CORPORATE QUALITY SYSTEM PROCEDURE

Similar documents
CORPORATE QUALITY SYSTEM PROCEDURE

Quality Management System

2. GENERAL REQUIREMENTS

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

INS QA Programme Requirements

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

ASA-100 QUALITY MANUAL

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456

METHOD STATEMENT FOR PIPE WELDING WORKS

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

D. All distributors shall be reviewed and approved as per company procedure.

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System

Quality Assurance Policy and Procedures

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 1)

External Provider Quality Requirements QCS-001 Processing Sources

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

NSK Steering Systems America

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 2)

General Purchase Order Requirements

M. F. Sullivan. 9/27/2016 Dr. Sandor Somogyi

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

Supplier Quality Manual

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

Facilities Planning and Construction (FP&C)

The Master of Master Distribution

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

Clause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks")

SUPPLIER GUIDELINES MANUAL

Vendor Quality. Requirements Manual

FIRST ARTICLE INSPECTIONS

Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Service 1

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

GE Oil & Gas Quality Management System Pressure Control Supplier Quality Requirements - Outsourced Manufacturing Services SQ-08 Rev: 2.

Washington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program

Vendor Qualification Survey

LM Logistic Services Quality Notes Conversion Chart

Cross Dock. Cross Dock Methods. Cross Dock Criteria and Benefits. Vendor Requirements for Vendor Prepared Cross Dock

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Logistics Routing Guide- Domestic Distribution Center - Mexico, Missouri

Supplier Quality Manual

D1 4426, Approved Process Sources. Purchase Order Flow Down Requirements

Uniform Hazardous Waste Manifests

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

Stainless Steel Aeration Equipment Specification

Rev A. Vendor Compliance Manual

3). DEFINITIONS. Title: Management Responsibility. Issue Date: June 19, Procedure Number: CP Page: 1 of 5 ACCEPT REJECT COMMENTS

The factory must establish in writing the persons who are authorized to complete and/or sign shipping documents.

Mantor Aviation Company

Master Sales Agreement and Policy Statement

SHELTON INDUSTRIAL PATTERN INC.

Supplier Quality Requirements Manual

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

Supplier Quality Manual

Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service 1

KOPETZ BUSINESS PROCESS MAP LEVEL 1 INQUIRY TO DELIVERY

CURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC SUPPLIER QUALITY REQUIREMENTS SQR-100. Rev. L.

... Supplier Manual . REV 1. P d --KICKHAEFER MANUFACTURING COMPANY SUPPLIER MANUAL (PRINTED COPIES ARE UNCONTROLLED)

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

ASA-100 QUALITY MANUAL

Association of American Railroads Mechanical Division MANUAL OF STANDARDS AND RECOMMENDED PRACTICES

CONTENTS SALES POLICY LITERATURE SAMPLES INSTALLATION DVDs

PCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 29 - March 30, 2017

WAREHOUSE SUPERVISOR

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement 1

01.48 Receiving and Processing Vendor Owned Surgical Instrumentation in the Sterile Processing Department

QUALITY ASSURANCE MANUAL

Activant Prelude. Entering Vendor Claims and Warranty Replacements

Standard Specification for Wrought Austenitic Stainless Steel Piping Fittings 1

SUPPLIER QUALITY ASSURANCE REQUIREMENTS MANUAL

SUPPLIER QUALITY MANUAL

001 Inspection/Test Data Reports

Pressure Control Supplier Quality Requirements Machining Services SQ-09 Rev: 1.1. Table of Contents

2

Class 2 Threaded Fasteners Qualified Suppliers List (QSL) with Criteria and Provisions

0. 0 TABLE OF CONTENTS

CHAPTER 14 VENDOR RETURNS & EXPENSE OFFSET TABLE OF CONTENTS

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Supplier Expectation Manual

Vendor Compliance. General Requirements

Quality Management System Manual

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

Supplier Quality Manual

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

ANCHOR ISO9001:2008 RPR-002 MARINE SERVICES REQUIRED PROCEDURE RECORDS CONTROL

To: All General Dynamics -OTS (GD-OTS) Suppliers

Eclipse Standard Operating Procedures - Release 8 Warehousing

ADC 217 Passive RFID Discrepancy Codes. b. Originator: DLA/J-375 phone: DSN / Commercial

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

Please Review page 4 for Style Separation. Violation charges for this requirement will not be in effect until October 1 st 2009.

