EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS

Similar documents
ROCK CRUSHING PLANT APPLICATIONS ADVICE

CO 2 Emissions Profile of U.S. Cement Industry

SUBPART OOO Check-OFF FORM July 11, 2005

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

TECHNICAL SUPPORT DOCUMENT (TSD) August, Mailing Address P.O. Box 35130, Tucson, AZ

APPENDIXG FUGITIVE DUST CONTROL PLAN

PRIMARY OR ALTERNATIVE OPERATING SCENARIO

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

Permit-by-Rule Notification Form Gas-fired Boiler and Heater

PSD Background Presentation

Potential to Emit Fact Sheet: What is Potential to Emit (PTE)?

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

Optimising a fall out dust monitoring sampling programme at a cement manufacturing plant in South Africa

Annual CCR Fugitive Dust Report. TS Power Plant. Eureka County, Nevada

Comments on Draft Permit #12-POY-079. FTS International Proppants, LLC. Acadia, Trempealeau, Wisconsin. March 15, 2013

Addendum A: Source Applicable Requirements

Greenhouse Gas Regulation (new Federal)

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc.

FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK. PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York

Statement of Basis. for Ash Grove Cement Company, Inc.

Air Quality Assessment Report Paris Grand Development County of Brant, Ontario

Air Permitting for Major Sources/Title V (Part 2)

Manufacturing Program

Title V. Model General Permit Template SERIES 1 FLARES. Template # SJV-FL-1-1

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

HOT MIX ASPHALT PLANTS

Energy Conservation at cement plant


The Evolution of California Portland s s Corporate Energy Strategy

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

Coal Mine Particulate Matter Control Best Practice Site-specific determination guideline. November 2011

Mercury Monitoring in a Cement Kiln

INNOVATION IN ENERGY CONSUMPTION

Mittal Steel BART Report September 8, 2006

The Energy Management and Emission Control with Chinese Cement Industry

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

Performance Analysis of Cement manufacturing Industry

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

California s Revised Mandatory Greenhouse Gas Reporting Regulation

40 CFR Part 257. Rollin M. Schahfer Generating Station

Particulate Matter Rules Update BAAQMD BACWA Meeting

Presentation on Life Cycle Assessment of Portland Cement Manufacturing Process

Tennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. January 28, 2015

Note: The definition of "photochemically reactive material" is based upon OAC rule (C)(5).

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

Ever wondered how bricks are made?

ABSTRACT AIR POLLUTION CONTROL IN THE CEMENT INDUSTRY. Russell E. Hailstone Technical Director General Portland Cement Company Dallas, Texas

CAM does have exemptions for certain emission units as follows: Page 1 of 8

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

Air Quality Permit File: TVOP & AR Cambria CoGen Company / Cambria Generation Facility

Dust Recovery Collector Systems. University of Iowa Iowa City, IA. Considerations for NAAQS & NFPA Compliance

Potential to Emit. Calculating your PTE Jenifer Dixon Public Affairs and Outreach

ABB Measurement & Analytics Monitoring cement plant stack emissions using FTIR

CEMENT MANUFACTURING PROCESS

PUBLIC DOCUMENT. 112(g) Case-by-Case MACT Analysis for the Lithium Ion Battery Plant. BASF Corporation Elyria, Ohio

Carbon Footprint. Carbon Footprint: some defini7ons

Environmental Leadership Program Inspection Form Portable Asphalt Facility

INTRODUCTION. Background

An Innovative Approach for Mercury Capture

IAC/MHC EPC CORE COMPETENCIES PRESENTATION. Innovation. Service. Product Excellence.

ATMO.5230 Air Pollution Control Spring Mini-Project Assignment In-class Presentations and Papers Due at End of Term (April 24 th Class)

Integrated Benchmarking Moves from Uncertainty to Solutions

I. CLEAN AIR ACT 103 AND 105 THE GRANT CARROT. 1. Agencies must be qualified. 3. Maintenance of effort required.

P.O. Box 1276 Westerville, OH (614)

John Freeze President/CEO Commonwealth Hosiery Mills, Inc. P.O. Box 939 Randleman, NC 27317

Oklahoma Department of Environmental Quality Air Quality Division

August 18, Mr. Randy Woolard General Manager IE Furniture, Inc Ball Park Road Thomasville, NC 27360

Capacity Enhancement and Energy Conservation in Cement Plant

Air Pollution Control Program Permits Section

UNITED STATES GYPSUM COMPANY BALTIMORE PLANT 5500 QUARANTINE ROAD BALTIMORE, MARYLAND PART 70 OPERATING PERMIT NO.

