CLIC Civil Engineering, Infrastructure and Siting Working Group, (CEIS) John Osborne Matthew Stuart CERN SMB-SE-FAS

Similar documents
ILC ASIAN DRAFT SCHEDULE

/1

ST IMPLICATIONS IN THE CNGS PROJECT

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics CERN TS DEPARTMENT

Report from the GDE director. Barry Barish Snowmass 14-Aug-05

Finnish Underground Lab

A Member of the Constructor Group STORAGE MACHINES. Increase efficiency and organisation in your warehouse

3D Layout Navigator. The world s first 3D positioning system designed specifically for construction layout.

Radiation Environment and Shielding Design Optimization at MEIC

Finnish Underground Lab

Geothermal Tunnel Linings. Principles of Geothermal Tunnel Linings

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications.

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20.

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Guy Crockford, BE/OP/LHC, CERN

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Status of MedAustron

llilliiiillllllllilllllllllllllllllllllllil CERN AT, (CR, 94'36

UNDERGROUND CHARACTERISATION AND RESEARCH FACILITY ONKALO ANTTI IKONEN, MIA YLÄ-MELLA, TIMO ÄIKÄS POSIVA Oy Olkiluoto, Finland

Prof. Dipl.-Ing. H. Quick Ingenieure und Geologen GmbH provides geotechnical engineering services e. g. for high-rise buildings in Germany and abroad.

Status of ITER Buildings construction and next procurement steps

Assignment I Design of a Marine Outfall

Energy efficiency and saving potential analysis of the high intensity proton accelerator HIPA at PSI

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

4th International Engineering and Construction Conference - July 28, 2006

Pipe Jacking. Progress is built on ideas.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Trenchless Pipeline Crossings

mediatek mediatek Library and archive shelving systems Taking shelving to the next level BC004.03

From Colonia Jardín to Cuatro Vientos

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

San Jacinto National Underground Science Laboratory. Site Visit February 28 March 1, 2001

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

NUMERICAL MODEL FOR PREDICTION OF CRACKS IN CONCRETE STRUCTURES

Metro Montreal Successful operation of a state-of-the-art roadheader ATM 105-ICUTROC competing with drill & blast operation in urban tunnelling

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

TABLE OF CONTENT. Equipment kit Description of the technology Installation of equipment Start of construction...

Palas. Catalogue of Questions and Answers.

UNDERPINNING A CRANE FOUNDATION

Concrete Pipe Jacking

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS

GRP System FX. The «all in one» railway surveying solution

Minimising construction waste through project design

INFRASTRUCTURE TUNNELS

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

Modeling and monitoring of an excavation support using CSM

UNIT III Earthwork Estimation & Reinforcement Estimation

Cut and fill productivity. Operating procedures. Introduction. 1. Approach of the model

Section 5 Roller Chain Drive Components

Procurement timetable - FUT

Technical specification Slipform Paver SP 1600

TBM Selection and Specification

DICTATOR Lift Shaft System

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe

Advantages. - They are quick, clean and. sizes, floor types and construction systems mean the mezzanines can be adapted to meet specific client needs.

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout

Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall

ESECMASE - SHEAR TEST METHOD FOR MASONRY WALLS WITH REALISTIC BOUNDARY CONDITIONS

4D grouting pressure model of a bored tunnel in 3D Tunnel

SUB-SLAB DEPRESSURIZATION SYSTEM DESIGN AND INSTALLATION

TEMPORARY FACILITIES

Com-Tray. Under Floor

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

THE DESIGN OF EXTERNALLY BONDED REINFORCEMENT (EBR) FOR REINFORCED CONCRETE STRUCTURES BY MEANS OF FIBRE REINFORCED POLYMERS (FRP)

Triple Wall and Double Wall Polypropylene Pipe-Joint Infiltration Tests

Economical paving of 4.0-m to 12.0-m wide concrete slabs Slipform Paver SP 1200

Ingula Pumped Storage Scheme: Project Management Case Study

THE COMPANY SYSTEMA STROY

INSTALLATION INSTRUCTIONS

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm

LHC and post-lhc accelerators Engineering challenges Frédérick Bordry 10 th October 2014

