Building Standards Review Process Changes for Designs beyond the Scope of Part 9 (Rev: Feb. 26, 2018)

Similar documents
Structural. Professional Engineers Ontario

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

Practice Note 16: Professional Design and Field Review By Supporting Registered Professionals

The Uniform Building and Accessibility Standards Regulations

DETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient,

NC Department of Insurance Office of the State Fire Marshal - Engineering Division 1202 Mail Service Center, Raleigh, NC

Quality Control and Quality Assurance for Installation of Steel Deck

SECTION PLATE CONNECTED WOOD TRUSSES

Individual Truss Marking Is it a Building Code Requirement?

Structural Requirements

Evaluation Report CCMC R LP SolidStart LVL

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

BUILDING PERMIT GUIDELINES - RESIDENTIAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

Power JoIst ADI-40, ADI-60, ADI-80 I-joists

TECO Certified Rim Board in Fire-Rated Assemblies TER No

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

BUILDING PERMIT APPLICATION PACKAGE

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

TABLE OF CONTENTS LIST OF APPENDICES ABBREVIATIONS 1.0 DEFINITIONS PURPOSE AND SCOPE GUIDELINES FOR PRACTICE 5

Truss Repair and Modifications. Overview Revised 4/7/2017

PIKES PEAK REGIONAL BUILDING DEPARTMENT

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP FABRICATED WOOD TRUSSES REPORT HOLDER: BARRETTE STRUCTURAL DISTRIBUTION, INC.

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES

A homeowners/applicants guide to understanding and making application for a building permit.

Course Information. Title: Modular Building Foundations Advanced Module

City of Tacoma Planning and Development Services

COFS Mission. AISI Standards Hierarchy. North American Standards for Cold-Formed Steel Framing. Member versus System Design. Specification 10/21/2016

General Requirements Yes N/A 1. Is the designer qualified for the proposed work?

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

2

The Construction Industry Labour Relations Act, 1992

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP FABRICATED WOOD TRUSSES REPORT HOLDER: BARRETTE STRUCTURAL DISTRIBUTION, INC.

Modular Wood Framing Goes Vertical

SECTION QUALITY REQUIREMENTS

Standards for Testing and Rating Shoring Equipment

Floor Truss Ribbon Board Load Path

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Basement Renovation Guide For Residential Dwellings

Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses. Educational Overview

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

November 12, The Law of Islamic Republic of Afghanistan Draft Law on Industrial Designs

Minimum Standards for Building Occupancy. Safety Resources

Last Updated March 15, 2016

INSPECTION SYSTEM REQUIREMENTS

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

The following materials and documents are required in order for you to obtain a Building Permit:

Chapter 1: Application and Administration

Practice Bulletin No

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

OUR STRENGTH IS BUILDING. FOUNDATION TO LOCK-UP FASTER. BROUGHT TO YOU BY:

Attachment of Residential Deck Ledger to Metal Plate Connected Wood Truss Floor Systems

Facilities Planning and Construction (FP&C)

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

INVITATION TO BID CITY OF HOPKINSVILLE

Airport FAP Application Guide v18.0

District of Barriere A GUIDE TO BUILDING PERMITS

Bulletin 90: Minimum Scope of Architectural Services

INSPECTION GUIDELINES: STRUCTURAL INSULATED PANELS (SIPs)

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

BUILDING CODES & DESIGN CRITERIA

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

and File No. T CONSENT ORDER

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

June 18, 2008 TO: BUILDING CODE USERS

What Should Constitute a Truss Submittal Package?

Administrative Changes

PURCHASING DEPARTMENT

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

The designer shall also submit additional information required by the University as described and underlined below.

Public Procurement Act

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

NOVA SCOTIA BUILDING CODE REGULATIONS BUILDING CODE ACT

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

Questions and Answers Questions et réponses

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL

Project Address: Name of Person Completing Form:

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Practice Advisory 14. Long span steel roof trusses: welding and section checks needed for some

FRP Floor Panels Standard Specification

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR DECKS

R CODE CHANGE PROPOSAL FORM (See instructions on page 2)

This document also describes the basis on which building permit fees should be calculated.

