New Division of Water Stormwater Regulations

Similar documents
Shelbyville, KY Stormwater Best Management Practices January Appendix F EPSC Qualified Contractor Forms

15-MM & 16-MA NOI and SWPPP Overview

EPA s 2015 Multi-Sector General Permit (MSGP)

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

PRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES

Caterpillar Inc. North Little Rock is applying for coverage under the NPDES General Permit ARROOOOOO for stormwater discharge.

INSTRUCTIONS TO FILL OUT WASTEWATER DISCHARGE PERMIT APPLICATION BASELINE MONITORING REPORT

TPDES INDUSTRIAL STORMWATER MULTI-SECTOR GENERAL PERMIT (TXR050000) Lindsay Garza. Stormwater and Pretreatment Team Water Quality Division

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

Harris County Pollution Control Services Department

ARG Notice of Intent for Operators Engaged in Hydrostatic Testing Located within the State of Arkansas

RE: AFIN: PERMIT NO.: 0751-WG-SW-4 FACILITY: Squires SWD Facility/Jessica 1-4 SWDW COUNTY: Conway Co.

Industrial waste pretreatment facilities that discharge to public sewers.

Generic Baseline Monitoring Report (BMR) Form Division of Surface Water

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State of Oklahoma

STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT TO DISCHARGE STORMWATER UNDER THE

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE

ANCHORAGE STORMWATER MANUAL

Maryland Department of Environment Water Management Administration Compliance Program 1800 Washington Blvd, Baltimore, MD

The Solution to Pollution is Dilution

Public Notice. Issuance of Industrial Waste Discharge Permit

STORMWATER MANAGEMENT PROGRAM. Table of Contents

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR)

The NPDES Storm Water Permit - Chasing Dirt. March 18, 2014 WaterCon 14 - Springfield

OHIO ENVIRONMENTAL PROTECTION AGENCY

Angelo State University. Stormwater Management Program. TPDES No. TXR040000

SoPo s SW Management Approach Purpose of SW Standards

Public Notice. Issuance of Industrial Waste Discharge Permit

Stormwater Preparing an Effective Industrial Stormwater Pollution Prevention Plan

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

Sewerage & Water Board of New Orleans

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

AFOs, CAFOs and MAFOs

U.S. Army Corps of Engineers Regulatory Program

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG850000

General NPDES Permit No. ILR40 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE

Storm Water Annual Report

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

Pollution Reduction Plan For Municipal Separate Storm Sewer System

STORMWATER MANAGEMENT PROGRAM & ILLICIT DISCHARGE DETECTION AND ELIMINATION

1. Pre-Construction Conference Information: Date of Pre-Construction Conference: Owner/Operator Name:

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

Public Notice: Wetland/Waterway/Water Quality Regulations

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015

RULE 2250 PERMIT-EXEMPT EQUIPMENT REGISTRATION (Adopted October 19, 2006)

General Permit No.: OHR Page 2 of 141

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

Water Quality Permitting Program Monitoring Matrix 1,2,3

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

POLLUTION PREVENTION AFTER CONSTRUCTION

NPDES Electronic Reporting Rule 40 CFR 127

Developing an Environmental Compliance Plan

Custom Wood Recycling, Inc. Inspection (Yell Co) Permit No.: AR and ARR000421

SUBCONTRACTOR SAFETY QUALIFICATION FORM

9. Evaluation Mechanisms

NPDES Permit No: AR , Routine Compliance Inspection

Reign Consulting Presents

Stantec Consulting Services Inc Lebanon Road, Cincinnati, OH 45241

Completion Instructions for the Industrial SWP3 Template

Module 7: When Things Deviate from the Plan!

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS

James Ferrell 10/3/07 Page 2

Construction Stormwater Compliance: Are You Covered Under the EPA s New 2017 Construction General Permit?

Photographic Processing Facility Sector Control Policy

FOOTING DRAIN DISCONNECTION PROGRAM GUIDELINES

MS4 NPDES PERMITS FREQUENTLY ASKED QUESTIONS (FAQ) 1

Environmental Plans and Procedures

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

Richland County Department of Public Works Engineering (Land Development) Division

South Carolina

February 17, Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX Fouke # D-3 SWD System Inspection (Miller Co)

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Occupational Safety & Health Environmental Health Laboratory Safety Industrial Hygiene Radiation Safety Hazardous Waste Pollution Prevention

Water Quality Physical / Chemical Data Report Page 1. United States Army Corps of Engineers Nashville District CELRN-EC-H / Water Management Section

LANCASTER COUNTY Act 167 Frequently Asked Questions (FAQs)

Bacon Creek Septic System Replacement Best Management Practices. Implementation Plan

WASTEWATER EFFLUENT DISPOSAL PUBLICLY OWNED TREATMENT WORKS (CAMP BARRETT WASTEWATER PUMP STATION)

Please take the time to complete the attached questionnaire and return the completed survey within thirty (30) days of receipt.

