Industrial flue gas probes. Instruction manual

Similar documents
Compact flue gas analyser: testo 300 M-I

Thermocouple for Flue Gas Temperature Measurements,

Cutlass Fasteners, Inc. 83 Vermont Ave., Unit 6, Warwick, RI Tel: (401) Fax: (401) cutlass-studwelding.com

New Measurement Engineering For Monitoring Emissions In Industry

Flue gas analyzer for industry

The Fast and Robust Flue Gas Measuring Instrument for All Important Parameters

Fine particle measuring system

testo 350-S/-XL testo 350 S/XL, flexible flue gas measuring system Additional information at Control unit Analysis box

Turbocharger / TPL-C Original assembly instructions English

testo 330 Flue gas analysis with increased convenience and safety

Multi-function VAC measuring instrument

Oxygen Sensor QGO20...

WE01A GMA (MIG) Plug Weld

testo 616 Appareil de mesure de l'humidité

Guide book AS 300 G. Waste water filtration unit. Im Geer 20, D Isselburg. Description / Type-No.: AS 300 G Type 523

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

Fast-action and userfriendly. exchange by the user on site

BakeMax Dough Mini Moulder BMMDM02

PE45 AMAZON MONKEY BARS OWNER'S MANUAL

Modular Coldroom Installation Manual

ST XX28 Stainless Steel Thermostatically Controlled Electric Model

On-roof system Tau Installation manual

INSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER

FW66 FORESTRY WINCH FW66. Owner s Manual 19/02/2016

testo 310 Flue gas analyzer Instruction manual

Air flue duct for use with ecotec boilers

ELECTRONIC EARTHING EQUIPMENT SERIES GRD 4200

Agilent G2615A Bar Code Reader

Just a few clicks away from a heating system

Urethane Booster Pump Seal Kit (Zenith or Nordson -Type)

Humidity/temperature measuring instrument

testo 327 Flue gas analyzer, country-specific version D Instruction manual

Operate Manual. DA-1600i Stud Welding Machine. DA-2000i Stud Welding Machine. DA-2500i Stud Welding Machine

the P.R. Skate, LLC Pallet Rack Moving System Product Manual

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

The new 4-sensor flue gas analyzer for emission measurement in industry

Operating Instructions

YINGLI SOLAR TWINMAX MODULES Installation and User Manual

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

HIGH SEAL ULF Live Loaded Packing System

Highly efficient flue gas analyzer

Gas sensors can be changed quickly and easily by the user on site

testo 338 Density gauge Instruction manual

Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual

Guidelines for QualiTru Line Sampling

7 PIECE TUBE FLARING KIT

!!!! WARNING!!!! WELDING FUMES AND GASES CAN BE DANGEROUS TO YOUR HEALTH.

FILTRATION & UV SYSTEM

ST 19 Aluminium Manually Controlled Electric Model

2-finger angular gripper SGB 32-50

geba fire damper WFK according to EN 15650

Adjustable Fused Power Supply

- CONSTRUCTIONS 300 SECTIONAL VIEW 300 SECTIONAL TABLE 301 QUANTITY FOR MODEL 302 MECHANICAL SEAL 303 BEARINGS 304

Exceptionally strong and flexible Proven durability and long life 20 year warranty CE marked and HETAS approved

Protective Capony RTC-16

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

ENGLISH Datasheet JIS Miniature Thermocouple Connector In-Line Plugs Types K, J, T, E, R/S & B (JIS Colour Code)

OPERATION MANUAL. Beam Clamp with Shackle

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

Thermocouples. Operating and Maintenance Manual English. Thermocouples

Conversion Station Model 711

Flue gas analysis brilliantly easy: testo 350

LOAD RAMP 1000 LB. CAPACITY

Instruction Manual HT 24 BM-D2400 Homogenizer

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

VERO-S Robot Coupling for Pallet Handling NSR 160 / PKL 160

Thermo Scientific. Fiberlite Rotors. for the Thermo Scientific Sorvall LYNX Centrifuge. Instruction Manual a 09 / 2014 Superspeed Centrifuge