AS Residential timber-framed construction Part 2: Non-Cyclonic Areas

STRUCTURAL TESTS AND SPECIAL INSPECTIONS

OVERVIEW OF THE AMENDMENTS TO PART II OF THE CANADA LABOUR CODE

Transcription:

Building Standards Review Process Changes for Designs beyond the Scope of Part 9 (Rev: Feb. 26, 2018) The Building Standards Branch is making a change to the building permit application review process for products or components outside the scope of Part 9 of the National Building Code (NBC). Products or components outside the scope of Part 9 must be designed and sealed by a professional engineer or architect. Examples include floor/roof trusses, dimensional components with non-uniform loads, and engineered wood products such as i-joists, laminated veneer lumber (LVL), and laminated strand lumber (LSL). The change demonstrates compliance with the Uniform Building and Accessibility Standards Act (UBAS Act) and the National Building Code (NBC) and helps to ensure the construction of safe, healthy and habitable buildings. This information package focuses on the process for floor/roof trusses; however, the process extends to any product or component outside the scope of Part 9. The review process provides direction on: a) what documentation must be submitted to the Building Standards Branch and when; b) information that must be onsite when inspections occur; and c) documents that will remain on file with Building Standards. A complete process outline along with sample documents is provided further in this information package. Extensive consultation and communication with a working group of three manufacturers and five builders put together by the Regina & Region Home Builders Association (RRHBA) in collaboration with the City of Regina has occurred, and June 1, 2018 has been designated as the effective date for this new process. Frequently Asked Questions Why is the review process changing? The City is changing its process to address industry concerns, ensure consistency across projects, align with industry best practices, provide a clear mechanism for owners to show adherence to the UBAS Act, the NBC and bylaw requirements, and the City to demonstrate due diligence in administering and enforcing the UBAS Act and the NBC. Why change the process right now? The City retained the services of a consultant to analyze the current state of the truss review process, review the proposal submitted by industry and provide recommendations. The new review procedure results from the consultant s report and a review of best practices in similar jurisdictions. The City is Page 1 P: (306)777-7551 F: (306) 546-6023

working with stakeholders over the winter season to finalize the new process in preparation for implementation during the 2018 construction season. This review process will extend to any product or component outside the scope of Part 9 of the NBC. What is the new process? The new review process for products and components beyond the scope of Part 9 is displayed below, and a larger version is provided at the end of this document. Please note that the City of Regina will be implementing software within the next year that allows permits and documentation to be applied for and submitted through the customer portal. The process below will remain, but communication and document submissions will be performed through the software upon its implementation. Note: A larger process diagram and examples of a roof truss layout and floor truss layout are included at the end of this document. Who will be responsible to submit the documentation? The owner/builder will be responsible to submit all required documentation to the City of Regina. The owner/builder will obtain all required documentation from the professional designer and will submit the documentation for permit application and subsequent submissions. Page 2 P: (306)777-7551 F: (306) 546-6023

Will I need to submit shop drawings for floor/roof trusses at time of permit application? It will be your decision. The minimum amount of truss documentation required at permit application are the unstamped floor/roof truss layouts. You may choose to submit the full set of stamped floor/roof truss shop drawings with the layout(s) at permit application as well. What will happen if the floor/roof truss layouts are not provided with the building permit application? If the unstamped layouts are not provided with the building permit application, the permit application will be rejected. When will I be required to submit the stamped design drawings? Stamped designs for all products or components outside the scope of Part 9 will be required before the framing inspection can be conducted. Inspectors will confirm that they have the required stamped designs prior to finalizing the requested inspection. Note: Stamped foundation designs and stamped tall wall designs will continue to be required at permit application. How can the stamped designs be submitted? Stamped designs must be emailed by the owner/builder only to buildingdocs@regina.ca before the framing inspection can occur. The subject line of the email shall include the address and permit number and the phrase Stamped Designs for clarification. Inspectors will confirm that they have the required stamped designs prior to finalizing the requested inspection. Note: the City of Regina will be implementing software within the next year that allows permits and documentation to be applied for and submitted through the customer portal. This process will remain, but communication and document submissions will be performed through the software upon its implementation. Why does the City require the stamped designs to be emailed in by the owner/builder and not the manufacturer? As the owner/builder is the one calling for the framing inspection, It is the owner/builder s responsibility to ensure that the documents are handed in to the City prior to requesting the framing inspection. Framing inspection will be refused by the Building Official should the City not have record of being in receipt of the appropriate documents. The inspection will have to be re-booked by the applicant. Page 3 P: (306)777-7551 F: (306) 546-6023

