DISTRICT HEATING IN BITOLA, NOVACI, AND MOGILA STAGE I

Similar documents
DISTRICT HEATING SYSTEMS FROM LIGNITE FIRED POWER PLANTS TEN YEARS EXPERIENCE IN GREECE

LOW-ENTHALPY POWER GENERATION WITH ORC-TURBOGENERATOR THE ALTHEIM PROJECT, UPPER AUSTRIA

CO-GENERATION PLANT KUSHA INDUSTRY CO.

International Conference POWER PLANTS 2010 Vrnjačka Banja, Serbia, October, 2010

Low enthalpy power generation with ORC- Turbogenerator The Altheim Project, Upper Austria

1 st Renewable Energy Technologies, LP. Organic Rankine Cycle

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3

Deliverable 3.a (Combining former deliverables 3.1; 3.2; 3.5)

INCREASE OF THE EFFICIENCY OF THE NEUBRANDENBURG GEOTHERMAL HEATING PLANT THROUGH SURPLUS HEAT STORAGE IN SUMMER

KWK Modellstadt Berlin

CNIM: the approach for WtE market!

SECTOR ASSESSMENT (SUMMARY): ENERGY

New 790-Megawatt Unit. Council Bluffs Energy Center

DH/CHP in EU Smart Energy Cities Wroclaw, of March 2012

University of Illinois Utility Master Plan and Dispatch Model

CO 2 Capture Utilization and Sequestration (CCUS)

The Energy Industry: Structure and Organization. Module 1, Unit B

Nuclear energy development in the Republic of Armenia. IAEA, Amsterdam June

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS

Chapter 9: Applications of the Laws of Thermodynamics

The answer is... yes!

Chapter 2 Energy Produced and Carbon Released from Fossil Fuels and the Amount of Alternative Energy Required as a Replacement

SIMULATION MODEL IN TRNSYS OF A SOLAR HOUSE FROM BRAŞOV, ROMANIA

Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi

ENERGY EFFICIENT SYSTEMS Recover & recycle your waste heat

Perspectives and evolution of reciprocating cogeneration systems. Pasquale Campanile

MEMO 27 June District heating and combined heat and power in China

COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES

Kendall Cogeneration Station

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

Liquefied Natural Gas Conversion Systems for Plant Startup and Shutdown and Natural Gas Curtailment at CT Stations

2016 BioCleantech Forum TURBODEN ORC TECHNOLOGY: STATE-OF-THE-ART. Ilaria Peretti. Manager, Sales and Business Development North America

Cogeneration. Thermal Chillers. and. .. ASHRAE National Capital Chapter. Arlington, VA 10/10/2012

RES - Status Quo, Potential and Prospects Vasileios Tsolakidis, CRES

Module 2: Conventional Power Generation I

Interaction Matrix Method in Hydrogeological Analyses at Coal Mines

The goals for renewable energy share of all energy

Electricity generation, electricity consumption, system integration, production and consumption balance

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

WASTE TO ENERGY (W2E) AS THE MODERN CONCEPT OF WASTE MANAGEMENT

Efficient and Flexible AHAT Gas Turbine System

TECHNICAL INFORMATION ABOUT UNDERGROUND STORAGE RESERVOIRS FOR NATURAL GAS

Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors)

World Energy Sources & Fossil Fuel Power Production. Josh Barnes, Cyrus Hughlett...and Karl. SL/AP Physics Hour 2

Feasibility Study. Solar plant with district heating net (Austria)

Cooperation in the Energy Sector

Conceptual Design of Nuclear CCHP Using Absorption Cycle

Absorption Chillers in Commerce

Chapter Six{ TC "Chapter Six" \l 1 } System Simulation

Integration of low grade heat with district heating

>> TRENDS IN INDUSTRIAL WASTE MANAGEMENT:

Covenant of Mayors: Fuel Switch and Sustainable Demand in signatories from "stress test" countries

Development of 1MW high efficiency gas engine cogeneration system

KEPCO KEPRI Kim eui hwan

Gas-fired efficiency in part-load and pulse operation

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

Doc. CEN/TC 228 N544 CEN/TC 228

COGENERATION THE SMART DECISION! Why and how cogeneration can make your company more profitable and energy efficient?

