PUBLIC NOTICE 20 DAY NOTICE

Similar documents
PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Notice No Closing Date: May 12, 2017

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

J O I N T P U B L I C N O T I C E

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

Public Notice of Application for Permit

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E

PN Comment Period: February 9, 2015 to March 9, 2015

JOI NT PUBLIC NOTICE

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

Public Notice of Application for Permit

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE. April 14, 2014

Public Notice 15 DAY PUBLIC NOTICE

JOINT PUBLIC NOTICE. Paul Shealy Big Man's Marina, LLC 125 Big Mans Road Leesville, SC LAKE MURRAY

Department of the Army Permit Application

LOCATION AND DESIGN DIVISION

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Information for File # PRH

Public Notice ISSUED: August 11, 2015 EXPIRES: September 10, 2015

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

CEMVR-OD-P Joint Public Notice. Illinois Environmental Protection Agency

CESAM-RD-M February 28, 2018 PUBLIC NOTICE NO. SAM PAH JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

J O I N T P U B L I C N O T I C E

Appendix D - Evaluation of Interim Solutions

STREAM STABILIZATION PLAN

Public Notice of Application for Permit

NOTICE OF PREPARATION

Public Notice Charlestown Road New Albany, Indiana 47150

DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina April 24, 2017

The regulatory authorities and responsibilities of the Corps of Engineers are based on the following laws:

J O I N T P U B L I C N O T I C E

Navigating the U.S. Army Corps of Engineers Regulatory Process

Holly Swartz and Jason Shirey

SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: San Francisco Marina West Harbor Maintenance Dredging

Temporary Watercourse Crossing: Culverts

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

THE CORPS REGULATORY AUTHORITY

Stormwater Local Design Manual For Houston County, Georgia

Cass County Soil Erosion & Sedimentation Control Program

Public Notice River Road Louisville, Kentucky Ohio River, left bank at Mile in Louisville, Jefferson County, Kentucky

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

(For individual lake and stream classifications in Cook County, refer to Appendix II)

J O I N T P U B L I C N O T I C E

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

DEPARTMENT OF THE ARMY GENERAL PERMIT STATE OF MAINE

LEGAL AUTHORITY AND JURISDICTIONS

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

SECTION TRENCHING & BACKFILLING

MODEL Stormwater Local Design Manual. City of Centerville

Public Notice. This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act:

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

CORPS REGULATORY PROGRAM

Chapter 11 Culverts and Bridges

Public Notice of Application for Permit

Survey of Bottom Substrate Composition and Fish Habitat Value at Nett Lake

Public Notice. East Kentucky Power Cooperative (EKPC) 4775 Lexington Road Winchester, KY

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Public Notice 30 DAY PUBLIC NOTICE

Environmental Information Worksheet

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

TEMPORARY SEDIMENT TRAP CODE

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

SECTION 11: REGULATORY FLOODWAYS

ODOT Design & Construction Requirements for MSE Walls

Reply To: U.S. Army Corps of Engineers Attn: CEMVS-OD-F 1222 Spruce Street St. Louis, Missouri

Public Notice. 800 Mary Ingles Highway Fort Thomas, Kentucky 41075

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Storm. Section. B. General Design and Drawing Standards Design

Nationwide Permit General Conditions

Public Notice. This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act:

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

SECTION RIPRAP, BOULDERS, AND BEDDING

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment

RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0)

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,

SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT. APPLICATION NUMBER: Shoreline Substantial Development Application PL

15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

INSTRUCTIONS FOR USING THE GENERAL PERMIT...i A. GENERAL DESCRIPTION AND FEES

J O I N T P U B L I C N O T I C E

Dredge and Fill Standards on the Highland Lakes

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

Department of the Army General Permit State of Rhode Island

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Transcription:

