AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

Department of the Army Permit Application

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

U.S. Army Corps of Engineers Permit Application Tips

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

Notice No Closing Date: May 12, 2017

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Port Planning Texas City International Terminal. William L. Allen, PE, SE*; Christopher B. Cornell, PE, SE**; and Dr. Joseph Moseley, PE***

US Army Corps of Engineers and Stream Restoration Permitting

CORPS REGULATORY PROGRAM

US Army Corps of Engineers. Permitting Process. Chad Konickson. Chief, Southwest Section St. Paul District Regulatory Branch.

Galveston Harbor Channel Extension Feasibility Study Houston-Galveston Navigation Channels, Texas

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement

The PHA s desire to develop an implement an EMS was driver by the following factors: Potential to improve environmental performance

Public Notice of Application for Permit

J O I N T P U B L I C N O T I C E

DRAFT GREATER MOOSES TOOTH TWO (GMT2) DEVELOPMENT PROJECT PERMITTEE RESPONSIBLE WETLANDS MITIGATION PLAN NATIONAL PETROLEUM RESERVE-ALASKA

Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill

U.S. Army Corps of Engineers Regulatory Program

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

J O I N T P U B L I C N O T I C E

Technical Memorandum

Environmental Information Worksheet

DECISION DOCUMENT NATIONWIDE PERMIT 12

CHAPTER 7. San Dieguito River Flooding Adaptation

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS

NOTICE OF PREPARATION

Municipal Stormwater Management Planning

Waters of the United States, Including Wetlands. Delineations and USACE Permits. For Harris County Projects

I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

House Select Committee on Strategic Transportation and Long Term Funding Solutions. November 6, 2017

KRISTOPHER J. KRZYSTON, CEI, CEM

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

SOUTHWEST CONNECTICUT RELIABILITY PROJECT

Information for File # PRH

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT San Diego Yacht Club Maintenance Dredging Project

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

(For individual lake and stream classifications in Cook County, refer to Appendix II)

ORM Printer Friendly JD Form

Houston-Galveston Navigation Channels, Texas Galveston Harbor Channel Extension Project

Nationwide Permit General Conditions

APPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Holly Swartz and Jason Shirey

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

5. Name of waterbody(ies) (if applicable & if known) in which work will occur? Harney Flats Canal

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Project sponsors provided a brief presentation on their project(s), followed by comments from the Committee.

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

US Army Corps of Engineers

J O I N T P U B L I C N O T I C E

CITY OF FRIENDSWOOD February 13, 2006 CLEAR CREEK WATERSHED PRELIMINARY NED ALTERNATIVES ANALYSIS

Public Notice ISSUED: August 11, 2015 EXPIRES: September 10, 2015

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

Remaining Wetland Acreage 16,194,500 8,784,200 7,410,300-46%

::no::

Navigating the U.S. Army Corps of Engineers Regulatory Process

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

The regulatory authorities and responsibilities of the Corps of Engineers are based on the following laws:

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico

Dredge Spoils Management for Sustainable Support of U.S. Coast Guard Missions

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

Appendix B. Storm Drain System Data

NEW RIVER INLET CHANNEL REALIGNMENT PROJECT UPDATE NOVEMBER 1, 2012

RECORD OF DECISION I. INTRODUCTION

3 PROJECT DESCRIPTION

Dredge Material Placement Issues

Public Notice of Application for Permit

The Morrow Pacific Project Coyote Island Terminal Barge Loading Dock:

Berths [Everport] Container Terminal Improvements Project Draft EIS/EIR Public Meeting

Project Alignment Appendix A

June 1, Dear Mr. Simpson:

Bayport, Texas August 27, 2012

Waterborne Commerce Statistics Center

COUNTY OF SAN MATEO COYOTE POINT MARINA 2017 MAINTENANCE DREDGING PROJECT COUNTY PROJECT NO. OD432 PROJECT FILE NO. E4953 ADDENDUM NO.

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Chapter 13: Wildlife and Vegetation

COMPARISON OF ALTERNATIVES

SPECIAL PUBLIC NOTICE NATIONWIDE PERMITS FOR ARIZONA

PUBLIC HEARING LOOP 9

Appendix A: Project Characteristics

June 14, 2017, by consultant; September 12, 2017, by USACE staff.