Visit us at

Operating Instructions Plasma generator PG31

Installation, Operation & Maintenance Manual

Shackles. Applications. Range. Design. CAD drawings. Finish

FIVE STAR PRODUCTS, INC. (800)

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5

REFERENCE MEASURING INSTRUMENT

Series description Wilo-Drain STS 40

AHP WELDS USER MANUAL

BEST ONE SUBMERSIBLE SUMP PUMPS EPA. Page Features & Applications 100 Exploded View 101 Pump & Motor Specifications 102 Selection Chart / Type key 103

ATV PULL BEHIND SPREADER OPERATION AND MAINTENANCE MANUAL

UL, KUL, WG-KUL, ARK, ARK-1

Installation instructions

Liner Replacement Instructions:

Installation instruction

AC50 Silver Adhesive Anchoring System

Instruction Manual. Filter System Bioflow 3.0, 6.0, 8.0.

Operating Manual. MELAquick 12+

LCS Series Integrated Speed Control. Product Manual (Revision NEW) Original Instructions

Installation and Operation Manual

ENG. Instruction Manual. Turbo SFcompact. LNS Turbo 203 Turbo Drive Kings Mountain, NC 28086

Installation recommendations. Washer-extractor PW 6080 EL AV/LP. en - GB Mat. no / 01

Flue gas analyser. We measure it. testo 327 The special class entry instrument. Simple menu structure

General Guidelines. Tools Required. Instructions for Part # SC500-AF. Safety

Cranio-caudal Fixation Unit CC-GE MR10063-CC-GE

DJ Switch 10F V2 ORDERCODE 50365

Furnaces for Research and Laboratory. Testing Drying Ashing Tempering Preheating Sintering Firing Annealing

These conditions must be maintained during transport to the laboratory.

SEMPEO SQA Unit Code H Assembling mechanical components

Item #20295 ARC 80 WELDER ASSEMBLY & OPERATING INSTRUCTIONS

Fitting and Operating Instructions

Installation Instructions. SUSPA Movotec SMS-I-40x80 SUSPA Movotec SMS-B-45x90. SUSPA GmbH. English

Given a functional welder, instruction and demonstration of use, each employee will be able to:

Transcription:

Industrial flue gas probes Instruction manual

2

1 Contents 1 Contents 1 Contents... 3 2 Safety and the environment... 4 2.1. About this document... 4 2.2. Ensure safety... 4 2.3. Protecting the environment... 5 3 Specifications... 6 3.1. Use... 6 3.2. Technical data... 7 4 Product description... 11 5 Using the product... 13 6 Maintaining the product... 15 6.1. Checking / cleaning / replacing the particle filter... 15 6.2. Cleaning / replacing the preliminary filter... 18 6.3. Cleaning / replacing metal sampling tube... 20 6.4. Cleaning / replacing the ceramic tube... 21 6.5. Replacing unheated gas sampling hose... 22 6.6. Cleaning the gas path in the probe handle... 23 6.7. Replacing the thermocouple... 27 7 Tips and assistance... 30 7.1. Recommendations and application instructions... 30 7.2. Tightening torques for screw connections... 30 7.3. Accessories and spare parts... 31 3

2 Safety and the environment 2 Safety and the environment 2.1. About this document Use > Please read this documentation through carefully and familiarize yourself with the product before putting it to use. Pay particular attention to the safety instructions and warning advice in order to prevent injuries and damage to the products. > Keep this document to hand so that you can refer to it when necessary. > Hand this documentation on to any subsequent users of the product. 2.2. Ensure safety CAUTION Danger of burning on hot surfaces! > Always wear heat-resistant gloves when touching the probe shaft. > Allow the probe shaft to cool down after a measurement, before touching it or placing it in the transport packaging. > Only operate the product properly, for its intended purpose and within the parameters specified in the technical data. Do not use any force. > Temperatures given on probes/sensors relate only to the measuring range of the sensors. Do not expose handles and feed lines to any temperatures in excess of 70 C unless they are expressly permitted for higher temperatures. > Do not operate the instrument if there are signs of damage at the housing, mains unit or feed lines. > Do not perform contact measurements on non-insulated, live parts. > Do not store the product together with solvents. Do not use any desiccants. > Only perform maintenance and repair work on this instrument that is described in the documentation. Follow the prescribed steps exactly. Use only original spare parts from Testo. 4

