PROSPECT - LEAD FIELD RECOVERABLE IN-PLACE TOTAL RESOURCES UNDISCOVERED RESOURCES DISCOVERED RESOURCES ESTIMATED ULTIMATE RECOVERY (EUR)

Similar documents
SPE/WPC/AAPG Petroleum Resource Classification

SPE/WPC/AAPG/SPEE Petroleum Resources Management System (PRMS)

Standardization of the Evaluation Criteria on Petroleum Resources

An Overview of the Petroleum Resources Management System (PRMS) and its Relationship to UNFC

Evaluation and Classification of Hydrocarbon Resources

Guidelines for Application of the Petroleum Resources Management System

UK Oil and Gas Reserves and Resources. As at end 2016

Executive Summary. Competent Person s Report Harvey Gas Prospect, UK North Sea. Harvey Gas Prospect CPR. PREPARED FOR: Independent Oil and Gas plc

Proved Reserves Statement (SEC Rules) Certain Properties in Europe as of 31 st December, 2015

7 April Prospective resources in Indonesia

Maximizing the Value and Recovery of Oil and Gas Resources

Probabilistic Aggregation and Project Definition: A Missed Opportunity E. Morales and W. John Lee

Hydrocarbon Reserves of Mexico

New Zealand Energy Corp.

Press Release February 6, 2018 VALEURA ANNOUNCES PROSPECTIVE RESOURCES FOR UNCONVENTIONAL BASIN-CENTERED GAS PROSPECT

Cuba Block 9 Production Sharing Contract (Melbana Energy 100% # )

For personal use only Operations Update

Exercise 14: Estimating HC Volumes

Operating Conditions Optimization of Steam Injection in Enhanced Oil Recovery Using Duelist Algorithm

Flexible Gross Split Sharing A new fiscal model for the upstream petroleum industry May 15, 2017 Pedro van Meurs

OG21 TTA2 Exploration and Increased Recovery. 26 th April, 2012 Erik Skjetne

Brad Berg 1. Search and Discovery Article # (2015)** Posted August 10, Abstract

Incremental Oil Recovery from Depleted Oilfields in a Low Oil Price Environment

Hassan S. Naji. Faculty of Earth Sciences, King Abdulaziz University, Jeddah, Saudi Arabia

The Effect of Different Carbon Dioxide Injection Modes on Oil Recovery

INCORPORATING CORE ANALYSIS DATA UNCERTAINTY IN ASSEST VALUE ASSESSMENT. Andre J. Bouchard and Matthew J. Fox Conoco Inc.

The Sole Gas Project Project update: 8 September 2016

Reservoir Engineering

Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco

Armour Energy Limited 2 September 2015 Armour to Become a Significant Gas, LPG, Condensate and Oil Producer

Shades of Energy Independence

Shouyang CBM Project Design for Production

Historic IOR/EOR practices in the Minnelusa

Status of Geothermal Resource Classification & Key Stakeholders

United Nations Framework Classification for Fossil Energy and Mineral Reserves and Resources 2009 incorporating Specifications for its Application

Thermal Recovery Status and Development Prospect for Heavy Oil in China

Notes: Slide 1 of 20. Long Term World Oil Supply

Facilities Cost Estimates Drivers in the Oil and Gas Field Development. By Ruby Aka. Independent Oil and Gas Consultant

This is Reservoir Engineering COPYRIGHT. By the end of this lesson, you will be able to:

For personal use only

Origin Energy 2011 Annual Reserves Report

Data Collection by National Regulators

P a n o r o E n e r g y A n n u A l S t A t E m E n t o f R E S E R v E S A P R i l

Canadian Spirit Resources Inc. Corporate Presentation. April 2018

E&P A Hart Energy Publication

Analysis of Trinidad and Tobago's Natural Gas Supply-Demand Balance

Economics & Technology of the Crude Oil, Natural Gas and LNG Value Chains. November 29-30, 2007

DEVELOPMENT OPTIMIZATION OF A MARGINAL OIL FIELD

Qualified Person s Report for the Edvard Grieg South Discovery, Norway

2017 ANNUAL RESERVES REPORT. For the year ended 30 June 2017

Successful Completion Optimization of the Eagle Ford Shale

SONATRACH ALGERIA SONATRACH. Vision & Perspectives. ALGERIA - Energy Day 04th May, 2016 HOUSTON - TEXAS - USA

CEO 1 The industry s response to the Paris Declaration HALL 5. CEO 2 How to be competitive in a cyclical environment HALL 6

Reserve growth in oil fields of the North Sea

Mature Fields: Key Factors for Successful EOR Projects*

Managing Subsurface Uncertainties in Deepwater Facilities Design

Status of SPEE Monograph 4 Estimating Developed Reserves in Unconventional Reservoirs John Seidle MHA Petroleum Consultants