ANSALDO ENERGIA STEAM TURBINE OPERATION IN FLEXIBLE COMBINED CYCLE. Authors:

Chapter 8. Vapor Power Systems

Siemens Solar Energy. Buenos Aires, November 2011 By Rolf Schumacher R2 Siemens AG All rights reserved

Waste to Energy WTERT, N.Y., October 2008

Your partner for the right solution

Gold Standard Passport CONTENTS

GEOFAR : Innovative geothermal technologies Last modifications: BINARY PLANTS

Investment Opportunities in Energy Sector of Montenegro

PureCycle 200 Heat-to-Electricity Power System

Combination of wind solar plants and district heating power plants

BUILDING FOR THE FUTURE

Innovative Zero-emission Coal Gasification Power Generation Project

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

RWE Power International. Bankable Feasibility Study Thar Lignite Mine Work Progress

Case study : Les Izards - Trois cocus - Toulouse (31) France

Sustainable District Heating in China

BioResHybrids in AUSTRIA

A proposed new gas-fired power station on the Wilton International site

Low temperature cogeneration using waste heat from research reactor as a source for heat pump

CC Repowering WorkStation. Capital Cost Breakdown ( x $1000) for:

HEAT PUMPS FOR HEAT SUPPLY OF INDUSTRIAL ENTERPRISE AND DISTRICT HEATING

VTU Energy concentrates on consultancy and software systems for the power and energy-intensive process industries.

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

Dry Flexicycle power plants a closed loop combined cycle with unique operational flexibility

RENEWABLE HEAT SOURCES: THE BEST AVAILABLE SOLUTION TO DECARBONISE THE HEATING SECTOR

CANADIAN RENEWABLE & CONSERVATION EXPENSE ("CRCE") "CLEAN" ENERGY TAX INCENTIVES MARCH 31, 2016

Overview of cogeneration technology and application

Carrington Power Station

DH Internationally Arto Nuorkivi D.Sc. (Tech) energy.at.nuorkivi.fi

CO 2 free Power Plant Project in Vattenfall Relations to the Dynamis project

DISTRICT HEAT DRIVEN ABSORPTION COOLING OF DISTRICT COOLING PLANTS IN TRONDHEIM, NORWAY

Small Scale DH in Austria. AEBIOM workshop:

COMPLEX PROJECT FOR THE DEVELOPMENT OF BROWN COAL DEPOSITS KARA-KECHE AND MIN- KUSH (AK-ULAK SECTION)

THE USAGE OF LOW POTENTIAL SOURCES OF HEAT FOR PRODUCTION OF ELECTRICITY AND HOT WATER

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION

CFB Combustion Control System for Multiple Fuels

TransPacific Energy Advantage: Case Studies

Eligibility of a Heat Pump Based on the Primary Energy Factor

GEOS / ENST Problem set #Grid Due: Tues. May 18

Development status of the EAGLE Gasification Pilot Plant

Energy Vocabulary. Word Definition Memory Aid the ability to cause an object to 1. energy move, change, or work

The desire for fossil fuel alternatives and environmentally friendly energy has

Transcription:

DISTRICT HEATING IN BITOLA, NOVACI, AND MOGILA STAGE I Prepared by: Development and Investments Department Skopje, 2017 1