2 Safety and the environment > Any additional work must only be carried out by authorized personnel. Testo will otherwise refuse to accept responsibility for the proper functioning of the measuring instrument after repair and for the validity of certifications. > The industrial flue gas probe must not be used in explosive environments. > When connecting the heated industrial flue gas probe, ensure correct mains voltage as specified on the type plate. > Before opening the probe housing of the heated industrial flue gas probe, pull out the mains plug. Safety-related symbols on heated industrial flue gas probes Symbol Explanation If the product is not used in strict compliance with this documentation, the intended protection may be impaired. > Operate the product only as described in this documentation. > Please consult your dealer or the manufacturer if in doubt. Risk of burns due to hot surface. Use heat-resistant gloves for protection against harmful thermal effects. 2.3. Protecting the environment > At the end of its useful life, send the product to the separate collection for electric and electronic devices (observe local regulations) or return the product to Testo for disposal. 5

3 Specifications 3 Specifications 3.1. Use The industrial flue gas probes have been designed for the following tasks / applications: Extractive sampling of the flue gas being analyzed at industrial plants with high temperatures of > 1000 C large sampling diameters wet flue gas to prevent distorted readings (heated industrial flue gas probe up to 600 C) The industrial flue gas probes are used in conjunction with the following flue gas analyzers: testo 340 testo 350 The industrial flue gas probes come in two pre-configured sets. A system-specific sampling solution can be put together using other accessories. 6

3 Specifications 3.2. Technical data General Feature Overpressure in the flue gas Negative pressure in the flue gas Values max. 100 mbar testo 340: max. 200 mbar testo 350: max. 300 mbar Ambient temperature -5 to +45 C Storage temperature -20 to +50 C Unheated handle (item no. 0440 0649) Feature Values Temperature resistance 600 C Handle - probe shaft connection Handle - thermocouple connection Internal thread G 1/4 Internal thread M8 x 1 Hose connection Adapter with hose nozzle, 7 mm outer diameter Material Stainless steel 1,4404 Unheated gas sampling hose (item no. 0554 3354) Feature Length Design Particle filter Values 4000 mm 2-chamber hose with Teflon inner hose To protect the measuring instrument from particulate matter and dirt Material: PE porous 10 µm 7

3 Specifications Unheated sampling tube up to 1200 C (item no. 0600 7617) Feature Values Temperature resistance 1200 C Dimensions Length 1053 mm, Probe shaft: Ø 12 mm, Threaded socket: Ø 17 mm Connection Thread G 1/4 Material 2.4856 alloy 625 Option Probe extension (extension tube item no. 0600 7617) Probe preliminary filter (item no. 0600 7616) can be attached Unheated sampling tube up to 1800 C (item no. 0600 7805) Feature Values Temperature resistance 1800 C Dimensions Ø 12 mm, length 1000 mm Handle Adapter with O-ring, Tmax: 220 C; Ø 22 mm Material Ceramic Al 2 O 3 >99.7% Thermocouple (item no. 0430 0088) Feature Values Temperature recorder Type K NiCr-Ni, insulated Class 1 Sheathed cable 2.4816 alloy 600 Length TC 1200 mm; optional length 2200 mm (item no. 0600 7615) available Diameter 2 mm Measuring range -200 to +1200 C Cable length 4.0 m 8