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Minor Source Permitting Guidance for Facilities Subject To Federal Standards

ENVIRONMENTAL FOOTPRINT COMPARISON TOOL A tool for understanding environmental decisions related to the pulp and paper industry

CISWI and solid-waste-identification rules

Emergency Engine and Turbine Requirements

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009

ABB Cement Fingerprint Holistic Approach for Cement Industries

Overview of the Clean Air Strategic Alliance (CASA) Project on Non-Point Air Emission Sources

May 28, 2010 Project No

TITLE V OPERATING PERMIT STATEMENT OF BASIS

Industrial IT : Optimization for the Cement Industry

PUBLIC PARTICIPATION DOCUMENTS For DCP Midstream, LP Hamilton Township, Michigan

Recycling and Reclamation of Airfield Pavements

Presented to. November 6, 2002

(Part 2: Cement Industry Sector) Stanley Santos

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

Dr. Richard Venditti Forest Biomaterials North Carolina State University Revised March 26, 2012

STATEMENT OF BASIS. NAICS Description: All Other Miscellaneous Chemical Product and Preparation Manufacturing NAICS Code:

Regulation I Rule 104 Prohibitions

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Department of Public Health Proposed Rules and Regulations for the Handling and Storage of Bulk Material Piles (Proposed December 19, 2013)

ALTERNATIVE EMISSIONS REDUCTION PLANS AND AUTHORIZATIONS

after water, concrete is the most consumed material on earth cement is the glue that holds it together

Huber Engineered Woods, LLC, TV Page 1 of 7

PUBLIC PARTICIPATION DOCUMENTS For Flakeboard America Limited, dba ARAUCO North America Grayling, Michigan

A PENNSYLVANIA FRAMEWORK OF ACTIONS FOR METHANE REDUCTIONS FROM THE OIL AND GAS SECTOR

Transcription:

FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS This form is to be completed for each cement manufacturing plant. State/Federal regulations which may apply to cement manufacturing plant are listed in the instructions. Note that there may be other regulations which apply to this emissions unit which are not included in this list. Note: This emissions activity category (EAC) form does not include roadways and parking areas, storage piles, mineral extraction operations, and material handling operations (e.g., raw material unloading, raw material charging to crushers, transfer and conveying, unloading to storage) which may also be associated with a cement manufacturing plant. Therefore, additional EAC forms for these emissions units may need to be submitted. 1. Reason this form is being submitted (Check one) New Permit Renewal or Modification of Air Permit Number(s) (e.g. F001) 2. Maximum Operating Schedule: hours per day; days per year If the schedule is less than 24 hours/day or 365 days/year, what limits the schedule to less than maximum? See instructions for examples. 3. Identification of fugitive dust emissions units: Check Those Fugitive Dust Emissions Units Present Emissions Units How many? Primary crusher Vibrating screen, secondary crushing grinding and feed/discharge exhaust systems blending and storage Leakage from grinding (coal) Cement kilns Finish grinding with leaks from milling and feed/discharge exhaust systems Clinker storage Cement silo vents Cement loading Cement packaging Other (describe): EPA FORM 3128 - REV2002 1 of 5

4. Cement kilns Emissions Unit ID(s) Number of identical kilns Type of process (e.g. wet, dry, semidry) Preheater? (yes/no) Fuel(s) used Capacity of each kiln (tons/hour) Capacity of each kiln (tons/year) 5. Cement silo information: Silo ID Storage Capacity (tons) Year Installed Number of Silo Vents EPA FORM 3128 - REV2002 2 of 5

6. Crushing and screening process data: Process activity Manufacturer Date installed Maximum design input capacity (tons/hour) Maximum processing rate (tons/hour) Maximum annual processing rate (tons/year) Primary crushing and screening Secondary crushing and screening grinding blending and storage Coal grinding Cement kilns Finish grinding Cement silo vents EPA FORM 3128 - REV2002 3 of 5

Cement loading Cement packaging 7. Control methods to be used for emissions from cement manufacturing and blending plants: Capture Method Capture Efficiency Control Method Control Efficiency Primary crushing and screening Secondary crushing and screening grinding blending and storage Coal grinding Cement kilns Finish grinding Clinker storage EPA FORM 3128 - REV2002 4 of 5