INTRODUCTION The introduction of a district heating system for the city of Bitola and its surroundings is an idea that has existed for decades in the past. The idea of introducing a heating system by using the heating energy from REK Bitola may also be seen as a kind of social responsibility of ELEM to the city of Bitola and its surroundings, having in mind the significant impact of REK Bitola on the environment. On the other hand, it is important to note that, when it comes to consumption, the use of heating energy will replace a considerable amount of the electricity, oil and wood that is currently used for heating. The implementation of this project will replace the use of electricity for heating to a great extent, thus increasing the level of safety and security of the electricity distribution grid. In terms of energy efficiency, the heating source of a district heating system with sizeable capacity and equipped with a modern system of regulation and automation of the heating energy generation process has a significant advantage over the individual heating sources used by the consumers. The possibility of heating energy generation was considered as early as in the stage of construction of REK Bitola, i.e. during the stage of its design. In the 1981 1986 period, several studies were conducted to treat the issue: 1. Information on the opportunities for district heating in Bitola Trombev, Mijakovski, Pejchinovski, Volkanovski; 1981 (not available) 2. Technical solution for a district heating system in Bitola Teploenergoproekt Kiev; 1981 (partially available) 3. District heating in Bitola previous studies, SOZT MZT Skopje, organizational unit Goce Radosavljevich, Bitola 1985 4. Investment and technical documentation for district heating in Bitola, SOZT MZT Skopje, organizational unit Goce Radosavljevich, Bitola 1985 (partially available) As part of the program for cleaner and more efficient production, financed by the Government of Norway and implemented by Norsk Energi and the Climate Changes Center, a pre-feasibility study was developed under the title District Heating in Bitola with Heating Energy from REK Bitola in April 2011. In 2012, Ekonerg from Croatia began its work on the Feasibility Study, which provided the main guidelines for the implementation of the project itself. The implementation of the first stage of modernization of REK Bitola s turbines envisages the installation of appropriate equipment for recovery of steam from the turbines, to allow for the generation of heating energy; this is practically the start of realization of the idea. Negotiations with international financial institutions began in 2013, during which interest in financing the project was expressed by KfW Bank. 2

TECHNICAL CHARACTERISTICS Fig. 1 Project location The district heating system foresees generation of heating energy by recovering the steam from turbines 2 and 3 in TPP Bitola. By means of a 12,61 km long hot water transmission line going through arable agricultural land along the settlements of Novaci and Logovardi would supply city of Bitola with heating energy. The climate in Bitola and the surrounding municipalities is basically of a moderate continental nature with pronounced continental elements, dry and hot summers and short, dry and cold winters. The mean annual air temperature is 11.1 C and the lowest projected one is -18 C. Going through the steam-water transformers, the steam recovered from the turbines generates heating energy transported via the hot water transmission line to the primary pump station in the city of Bitola. The heating energy will be distributed to Bitola by a primary and secondary hot water transmission line to the ultimate users. The hot water distribution line (DL) from REK Bitola to the municipality of Bitola will be constructed from two previously isolated pipes with a leakage detection system. The temperature regime of the transmission line is defined at 115/70 0 C (incoming temperature of 115 0 C, return temperature of 70 0 C). As regards the supply of lignite for REK Bitola, this is currently done by exploiting the Suvodol and Brod-Gneotino mines; in addition, coal supply from underlying coal series will begin within recent time period. At the same time there is ongoing development of 3

Main Mining Project for opening the Zhivojno mine, TOR for analysis of possibility for supplaying TPP Bitola with coal from potential deposit Mariovo was prepared and Study for supplying TPP Bitola from the coal reserves in the potential deposit Mariovo is prepared in year 2016. The table below is a summary of the remaining coal reserves to be exploited in the wider area of Bitola; these reserves may be used as fuel for the thermal power plant. Table 1 Remaining exploitable reserves Mine / Deposit Remaining exploitable reserves (December 2016 data) (millions of tons) Suvodol open cut mine 2,4 Suvodol ground coal series 49,9 Brod-Gneotino 22,3 Zhivojno 21 Brod-Gneotino underground mine 40 Mariovo 60 Total 195,7 The above stated quantities of coal have been calculated on the basis of the worst possible scenario, based on the assumptions of maximum errors in the estimates of proven geological reserves; these are the quantities required for 30-35 years of operation of TPP Bitola. In addition to the domestic lignite, ELEM is also considering other possibilities of providing fuel for TPP Bitola, such as: - Imports of high calorie count coal; - Natural gas. It needs to be emphasized that, in line with the long-term development plans of ELEM, it is foreseen that REK Bitola will both in the present and future times be the main pillar of the energy system. This means that the heating energy required for the district heating system will certainly be provided. 4