3 Specifications Heated sampling tube (item no. 0600 3502) Feature Values Temperature resistance up to 600 C Voltage supply Power consumption Dimensions Ready for operation 230 V/50 Hz 400 W Ø 25 mm, length: 1110 mm within 15 min. Heating temperature >180 C Option Probe extension (extension tube) (item no. 0600 7617) Probe preliminary filter (item no. 0600 7616) can be attached Heated gas sampling hose (item no. 0600 3501) Feature Design Dimensions Heating temperature range Ready for operation Values Corrugated hose with Teflon inner hose Length: 4000 mm Corrugated hose: Ø 28 mm Silicone caps: Ø 34 mm >120 C within 15 min. Outside temperature max. +45 C Voltage supply Power consumption Bending radius 230 V/50 Hz 160 W min. 200 mm Preliminary filter (item no. 0600 7616) Feature Values Operating temperature max. 1000 C Dimensions Filter seat Ø 32.6 mm, length 110 mm Material:1.4841 Connecting thread: G 1/4 9

3 Specifications Feature Values Filter nut Material: 1.4841 Thread: G 1/4 Filter element Filtration grade for gases Safety cotter pin Dimensions: Ø 30 mm, length 75 mm Material: porous silicon carbide Particle size: 10 μm 2 μm DIN 94, dimensions: 2.0 x 16 mm, Material: stainless steel A4 Warranty Feature Thermocouple Heated sampling tube Heated hose Sampling / extension tube Unheated hose Unheated handle Warranty terms Values 12 months 24 months 24 months 24 months 24 months 24 months see website www.testo.com/warranty 10

4 Product description 4 Product description Industrial flue gas probe set 1200 C (0600 7610) 1 Unheated handle 2 Unheated metal sampling tube 3 Preliminary filter (optional) 4 Instrument connections 5 Unheated gas sampling hose 6 Particle filter 7 Thermocouple type K 8 Gas path 11

4 Product description Industrial flue gas probe set 1.800 C (0600 7620) 1 Unheated handle 2 Unheated ceramic sampling tube 3 Unheated gas sampling hose 4 Instrument connection 5 Particle filter 6 Gas path Industrial flue gas probe set, heated (0600 7630) 1 Heated sampling tube 2 Preliminary filter (optional) 3 Heated gas sampling hose 4 Instrument connection 5 Probe heater connection cable 6 Probe heater 7 Thermocouple type K 12

Pos: 28 /TD/Überschriften/6. Produkt verwenden @ 0\mod_1173774928554_79.docx @ 328 @ 1 @ 1 5 Using the product 5 Using the product Heated industrial flue gas probe > The heated industrial flue gas probe is designed for a mains voltage of 230 V! > Uncoil the coiled gas sampling hose correctly so that there is no torsional strain. > Lay the gas sampling hose so that it is protected from the wind and the weather, because depending on the wind/weather conditions, there is considerable loss of heat at the outer sheath. > When installing in closed rooms please ensure that there is sufficient ventilation to prevent heat build-up. > To prevent damage Do not route the gas sampling hose over sharp edges or via feedthroughs. When securing, make sure that the gas sampling hose is not squashed. There should be no moving or bending stresses on the connections themselves. When installing, please ensure a minimum bending radius of 200 mm. > Following final installation, visually inspect the heated industrial flue gas probe for any damage. > After the mains plug has been plugged in, the total heating up time is approx. 20 minutes. > Once the heating up time has elapsed, the heated sampling tube is very hot and should only be touched with heat-resistant gloves. CAUTION Danger of burning on hot surfaces! > Always wear heat-resistant gloves when touching the probe shaft. > Allow the probe shaft to cool down after a measurement, before touching it or placing it in the transport packaging. 13

5 Using the product Checking the thermocouple > Make sure that the thermocouple of the industrial flue gas probe does not touch the probe shaft. Bend the thermocouple back if necessary. Aligning the industrial flue gas probe > Align the industrial flue gas probe in the flue gas duct so that the tip is in the centre of flow (area of the highest flue gas temperature). Optional - Mount extension tube. - Mount preliminary filter. - Install thermocouple 2200 mm. 14