Supplier Quality Requirements

Transcription:

Page 1 of 7 Approvals Author Quality System Manager Name: Randy Bennett Doyle Cassity Signature: Date: 04/1/2011 04/1/2011 Electronic versions of this procedure are considered the latest revision and a Controlled Copy when viewed from the JVIC Corporate site. When printed, this procedure is considered an uncontrolled copy unless signed by the Corporate Quality System Manager or his Designee. Doyle Cassity Corporate Quality System Manager TABLE OF CONTENTS BULLET POINTS 1.0 SCOPE/FIELD OF APPLICATION 2.0 REFERENCES 3.0 RESPONSIBILITIES 4.0 5.0 RECORD OF REVISION

Page 2 of 7 BULLET POINTS Receiving, checking condition, verifying compliance with Purchase Order and storing materials. Reporting non-conforming materials to QC and Corporate Purchasing Departments. Notification to QC for materials that have received special services by other than JVIC. Notification to QC for materials requiring supplementary testing or inspections. Actual heat numbers shall be compared to the MTR s received for the materials. Compare information between the PO and the packing list for each item and verify the actual material received matches the description. Depending on the part received the inspection points and steps to follow may vary. Customer Furnished Materials shall be marked with CFM and the job number. Materials shall be protected, properly marked and stored.

Page 3 of 7 1.0 SCOPE/FIELD OF APPLICATION 1.1 This procedure applies to all JV Industrial Companies, LTD. Field and shop locations unless otherwise directed by the client or the JVIC Quality System Department. 2.0 REFERENCES 2.1 Quality System Manual 2.2 Quality Control Manual 2.3 JVICQC-9.0 - Authorized Vendors List (Procedure) 2.4 JVICQC-1.0 - Handling Nonconformance s (Procedure) 2.5 JVICQC-4.0 - Product Identification and Traceability (Procedure) 2.6 JVICQC 20.0 Color Code Procedure (Procedure) 2.7 JVICQC-18.0- Handling and Storage 3.0 RESPONSIBILITIES This procedure is approved by the JVIC Corporate Quality System Manager. All JVIC personnel are required to follow this procedure. 4.0 4.1 Material Receiving will sign and date the Bill of Lading and stamp or write Subject to Check and then release the truck. 4.1.1 If the counts are as specified on the Bill of Lading or Freight Bill, and there is no damage to received materials, Material Receiving will legibly SIGN AND DATE for material that has been checked. 4.1.2 If counts deviate from the Bill of Lading or Freight Bill, Material Receiving shall note discrepancies on Bill of Lading or Freight Bill so that a claim may be placed with the material supplier. 4.2 Using the vendors Packing List, Material Receiving will verify individual items and circle those received in full. Items received as partial shipment or over shipment will be noted on the packing slip. 4.3 Material Receiving will inform Quality Control upon the following: 4.3.1 Receipt of any materials which have received special services such as bending, forming, or partial fabrication.

Page 4 of 7 4.3.2 Receipt of materials requiring supplementary testing or inspections. 4.4 Material Receiving shall make Quality Control and Corporate Purchasing, aware of all nonconformities noted on the packing slip. 4.5 If any items do not have a packing list, Material Receiving shall contact the Supplier to request the documents. 4.6 Material shall be purchased in accordance with JVICQC-23.0 Purchasing, and the requirements of the applicable Code section governing the work to be performed and customer specifications. MTRs (Material Test Reports) will be provided by vendor on materials as directed by the QC Department, Client and/or Code requirements. PMI may be performed to verify Alloy materials as determined by the Area QC Managers or the Corporate Quality System Manager or his designee. 4.7 Quality Control shall generate a nonconformance for items that do not meet specifications (Back orders, and shortages are not a concern at this point.), which will be treated per JVICQC-1.0 and JVICQC-9.0. Material shall not be received until the nonconformance is closed. 4.8 The actual heat number on the material shall be compared to the Material Test Reports received and recorded on the Packing List. Any discrepancies shall be noted on the Packing List and handled in accordance with JVICQC-1.0 and JVICQC-9.0. 4.9 Material Receiving shall match each piece of material to the Purchase Order and the packing list and verify material, grade, size, schedule, manufacturer, required material markings, supplementary requirements, special instructions, etc. 4.10 Material receiving shall remark items with fair to poor legibility of manufacturer s markings. 4.11 When receiving steel flanges, match material, grade, size, schedule, manufacturer, required material markings, supplementary requirements, special instructions, etc. to the Purchase Order and Packing List. Also, verify condition of flange faces and the condition of ends. 4.12 When receiving fittings, match material, grade, size, schedule, manufacturer, required material markings, supplementary requirements, special instructions, etc. to the Purchase Order and Packing List. Also, verify condition of ends. 4.13 When receiving steel piping, match material, grade, size, schedule, manufacturer, required material markings, supplementary requirements, special instructions, etc. to the Purchase Order and Packing List. Also, verify condition.