Energy & Data Transmission Systems for Underground Applications

DAIMLERCHRYSLER CORPORATION Design Standard Category Code: N/A EASL Requirement: Yes RESTRICTED: Yes

LANDSCAPE RETAINING WALLS

Telecommunication Spaces

THE GROUNDBREAKING TUNNEL

Vest Process Propane Cavern Project, Norway

2012 Results Announcement

ES 3 / 7 / 8000 Interactive Management in Price Labelling

Introduction to Longwall Mining and Subsidence

Instrumentation and Data Management for the Zurich Zimmerberg Railway Tunnel Construction Daniel Naterop Solexperts Ltd.

STATE UNIVERSITY CONSTRUCTION FUND

THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION

PERMEABLE INTERLOCKING PAVERS

Basic Design Considerations for a Laboratory. The Ministry of Health & Family Welfare, under the Drugs & Cosmetics Act, laid down

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

CHAPTER 9 STAIR CASES 9.1 GENERAL FEATURES 9.2 TYPES OF STAIR CASES

The Aizhai Suspension Bridge is

Transcription:

CLIC Civil Engineering, Infrastructure and Siting Working Group, (CEIS) John Osborne Matthew Stuart CERN SMB-SE-FAS 1

CEIS Working Group Civil Engineering, Infrastructure and Siting Core Disciplines: Civil Engineering and Chair J.Osborne Technical Secretary M.Stuart CE Fellow started 1 st March 17 CLIC Link Persons S.Stapnes/D.Schulte/C.Rossi/R.Corsini Cooling and Ventilation CV M.Nonis + Fellow/PJA Electricity EL N.Bellegarde/D.Bozzini Survey SU H.Mainaud Durand Transport & Handling HE I.Ruehl Interaction Region K.Elsener Logistics/lab readiness M. Tiirakari CE Layouts and cross-sections SMB/Civil Engineering Design Office HSE Link Person S.Marsh Schedule K.Foraz ILC Link Persons J.Osborne/A.Yamamoto 2

Mandate for the CLIC Civil Engineering & Infrastructure and Siting (CEIS) Working Group General Objective Develop the existing layouts for the project from a civil engineering and technical infrastructure point of view, and work with the various actors towards a realistic design and project planning as needed for the CLIC Implementation Plan, due 2018-19. Specific responsibilities: Develop new and/or update civil engineering layouts for 380GeV, 1.5TeV and 3TeV machine. Develop new civil engineering layout for 380GeV machine using Klystron technology. Update the tunnel design and layout to accommodate the machine (e.g. ventilation, electricity, survey, controls, safety and handling equipment). Develop a layout for the interaction region. Study environmental aspects of the project and siting preparation. Work together with ILC on areas of synergy. Produce schedule and cost estimates. Consider and update transport, installation and CERN logistics issues for the project. Technical infrastructure and installation scheduling. This group will report to the CLIC Accelerator Steering Committee. Regular meetings are planned for approximately every 6 weeks. Provisional slot is Friday mornings from 9am until 11am. Initial Kick-off meeting took place on Friday 31 March 2017. Ad-hoc meetings as needed on dedicated subjects. Additional experts will be contacted as needed. 3

CDR Updated Plans and Layouts Comments: Most important drawing for costing Tunnel length includes all tunnels (main tunnel, turnarounds etc ) Site length is the amount of land needed to build CLIC Colour Code: 380 GeV Dark Red 1.5 TeV Pink 3 TeV Light Pink BDS Light Blue section. Injection Complex - Green 4

CDR Updated Plans and Layouts Long profile from CDR updated for new energy stages: Laser straight tunnels (unlike horizontal tunnel for ILC) 3 TeV 1.5 TeV 380 GeV Tunnel was rotated to reduce depths Tunnel passes through the Gland depression i.e. same depth as ILC RDR 3TeV machine enters into Limestone rock Water transfer tunnel from lake has been removed 5