Cement silo vents Cement loading Cement packaging EPA FORM 3128 - REV2002 5 of 5

INSTRUCTIONS FOR COMPLETION OF THE EMISSIONS ACTIVITY CATEGORY FORM FOR CEMENT MANUFACTURING PLANTS GENERAL INSTRUCTIONS: Provide complete responses to all applicable questions. If an item does not apply to the emissions unit, write in Not Applicable or NA. If the answer is not known, write in Not Known or NK. If you need assistance in understanding a question after reading the instructions below, contact your Ohio EPA District Office or Local Air Agency for assistance. Submittal of an incomplete application will delay application review and processing. In addition, the application may be returned as incomplete if all applicable questions are not answered appropriately. APPLICABLE REGULATIONS: The following State and Federal Regulations may be applicable to cement manufacturing plants. Note that there may be other regulations which apply to this emissions unit which are not included in this list. Federal: State: 40 CFR, Part 60, (NSPS) Subparts A (General Provisions) and OOO (Standards of Performance for Nonmetallic Mineral Processing Plants) Ohio Administrative Code (OAC) Rules: 3745-31-02 (Permits to install) 3745-35-02 (Permits to operate) 3745-17-07 (Control of visible particulate emissions from stationary sources) 3745-17-08 (Restriction of emission of fugitive dust) 3745-17-11 (Restrictions on particulate emissions from industrial processes) If you would like a copy of these regulations, contact your Ohio EPA District Office or Local Air Agency. State regulations may also be viewed and downloaded from the Ohio EPA website at http://www.epa.state.oh.us/dapc/regs/regs.html. Federal regulations may be viewed and downloaded at http://www.epa.gov/docs/epacfr40/chapt-i.info/subch-c.htm. CALCULATING EMISSIONS: Manufacturers of some types of emissions units and most types of control equipment develop emissions estimates or have stack test data which you can request. Stack testing of the emissions may be done. Emissions unit sampling test data may be either for this emissions unit or a similar one located at the facility or elsewhere. You may develop your own emission factors by mass balance or other knowledge of your process, if you can quantify inputs and outputs accurately. You may be able to do this on a small scale or over a short period of time, if it is not practical during regular production. If you have control equipment, you may be able to quantify the amount of pollutants collected over a known time period or production amount. Any emission factor calculation should include a reference to the origin of the emission factor or control efficiency. The emissions from cement manufacturing operations may be estimated using the information from Chapter 11.6 (Portland Cement Plants) of AP-42, Compilation of Air Pollutant Emission Factors, Fifth Edition, Volume I, available from the following website: http://www.epa.gov/ttn/chief/ap42/index.html EPA FORM 3128 - INSTRUCTIONS 1 of 2

SPECIFIC INSTRUCTIONS: This emissions activity category ( EAC ) form is to be used for certain operations at cement manufacturing facilities which emit fugitive dust and/or particulate emissions from a stack or stacks. Typical emissions units to be included on this form are listed in item # 3. Please use the specific EAC forms for roadways and parking areas, storage piles, material handling operations (e.g., for unloading, conveying, and handling or raw materials) and mineral extraction for these emissions units. Any other emissions unit that does not have a specific EAC form should be entered on this form under "other (describe)." Paragraph (B)(6) of OAC Rule 3745-17-01 defines "fugitive dust" as "...particulate matter which is, or was prior to the installation of control equipment, emitted from any source by means other than a stack." Aggregate processing facilities emit particulate matter in such fashion, and the requirements of OAC Rules 3745-17-07(B) (Visible particulate emission limitations for fugitive dust) and 3745-17-08 (Restriction of emissions of fugitive dust) may be applicable. Particulate emissions that are exhausted through air pollution control equipment or an uncontrolled stack may be subject to OAC Rules 3745-17-07(A) (Visible particulate emission limitations for stack emissions) and 3745-17-11 (Restrictions on particulate emissions from industrial processes). 1. Indicate whether this is an application for a new permit or an application for permit renewal. If applying for a permit renewal, provide the 4-character OEPA emissions unit identification number. 2. Provide the maximum number of hours per day and the maximum number of days per year the aggregate processing plant is expected to operate. The following are examples of why the maximum number of hours per day may be less than 24 or the maximum number of days per year may be less than 365 (this list is not all-inclusive): - The facility can only operate during daylight hours. - The process can only operate within a certain range of ambient temperatures. - The process is limited by another operation (i.e., a bottleneck). - The plant is under union contract to operate only a certain amount of time. 3. Identify the types of processes at the facility by placing a check mark in the appropriate block adjacent to the respective emissions unit type. If there are other processes at the facility which were not specifically listed and do not have other applicable EAC forms, please identify such emissions unit(s) in the section marked "Other (describe)". 7. For each operation identified elsewhere in this form, describe how the emissions are captured and estimate the percentage of emissions which are captured. Also describe how the emissions are controlled and estimate the percentage of reduction attained. Efficiencies may be determined, in order of preference, by testing, design, published estimation methods or best engineering judgement. For multiple methods, enter them in the blank separated by a slash (/) and do the same for the efficiency. EPA FORM 3128 - INSTRUCTIONS 2 of 2