Port Everglades. is South Florida s Powerhouse Port. Presented to American Association of Port Authorities Environment Committee. September 17, 2015

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

Hudson River PCBs Superfund Site

LONG-TERM MANAGEMENT STRATEGY FOR THE PLACEMENT OF DREDGED MATERIAL IN THE SAN FRANCISCO BAY REGION

Transcription:

ALTERNATIVES ANALYSIS LBC SHIP DOCK 5 PROJECT SWG-2016-00832 HARRIS COUNTIES, TEXAS Prepared for: LBC Houston, LP 11666 Port Road Seabrook, Texas 77589 Prepared by: Lloyd Engineering, Inc. 6565 West Loop South, Suite 708 Bellaire, Texas 77401 February 2017

Table of Contents Page Acronyms and Abbreviations... iii 1.0 INTRODUCTION... 1-1 2.0 ALTERNATIVE ANALYSIS METHODOLOGY... 2-2 3.0 ALTERNATIVE SITE ANALYSIS... 3-2 3.1 NO-ACTION/NO-BUILD ALTERNATIVE... 3-2 3.2 ALTERNATIVE SITE A... 3-2 3.3 ALTERNATIVE SITE B... 3-3 3.4 PREFERRED SITE... 3-3 3.5 ALTERNATIVE SITE ANALYSIS SUMMARY... 3-3 4.0 ALTERNATIVE DESIGN ANALYSIS... 4-4 4.1 ALTERNATIVE DESIGN A ORIGINAL DESIGN... 4-4 4.2 PREFERRED DESIGN... 4-5 5.0 ALTERNATIVE SUMMARY... 5-5 6.0 AVOIDANCE AND MINIMIZATION OF ADVERSE EFFECTS TO WATERS OF THE U.S.... 6-1 Tables Table 1 - Alternative Site Analysis for the Ship Dock 5 Project Appendices Appendix A Alternative Analysis Figures Lloyd Engineering, Inc. ii

Acronyms and Abbreviations BMP CY DSU E2EM ihgm LBC LEI MLLW NHD NWI PEM PFO PSS RHA SWG USACE VCU WOUS best management practices cubic yard(s) dock safety unit estuarine intertidal emergent interm hydrogeomorphic LBC Houston, LP Lloyd Engineering, Inc. mean lower low water National Hydrography Dataset National Wetlands Inventory palustrine emergent palustrine forested palustrine scrub-shrub Rivers and Harbors Act Southwest Galveston District U.S. Army Corps of Engineers vessel control unit waters of the U.S. Lloyd Engineering, Inc. iii

1.0 Introduction Lloyd Engineering, Inc. (LEI) on behalf of LBC Houston, LP (LBC) has prepared this alternatives analysis for the proposed Ship Dock 5 project to further justify the preferred site location and design with consideration to environmental impacts and constructability concerns. LBC proposes to construct and operate the Ship Dock 5 project at a site located adjacent to the Bayport Ship Channel, in Harris County, Texas. The proposed project consists of the construction of 1,077 feet of new 72-inch-diameter new bulkhead wall, 215 feet of sheet pile wall, new ship dock, breasting dolphins, and the construction of San Jacinto Junior College campus expansion facilities. Based on current project designs, the proposed project will include dredging 7.738 acres to a depth of -45 feet with a 2 foot over dredge to create the water depths necessary to safely maneuver incoming and outgoing vessels to the newly constructed ship dock. Dredging activities will result in the removal and relocation of approximately 450,000 cubic yards (CY). The proposed ship dock will be 60 feet wide and 90 feet long and will exhibit a 225-foot setback from the limits of the Bayport Ship Channel. The following sections detail the alternatives analysis study completed to support U.S. Army Corps of Engineers (USACE) Permit No. (SWG-2016-00832), as well as methods to be implemented to minimize potential impacts to waters of the U.S. (WOUS) as a result of construction activities. Lloyd Engineering, Inc. 1-1

2.0 Alternative Analysis Methodology During the initial project feasibility study, an exhaustive alternatives analysis was conducted to determine the best project location and design which fulfills project goals and objectives while minimizing environmental impacts to the maximum extent practicable. The following sections provide details as to the alternatives analyzed, their associated impacts, and ability to fulfill project goals and objectives. 3.0 Alternative Site Analysis LBC examined alternative project sites within the geographical area which encompassed the critical elements necessary to fulfill project objectives. The critical elements that were used to determine the preferred project site are listed below. 1. Extent of potential environmental impacts required for site modifications and construction activities. 2. Safety and navigability of incoming and outgoing vessel traffic with consideration to neighboring infrastructure and operations. 3. Overall project site constructability and associated cost. 4. Project site adjacency to existing pipeline and industrial infrastructure. 5. Neighboring land-use and esthetic perception of the proposed project. The described critical elements necessary for the proposed project exist predominantly within highly industrialized corridors adjacent to waterways leading to Galveston Bay. A total of four alternatives were considered including No Action/No Build, Alternative Site A, Alternative Site B, and the Preferred Site. Refer to Appendix A, Figure 1 for a depiction of the locations of the project sites considered as part of the alternative site analysis. 3.1 No-Action/No-Build Alternative The No-Action/No-Build alternative was considered as an alternative. However, the No-Action/No-Build alternative would not fulfill project objectives to offer clients the opportunity to import, export, and store petrochemical products ultimately to be sold on the domestic/international market. Construction of the proposed project would provide the intermodal transportation capabilities necessary to fulfill strategic corporate expansion initiatives and stability within a growing market. 3.2 Alternative Site A Alternative Site A is located in Deer Park in southern Harris County, Texas. Based on a review of the National Wetlands Inventory (NWI), Alternative Site A would require permanent impacts to approximately 0.3 acres of tidally influenced wetlands and approximately 12.9 acres of non-tidally influenced wetlands. In addition, Alternative Site A would require impacts to a tidally influenced tributary that traverses the middle of the project area. Waterbodies located adjacent to Alternative Site A would require extensive dredging to provide sufficient depths necessary to safely navigate vessels to the proposed infrastructure. As such, impacts to oyster resources would likely be required to establish the site conditions required for operations. Additionally, Alternative Site A is not located adjacent to existing infrastructure and therefore would require Lloyd Engineering, Inc. 3-2

