Tech Review Guideline. Please arrive at your Tech Review ready to present and discuss all of the following information.

Similar documents
Revision no: 01 Date: Global Supplier Quality Assurance Network

Production Part Approval Process (PPAP)

Teaching Aid. (SCARs are not addressed in this guide) Last Revised September 26, 2014

GENERAL SUPPLIER GUIDELINE DATE: OCTOBER 2013

TSV Supplier Quality Manual TABLE OF CONTENTS

SUPPLIER PROFILE INFORMATION. Company Name : Address : Telephone: Fax: Internet Homepage: Duns Number: Parent Company : Address :

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

Quality CNC Machining ISO/TS 16949:2002 Registered. Presentation Revised 8/10/10

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Supplier Quality Manual CHASSIX Inc.

Transitioning from ISO/TS 16949:2009 to IATF 16949:2016 Presented by Brandon Kerkstra Revision: 10/24/2016

GLOBAL PURCHASING. Supplier Technical Assistance. Phased PPAP

- Rev 4 Date

HTNA SUPPLIER QUALITY MANUAL

DaimlerChrysler (Chrysler Group) Customer-Specific Requirements

Newcor Precision Machining Group Supplier Quality Manual

Supplier Quality Assurance Manual NSK Corporation NSK-AKS NSK NSSA NSK NBMX

Supplier Requirements Manual

Annex 1. Customer Specific Requirements For Use With ISO/TS16949

SMC Corporation of America Supplier Quality Assurance Manual

Global Supplier Manual

PRECISION SENSORS QUALITY ASSURANCE MANUAL

Torque Transfer Solutions

QMS CO-ORDINATOR & GENERAL PROCEDURES:-

Annex 1. Customer Specific Requirements For Use With ISO/TS16949

SUPPLIER QUALITY MANUAL

DIEMOLDING CORPORATION QUALITY MANUAL

FIAT GROUP AUTOMOBILES and FIAT POWERTRAIN TECHNOLOGIES CUSTOMER-SPECIFIC REQUIREMENTS. for use with ISO/TS 16949:2009

This document has been printed from the network and will not be updated. The user is responsible for verification of current revision.

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

STANDARD. Date SP Jan F Visscher UTMS Michaela Bundschuh

ASPIRE Guideline. ASPIRE Guideline Achieving Greatness. Together

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5

hti - Business System Manual

AS9102 Frequently Asked Questions

SUPPLIER QUALITY ASSESSMENT

Supplier Quality Manual (QQS )

Business Management System: Manual 00-BMS-001

Key Process Audit Checklist Record answers and notes on blank turtle diagrams or audit checklist or note page

Design Molded Plastics, Inc.

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

Greenslade & Company, Inc.

PPAP. Supplier Submission Preparation Guide. Production Product Approval Process. Version 1.0 April 2015

Supplier Quality Standard

SUPPLIER QUALITY MANUAL

PPAP 3rd Edition Check List (Steel Suppliers)

Audit Report No: QE /12 - S. Hooks Industrial, Inc. Contact Person: Mr. John Valentine Phone: « »

Supplier Quality Manual

QCL and DSS Training For Suppliers

Quality Systems Basics

Comparison of Requirements ISO/TS vs. AS9100 and ISO 13485

Metal Powder Products Company

Supplier Quality Manual

Quality System Manual

QAA1, Appendix 2. APQP Elements. Customer order. 1.1 Customer specifications

CURRICULUM SUMMARY COURSE DESCRIPTIONS & OUTLINES MENU MANUFACTURING INDUSTRIES INTRODUCTION TO MANUFACTURING OTHER INDUSTRIES ENERGY INDUSTRIES

Global Supplier Quality Manual. Revision 4

STANDARD. S P-O Svedlund UTDH Markku Backholm. SDT Eva Ivrell Hedensjö UTDH Iréne Klingberg

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

Measurement Systems Analysis

PPQ Requirements training pack for suppliers

SUPPLIER QUALITY MANUAL For ISO/TS16949:2009 (Level 1)

PRODUCT DEVELOPMENT STATUS

Progressive Metal Forming, inc Hall Road Hamburg, MI 48139

Aptiv Customer Specific Requirements. For Use with ISO 9001:2015 and IATF16949:2016

CHAPTER 7A MATERIAL MANAGEMENT

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

Field Service Management: Strategies to Improve Profit and Customer Loyalty

Wonderware MES/Operations

Infor LN Manufacturing User Guide for Costing

PROCESS. Failure Mode & Effects Analysis. Practitioner Guide

Delphi Technologies Customer Specific Requirements. For Use with ISO 9001:2015 and IATF16949:2016

ICAO WCO JOINT WORKSHOP AIR CARGO SECURITY AND FACILITATION

Supplier Quality Assurance Manual

A CHECKLIST FOR QUALITY. Seven Questions to Gauge Quality in Metal Stamping Suppliers

Visteon Corporation. Customer Specific Requirements Fifth Edition. For Use with ISO/TS 16949:2009

Engineer to Order In Microsoft Dynamics NAV

Supplier Quality Requirements Guide

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Supplier Quality Manual. QF-SQR001 / Rev. Date: 10/14/2017 / Rev. Level: E

Supplier Quality Survey

QMS: Quality Management Systems

Divisional Manufacturing Engineering

Customer Specific Requirements. For Use with ISO/TS16949 And ISO 9001

IAQG 9100:2016 Clarifications

Supplier Quality Manual

Advanced Seminar in Business

Supplier Quality Manual

[SUPPLIER S QUALITY MANUAL] July 14, Control #: AIES-SQDM-001. Revision: December 2012 SUPPLIER QUALITY AND DEVELOPMENT MANUAL

IBM Integrated Product Development (IPD)

ConMet Supplier Quality Manual

PRODUCTION QUALITY PLANNING

Summary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000

Consolidated Metco, Inc. Supplier Quality Manual

IATF transition. Only 1 year to go for over 69,000 ISO/TS16949 certified organizations to transition to ISO9001: 2015 and IATF 16949: 2016.

