Mechanical Integrity Assessment Training

Similar documents
SafeWells. Custom built, ISO compliant total well integrity management software

Analyzing Data with Power BI

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications

Contents OVERVIEW... 3

Wellhead Protection General Guidelines for New Private Domestic Wells

Order Management. Manage Inventory

Welcome to the topic on purchasing items.

(NOTE: Unless specifically identified, the changes outlined below apply to BOTH Chapter 78 and Chapter 78a.)

Zone Delivery Charges SO-1315

Contents OVERVIEW... 3

Using Shiftboard s Demand Planner

Department Asset Queries

Using the Vendor Scorecard. Release 9.0.2

Current Regulatory Issues Impacting the Appalachian Basin. Gary E. Slagel Steptoe & Johnson PLLC October, 2014

Contents OVERVIEW... 3 CONFIGURATION... 4

Sanjay Srinivas PH:

Year End Close Procedures - 1 -

Lab 2: Work Management From Service Request to Work Completion

GMP Inspection Process. Types of GMP Inspection. Module 18 Slide 1 of 14 WHO - EDM

ASI Point Of Sale 6.0 Startup Guide.

Integrating PPC s SMART Practice Aids with Engagement CS (Best Practices)

Adding Inventory. 1. From the Home screen, go to Operations Inventory Search Product Inventory. The Search Product Inventory screen displays.

Maintenance Contract Basics Webinar July 2010

Performance Evaluation

Monitor your network and report service issues quickly

Pennsylvania Oil and Gas Production Public Reporting Application

EPA s Underground Injection Control Program Overview. Solid Waste Advisory Committee Meeting June 5, 2014

Landed Cost PO This Extended Solution cannot be enabled if Landed Cost is enabled.

Work Order and Inventory Enhancements. Release 5.1

Guide for Teachers & Students Online Web Application

NRRI Colloquium July 11, 2015 Answering Questions about Methane Emissions from the Natural Gas Sector

Analyzing Data with Power BI

Audience Profile The course will likely be attended by SQL Server report creators who are interested in alternative methods of presenting data.

TRAINING OBJECTIVES CURRICULUM SALIENTS

Tubing-Conveyed Perforating Systems

Best Practices for Cementing Job Software

STEP ONE: becoming a videonext reseller

Frequently Asked Questions

Last Updated March 13, IndustriOS Software, Inc.

The recording of losses in the SEEA Central Framework. Carl Obst

User Guide. User Guide to Recurring Billing and Storage. Setting up and using the Recurring Billing system

Contents OVERVIEW... 3

Decision Support System Software Asset Management (SAM)

Salary Transfer and Effort Certification Reporting

ACTIVANT STANPAK. SalesFORCE Proforma Review QicSTART. Version 6.0

WELL RECORD INSTRUCTIONS (Unconventional Operators only)

What's New - Task Planning

Top 10 Best Practices. for Migrating Data from. On-Premise to the Cloud

"Charting the Course... MOC A Retail n Brick and Mortar Stores: Development and Customization for Microsoft Dynamics AX 2012 R2.

MAS90 & MAS200 Order of Closing

Installation and Configuration Assistance PSA Solution

Delphi Supplier Profile Supplier Administrator - E-Learning How To Enter Diversity Spend Data

The latest version of the Locator software and the PC Tools software has changes listed in the Release notes below.

Assessing Your Progress In Building a Unit Safety Program 2016

CA Workload Automation Agent for Micro Focus

At the end of this module, you will be able to:

Sage ERP Accpac Online 5.6

SLIM TIMESHEET INSTRUCTIONS

Price Code Pricing Records by Unit of Measure IM-1168

Presented by: J. Daniel Arthur, P.E., SPEC ALL Consulting. Presented at: 23 rd IPEC Conference November 8-10, 2016 New Orleans, Louisiana

Enterprise etime. Getting Started Participant Guide V.6.1. ADP Time & Labor Management

SUBCHAPTER 8. ADDITIONAL REQUIREMENTS FOR UNDERGROUND INJECTION CONTROL (UIC) PROGRAM

THE HOME DEPOT. Vendor SSR Training Guide

IBM TRIRIGA Application Platform Version 3 Release 4.1. Reporting User Guide

Purchase Order, Requisitions, Inventory Hands On. Workshop: Purchase Order, Requisitions, Inventory Hands On

APPENDIX A STATEMENT OF WORK SCRAP RUBBER/TIRE REMOVAL AND RECYCLING SERVICES

WATER UTILITY WORKER, 3912 WATER UTILITY SUPERVISOR, 3976

Managed System Services Individualized support through proactive system services

Sage MAS 90 and 200 Product Update 2 Delivers Added Value!