TECHNICAL DESCRIPTION OF THE PROJECT DISTRICT HEATING SYSTEM FOR BITOLA, MOGILA AND NOVACI STAGE ONE The first stage in the introduction of a district heating system to supply heating energy to the municipalities of Bitola, Novaci, and Mogila using the heating energy from REK Bitola will include the construction of: 1) a heating energy generation system (HS REK) 2) a hot water transmission line (HTL), 3) a primary pump and heating station in Bitola (PPHS), 4) a hot water distribution grid (HDG) in Bitola 5) heating substations (HS) in buildings. The concept of a district heating system is given in the simplified diagram contained in the addition to the Feasibility Study and the general piezometric diagram of pressure drop in Figure 2. Figure 1- General piezometric diagram of pressure drop Heating energy generation system (HS REK Bitola) The heating energy generation system consists of: 1) A system for recovery of steam from the steam turbines at blocks 2 and 3 for the needs of the stage one heat transformers (up to 115 C ) 2) Stage one heat transformers (2 x 50 MW) 3) Pump station (circulation pumps) 4) Pressure maintenance system in the Distric Heating System 5

System steam recovery from steam turbines unit 2 and 3 for stage one To enable them to recover steam from the turbine, unit 2 and 3 at REK Bitola were reconstructed in 2012 and 2013. The reconstruction will allow for regulated recovery of steam for heating the water in the district heating system. Steam recovered from the turbines will be transported via a steam pipeline equipped with control, safety and lock valves. The condensate from the hot water heater is sent back to the turbine ring of each unit mixed with the main (turbine) condensate, and passes through the condensation regeneration system for previous heating. Stage one heat transformers In the first stage, the heat transformers will be located on the plateau (elevation point 0), between unit 2 and 3. To ensure the supply of district heating during this stage, two 50 MW heater transformers will be installed at the hot water station located at REK Bitola. The heat transformers will be classical one, with U pipes and, depending on the accessibility of the area, may be vertical or horizontal. The generation of heating energy by the hot water heat transformers will be controlled by the steam, i.e. by suppressing the steam to maintain the temperature required at the hot water outlet. Table 2 Heat transformers data Basic hot water heat transformers Number of heat transformers 2 х50 MW heating energy generation: 100MW Primary: Secondary: Steam / Condensate Hot water Pressure 1.9 Bar (a) Pressure 10.0 Bar (a) Temperature 205/70 C Temperature 70/115 C Pump station (circulation pumps) The pump station will be located at elevation points -3,60m between unit 2 and 3. At the pump station, there are electromotor pumps with a regulated number of revolutions. This concept allows for energy efficient operation, i.e. reduction in the consumption of electricity, depending on the flow in the system. The system also foresees static pressure maintenance pumps, unless it is a hydraulic regime. Hot water transmission line The hot water transmission line consists of pre-isolated pipes placed directly into the ground. These pre-isolated pipes have a leakage detection system. The starting point of the transmission system is the hot water station, i.e. the heating station HS-REK, with the end point at the primary pump and heating station Bitola (PHS). 6

Local pump and heating stations for the settlements of Novaci, Mogila and Logovardi (LPHS - S) In the first stage of the project, only the connections to the future distribution grids for these settlements will be installed, while the users will be connected following further analyses of the justifiability and according to the specific interests of the users. Primary pump and heating station Bitola (PPHS) The location of the primary pump and heating station is defined in the physical plan at the city entrance, on the crossroad between the streets of Zheleznichka and Cvetan Dimov, on the east side of the railroad. The main purpose of the PPHS is to increase the hot water pressure in the transmission line, in order to achieve the required parameters for circulation through the hot water distribution grid in the city. Hot water distribution grid (HDG) in Bitola The main purpose of the hot water distribution grid is to distribute heating energy to the consumers. The main hot water grid ought to be installed in such a way that it will connect the heating source (or several sources) to the heating energy consumers in the shortest possible way. The urbane, hydrological and other technical conditions for installation of the pipes should be taken into account. The hot water grid is constructed of pre-isolated pipes placed directly into the ground and equipped with a leakage detection system. The temperature regime of the hot water transmission grid is as follows: Incoming temperature 115 C Return temperature 70 C Hot water distribution grid in the settlements of Novaci and Logovardi In the first stage of the project, only the connections to the future distribution grids for these settlements will be installed. Users will be connected following further analyses of the justifiability and according to the specific interests of the users, through heating substations (HS) in the buildings of the end users. Environamental protection and energy efficiency aspects Over the past decades, the city of Bitola has had experiences with a district heating system, which operated using liquid fossil fuel; this, however is not the case today. Both households and public buildings currently use various types of energy for heating purposes: crude oil, household oil, wood, coal and electricity. The implementation of this project will not only improve the comfort of the citizens, but will also reduce the negative impacts on the environment that are present especially in the winter periods. 7