How can revisions be submitted? Revisions must be emailed by the owner/builder to buildingdocs@regina.ca. The subject line of the email shall include the address and permit number and the word Revisions for clarification. Revisions shall be bubbled in red. Revisions must also be provided on site. Revisions will require additional review and may cause delays. It is the responsibility of the owner/builder to provide the revisions in enough time for the City to review the changes to the NBC and the construction drawings. Should the revisions of these documents require new construction drawings, it is the owner/builder s responsibility to remit these at the same time as the revisions to the stamped designs. Note: the City of Regina will be implementing software within the next year that allows permits and documentation to be applied for and submitted through the customer portal. This process will remain, but communication and document submissions will be performed through the software upon its implementation. What will happen if the stamped designs are not provided prior to the framing inspection? If the proper documentation is not provided, as required for the framing inspection to occur, the inspection will not be conducted and a re-inspection must be booked by the applicant. A re-inspection fee may be charged. Work cannot continue until the framing inspection is completed. How does this change benefit me? As a customer, this change will result in: 1. A simplified and consistent process for each project and customer: Stamped shop drawings will NOT be required at the time of permit application. Rather, unstamped layout(s) will be the minimum amount of truss documentation required when applying for a permit. This will simplify the documentation required at the time of permit application and allow final design and analysis of truss systems to be performed just prior to fabrication. 2. Clear requirements from permit application to file closeout, reducing confusion and delays with the review and inspection of floor and roof trusses, and other products and components beyond the scope of Part 9. Adequate detail will be available during the plan review stage, as well as during inspections. This will ensure that both the owner and City of Regina are meeting the requirements of The UBAS Act and the NBC. 3. Faster turn-around times with fewer permit applications placed on hold. 4. Demonstrates conformance to the UBAS Act and the NBC. Page 4 P: (306)777-7551 F: (306) 546-6023

Why is the City of Regina focusing on the process for evaluating trusses? What about other engineered products? Structural designs that are beyond the scope of Part 9 of Division B of the National Building Code are required to be designed in accordance with Part 4 of Division B. This includes trusses, engineered wood products such as i-joists, laminated veneer lumber (LVL), and laminated strand lumber (LSL), engineered beams, engineered joists, lintels supporting non-uniform loads, and lintels not covered by the span tables. Products designed in accordance with Part 4 of Division B must be designed by a professional engineer or architect skilled in the work concerned, and the design shall bear the authorized professional seal and signature of the designer. The City has been working with stakeholders to identify a process that works for trusses and any product or component outside the scope of Part 9. However, please note that stamped foundation designs, and stamped tall wall designs will continue to be required at permit application. Who is responsible for the design of connections to supporting members or for products that are not being provided by the truss manufacturer? This is a question between the truss designer and the client. The information is required to be on either the architectural drawings or the truss shop drawings, but it will be up to the truss designer and the client to determine who takes responsibility for and provides that portion of the design. Who is responsible for the dropped bottom chord details on plans where trusses are to be designed to support the load from the foundation, but the load from the foundation has not been provided? This must be worked out between the truss designer and the foundation designer, but shall be coordinated by the owner/builder. What about modifications or repairs to trusses performed on site? Any deviation from plans requires documentation to be submitted to the City of Regina. Repairs to engineered products are required to be engineered. Therefore stamped documentation from a professional designer is required to show that the repair will perform as well as the original design. The owner/builder is required to obtain and submit all documentation to the City of Regina. What is the process for site-framed portions? There are times when a set of plans shows something that cannot be done with trusses, so it is noted that it must be stick-framed on site. The site framed portions can be covered under Part 9 of the NBC. Therefore, it does not have to be engineered but must be shown either on the architectural drawings and sized by the designer or it must be included with the truss plans. Either the truss designer or the owner/builder must provide the information for the site-framed portions. Page 5 P: (306)777-7551 F: (306) 546-6023

Can stamped layouts be used in lieu of stamped shop drawings? If specific products or components are provided on a sealed layout with sufficient design detail provided, this seal can cover the designs for those components. It must be clearly noted what designs the seal is applied to on the layout. Stamped shop drawings for the trusses will still be required, but certain components (eg. LVL lintels, beams, etc.) may be sealed on the layout when sufficient design detail is provided on the layout for that component. It is important to remember that all structural designs that are beyond the scope of Part 9 of Division B of the National Building Code are required to be designed in accordance with Part 4 of Division B. This requires a design professional skilled in the work to carry out the design, and the design shall bear the authorized professional seal and signature of the designer. The City of Regina must receive sealed designs for all products or components beyond the scope of Part 9 either at permit application (green path), or prior to framing inspection if only layouts are provided at permit application (blue path). Stamped foundation designs, and stamped tall wall designs will continue to be required at permit application. What is the targeted start date for this change? The City will implement this change starting June 1, 2018. However, from April 1 to May 31, 2018 stakeholders will have the opportunity to voluntarily adapt to the new process prior to full implementation on June 1, 2018. Note: the City of Regina will be implementing software within the next year that allows permits and documentation to be applied for and submitted through the customer portal. This process will remain, but communication and document submissions will be performed through the software upon its implementation. Page 6 P: (306)777-7551 F: (306) 546-6023