Myridas Advanced Inventory Replenishment User Guide

Optimising Cementing. Rev: /04/01. Author: Peter Aird Ref:

Asset Management. Visit us at: or call SCAN

Contents. Manage Prospects and Fundraisers for Major Giving. Prospect Management 1. Overview of Prospect Research Request Management 33

Committed Items for Sales Order SO-1460

Unit4 PSA Suite Business Performance Edition

BI360 Suite and Dynamics CRM

VERITAS Storage Exec Sales, Pricing, and Licensing Guide VERITAS STORAGE EXEC /22/2004 1

KENTUCKY DIVISION OF OIL & GAS KIM COLLINGS, DIRECTOR STATE-BID PLUGGING AND ABATEMENT PROGRAM

Proficiency Testing Program User Guide

HDD Inadvertent Return Assessment, Preparedness, Prevention and Contingency Plan. Pennsylvania Pipeline Project

Microsoft Dynamics GP. Enhanced Intrastat

Retail POS Manual. User Guide - Table of Contents Fall Edition

Keeping Your Customers Out of Trouble October 14, 2014

Engineer To Order (ETO) for Dynamics GP

Microsoft Dynamics GP2010 Inventory Year-End Closing Checklist

How To Set Up and Use SAP ME Complex Assembly

Old Wells or New Wells?

SellWise Year-End Procedures 2016

TimeClick QuickBooks Pro Integration Manual

Solution Whitepaper, Setup and User Guide. TAG Software. A Maintenance Solution (CMMS)

Advanced Well Integrity Management

Solar Eclipse Role Maintenance. Release 9.0.3

Barrier verification and leakage risk. Dave Gardner, IRIS Norwegian Oil and Gas Plug & Abandonment Seminar October 18 th 2017

A PENNSYLVANIA FRAMEWORK OF ACTIONS FOR METHANE REDUCTIONS FROM THE OIL AND GAS SECTOR

How do I Reconcile MCPS Invoices?

Inventory Item Unit Cost by Line in Order Entry SO-1381

DRP Report. Using the ForecastX Wizard The Report Tab: Choosing Your Output

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

I. Project Overview and Limits. Project Goal

New Jersey Department of Environmental Protection. April Division of Water Quality (609)

Transcription:

Mechanical Integrity Assessment Training Pennsylvania Independent Oil and Gas Association November 14, 2013 PADEP: Bureau of Oil and Gas Planning and Program Management Division of Well Plugging and Subsurface Activities Seth Pelepko, P.G. Harry Wise, P.G. Gene Pine, P.G. Stew Beattie

Presentation Outline Introduction to MIA Program Overview and History Module 1: Review of Form A Instructions Definitions Guidance/Best Practices Significant Updates Naming Conventions for Annular Spaces Module 2: Form A Form A Overview Form A Use with Examples Form A 2-Year Example and Data Transfers Form B Overview Form B Use with Examples Form B Data Transfers

FORM B Overview Form B can accommodate up to 6,000 well entries Only compatible with Microsoft Excel versions 2007 or later It contains limited instructions in the form of embedded comments Form B is intended for operators/owners who know what inspection components apply to the different wells in their inventory If they are uncertain, they are advised to download Form A and the instructions and profile their inventory to determine what inspection components are required on a well type-by-well type basis Once they have the inspection components defined for their well inventory, they should be capable of using Form B without much trouble

Form B Overview

Form B Use with Examples Form A is designed to help operators understand how to set up and populate Form B This is accomplished by entering data into the first 9 fields (numbered 1 9) in Form A it may also be necessary to enter one date Use the specified fields on Form A to determine what fields on Form B must be populated with data

Form B Use with Examples In this example, Operator A has reviewed their inventory and determined they have the following well design: 354 four-string gas wells in coal areas producing through a tubing assembly similar to the CATALANO 2H design

CATALANO 2H

Form B Use with Examples In this example, Operator A has reviewed their inventory and determined they have the following well design: 210 three-string gas wells with annular production with the primary production through a tubing assembly and annular gas production inside of the intermediate casing similar to the SWANK 4H design

SWANK 4H

Form B Use with Examples In this example, Operator A has reviewed their inventory and determined they have the following well design: 280 two-string combo wells producing oil through a rod and tubing assembly and annular gas inside of the surface casing and outside of the production string similar to the WELSH NO. 3 design

WELSH NO. 3

Form B Use with Examples In this example, Operator A has reviewed their inventory and determined they have the following well design: 617 combo wells equipped only with freshwater casing only and producing oil through a rod and tubing assembly and gas outside of the tubing and inside the surface casing similar to the COSTELLO NO. 1 design

COSTELLO NO. 1

Important Notes Enter the well design criteria in Form A to profile inventory and determine what parameters need to be measured quarterly for each well design The well type and production information will dictate how to fill out the columns in Sections 13 and 14 of Form B. The number of casing strings in the well design will determine what columns must be completed in Sections 15, 16 and 17 of Form B, JUST LIKE IN FORM A The status of the production annulus (Section 14), must be filled out appropriately on Form B based on actual conditions, unless that annulus is produced If the well is routinely vented, or there are any leaks, Section 18 must be completed on Form B

Main Closing Points: Profile your wells in order to divide them into distinct groups Complete one row in Form A for each distinct group, remembering to enter at least one date for each entry Gray or block out unnecessary cells in Form B based on Form A designs evaluated Use your own software/tools to complete well integrity assessments and copy and paste required well data into Form B prior to submitting annual report to DEP

Form B Data Transfers After all annual inspection data are entered in Form B and validated by the operator/owner, select the button labeled Create Data Summary Sheet for Annual Report to submit to the Department

Thank You Questions? Harry C. Wise, P.G. Licensed Professional Geologist Subsurface Activities Section 717.772.2199 (hwise@pa.gov)