL Lining Channel) to determine the maximum undulation in the wall or service protrusion. This will determine the minimum cavity depth. Determine cavity depth required and mark chalk lines to floor and ceiling to indicate positioning of Gypframe GL8 Track. Fix Gypframe GL8 Track to perimeters, with the longer leg towards the lining, at 00mm centres using appropriate fixings. 4

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie GypLyner 4 5 Mark vertical lines on the wall at 00mm intervals (450mm intervals for 900mm width boards) to indicate bracket fixing centres. Mark horizontal lines at 800mm centres to determine individual bracket position. Position each bracket, ribs to the wall, and fix through bracket slot into the masonry wall using a Gypframe GL GypLyner Anchor. Cut Gypframe GL Lining Channels to size and round-off ends with tin snips for an easier fit. Extend Gypframe GL Channels, where required, by engaging channel ends over a Gypframe GL Channel Connector. NB Additional Gypframe GL Lining Channels may be required to pick up fixings for subsequent adjacent linings. Friction fit Gypframe GL Lining Channel into the track. Bend bracket legs forward and fix each leg to the channel using a Gyproc Wafer Head Drywall Screw. Insert screw through the hole in the bracket nearest to the back of the channel (See Construction details, Figure 8). NB Avoid exerting any backwards or forwards pressure on the channels when screw-fixing the brackets, otherwise a straight and true lining surface may not be achieved. 5

GypWall GypLyner CLASSIC www.gypsum.ie 7 8 9 Bend back protruding bracket legs to sit clear of the channel face. Fix Gypframe GFS Fixing Strap or GFT Fixing T to back horizontal board joints if required. Internal angles Position a Gypframe GL Lining Channel tight into the corner in order to provide support for the lining. Bend one bracket leg across the face of the Gypframe GL Lining Channel and fix with a Gyproc Wafer Head Drywall Screw to secure and restrain the channel at the corner position. Board fixing Fix boards to all framing members at 00mm centres using Gyproc Drywall Screws from top to bottom. Lightly butt boards, inserting screws not closer than 0mm from bound edges and mm from cut edges. NB Select the appropriate length of fixing to provide a nominal 0mm penetration into the steel framing.

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie GypLyner 0 Perpendicular linings to be fixed through previous plasterboard into the Gypframe GL Lining Channel behind. Locate Gypframe GL8 Track tight to the wall at the corner position and fix through the lining into the channel. Openings Position a Gypframe GL Lining Channel each side of the opening while compensating for the thickness of the plasterboard to be fixed into the reveal. Fix to Gypframe GL8 Track at head and base with Gyproc Wafer Head Drywall Screw. Continue boarding, fixing boards to all framing members. Install cut and bent Gypframe GL8 Track to form the head of the opening and fix to the side of the Gypframe GL Channels using two Gyproc Wafer Head Drywall Screws. Position a short length of Gypframe GL Lining Channel above the opening to support vertical board joints and fix using two Gyproc Wafer Head Drywall Screws. Maximum 00mm centres for Gypframe GL Channels must be maintained. 7

GypWall GypLyner CLASSIC www.gypsum.ie Fix Gyproc edge bead to the perimeter of the window frame to provide edge restraint and protection to the reveal and soffit linings. 4 Cut reveal and soffit boards to width, locate into the perimeter edge bead and fix into the Gypframe GL9 Channel and Gypframe GL8 Track. Fix boards to complete drylining at the opening. 5 Where openings occur in the run of lining, cut board around the opening to avoid a joint directly in line with edge of openings. Ensure vertical board joints above door opes are supported by Gypframe GL Channels. 8

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie GypLyner 7 Insulation If Moy insulation is specified, install progressively as boarding proceeds. NB The insulating backing of Gyproc Thermal laminates should not be chased to accommodate services. PVC covered cables must not come into contact with polystyrene insulation. Use suitable isolation methods (conduit or capping) Service installations The drylining cavity facilitates the incorporation of services. Fix pipes and conduits in position before installing the framing. All services should be installed in accordance with all available standards, guidelines and recommendations. 9

www.gypsum.ie GypWall GypLyner CLASSIC Construction details 4 5mm (maximum stand-off) to face of channel 8 Channel fixing (Gypframe GL9 Bracket shown at maximum extension) 9 Base detail Gypframe GL or GL9 Bracket Gypframe GL Lining Channel Gyproc Wafer Head Drywall Screw 4 Gypframe GL8 Track 0

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie 9 GypLyner 8 7 4 4 5 7 7 0 Window reveal Internal angle (perimeter sealing to external wall) Gypframe GL Lining Channel Gypframe GL8 Track Gyproc Sealant 4 5 Gypframe GL or GL9 Bracket Gypframe GL GypLyner Anchor Wall structure 7 8 9 Gyproc plasterboard lining Proprietary window unit Moy Isover Insulation (subject to requirements)

www.gypsum.ie GypWall GypLyner CLASSIC Junction details 4 External angle Gypframe GL or GL9 Bracket Gypframe GL Lining Channel Gyproc plasterboard lining 4 Wall structure

Technical support: T 0 9 8400 E technical.enquiries@gypsum.ie GypLyner