Optimizing Reverse Logistics with SAP

Quality Manual QM-9001 Revision 25 May 2013

Effective Inventory Management

Introduction. ISO 9001: 2008 certified

Transcription:

Tech Review Guideline Please arrive at your Tech Review ready to present and discuss all of the following information.

Agenda Company Overview (Limited to 20 mins) Quality Manufacturing Product design Questions/Clarifications Packaging and logistics Commercial

Company Overview (Limited to 20 mins) Commercial Overview of Company Resource Plan Total corporate organization chart clearly identifying the resources allocated for each particular program quoted. Staffing ramp up chart, engineering plan. Program Timing Plan (ref. last slide) Average seniority of the management with your company at the proposed manufacturing site Employee turn over rate at the proposed manufacturing site Unigraphics Compliance and data communication process between Allison, your company and Tier II suppliers. Program management and change management system. Summarize the key technology, concept, or strategy on which your business is based. Show similar products currently producing.

Company Overview (Continued) Summarize the key technology, concept, or strategy on which your business is based. Show similar products currently producing. Safety Major OSHA/safety violations last 5 years Work related accidents within last 5 years. Continuous Improvements Investment in production technology and equipment as a % of sales last year. Change in man hours per ton by year for the last 5 years. Organizational charts and ownership structure Free trade zone location

Quality Quality metrics Internal PPM (Parts per million), External PPM, Scrap %, PPM reduction internal & external per year for the last 5 years Delivery performance Certifications (ie. TS, QS, ISO ) APQP (Advance Product Quality Planning) Warranty Warranty data for Allison and other customers. Provide quality control process and tools through development and production. Preliminary PFMEA / Control Plan Process Flow (must identify all operations and type of machine model)

Manufacturing Follow the following outline for casting if applicable, if not follow a similar format for the commodity being quoted. List the critical tolerances for the components being quoted & what is the proposed inspection method. Provide examples of similar parts and tolerances your facility currently produces with the historical CpK values for those dimensions. If any operations will be outsourced provide the company names that will conduct the outsourced operation.

Manufacturing-Casting Process Flow Including: Manufacturing location, plant w/duns code, capacity, plant layout, manufacturing process validation plan Furnace- equipment brand, model, year, size Core Process - equipment brand, model, year, size, est. cycle time Molding Process - equipment brand, model, year, size, est. cycle time Flow modeling / simulation Special Tooling material, size, patterns per mold, gating & riser locations Special Gauging Special Testing Error Proofing/Detection Tier II Suppliers Any process/operations that is completed outside of manufacturing location.

Manufacturing-Value Added (Machining, Heat Treat, Testing/ Assembly) Process Flow Including: Manufacturing location, plant w/duns code, capacity, plant layout, manufacturing process validation plan Proposed machine brand, model, year, number of machines, Estimated cycle time (AT-1960-C) Clamp & Fixturing locations ( ie. pictures) Dimensions Machined Understanding of critical features. (ie KPC (Key Product Characteristics), PQC (Product Quality Characteristics), SCCPC s (Standard Care Control Plan Characteristics) Leak Tests, Porosity Specs., Deburring, Hardness, TES, TIS, TMS specs. Special Tooling Listed Special Gaging Complete Gage list needs to be reflected on control plan Error Proofing/Detection Listed for each operation including packaging (preventing mixed parts) & labeling Explain how the parts will be cleaned & deburred Tier II Suppliers Any process/operations that is completed outside of manufacturing location.

Product Design/ Manufacturability Product description Bill of Materials Illustrations, Exploded Views, etc.(new connectors, routing channels, etc.) Technologies used Itemize quote assumptions and exceptions to prints and Component Technical Specs. Review acceptance of SOR (Standard of Requirements) by paragraph number (yes / no / exceptions) Review print dimensions & special specifications that are called out. Review details of material specification.

Product Design/ Manufacturability Design & Process Validation Plan Analysis, design and validation plan. Testing/validation facilities and capabilities Leak test Functional test Math Data capability- Unigraphics Compliance Supplier Proposals to Improve Cost, Weight and Quality not constrained by Allison Mandatory Requirements.

Packing and Logistics Anticipated packaging design (AT1703) Provide detail costs for returnable and expendable packaging designs Quoted Inco Term International Suppliers provide the warehouse name and address Ship from address Review AT-1700 & AT-1724 and provide a list of any questions or exceptions Specify the Tariff classification List minimum purchase quantities if any

Commercial Review and feedback: Commercial Data Provide and review: Completed Cost Breakdown sheets (1804, 1810 documents) all operations must be broken down on 1804. Costed BOM detail Tooling cost, capacity & line-ups Provide a list of your potential sub tier 2-3 Suppliers and the selection criteria used.

Closing Questions and clarifications Recap action items, assign owners & dates

Required Forms AT-1804 - Every operation must be listed AT-1810 All tooling must be detailed out AT-1927-02 Program Timing Chart AT-1960-C Run @ Rate Summary (Estimated) AT-1927-03 SQ SOR AT-1927-04 Required Quality Info AT-1927-05 APQP Open Issues AT-1927-17 APQP Contact List AT-1927-19 Supplier Mfg Assmt Ltr AT-1703-Packaging *All forms are to be filled out completely and submitted before tech. review. All forms can be located on http://www.allisontransmission.com/suppliers/supplier-forms