6 Maintaining the product 6 Maintaining the product 6.1. Checking / cleaning / replacing the particle filter Checking the particle filter: Check the particle filter of the industrial flue gas probe regularly for Damage to and contamination of the housing Filter saturation of the PE filter Visual inspection Cleaning the particle filter housing: > If there are any signs of contamination, clean the particle filter housing. 1. Open the filter cover of the housing 2. Remove dirt using a cloth. 3. Put the filter cover on and lock it: turn slightly clockwise 15

6 Maintaining the product Replacing the particle filter housing: > In the event of any damage to the housing, replace the particle filter (item no. 0440 0668). 1. Remove bend protection springs and hose connections from the particle filter by turning clockwise. 2. Attach new particle filter to the hose connections. If the saturation level is low, the PE filter can be inserted in the new housing. 3. Push the bend protection springs over the hose connections by pressing and simultaneously turning clockwise. Checking the PE filter: Check the particle filter of the industrial flue gas probe regularly for filter saturation. Carry out a test. - Measuring instrument is switched on. > Remove bend protection spring and hose connection from the particle filter by turning clockwise. - The measurement gas pump now sucks in ambient air via the filter. Filter needs replacing if: Flow rate < 0.6 l/min testo 350 Flow rate < 0.2 l/min testo 340 16

6 Maintaining the product If the flow rate value is >0.6 l/min (testo 350) or > 0.2 l/min (testo 340), the particle filter is not yet saturated. We recommend checking the handle, the preliminary filter and the sampling tube. Replacing the PE filter: > If the PE filter is visibly saturated: replace the PE filter. 1. Open the filter cover of the housing 2. Remove the spent PE filter. 3. Insert new PE filter. Insert the PE filter into the filter holder as far as it will go. 4. Put the filter cover on and lock it: turn slightly clockwise. 17

6 Maintaining the product 6.2. Cleaning / replacing the preliminary filter Check the preliminary filter of the industrial flue gas probe regularly for contamination: visual inspection > In the event of any visible contamination, clean or replace the preliminary filter. 1. Fix the sampling tube securely in place. 2. Press the ends of the safety cotter pin together with pliers and slide upwards. 3. Remove safety cotter pin. 4. Remove the preliminary filter (size SW17) from the sampling tube (size SW13) using wrenches. 18

6 Maintaining the product 5. Open preliminary filter using wrenches (size SW17). 6. Remove screw connections from the preliminary filter. 7. Clean the preliminary filter. ATTENTION Do not clean preliminary filter in liquids or ultrasonically. Damage due to improper cleaning! > Soot or particle deposits on the preliminary filter can be brushed off using a wire brush. Then blow compressed air through the preliminary filter. 8. Put together, screw together and tighten the cleaned or new preliminary filter and insert safety cotter pin, see Tightening torques for screw connections, page 30. It is recommended that the thread of the prefilter to grease with a commercial ceramic paste. 9. Tighten the preliminary filter (size SW17) on the sampling tube (size SW13) using wrenches, see Tightening torques for screw connections, page 30. 10. Disengage the sampling tube. 19

6 Maintaining the product 6.3. Cleaning / replacing metal sampling tube Check the sampling tube of the industrial flue gas probe regularly for contamination: visual inspection > In the event of any visible contamination, clean or replace the sampling tube. CAUTION Hot probe shaft! Risk of burns! > Allow the probe shaft to cool down before you touch or pack it! 1. Fix the sampling tube securely in place. 20 2. Remove the sampling tube (size SW13) from the handle (size SW19) using wrenches. If necessary remove preliminary filter from the sampling tube. 3. Cleaning the sampling tube > Brush off soot or particle deposits on the sampling tube using a wire brush. > Scrape out the inside of the sampling tube using a sturdy wire (e.g. Ø 3 mm). Hold the tube at a slight angle, so that the dislodged particles fall out. > Then blow compressed air through the sampling tube. 4. Screw cleaned or new sampling tube onto the handle and tighten, see Tightening torques for screw connections, page 30. If necessary screw preliminary filter onto the sampling tube. 5. Disengage the sampling tube.