Permit To Take Water Inspection Report

Landfills And The New Virginia Stormwater Management Program Regulations

Colorado Department of Agriculture, DPI

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #

The Philippine Environmental Impact Statement (EIS) System

PA Municipal Separate Storm Sewer System (MS4) TMDL Plan

Stormwater Management at San Diego International Airport

Stormwater Construction General Permit CGP-2013

Notice of Violations and Intent to File Suit under the Federal Water Pollution Control Act

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

September 26, RE: Waste Water Treatment System. Dear Mr. Starks:

STORM WATER MANAGEMENT PROGRAM. City of Jacksonville, Alabama Phase II Small MS4 NPDES General Permit ALR040004

MSD Water Quality Standards Academy

Virginia Stormwater Management Permitting

New Castle County Stormwater Management Facility Maintenance and Inspection Program. Department of Special Services May 15, 2012

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment

Appendix B Stormwater Pollution Prevention Plan Outline

Transcription:

New Division of Water Stormwater Regulations

General Permit for Stormwater Discharge in Kentucky

KPDES No.: KYR000000

Handouts today: Copy of General Permit Notice of Intent Form

Notice of Intent You are required to electronically file a Notice of Intent to Renew your Stormwater General Permit. Filing deadline is August 29, 2013 (existing). Filing deadline is June 16, 2013 (new, but existing) Filing deadline is 15 days prior to modification.

Notice of Intent Information you will need to fill out the NOI: AI Number Permit Number (KPDES) Primary Receiving Water (river or stream) Latitude and Longitude of Facility SIC Code Potential Pollutants Latitude and Longitude of Outfall(s) DMR Signatory Official (DMR = Discharge Monitoring Report) DMR Recipient NOI Preparer Site Location Map / Site Layout Map

Permit Issuance We have been informed by Division of Water personnel that a permit certification letter will be issued to the NOI Preparer and the DMR Signatory Official by email informing them of their new permit. The actual permit will not be sent, but is available on the Division of Water website. We have been told that they are taking about 30 days to review the NOI s and issue the letters. As of this week they are just reviewing the NOIs from the end of June. (More like 45 60 days.)

Comparison of Old Permit to New Requirements Old Permit Requirements Paper NOI (one page) Stormwater Pollution Prevention Plan required Stormwater sampling twice per year Sample parameters: ph, COD, TSS, Oil & Grease, and Flow No requirement to submit sample results No requirement for precipitation log New Permit Requirements Electronic NOI (with more site information) Stormwater Pollution Prevention Plan (with specific criteria) Stormwater sampling twice per year Sample parameters: ph, COD, TSS, Oil & Grease, and Flow (KY DOW can add additional parameters) Required to submit sample results to KY DOW Precipitation log is required to be maintained Outfall signs recommended; required for Ohio River Recordkeeping requirements are written in permit

Records to be Maintained at Facility Copy of NOI submitted Copy of coverage letter from KY DOW Copy of permit Daily precipitation log Incident reports (if applicable) Employee training records (date, name, subject)

Records to be Maintained at Facility Control measure repair log Inspection reports/records Corrective actions taken Summary of all analytical results of sampling (including from last permit)

Precipitation Log

Discharge Monitoring Reports With the new Stormwater Requirements, results of your stormwater sampling will be required to be submitted to the Division of Water. You will be required to fill out a Discharge Monitoring Report. The report will require a signature (DMR Signatory Official), and must be submitted to the Division of Water.

Discharge Monitoring Reports Discharge Monitoring Reports will be mailed to the DMR Recipient. The form(s) must be filled out with the analytical results from your stormwater sampling event. The form(s) require a signature by the DMR Signatory Official. The report must be submitted to the DOW.

Discharge Monitoring Reports Starting July 28, 2014 Discharge Monitoring Reports are required to be submitted electronically to the Division of Water. Reports will be submitted using the NetDMR system. At a date yet to be determined, a letter from the DOW with detailed information will be sent to all permit holders on the NetDMR requirement.

Discharge Monitoring Reports You will be required to set up an account with the NetDMR system as a Permittee Signatory. NSSE can be authorized to sign onto your account in order to fill out the DMR form with your stormwater analytical results or you can choose to fill out the DMRs yourself. Once the DMR form has been filled out, the DMR Signatory Official must certify the report and submit to DOW.

Discharge Monitoring Reports NSSE has been working within a test environment in the Net DMR system and has found the process to be fairly user friendly. If you have multiple Outfalls then the fun begins. We suggest that facilities sign up for the test environment and become familiar with the system.

Discharge Monitoring Reports NetDMR Test Environment https://netdmrtest.epacdx.net/netdmr web/public/home.htm

Outfall Signage As part of your new Permit the facility is required to place signs at the location of all Outfalls. The signs must signify the Outfall number (i.e., Outfall #001).

Outfall Signage