H.R.6. Energy Independence and Security Act of 2007 (Enrolled as Agreed to or Passed by Both House and Senate) Subtitle B--Geothermal Energy

SANTA MARIA BASIN MONTEREY SHALE ONGOING DEVELOPMENT (PROVED-INFILL) DRILLING PROGRAM THIRD QUARTER

Petrotechnical Expert Services. Multidisciplinary expertise, technology integration, and collaboration to improve operations

CAPROCK INTEGRITY FOCUS Analyzing How To Utilize Technical Testing Methodologies To Ensure Caprock Integrity. Tuesday, May 24 th, 2011

ADX ASSETS & STRATEGY A PIVOTAL PERIOD AHEAD

Oil Search Update - Projects & Initiatives

For personal use only

U.S. Crude Oil and Natural Gas Proved Reserves, 2012

Optimization of Polymer Flooding and Comparison with Infill Well Drilling

Potential Supply of Natural Gas in the United States Report of the Potential Gas Committee (December 31, 2016)

OIL & GAS. solutions and services. tecnologiasparis.net/klmoilllc.com. Paris Technologies

Production: Industry view. World Oil Reserves and. World Oil Reserves and. Kuwait Energy Company. Ray Leonard. ASPO 2007 Cork Ireland

Africa 2013: New roles for Oilfield Service companies in an emerging market. Gavin Graham EVP Business Development

The SPE Foundation through member donations and a contribution from Offshore Europe

Analysis Fraction Flow of Water versus Cumulative Oil Recoveries Using Buckley Leverett Method

BP Alaska Heavy Oil Production from the Ugnu Fluvial-Deltaic Reservoir*

SPE Abstract. Introduction

Adjustment to Oil Saturation Estimate Due to Various Reservoir Drive Mechanisms

Steam Injection. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

PROVED GEOTHERMAL RESERVES FRAMEWORK AND METHODOLOGY

INVESTIGATION ON SURFACE AND SUBSURFACE FLUID MIGRATION: ENVIRONMENTAL IMPACT

EVALUATION OF WATER AND GAS INJECTION IN A CARBONATE RESERVOIR

FEEDING A GROWING SOUTHERN AFRICA DOMESTIC GAS MARKET

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

BERRY PETROLEUM COMPANY

A suggestion for SEEA classifications of energy resources

Establishing Minimum Economic Field Size and Analysing its Role in Exploration Project Risks Assessment: Three Examples*

Chevron Australasia Overview

DEPLETED FIELDS WITH ACTIVE AQUIFERS

Quarterly Activities Report

STUDY OF THE VARIOUS EOR METHODS (Chemical Injection and Steam flooding with case studies)

The Science and a Case History of CO 2 Conformance Through the Use of Complex Nano Fluids

Practices and Pitfalls in Estimating Coalbed Methane Resources and Reserves*

Investigate Polymer Flooding for Enhanced Oil Recovery in a Mature Oil Field

Application of the Power Law Loss-Ratio Method of Decline Analysis

Alaska s 10-year Oil Production Outlook And Potential Future Developments Report. Pascal Umekwe Division of Oil and Gas, DNR 04/27/2017

World and U.S. Fossil Fuel Supplies

Coal and Natural Gas The Evolving Nature of Supply and Demand

Petroleum Engineering Minor


Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

8 th Annual Wyoming CO 2 Conference

8. Storage options with EOR

Transcription:

1

2

RECOVERABLE IN-PLACE CUMULATIVE PRODUCTION ESTIMATED ULTIMATE RECOVERY (EUR) PROVED FIELD DISCOVERED RESOURCES RESERVES PROVED+ PROBABLE PROVED + PROBABLE +POSSIBLE 1P 2P 3P TOTAL RESOURCES LOW ESTIMATE (1C) P90% CONTINGENT RESOURCES (CR) BEST ESTIMATE (2C) P50% HIGH ESTIMATE (3C) P10% PROSPECT - LEAD LOW ESTIMATE (1U) P90% UNDISCOVERED RESOURCES PROSPECTIVE RESOURCES (PR) BEST ESTIMATE 2U) P50% HIGH ESTIMATE (3U) P10% DEVELOPED UNDEVELOPED DEVELOPED UNDEVELOPED ASSOCIATED WITH THE GEOLOGICAL RISKS 3