CDR Updated Plans and Layouts Plan The second detector hall has been removed. Only one shielding wall now required. A new service cavern has been added and includes a 12m diameter shaft Section Assembly and testing hall required for the detector. 6

Turnaround Region Plan Turnaround Plan: Turnaround region every 878m The size of the facility cavern has increased significantly to host power converter/cv/ EL equipment The lengths of the turnaround loops may need to be increased. 7

Injector Complex Layout Injection Complex Layout: 2.5km drive beam injector building, feasibility study required for transport options within the building. 2500mx30mx9m building the full area of this building is only required for the 3 TeV energy stage. 8

Drive Beam Injector Since the CDR, RF power distribution has been moved out of the 2.5km Klystron and Modulator building: Approximately 10,000m 2 of building space required for 6 substations highlighted below. 9

Drive Beam Injector Section A-A: For 380 GeV a reduced building cross section has been shown: Minimum width possible for reduced cross section is 17m. 10

Drive Beam Injector Section A-A: For 380 GeV a reduced building cross section has been shown: Extension of a further 15m will be required for upgrades. 11

Drive Beam Injector Section A-A: For 380 GeV a reduced building cross section has been shown: Increased Material and installation costs Two cranes will be required for future upgrades (transport options still being studied). 12

Drive Beam Injector Section A-A: For 380 GeV a reduced building cross section has been shown: Initial cost saving due to decreased surface building size by approx. 40% 13

Shaft Layout CDR Shaft Layout: Expected to change a second lift required. Current shafts are 9m in diameter. The depth of the shafts are expected to be less than 300m. 14

M Fire Safety and ventilation Fire doors seal off the section on fire and the two adjacent sectors. M M M Each sector of tunnel shall be a fire compartment with a capable fire resistance of at least 2 hours. Positive pressurization from the ventilation system in adjacent sectors to contrast the smoke pressure. 15

CLIC-Tunnel Optimisation Tool CLIC TOT will allow us to optimise the position, depth, and angle of the tunnels. Using a separate layer CLIC TOT will enable us to optimise the position of the surface Injection complex and relate this to the position of the main tunnel. User inputs and Geological data requirements are to be refined to understand the potential for a machine learning tool that can be used to automatically optimise the position of CLIC based on the user inputs. 16

Data & Functionality Prioritisation Datasets: Rotation of the machine tunnel in both the vertical and horizontal plane in 0.1 degree increments. Task 1 Establish Project Setup and Technical Basis June (mid) Task 2 Data and Functionality Prioritisation June (end) A max gradient of 6%. Task 3 Specifications and TOT-CLIC architecting/wireframing July (mid) Adjustable shaft locations Aiming for one shaft per 5km. A maximum shaft depth of 300m inclined tunnels a possibility if required. Central injection complex input as a separate file. (Concept Stage) Task 4 Data Integration and TOT-CLIC (beta) development July (mid) Task 5 Finalised TOT-CLIC Development Sept (end) Task 6 Troubleshooting and Technical Support - 17

CLIC Study Boundary Study Area Position of CLIC between the Jura and Lake Geneva Jura mountain range. Lake Geneva 18

CLIC Study Boundary Study Area CLIC straddles the France Switzerland border Potential to keep the first energy stage in France. Lake Geneva Border: Dotted red line. 19

CLIC Study Boundary Study Area Two depressions containing complex moraines Gland and Allondon. Could be avoided at lower energy stage. Allondon Gland 20

BIM Tunnel Optimisation Tool (FCC) Streamlines the conventional approach which is broadly linear and manual Max value extracted from early project data Single Source of Data Visual decision aid Clash detection Regional Scale Iterative process and comparison of options 21

Feasibility Study Hydrology Lake Geneva The Rhone L Arve River Aquifers 22

Environmental Considerations Nature reserves Protected wetlands Areas of biological importance 23

Buildings 24

Geothermal Boreholes Water supply pipelines Geothermal drillings 25

User interface Input Parameters 26

User interface Input Parameters 27

User Interface Alignment Profile 28

User Interface - Outputs 29

CERN/KEK Collaboration to develop TOT for ILC Optimisation Many new features added to the tool that can be utilised in CLIC TOT, such as : IP position can be changed. LINAC Rotation/Flip Inclined Access tunnels 30