6 Maintaining the product 6.4. Cleaning / replacing the ceramic tube Check the sampling tube of the industrial flue gas probe regularly for contamination: visual inspection > In the event of any visible contamination, clean or replace the sampling tube. CAUTION Hot probe shaft! Risk of burns! > Allow the probe shaft to cool down before you touch or pack it! CAUTION Fragile ceramic sampling tube! > Avoid mechanical loads. 1. Remove sampling tube from the handle. 2. Cleaning the sampling tube > Scrape out the inside of the sampling tube using a sturdy wire (e.g. Ø 3 mm). Hold the tube at a slight angle, so that the dislodged particles fall out. > Then blow compressed air through the sampling tube. 3. Check handle - If the O-ring in the handle is damaged, the handle must be replaced. 4. Insert a cleaned or new sampling tube into the handle as far as it will go. 21

6 Maintaining the product 6.5. Replacing unheated gas sampling hose Check the unheated gas sampling hose of the industrial flue gas probe regularly for damage and contamination: visual inspection Replacing the gas sampling hose 1. Undo all hose clamps on the gas sampling hose. 2. Remove all bend protection springs from the hose connections and the thermocouple clamping screw by turning clockwise. 3. Remove hose connections from the particle filter, gas path connection and gas path plug by turning clockwise. 4. Remove bend protection springs from the hose connections. 5. Undo the thermocouple clamping screw connection. 6. Pull the thermocouple approx. 100 mm out of the probe handle. 7. Push bend protection spring over the thermocouple. 8. Remove the thermocouple cable, starting at the instrument plug, from the slotted tube. 9. Insert the thermocouple cable, starting at the instrument plug, into the slotted tube of the new gas sampling hose. 10. Push the bend protection spring over the slotted tube. 22

6 Maintaining the product 11. Carefully thread the thermocouple up to 50 mm through the clamping screw and the probe handle into the probe shaft. 12. Tighten clamping screw using a wrench (size SW8), with 1 3/4 turns. When refitting the same clamping screw, this is tightened with a 1/4 turn more. 13. Push bend protection springs over the clamping screw. 14. Attach bend protection springs to the hose connections for the particle filter, gas path connection and gas path plug. 15. Connect the particle filter, gas path connection and gas path plug to the hose connections. 16. Push the bend protection springs over the hose connections by pressing and simultaneously turning clockwise. 17. Fasten hose clamps to the gas sampling hose. 6.6. Cleaning the gas path in the probe handle Check the gas path in the handle regularly for contamination. 1. Fix sampling tube and handle securely in place. 2. Remove the sampling tube (size SW13) from the handle (size SW19) using wrenches. 23

6 Maintaining the product 3. Undo upper hose clamp. 4. Remove bend protection springs from the thermocouple clamping screw. 5. Undo the thermocouple clamping screw using a wrench (size SW8). 6. Carefully pull out thermocouple. 24

6 Maintaining the product ATTENTION Never pull on the connection cable when removing the thermocouple from the handle. Damage due to inappropriate handling! > Hold thermocouple tightly in front of the ferrule and carefully pull it out of the handle. 7. Undo the clamping screw connection using a wrench (size SW12). 8. Remove bend protection spring and gas path hose at the gas path connection by turning clockwise. 25

6 Maintaining the product 9. Insert the cleaning brush into the probe handle. 10. Push the cleaning brush through to the tip of the probe handle and pull out. 11. Repeat steps 9 and 10 several times depending on the degree of contamination. 12. Clean gas path connection. 13. Repeat step 11 several times depending on the degree of contamination. 14. Attach hose to the gas path connection and push bend protection springs over the gas path connection by pressing and turning clockwise simultaneously. 15. Tighten clamping screw connection on the probe handle using a wrench (size SW12), see Tightening torques for screw connections, page 30. 16. Screw clamping screw on the clamping screw connection by hand as far as it will go. 26