TOTAL PETROLEUM INITIALLY IN-PLACE UNDISCOVERED PETROLEUM INITIALLY IN-PLACE DISCOVERED PETROLEUM INITIALLY IN-PLACE SUB-COMMERCIAL COMMERCIAL LOWER RISK PROJECT STATUS PETRONAS STATUS CATEGORIES PV. PRODUCTION EST. ULTIMATE RECOVERY RESERVES (EUR) 1P 2P 3P PV. + PROB PV. + PROB + POSS. On Production Under Development Planned for Development LOW ESTIMATES. LOW ESTIMATES CONTINGENT RESOURCES (CR) 1C 2C 3C BEST ESTIMATES UNRECOVERABLE BEST ESTIMATES HIGH ESTIMATES PROSPECTIVE RESOURCES (PR) 1U 2U 3U HIGH ESTIMATES Development Pending Development on Hold Development Not Viable Prospect Lead Play Category #1 - #2 Category #3 - #6 Category #7 - #8 Viable + Committed Viable + Non-committed Non-viable HIGHER RISK PROJECT MATURITY UNRECOVERABLE RANGE OF UNCERTAINTY

INCREASING CHANCE OF COMMERCIALITY 5

PETRONAS Resource Classification was established with the objective to Standardize and establish coherency in petroleum resource definition, classification and reporting for an overall management of the resources and reserves portfolio 6

PETRONAS Definitions and Guidelines For Classification of Petroleum Resources - the resource definitions and guidelines for this classification are in compliance with the definitions and classification adopted by internationally recognized organization such as SPE, WPC, AAPG in particular the petroleum reserves definitions promulgated by the SPE/WPC March 1997 and petroleum resources classifications and definitions promulgated by the SPE/WPC/AAPG in Feb 2000. 7

TECHNICAL APPLICATIONS BUSINESS APPLICATIONS 1 2 3 4 5 6 7 8 9 Prospect Evaluation Block Assessment Work Program & Budget Project Identification Field Development Plan Facility Plan Appraisal Plan R&D Promotion IOR / EOR Project 1 2 3 4 5 6 7 8 9 Corporate worth Fund raising (credit rating) Stock exchange reporting Sales contracts (LNG buyers) Earning basis Investment decision (FDP) Corporate financial outlook Equity determination Petroleum arrangement (economic evaluation, PSC terms) 8

PETRONAS DOMESTIC (MALAYSIA) INTERNATIONAL PETRONAS UPSTREAM ARM PRODUCTION SHARING CONTRACTORS (PSC) RISK SERVICE CONTRACTORS (RSC) PETRONAS UPSTREAM ARM 9

.. are defined as the total estimated quantities of petroleum* at a specific date to be contained in, or that have been produced from known accumulations, plus those estimated quantities in accumulations yet to be discovered In these definitions, the quantities estimated to be initially-in-place are defined as Total Petroleum Initially-In-place, comprising Discovered Petroleum initially-in-place and Undiscovered Petroleum initially-in-place KEY ELEMENTS Resources Discovered (C/R/Np) Undiscovered (PR) SPECIFIC DATE TOTAL REMAINING VOLUME TOTAL PRODUCED, Np SPECIFIC DATE TOTAL VOLUME YET TO BE DISCOVERED 10

is the total quantity of petroleum that is estimated to exist originally in naturally occurring reservoir. Oil Initially -In-place and Gas Initially-In-place are defined in the same manner PETROLEUM Initially- In-Place Gas-in-place Oil-in-place 11

12

INCREASING CHANCE OF COMMERCIALITY 13

Discovered Resources The total estimated in place quantities of petroleum at a specific date to be contained in known accumulations, plus those quantities already produced from there from Undiscovered Resources The total estimated in place quantities of petroleum at a specific date to be contained in accumulations yet to be discovered. The estimated potentially recoverable portion of undiscovered Petroleum- Initially-In-place is classified as Prospective Resources 14

Estimated Ultimate Recovery (EUR).. is defined as those quantities of petroleum which are estimated, on a give date, to be potentially recoverable from an accumulation, plus those quantities already produced there from Estimated Ultimate Recovery is the sum of Cumulative Production plus Reserves 15

Estimated Ultimate Recovery (EUR).. is defined as those quantities of petroleum which are estimated, on a give date, to be potentially recoverable from an accumulation, plus those quantities already produced there from Estimated Ultimate Recovery is the sum of Cumulative Production plus Reserves 16

Cumulative Production (Np).. is defined as the total quantities of petroleum that have been produced at a specific date 17

Reserves.. are defined as those quantities of petroleum which are anticipated to be commercially recoverable from known accumulations from a given date forward 18

Proved Reserves.. are defined as those quantities of petroleum which, by analysis of geological and engineering data, can be estimated with reasonable certainty to be commercially recoverable from a given date forward, from known reservoirs and under current economic conditions, operating methods and government regulations. 19

Proved Developed Reserves.. are those Proved Reserves that are expected to be recovered through existing wells and facilities and by existing operating methods. Improved recovery reserves can be considered as proved Developed Reserves only after an improved recover project has been installed and favorable response has occurred or is expected reasonable degree of certainty. 21