US Army Corps of Engineers New Enciland District Maine Project Office 442 Civic Center Drive, Suite 350 Augusta, Maine 04330 PUBLIC NOTICE Date: April 24, 2018 Comment Period Ends: May 14, 2018 File Number: NAE-2017-00187 In Reply Refer To: Jay L. Clement Or by e-mail: jaylelement@usace.army.mil 20 DAY NOTICE The District Engineer has received a permit application from the applicant below to conduct work in waters of the United States as described below. The Corps is soliciting comments on both the project itself and the range of issues to be addressed in the environmental documentation. APPLICANT: PISCATAQUIS COUNTY COMMISSIONERS, 163 EAST MAIN STREET, DOVER FOXCROFT, MAINE 0426 ACTIVITY: Place temporary and permanent fill below the ordinary high water line of Whetstone Brook at Williamsburg Township, Maine in order to remediate ongoing scouring of the substructure of the Williamsburg Road Bridge. The proposed in-water work window is July 15 to September 30. Work will include construction of upstream and downstream sandbag cofferdams as well as a pumping system to divert water around the project area. A second pumping system will remove water from within the cofferdams. Once water is diverted from the work area and the area dewatered, contractors will excavate stream bed materials from around the footings and then install partially grouted riprap to within 6" of the streambed elevation. Excavated stream bed materials supplemented with native rocks and boulders will be used as backfill over the riprap to match natural stream bed elevations. The proposed work will result in approximately 590 square feet of instream impacts. Standard erosion controls will be installed and maintained throughout construction. This work is designed to stabilize critical transportation infrastructure, insure public safety, and protect the economic vitality of the local transportation network. WATERWAY AND LOCATION OF THE PROPOSED WORK: Whetstone Brook; Williamsburg Township, Maine. The project site is located on the USGS BROWNVILLE JUNCTION, ME quadrangle sheet at latitude 45.344761 N; and longitude 69.082655 W. AUTHORITY Permits are required pursuant to: Section 10 of the Rivers and Harbors Act of 1899 X Section 404 of the Clean Water Act Section 103 of the Marine Protection, Research and Sanctuaries Act). The decision whether to issue a permit will be based on an evaluation of the probable impact of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which may reasonably accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are: conservation, economics, aesthetics, general 1

environmental concerns, wetlands, cultural value, fish and wildlife values, flood hazards, flood plain value, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food production and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Where the activity involves the discharge of dredged or fill material into waters of the United States the evaluation of the impact of the activity in the public interest will also include application of the guidelines promulgated by the Administrator, U.S Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act. ESSENTIAL FISH HABITAT (EFH): The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all federal agencies to consult with the National Marine Fisheries Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat ("EFH"). In water construction at the site will impact Essential Fish Habitat ("EFH") for Atlantic salmon. This habitat consists of stream bed composed of cobbles and boulders interspersed with smaller stones, silt, sand, and gravel. The District Engineer has made a preliminary determination that the site-specific adverse effect will not be substantial. Any consultation with the National Marine Fisheries Service regarding EFH conservation recommendations will be concluded prior to the final decision. SECTION 106 COORDINATION: The Corps has initiated consultation with the Maine Historic Preservation Commission and Maine's Indian Tribes pursuant to Section 106 of the National Historic Preservation Act of 1966 as amended. The District Engineer has determined that the proposed work is not likely to affect properties listed in, or eligible for listing in, the National Register of Historic Places. The Corps will continue review and consultation to fulfil requirements under the Historic Preservation Act as part of the environmental documentation. ENDANGERED SPECIES ACT CONSULTATION: The Corps has initiated consultation with the US Fish & Wildlife Service pursuant to Section 7 of the Endangered Species Act regarding the presence of Atlantic salmon, Atlantic salmon critical habitat, and northern long-eared bats. Consultation with the Service will be concluded prior to any final action in this matter and will be addressed in the environmental documentation. OTHER APPROVALS: The applicant has supplied the Maine Department of Environmental Protection with a permit application for the work described in this public notice and is requesting that the Department either grant or waive Water Quality Certification in accordance with Section 401 of the Clean Water Act. Comments regarding the applicant's Permit/Water Quality Certification request may be submitted in writing to: Mark Stebbins, Land Division, Bureau of Land Resources, Department of Environmental Protection, 17 State House Station, Augusta, ME, 04333-0017 or by email to: Mark.N.Stebbins@ maine.gov 2