6 Maintaining the product 17. Carefully thread the thermocouple up to 50 mm through the clamping screw and the probe handle and into the probe shaft. 18. Tighten clamping screw using a wrench (size SW8), with 1 3/4 turns. When refitting the same clamping screw, this is tightened with a 1/4 turn more. 19. Push bend protection springs over the clamping screw. 20. Fasten upper hose clamp to the gas sampling hose. 21. Screw sampling tube onto the handle and tighten, see Tightening torques for screw connections, page 30. 6.7. Replacing the thermocouple Before replacing the thermocouple, disconnect the industrial flue gas probe from the Testo measuring instrument. 1. Undo all hose clamps on the gas sampling hose. 27

6 Maintaining the product 2. Remove bend protection springs from the thermocouple clamping screw. 3. Undo the thermocouple clamping screw using a wrench (size SW8). 4. Carefully pull out thermocouple. 5. Remove the thermocouple cable, starting at the instrument plug, from the slotted tube. 28

6 Maintaining the product ATTENTION Never pull on the connection cable when removing the thermocouple from the handle. Damage due to inappropriate handling! > Hold thermocouple tightly in front of the ferrule and carefully pull it out of the handle. 6. Remove bend protection spring from the thermocouple. 7. Attach bend protection spring to the new thermocouple. 8. Insert the new thermocouple cable, starting at the instrument plug, into the slotted tube. 9. Push the bend protection spring over the tube. 10. Carefully thread the new thermocouple up to 50 mm through the clamping screw and the probe handle into the probe shaft. 11. Screw the clamping screw by hand as far as it will go. Then tighten using a wrench (size SW8) with 1 3/4 turns. When refitting the same clamping screw, this is tightened with a 1/4 turn more. 12. Carefully bend thermocouple 90 between ferrule and clamping screw connection. Do not kink the thermocouple. 13. Push bend protection springs over the clamping screw. 14. Fasten hose clamps to the gas sampling hose. 29

7 Tips and assistance 7 Tips and assistance 7.1. Recommendations and application instructions Application / problem The screw connections are difficult to undo following usage at high temperatures (>600 C). In the event of heavy dust loads (e.g. measurement on a rotary kiln), the particle filter gets clogged very quickly. A filter cake forms on the probe shaft tip during measurement. Recommendation / solution Grease the threads of the screw connections with a standard ceramic paste before use. To achieve a longer service life, replace the particle filter with a standard fuel filter. The measurement period can last 10 to 20 min as a result. The filter cake can be knocked off either straight after measurement or once the cooling time has elapsed. If we have not been able to answer your question, please contact your dealer or Testo Customer Service. For contact details, see the back of this document or visit the website www.testo.com/servicecontact. 7.2. Tightening torques for screw connections Screw connections Tightening torque Handle - probe shaft Probe shaft - probe shaft Handle - gas path hose adapter Handle - TC clamping screw connection Probe shaft - preliminary filter Preliminary filter: Filter nut - Filter seat 20 Nm 20 Nm 6 Nm 10 Nm 20 Nm hand screwd 30

7 Tips and assistance 7.3. Accessories and spare parts Description Item no. Probe preliminary filter for dusty/dirty flue gases 0600 7616 Extension/sampling tube, length 1000 mm, up to max. 1200 C 0600 7617 Transport case for flue gas probes 0516 7600 Thermocouple, length 2200 mm, up to max. 1200 C 0600 7615 Particle filter (housing incl. PE filter) 0440 0668 PE filter (10 pcs.) 0554 3371 Unheated probe handle 0440 0649 Spare thermocouple 1200 mm 0430 0088 Seal ring for thermocouple, stainless steel 0170 0474 Clamping screw connection for thermocouple 0400 0083 Unheated gas sampling hose 0554 3354 Spare filter element 0133 0043 Replacement ceramic sampling tube 1.800 C 0440 0669 Adapter for ceramic sampling tube 0190 0186 O-ring for adapter 0135 0312 31

0970 0394 en 04