Proved Undeveloped Reserves.. are those proved reserves that are expected to be recovered from future wells and facilities, including future improved recovery projects which are anticipated with a high degree of certainty in reservoirs which have previously shown favorable response to improved recovery projects. 22

Unproved Reserves.. are defined based on geological, geophysical and engineering data similar to that used in estimates of Prove reserves; but technical, contractual, economic, or regulatory uncertainties preclude such reserves being classified as Proved. 23

Probable Reserves.. are defined as those Unproved Reserves which analysis of geological, geophysical and engineering data suggests are more likely than not to be recoverable. 24

25

Possible Reserves... are defined as those Unproved reserves which analysis of geological and engineering data suggests are less likely to be recoverable than Probable reserves 26

27

INCREASING CHANCE OF COMMERCIALITY 28

Contingent Resources (CR)..are defined as those quantities of petroleum which are estimated on a given date, to be potentially recoverable from known accumulation but which are not currently considered to be commercially recoverable. The reasons for noncommerciality could be economic, political, environmental or technological. Economic Production Sharing Contract (PSC) Development concept Hydrocarbon quality (API, CO2, H2S etc) Small fields Reservoir with inconclusive data Location Adverse parameters Geological complexity Technological CR (P90, P50, P10) Political Under unitization Environmental HSE regulation 29

Contingent Resources (CR) Some ambiguity may exist between the definitions of CR and Unproved Reserves Subject to degree of commitment to be developed or placed on production Accumulations currently no viable market or commercial recovery is dependent on the development of new technology, or early evaluation If Probabilistic, P90%, P50% and P10% If deterministic, technical definitions same as reserves except they are not currently producible. Low Estimate = Proved Reserves, Best and High Estimate = Unproved Reserves 30

Contingent Resources may include: Accumulation being held in inventory such as marginal fields. Accumulations that will probably be commercially recoverable in the near future/short term (non-commercial subject to size, location, technology and economics Accumulation that have no plans for development in near future Non-producing reservoirs due to: a. Adverse parameter i.e. very low porosity development, low permeability b. Unfavorable petroleum parameters i.e. gravity, viscosity c. Extreme non-hydrocarbon content, i.e. CO 2, H 2 S. IOR changes characteristics of the fluid in the reservoir through injection or steam, gas or chemicals.. 31

32

INCREASING CHANCE OF COMMERCIALITY 33

Undiscovered Resources Are defined as the total estimated in-place quantities of petroleum at a specific date to be contained in accumulations yet to be discovered. Prospective Resources (PR) are defined as those quantities of petroleum which are estimated, on a given date, to be potentially recoverable from Undiscovered accumulations. Undiscovered Resources - Total In-place quantities of petroleum - A specific date - To be contained in accumulations - Yet to be discovered 34

Prospective Resources (PR) are defined as those quantities of petroleum which are estimated o given date to be potentially recoverable from undiscovered accumulations. Prospective Resources (PR) - Estimated quantities of petroleum - Estimated on a given date - To be potentially recoverable (apply RF) - From undiscovered accumulations - Reporting : Un-risked P90%, P50%, P10% as 1U, 2U & 3U or LE, BE & HE - Geological Risk, Pg should be given alongside each estimate 35

Prospective Resources (PR) - Reporting : Deterministic ( LE, BE and HE) & Probabilistic (P90%, P50% & P10%) - PR should be risked for probability of geological success, Pg the chance of the geological model being correct. Pg is established based on technical assessment - Prospective Resources should imply an UNRISKED estimate - In principle the technical definitions for these categories are the same as for reserves in terms of reflecting a range of uncertainties. However, PR represent undiscovered volumes. - LE/P90% should be derived using the highest confidence data & HE/P10% estimate derived from the least confidence data 36

ESTIMATED ULTIMATE RECOVERY (EUR) Discovered EUR = Np + Reserves Commercial : current economic conditions, regulations, practice Producing fields Firm development CONTINGENT RESOURCES Discovered Currently not producible: economic, political, environmental or technological reasons Adverse Reservoir: tight, geopressures Extreme fluid parameters : heavy crude Insufficient / Inconclusive data PROSPECTIVE RESOURCES Undiscovered Unproven trap Deeper reservoir in producing field P1 P2 P3 ODT EOWC P1 P4 P4 SPILL OWC GDT C1 BLOCK 1 BLOCK 2 BLOCK 3 P6 C1 C3 P5 C2? C1 P4 P5 P6 EOWC? SPILL? EXPECTED BLOCK 1 BLOCK 2 BLOCK 3 C2 C3 LOW BEST HIGH 37

38