UBAS Act, UBAS Regulations and NBC 2010 Supporting Documentation Subsection 4(1) of the UBAS Act: Administration by local authority 4(1) Subject to the other provisions of this section, each local authority shall administer and enforce this Act, the regulations and orders and decisions of the appeal board pursuant to sections 12 and 18. Subsection 7(1) of the UBAS Act: Application of Part 7(1) Subject to subsections (2) and (3), the owner of each building in Saskatchewan shall ensure that the building is designed, constructed, erected, placed, altered, repaired, renovated, demolished, relocated, removed, used or occupied in accordance with the building standards Subsection 3(1) of the UBAS Regulations: Code 3(1) The National Building Code of Canada 2010, with the amendments set out in the Appendix to these regulations incorporated into it, is declared to be in force except for clause d) of sentence 3.1.2.5(2) of Division B. Section 4 of the UBAS Regulations: No relief of obligation to comply with Code 4 An owner of a building or an owner s contractor or employee is not relieved from the obligation to carry out any work that is within the scope of sections 7 and 10 of the Act in accordance with the Code by reason only of: (a) the granting of a permit; (b) the review of drawings and specifications; (c) the making of inspections; or (d) the absence or omission of any of the things mentioned in clauses (a) to (c). Division B, Sentence 9.23.14.11.(2) of NBC 2010: 2) The joint connections used in trusses described in Sentence (1) shall be designed in conformance with the requirements in Subsection 4.3.1. (See Appendix A.) Division B, A-9.23.14.11.(2) of NBC 2010: A-9.23.14.11.(2) Wood Roof Truss Connections. Sentence 9.23.14.11.(2) requires that the connections used in wood roof trusses be designed in conformance with Subsection 4.3.1. and Sentence 2.2.1.2.(1) of Division C, which applies to all of Part 4, requires that the designer be a professional engineer or architect skilled in the work concerned. This has the effect of requiring that the trusses themselves be designed by professional engineers or architects. Although this is a departure from the usual practice in Part 9, it is appropriate, since wood roof trusses are complex structures which depend on a number of components (chord members, web members, cross-bracing, connectors) working together to function safely. This complexity precludes the standardization of truss design into tables comprehensive enough to satisfy the variety of roof designs required by the housing industry. Page 7 P: (306)777-7551 F: (306) 546-6023

Subsection 8(2) of the UBAS Regulations: (2) An owner who undertakes to construct or have constructed a building with a structure within the scope of Part 4 of the Code shall have an architect or engineer complete: (a) the design or design review of the structure; (b) an inspection of construction of the structure to ensure compliance with the design; and (c) the reviews required by the Code. Division C, Sentence 2.2.1.2.(1) of NBC 2010: 2.2.1.2. Structural Design 1) For design carried out in accordance with Part 4 of Division B, the designer shall be a professional engineer or architect skilled in the work concerned. (See Appendix A.) Division C, Sentence 2.2.4.2.(1) of NBC 2010: 2.2.4.2. Professional Seal and Signature of Designer 1) Structural drawings and related documents submitted with the application to build shall be dated and shall bear the authorized professional seal and signature of the designer as defined in Sentence 2.2.1.2.(1). Division C, Sentence 2.2.7.2.(1) of NBC 2010: 2.2.7.2. Review of Construction 1) The designer or another suitably qualified person shall review the construction of any building or part thereof to determine conformance with the design. Division C, Sentence 2.2.7.3.(1) of NBC 2010: 2.2.7.3. Review of Shop Drawings 1) The designer or another suitably qualified person shall review all shop drawings and other related documents relevant to the design to determine conformance with the design. Page 8 P: (306)777-7551 F: (306) 546-6023

Process Diagram Page 9 P: (306)777-7551 F: (306) 546-6023

Page 10 P: (306)777-7551 F: (306) 546-6023

Page 11 P: (306)777-7551 F: (306) 546-6023