In order to properly evaluate the proposal, we are seeking public comment. Anyone wishing to comment is encouraged to do so. Comments should be submitted in writing by the above date. If you have any questions, please contact Jay Clement at 207-623-8367, ext. 1 at our Augusta, Maine Project Office. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for a public hearing shall specifically state the reasons for holding a public hearing. The Corps holds public hearings for the purpose of obtaining public comments when that is the best means for understanding a wide variety of concerns from a diverse segment of the public. The initial determinations made herein will be reviewed in light of facts submitted in response to this notice. All comments will be considered a matter of public record. Copies of letters of objection will be forwarded to the applicant who will normally be requested to contact objectors directly in an effort to reach an understanding. For more information on the New England District Corps of Engineers programs, visit our website at http://www.nae.usace.army.mil. THIS NOTICE IS NOT AN AUTHORIZATION TO DO ANY WORK. /IA el Giudice Chief, Permits and Enforcement Branch Regulatory Division If you would prefer not to continue receiving Public Notices, please contact Ms. Tina Chaisson at (978) 3188058 or e-mail her at bettina.m.chaisson@usace.army.mil. You may also check here ( ) and return this portion of the Public Notice to: Bettina Chaisson, Regulatory Division, U.S. Army Corps of Engineers, 696 Virginia Road, Concord, MA 01742-2751. NAME: ADDRESS: 3

0,1... -..., _..., i...-. k,--- :,-, 'T-- - ) - 1/4.. _ \ -1/4%- "7A,T s _ Declination MN 16.23 W WHETSTONE BRIDGES OVER WHETSTONE BROOK SCALE 1:12000 0.0 Oil 0i2 0i3 0.4 MILES 0 100 200 300 400 600 700 YARDS 1-1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 KILOMETERS Name: BROWNVILLE JUNCTION Date: 04/13/18 Scale: 1 inch = 1,000 ft. Location: 45.344981 N, 69.082689 W Caption: «Type caption here.» Copyright (C) 2009 MyTopo

2-2 SHAWN E. SCRIBNER NO WORK BELOW OHW MARK FOR THIS STRUCTURE SEE CATCH BASIN S BRIDGE DETAIL POLE.14 NET&T CO. PENOBSCOT INDIAN NATION SIGN STRUCTURE.1 STREAM4(-1 2-2 SHAWN E. SCRIBNER IN STREAM PARTIALLY GROUTED SHOWN ON SHEET 3 POLE.13 NETAT CO. i/ PROPERTY --R.O.W. 2, 11 DOUGLAS AND MICHELE WILLINSKI 01-dn plscataq uis E TREES TO BE REMOVED CLUMP OF (4) TREES (2) 6" ( 1) 1-0" (1) 1'-6" 2-12 THEMLMA AND ERIC L. RANDALL ",--PROPERTY LINE,,, ROW. STREAM WIOTH 25 25 50 OR mm NO 011111 CLUMP OF (3) TREES (1) 6" (1) 1.-0" III 1-6" STREAM WIDTH 16'-0"A STREAMit] 2-10 EDWARD A. AND PANELA J. MALLOWES GENERAL SITE PLAN SCALE: 1" - 20'-0" (2) LARGE BOULDERS ALONG STREAM BED TO REMAIN EXPOSED LEDGE ALONG STREAM BED NOTE: R.O.W. )= 66 FT (4 RODS) MAP-LOT LAND OWNER,.---PROPERTIES a DOWNSPOUT S'-O"± (TYP) ATCH BASIN OUTLET PIPE CATCH BASIN DOWNSPOUT SHALL TERMINATE PRIOR TO HIGHWATER MARK (TYP) NOTES: -CATCH BASINS SHALL BE MOOT "SHAPE 5" - DOWNSPOUTS SHALL CONFORM TO MOOT STANDARD DETAIL 602(06) -CATCH BASIN AND OUTLET PIPE SHALL CONFORM TO MOOT STANDARD DETAIL 604. SITE PLAN SHALL TERMINATE PRIOR TO HIGHWATER MARK (TIP) OUTLET PIPE 4+00 1V-0"± (TYP) SHEET NUMBER CATCH BASIN e CULVERT DETAIL SCALE: 1" = 5'-0" CATCH BASIN @ SCALE: 1" = 5'-0" BRIDGE DETAIL 1 013