Page 5 of 7 4.13.1 Material receiving shall tally the lengths of all pipe and write the job number on one end of the pipe. 4.13.2 Material Receiving will be required to color code each length of pipe per the Color Code Chart and JVICQC-20.0 (Procedure). 4.13.3 Dimensional inspection will be performed if required in the Job Instructions or requested by Management. 4.13.4 Materials such as Hollow Forged Pipe that are identified on the end of the pipe will be remarked upon receipt, on the OD of the pipe, approximately six inches (6 ) from one end. All identification for traceability shall be remarked and witnessed. 4.14 When receiving valves, Material Receiving will match the material, grade, tag number, end conditions, pound rating, type trim and size of valve to the Purchase Order and Packing List. 4.15 Items ordered specifically for a job will have the job number or identifying code written on each item received. Items ordered for stock will have the word STOCK written on it. 4.16 When receiving filler metal, Material Receiving shall inspect the packages of welding materials for damage, proper identification, compliance with the Purchase Order, MTR s, Packing List and AWS designation. 4.16.1 Welding consumables received shall be verified to ensure compliance with the filler metal requisition and the approved Weld Procedure Specification (WPS). 4.16.2 Material in damaged containers, unidentified or improperly identified or does not meet the Purchase order requirements shall be identified as Nonconforming by Material Receiving, who shall advise Quality Control to initiate a Nonconformance report in accordance with JVICQC-1.0 and will rate the vendor in accordance with JVICQC-9.0. Materials that are rejected shall be stored in a segregated controlled area. 4.16.3 Materials receiving will initiate an Over / Short / Damaged Report for Material in damaged containers, and such material shall be stored in a segregated controlled area. 4.16.4 Containers of materials that are accepted shall be placed in inventory. 4.17 When receiving Customer furnished materials, Materials Receiving shall verify all items, per the applicable paragraphs above.

Page 6 of 7 4.18 Customer Furnished Materials shall be marked with CFM and the job number. Customer Furnished Materials shall be segregated from stock materials. 4.19 Materials should be stored to prevent direct contact with the ground. 4.20 Markings on stainless steel and high alloy materials shall be applied with low Chlorides and Halogens/ high purity markers. 4.21 Stainless steel pipe and fittings shall be handled with nylon slings; wood; rubber; or stainless steel lined equipment when practicable. Contact with carbon steel shall be avoided. 4.22 Material Receiving shall sign their name, date, SFM (Shop Furnished Material) or CFM (Customer Furnished Material), Job Number or Stock and a note with or without test reports on the Packing List. 4.23 Document Control shall complete a Receiving Log covering all materials received on a daily basis. Each receipt shall have the date (month/day/year) written or stamped on all accompanying paperwork (Packing List, MTRs, Reject Forms, etc.). 4.24 The Receiving Clerk will reconcile the Packing List and the Purchase Order. Production will post the materials received from the Purchase Order to the appropriate inventory records. 4.25 The original MTR s shall be attached to the Material Receiving copy of the P.O. and sent to Document Control.

Page 7 of 7 5.0 RECORD OF REVISION Revision Date Description 0 Initial Issue 1 11/05/2008 Complete Rewrite 2 01/27/2009 Changed Format 3 04/22/2010 Changed wording in paragraph 4.5.1 from Mill to Material 4 09/27/2010 Changed Format, and added Bullet Points 5 04/1/2011 Revised Section 4.16.1