the installation of additional infrastructure to efficiently transport products, and thereby resulting in increased and dispersed impacts to WOUS. 3.3 Alternative Site B Alternative Site B is located in Seabrook in southern Harris County, Texas. Alternative Site B is located in between two public recreation areas (El Jardin Beach and Pine Gully Park). As such, there was a high concern regarding the overall esthetic perception of the proposed project due to its adjacency to two major public recreation areas. Construction within the Alternative Site B project area would require permanent impacts to approximately 3.2 acres of tidally influenced wetlands and 6.5 acres of non-tidally influenced wetlands. Additionally, Alternative Site B would require a significant volume of dredged material to be removed and relocated to provide the area necessary to safely navigate both incoming and outgoing vessels to the berth infrastructure. Alternative Site B is not located adjacent to any existing infrastructure and therefore would require the installation of additional product transport and storage facilities necessary to efficiently fulfill project goals and objectives. 3.4 Preferred Site The Preferred Site is located adjacent to the Bayport Turning Basin in southern Harris County, Texas. The Preferred Site is approximately 22.74 acres in size consisting of 7.738 acres of open-water adjacent to the Bayport Turning Basin. Terrestrial portions of the Preferred Site consist of vegetated area located adjacent to existing LBC infrastructure. The Preferred Site is located within an already industrialized area therefore allowing for sufficient access to existing petrochemical infrastructure including pipelines and storage facilities. A formal wetland delineation was conducted within the project limits of the Preferred Site and approximately 2.165 acres of palustrine forested wetlands (PFO), 3.013 acres of palustrine scrub-shrub wetlands (PSS), 0.389 acres of palustrine emergent wetlands (PEM), and 0.138 acres of estuarine intertidal emergent (E2EM) wetlands were identified. Additionally, a functional wetland assessment was conducted using the USACE-Southwestern Galveston District (SWG) interm hydrogeomorphic (ihgm) approach to determine the functional capacity of the wetlands proposed to be impacted as a result of the proposed project. In summary, the wetlands located within the project area were considered low-quality wetlands commonly occurring within the region, and predominantly consisted of monocultures of highly invasive species (Triadica sebifera Chinese tallow). 3.5 Alternative Site Analysis Summary Table 1 provides a summary of the alternative site analysis completed for the proposed project. Based on this review, the Preferred Site was selected as it presented the lowest potential for environmental impacts, low constructability concerns and associated cost, is located adjacent to existing infrastructure, with only medium concern related to neighboring esthetic perception of the proposed project. Lloyd Engineering, Inc. 3-3