STREAM PRIOR ROADWAY LEDGE TO SCOUR OUTCROP 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75 4+00 4+25 4+50 505 505 WATER 01-dn-plscataquIs 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 34-50 3+75 4+00 4+25 4+50 STREAM BOTTOM HORIZ. 25 0 IF 41 VERT. 5 0 5 STREAM SCOUR DEPTH POTENTAL. OMITTING LEDGE OUTCROPS EXISTING STREAM PROFILE: STRUCTURE #1 ONLY 25 50 HORIZONTAL: 1" = 20'-0" VERTICAL: 1" NOTE: STREAM BOTTOM AND WATER S ARE SURVEYED POINTS (12/26/16) 8 6 MATCH LEDGE AND EXISTING STREAM ROADWAY 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75 4+00 4+25 4+50 505 505 WATER 1+25 1+50 1+75 2+00 I 2+25 2+50 STREAM SCOUR DEPTH POTENTAL. OMITTING LEDGE OUTCROPS 6" EXISTING STREAM LAYER 6" EROSION CONTROL-- FILTER LAYER 2+75 3+00 zvi PATRIALLY GROUTED 3+25 3+50 3+75 4+00 4+25 4+50 STREAM BOTTOM STREAM PROFILE HORIZ. 25 VERY. 5 0 0 5 PARTIALLY GROUTED PROFILE: STRUCTURE #1 ONLY 25 50 HORIZONTAL: 1" = 20.-0" VERTICAL: 1". 4.-0" 10 SHEET NUMBER 2.13

- P2 TEMPORARY SEDIMENT BASIN PER MenoDOT BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL DETAIL 80205) WATER TO BE PUMPED FROM WITHIN COFFERDAM 70 TEMPORARY SEDIMENT BASIN SANDBAG COFFERDAM PARTIALLY GROUTED STRUCTURE ONLY I POLE 413 NET&T CO. E FILL NOTES, FOOTING GROUT - CI. PARTIALLY OROUTED -55 CI. AREA OF - 590 Sart: AREA WITHIN COFFERDAMS -720 sarr DEXISTING STREAMBED LAYER PARTIALLY GROUTED GROUTED NOTES, I. PARTIALLY GROUTED 70 BE INSTALLED PER SPECIAL PROVISION WIG 2. RIP RAP SHALL HAVE A D50 OF I2 INCHES 3. GROUT TO HAVE A MINIMUM CO OF 2000PS7 4. RIP RAP TO BE WASHED CLEAN AFTER PLACEMENT BUT BEFORE GROUTING COMMENCES S. GROUT SHALL BE PLACED WITHIN A COFFERDAM AND MUST REMAIN DO/WATERED FOR A MINIMUM OF 2 HOURS AFTER ALL GROUTING HAS BEEN COMPLETED 6. EROSION CONTROL LAYER TO CONSIST OF A CLASS I. NON-WOVEN EROSION CONTROL GEOTEXTILE MEETING STANDARD SPECIFICATION 722.03 AND A & LAY ER OF GRANULAR BORROW MEETING STANDARD SPECIFICATION 703.19 (SEE MaInoDOT STANDARD DETAIL 610(02)1 7. 6"EXISTING STREAMBED LAYER ON TOP OF GROUTED TO CONSIST OF MATERIAL THAT MATCHES STREAMBED MATERIAL FOUND UPSTREAM AND DOWNSTREAM OF THE PROJECT L.T.7 C.T.1 g Z C.7 a ;;- o pd ` 1 01-dn-piscataquis SQUARE FOOTAGE TO BE DETERMINED IN FIELD. DEPENDANT ON STREAM DEPTH DURING CONSTRUCTION \ BASIN TD BE 25-0. FROM WATERBODY EXPOSED BEDROCK 3'-Cr EROSION CONTROL FILTER LAYER SCOUR COUIVTERMEASURES SCALE: 7 1O-0. 6. EXISTING STREAMBED LAYER TO MATCH EXISTING STREAMBED MATERIAL UPSTREAM AND DOWNSTREAM OF PROJECT STREAM SECTION A-A SCALE, 4'57 TYPICAL UPSTREAM AND DOWNSTREAM FORM FLUSH TV ORIGINAL MMHG 505 " PARTIALLY P051057.2 485.owawnwasemasumi 6. EXISTING STREAMBED LAYER :WEROSION CONTROL?RYER LAYSR 5 5 011 FOOTING REPAIR SECTION: STRUCTURE #1 ONLY /0 SCALE, r 50 9 PARTIALLY GROUTED SECTION: STRUCTURE NI ONLY SCALE, - 0 5 10 6' EXISTING STREAMBED LAYER TO MATCH EXISTING STREAMBED MATERIAL UPSTREAM AND DOWNSTREAM OF PROJECT f eitn7.f.7.4.1.t SHEET NUMBER 3