CLIPPER ESTATES HOMEOWNER S ASSOCIATION DESIGN GUIDELINES
CLIPPER ESTATES DESIGN GUIDELINES FEBRUARY 1995 INTRODUCTION 1 THE DESIGN REVIEW PROCESS 1 Design Review Approval 2 Architectural Submission 2 Landscape Architectural Submission 3 SITE DESIGN 4 Building Setbacks 5-6 Grading and Drainage 7 Driveways and Walkways 8 Walls and Fences 8-9 Landscaping: 9-10 Recommended Plant Materials 11-15 Street scape: 16 Address Numbers 16 Mailboxes 16 Flagpoles 16 Site Amenities: 16 Tennis Courts 16 Pools, Spas and hot Tubs 16 Radio and Television Antenna 17 Bulkheads 17 Site Lighting 18 Security Flood Lighting 18 Basketball Goals 18 Details: Doors 21 Windows 21 Shutters 21 Fascia. Eaves and Soffits 21 Porches 21-22 Steps and Stairs 22 Roofs 22 Materials and Design 23 Dormers 23 Skylights 23 Solar Collectors 23 Chimneys and Slack Vents 23-24 Ancillary Structures: 24 Garages 24 Gazebos 25 Storage Sheds 25 Air Conditioning and Meter Boxes 25 Decks 25 Arbors and Trelliage 25 CONSTRUCTION RESTRICTIONS 26 Operations 26 Site Maintenance: 27 Vacant Lots 27 Construction Site 27 Builders Signs 27 Disposal of Construction Debris 27-28 ARCHITECTURE 18 APPROVAL CHECK LIST 29 Foundations 19 Height, Bulk and Mass 20 Exterior Treatments: 20 Materials 20 Colors 20 APPLICATION FOR APPROVAL 30-31 CLIPPER ESTATES MASTER HOMEOWNERS ASSOCIATION, INC. 1299 Cutter Cove Slidell, LA 70458 Office: (985) 643-9868 Fax: (985) 643-2892
CLIPPER ESTATES MASTER HOA ARCHITECTURAL REVIEW COMMITTEE Application for Approval Revised 02/12/2009 Date: Owner's Name: Address: Home Phone No. Business Phone No. Phase No. Lot No. CHECK ONE Design Review Submittal Changes/Additions ITEMS SUBMITTED FOR APPROVAL New House Modification to Residence Site Work or Grading Fence Landscaping Recreational Facilities Deck/Dock/Bulkhead Other Contractors Name Address Office Phone No. Cell No. Lot Size S.F. Acres SQUARE FOOTAGE BUILDINGS Inside Living Area Garage Area Auxiliary Structure Total Area Covered by Structures Number of Stories (Include accessory buildings, pools, porches, tennis courts, etc.) Height at Highest Point (per height limit regulations) WALLS/FENCES Height Length Materials Finish (paint or colors): Material Color BUILDINGS/DECKS/DOCKS/PATIO COVERS EXTERIOR Material (walls, windows, doors, floors): COLOR SCHEMES STRUCTURES Exterior Walls/Fencing: Trim: Roof Material Color: Windows & Doors:
W ALKWAYS/PATIOS/DRIVEWAYS Concrete with Broom Finish Concrete with Rock Salt Finish Concrete with Exposed Aggregate Finish Stamped Concrete Tiles Wood Deck Brick (note color): Stone (note color): Other Color Schemes/Designs: All other, projects or details, scope of work described: One complete set of working plans which includes plot plans, survey, building floor plans, complete building elevations, grading and improvement plans, and specifications must be filed with this application. Samples of roofing material and exterior color samples must be submitted and approved before use. Additionally, landscape plans (including hardscape and softscape) must be included with the submittal. Signature of Owner Signature of Owner Agent Date Date Date ARCHITECTURAL REVIEW Date Committee Action FEES: $ Application Fee Paid $ Compliance/Damage Deposit Fee Paid FEES: $ Dumpster Fee Paid $ Portable Toilet Fee Paid $ Total Paid toward project RECEIVED BY: Signatures
EFFECTIVE February 2, 2009 ARC APPLICATION FEES NEW CONSTRUCTION HOUSE PLANS: CLIPPER ESTATES PHASES 1-8 All Homes $2,500.00 Deposit $500.00 Fee* = $3,000.00 THE PALMS Single Unit $2,500.00 Deposit $500.00 Fee* = $3,000.00 Double Unit $2,250.00 Per Unit Deposit $450.00 Fee Per Unit* = $2,700.00 Four Plex $2,000.00 Per Unit Deposit $250.00 Fee Per Unit * = $2,250.00 RENOVATIONS/MODIFICATIONS ALL PHASES: Swimming Pools/Recreational -------------- $450.00 ($200.00 review fee; $250.00 refundable deposit) Fence -------------------------------------------- $200.00 ($75.00 review fee; $125.00 refundable deposit) Boathouse/Bulkhead -------------------------- $450.00 ($200.00 review fee; $250.00 refundable deposit) Docks/Decks ----------------------------------- $450.00 ($200.00 review fee; $250.00 refundable deposit) Outdoor Kitchen ------------------------------ $450.00 ($200.00 review fee; $250.00 refundable deposit) Fill/Grade Work ------------------------------- $200.00 ($75.00 review fee; $125.00 refundable deposit) Landscaping ----------------------------------- $200.00 ($75.00 review fee; $125.00 refundable deposit) All Other Reviews ---------------------------- $200.00 ($75.00 review fee; $125.00 refundable deposit) Member is responsible to inform contractor(s): Clipper Estates Subdivision contracts with a specific waste service company and that company, exclusively, shall provide construction debris containers and portable toilets for each construction project as required by Parish Ordinances. This allows the Association the ability to assure that each site be kept clean and orderly. Member is responsible to provide the name of the person responsible for clean up and container management to the Association. When the permit from Parish to begin construction is obtained, contact person must contact the Association to schedule delivery of portable toilet and debris container (985) 643-9868 extension 302. Failure to comply will result in fees and fines applied to the Member above and beyond all other necessary application fees. * Waste Fees: 1. Roll Off Container (dumpster) All Homes $400 for 30 yard container a) Maximum weight inside roll off is 4 tons for haul rate. Overage tons are charged $30.00 per ton. b) Weight must be evenly distributed throughout the roll off. c) Material in roll off must not extend over the top or side. ** Note: Allowance for heavy objects in construction container, such as concrete debris or washout concrete debris; Member must only fill the container halfway with such heavy materials. 2. Portable Toilets All Homes $70.00 per month, serviced once per week ** Compliance Portion of Deposit is refundable so long as project is completed (including landscaping) during project time allowance, and has received final inspection by ARC approval. New Construction: one (1) year from date of ARC approval to begin project letter. Exterior Projects: time set with application begins from date of ARC approval to begin project letter not to exceed six (6) months.