Potential reductions of emissions that would result from the implementation of this project: Table 6. Potential reduction of emissions (t/year) in the city of Bitola (as per the Project Study) Emission source (type NOx SO 2 CO PM CO 2 of heating) Individual (wood) 10.3 2.1 1,237.7 175.3 Central (wood) 48.5 12.1 1,617.5 202.2 Individual (household oil) 0.060 0.343 0.120 0.018 Central (household oil) 47.6 136.3 19 13.1 35,300 Individual (coal) 0.106 0.42 5.3 0.528 3,430 Central (coal) 3.8 11.47 116.6 11.7 Reduction of electricity generation 255.77 999.27 8.93 114.48 98,980 TOTAL 366.2 1,162 3,005.2 517.3 137,800 The implementation of the District Heating System (DHS) will optimize the use of energy resources that would otherwise be used on an individual basis. Once the DHS is implemented / built, energy efficiency of al facilities industrial, individual, commercial and public will be increased. Part of them are connected or will be connected to new DHS and all necessary measures need to be undertaken to comply with the legal norms for consumption of energy/m 2 annually. Calculation of the reduced electricity generation In the process of generation of heating energy by recovery of steam from the turbine, there is a certain loss of the electricity generated due to the heating energy produced. Having in mind the only temperature regime (115/70 0 C) adopted for the Feasibility Study, it has been precisely calculated that the loss of electricity per each 1MW of heating energy is within the range of 0.194 and 0.253MW. Table 4. Costs for lost electricity generation depending on the power factor provided Heating power factor (MW) Lost production at TPP Bitola [MWh el ] electricity Regulated price of electricity [ /MWh] Value of lost production ( ) 60 (base year) 19,200 40.75 782,400 80 *(next year) 25,600 40.75 1,043,200 100** (second year) 32,000 40.75 1,304,000 8

*refers only to the maximum power factor of steam recovered from turbines **refers to the total installed demand of 100 MW for which energy is provided maximum 80 MW from REK Bitola and an additional 20 MW from top boilers INVESTEMENT COSTS EUR % Studies, design, land acquisition 1,900,000 4% Civil engineering works 29,787,800 64% Equipment 9,735,200 21% Consultants 964,000 2% Contingencies 3,950,000 9% TOTAL 46,337,000 100% Activities in progress for the project "District heating in Bitola, Novaci and Mogila" - I phase A loan agreement with a sovereign guarantee with a KfW Bank was signed A contract for consulting services with IC Consulenten Austria has been concluded On 19.06.2017 a tender for LOT 1 was announced on 31st of July 2017, Bids were received for LOT 1 Evaluation of received bids for LOT 1 Preparation of technical specification for LOT 1 (draft version) Preparation of tender for pre-qualification for LOT 2 (draft version) Aprovalof tender documentation for LOT 2 from KfW Contract with Power Machines for nominated subcontractor for LOT 2 Starting a process of expropriation CONCLUSION In addition to the positive financial parameters for the feasibility and acceptability of the project, the positive parameters of the comparative analyzes of the price of the competitive fuels with the competitive fuels from the aspect of environmental protection and energy efficiency, which results in: - Reduction of emissions from combustion of wood, household and coal fuel in small domestic stoves as well as in furnaces of public and commercial buildings, SOx, NOx, CO, etc. ; - Reduction of CO2 emissions at the level of R. Macedonia; - Improving the quality of ambient air; - Improving the quality of the agricultural arable land; - Reduction of noise; - Reduction of negative impacts on natural ecosystems; - Safe and continuous supply of thermal energy; - Reducing the likelihood of possible inadequate treatment of waste oil in the preparation, which is used for heating; - Reduction of respiratory diseases; - Increasing the quality and service of living; - Reducing the consumption of electricity used for heating the premises; - Reduction of losses in distribution of electricity to low voltage and high voltage networks; - Optimization of the energy resources used for heating the premises in individual objects. 9