Table 1 Alternative Site Analysis for the Ship Dock 5 Project Tidally Influenced Wetland Impacts c Non-Tidally Influenced Wetland Impacts c Adjacent to Existing Infrastructure Neighboring Esthetic Perception Concern Alternative Site Waterbody Impacts d Construction Cost No Action/No Build 0 0 0 N/A N/A N/A Alternative Site A b 12.5 0.3 12.9 No High Low Alternative Site B b 10.3 3.2 6.5 No High High Preferred Site a 7.738 0.138 5.567 Yes Low Medium a Wetland and waterbody counts include NHD, NWI, and field-collected data. b Wetland and waterbody counts include NHD and NWI data. c Total acreage of wetland impacts as a result of the construction and operation of the proposed project. d Total acreage of waterbody impacts as a result of dredging activities and impacts to tributaries within the project area. 4.0 Alternative Design Analysis Once the preferred project site was determined, an alternative design analysis was conducted to determine the optimal project design that would fulfill project goals and objectives while minimizing adverse impacts to the maximum extent practicable. Due to the nature of the proposed project and associated infrastructure, impacts to WOUS are unavoidable. Through collaboration between project engineers and environmental investigators multiple project designs were evaluated based on the designs ability to: 1. Accommodate for the space necessary for the required building and parking lot infrastructure associated with the expansion of the San Jacinto Junior College campus; 2. Provide sufficient access to both newly constructed and existing facilities; 3. Provide sufficient vehicle parking area and terminal equipment staging areas to accommodate for the expansion of existing facilities; 4. Ensure the structural integrity and longevity of constructed infrastructure to minimize the need for future maintenance activities and additional impacts to natural resources, and; The required infrastructure to fulfill the objectives outlined above includes a building to support the San Jacinto Junior College Campus expansion initiatives and adequate parking areas, vessel control unit (VCU) building, dock safety unit (DSU) building, pipe rack, ship dock platform, and sufficient access roads to allow access between the proposed infrastructure and existing neighboring infrastructure. As part of the proposed project, modifications to existing site contours and elevations would be required to bring the project area to a sufficient elevation to ensure structural integrity and longevity of the constructed infrastructure. Two project design configurations were analyzed to determine which fulfilled the above described criteria with minimal impacts to WOUS, including wetlands. 4.1 Alternative Design A Original Design The Original Design consist of modifications to existing project area contours and elevations to land located above the mean lower low water (MLLW) line as well as the discharge of fill material located below the MLLW line. Approximately 1.1 acres of open-water located below the MLLW would be filled behind the proposed bulkhead wall to create the space necessary to accommodate the proposed infrastructure Lloyd Engineering, Inc. 4-4

associated with the Original Design. The Original Design would result in approximately 14.5 acres of permanent impacts to WOUS, including wetlands, as a result of the required modifications to existing site elevations and fill activities within areas located behind the bulkhead wall. Refer to Appendix A, Figure 2 for a depiction of the Original Design for the proposed project. Following conversations with the Houston Piolets, modifications to the original project design were required to ensure the navigational safety for incoming and outgoing vessel traffic as well as on-site and neighboring personnel. As such, LBC revised the proposed project design to what is now recognized as the Preferred Design. 4.2 Preferred Design Through collaboration between project engineers and environmental investigators, the Preferred Design was developed to accommodate for the navigational safety concerns of the Houston Piolets and minimize impacts to WOUS where possible. The preferred design utilizes the minimum space possible to safely construct and operate the proposed infrastructure. The Preferred Design consisted of modifications to the alignment of the proposed bulkhead wall to avoid fill within all areas located below the MLLW. Additionally, the revised alignment provided the space necessary to ensure the safety of on-site and neighboring personnel and ongoing vessel traffic. The Preferred Design would result in approximately 13.44 acres of unavoidable permanent impacts to WOUS as a result of the required modifications to existing elevations to establish site conditions to ensure structural integrity and longevity of the proposed project. Refer to Appendix A, Figure 3 for a depiction of the Preferred Design for the proposed project. 5.0 Alternative Analysis Summary This analysis was completed based on comprehensive knowledge of the requirements to complete a project in this environment. The information was assembled, as requested, to further justify the preferred project site location and design with consideration to environmental impacts and constructability concerns. The preferred project location and design was selected as it presents the lowest potential for environmental impacts, constructability concerns, and hazard to project personnel while accomplishing the project purpose and need. Lloyd Engineering, Inc. 5-5

6.0 Avoidance and Minimization of Adverse Effects to Waters of the U.S. Through collaboration between project engineers and environmental investigators, LBC has minimized impacts to WOUS, including wetlands, through strategic site selection, modifications to project designs, and minimization of the space necessary to fulfill project goals and objectives. Best Management Practices (BMPs) will be utilized to minimize the potential for temporary impacts to waters of the U.S. to the greatest extent practicable during construction and dredging activities. The excavation and temporary side casting of material will be completed using BMPs. As such, material temporarily side-cast will be placed at nearby locations of the highest elevation practicable to prevent potential adverse effects as a result of the proposed construction activities. LBC has made every effort to prevent the development of multiple sites which reduces operational efficiencies, requires the installation of additional infrastructure (i.e. pipelines; storage facilities), and results in increased and dispersed impacts to WOUS and fragmentation of natural resources. For impacts to WOUS that cannot be avoided, LBC is proposing compensatory mitigation through a permittee-responsible mitigation project. Lloyd Engineering, Inc.

Appendix A Alternatives Analysis Figures Lloyd Engineering, Inc.

N ALT. A ALT. B ALTERNATIVE SITE ANALYSIS MAP FIGURE 1

FIGURE 2 ALTERNATIVE - A - ORIGINAL DESIGN N

FIGURE 3 PREFERRED ALTERNATIVE N