FCC Cross Section Development Previously updated Large 6.8m tunnel. Transport tunnel located beneath false floor. Increased dimensions of machine components. Original 6m cross sectional design. Two compartments separated by fire protection wall. Small emergency air extraction 31

FCC Cross Section Development New FCC Layout. Extraction located above false ceiling. 32

FCC Cross Section Development New FCC Layout. Air intake located below false floor. 33

FCC Cross Section Development New FCC Layout. Machine dimension reduced from 1500mm to 1480mm. 34

FCC Cross Section Development New FCC Layout. Fire doors section off the tunnel at specified intervals. 35

FCC Cross Section Development New FCC Layout. Extraction located above false ceiling. Air intake located below false floor. Fire doors section off the tunnel at specified intervals. Can these concepts be considered for CLIC? 36

Klystron Single Tunnel - TBM Extraction located above false ceiling 2.6m 2 1.5m TBM Tunnel 10m TBM required to achieve required surface width within tunnel. 3.2m A lot of space below the floor potential to have a services located here. (see example for Tunnel Mont-Sion) 9.9m Backfill from tunnel excavation to be utilised. (see example for Tunnel Mont-Sion) Backfill around Service tunnel Access to be provided at regular intervals 37

Mont-Sion Tunnel (Autoroute, Geneva to Annecy) TBM Tunnel Slightly larger than the CLIC tunnel at a diameter of 12m The example shows the utilisation of space below the road level in Mont-Sion tunnel a similar thing could be done for a single TBM tunnel at the Klystron 380 GeV energy stage. 38

Klystron Single Tunnel - Roadheaders Roadheader Tunnel Single tunnel layout 10m width, similar to the ILC potential for the same space reductions as the TBM tunnel. Crane requirements for klystron module cavern to be determined? What services will be required? (Machine Design is for presentation purposes only and is subject to change) 39

Klystron Single Tunnel - Roadheaders ILC CLIC Comparison (Machine Design is for presentation purposes only and is subject to change) 40

Klystron Single Tunnel - Roadheaders Roadheader Tunnel Must be compatible with TBM drive beam upgrades. 41

Drive Beam Option Main Tunnel Cross Section Main tunnel cross section: Cross section was increased from 4.5m to 5.6m 5.6m is the standard size for European subways Power converter community requested a lot more space => increase diameter of tunnel CV pipes in slab are now isolated from machine by a compressible filler Cable trays are not individually labelled for now Transversal Ventilation no longer compatible with current heat loads. 42

Cooling and Ventilation Ventilation schemes: Original concept was a transversal ventilation system as shown. Extremely high air flow rate required to cool down the modules. Current numbers are much higher with respect to the CDR! CDR numbers omitted the heat loads of the RF components to air (Accelerating structures + RF-loads and PETS 350-410 W/m) Feasibility study for local Cooling system is to be undertaken. 43

Cooling and Ventilation Heat Loads Heat load to air (worst case at one beam): 380 GeV: 1679.249W 472.7W/m 3 TeV: 11,469,708W 537.9W/m Heat Load to water (worst case at one beam): 380 GeV: 8,148,798W 3 TeV: 57,258,415W 44

Summary 380GeV, 1.5TeV and 3TeV machine layouts to be created. Develop new engineering layouts for the 380 GeV Klystron Machine both single and double tunnel layouts 380 GeV Klystron design compatible with energy upgrades. Double tunnel or single tunnel required. New Tunnel Optimisation Tool to be developed specifically for CLIC. Civil Drawings are to be produced by Civil Draughtsmen - new drawings to be produced for the Klystron design and existing drive beam design drawings to be changed. A detailed cost estimate for infrastructure to be produced and work together with ILC on areas of synergy. We are looking forward to the ILC AAA visit at CERN on the 12/13 th July 2017 45

Thank You For Your Attention Thank you to all contributors 46