City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting

Similar documents
Appendix H: Construction Impacts H-5 Dredged Materials Management Alternatives Analysis

Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill

RESTORATION OF THE NORTHERN TIP OF MON LOUIS ISLAND Mobile Bay National Estuary Program. Fowl River WMP Steering Committee May 19, 2015

CHAPTER 7. San Dieguito River Flooding Adaptation

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites

Dredging and Dredged Material Disposal Overview

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Hudson River PCBs Superfund Site

FINAL SANTA CRUZ HARBOR DREDGE MANAGEMENT PLAN. Prepared for MONTEREY BAY NATIONAL MARINE SANCTUARY

Introduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011

J O I N T P U B L I C N O T I C E

1-6 CORDOVA HARBOR, ALASKA (CWIS NO ) (CWIS NO ) (CWIS NO ) Condition of Improvement 30 September 2011

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment

Dredge Spoils Management for Sustainable Support of U.S. Coast Guard Missions

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment

CONSERVATION & COASTAL MANAGEMENT

CORPS REGULATORY PROGRAM

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

Request for Proposal Subsurface Soil Investigation

The Port of New York and New Jersey. The Environment

CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS

CONFINED DISPOSAL FACILITIES (CDFS): GREAT LAKES EXPERIENCE. J. Miller

Department of the Army Permit Application

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Testing and Evaluation for Upland Placement of Dredged Material

3.0 CUMULATIVE PROJECTS SCENARIO

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

REUSE OF DREDGED SEDIMENTS

Great Lakes Perspective Sediment Choreography

Marine Fueling Facility Program Update Advisory

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

SEATTLE DISTRICT CIVIL WORKS PROGRAM

US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition

U.S. Army Corps of Engineers Mobile District

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

CEMVR-OD-P Joint Public Notice. Illinois Environmental Protection Agency

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

The following answers are provided in response to questions received.

Coastal Resilience Grant Program

Alaska Deep-Draft Arctic Ports Navigation Feasibility Study. U.S. Army Corps of Engineers Bruce Sexauer P.E. Chief of Planning, Alaska District

A Case Study of Brownfields Redevelopment Recycling Old Contaminated Sites

Estuary Adventures. Background. Objective

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE

Oregon Department of State Lands. Protecting Natural and Fiscal Resources to Support Schools

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL

Greenfield Pond B Rehabilitation

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

Habitat Grant Projects Clinton River Watershed

Ports of Long Beach and Los Angele Summary of Key Water and Sediment Quality Programs & Projects. Common and/or Joint POLB/POLA Programs & Projects

Maryland s Living Shorelines Program. Bhaskaran Subramanian February 27, 2015

Harbour Improvements. St. Lunaire, NL. Environmental Registration Document

INCORPORATING AQUATIC HABITAT RESTORATION/MITIGATION INTO DREDGING PROJECTS

General Authorization

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

PUBLIC SCOPING MEETING AGENDA

3.8 LAND USE Introduction Environmental Setting

Peninsula Harbour. Area of Concern Status of Beneficial Use Impairments September 2010

KRISTOPHER J. KRZYSTON, CEI, CEM

USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

Closure Plan Ash Disposal Area PGE Boardman Power Plant

OUR GOAL IS TO PREVENT SPILLS ENTIRELY

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA

Risk Assessment Needs for Land Management Decisions at Cherry Point, Whatcom County, Washington

A Story of Revitalization Onondaga Lake Dredging, Capping, and Habitat Restoration Project, Syracuse, New York

PRENTISS CREEK (SUB-E) KENSINGTON PLACE CONCEPT PLAN VILLAGE OF DOWNERS GROVE, ILLINOIS AUGUST, 2011

Construction of Offshore Stormwater Discharges using HDD Technologies

SECTION 11: REGULATORY FLOODWAYS

Less than 8 feet finished water depth. 4-Foot Cap 3-Foot Cap Foot Cap. 4 Ft

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

A Salt Marsh Advancement Zone Assessment of West Haven, Connecticut

Dredge and Fill Standards on the Highland Lakes

Regional Sediment Management: Background and Overview of Initial Implementation

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form

Economics of Implementing Two-stage Channels

Port Planning Texas City International Terminal. William L. Allen, PE, SE*; Christopher B. Cornell, PE, SE**; and Dr. Joseph Moseley, PE***

THE BENEFITS OF MECHANICAL DEWATERING: CASE STUDY OF MACHADO LAKE ECOSYSTEM REHABILTATION PROJECT IN LOS ANGELES, CALIFORNIA

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

Cass County Soil Erosion & Sedimentation Control Program

Municipal Infrastructure

Memorandum. California public trust law governs the administration of tidelands and submerged lands in several ways:

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

Public Notice 30 DAY PUBLIC NOTICE

The regulatory authorities and responsibilities of the Corps of Engineers are based on the following laws:

Appendix A: Project Characteristics

Environmental Information Worksheet

15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.

EBC 11 th Annual Dredging Conference Beneficial Use of Dredged Material. Friday, October 27, Battelle Norwell, Massachusetts AGENDA

HEIDI J. CLARK, PH.D.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

ROTAWN ENERGY AND LOGISTICS DREDGING PROFILE

Public Notice: Wetland/Waterway/Water Quality Regulations

Transcription:

City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting

Total Estimated Dredge Material required for North to South of the City 500,000 Cubic Yards of Dredge Material Includes: North to South of the City, channels and private boat slips

Why Dredging? (Snug Harbor - Pictured)

Why Dredging? (Continued)

Background Dredging in the Past Going back to the creation of the current lagoons, there were no rules and/or regulations for dredging. Most of the lagoons were created by dredging and the material dredged was used as fill to create the current uplands. Prior to current rules and regulations, the City owned a dredge for maintaining back bays and lagoons and pumped the material onto the north end beaches. In the 1970s, regulations prevented this from continuing.

Background Dredging in the Past (Continued) Currently, rules and regulations require dredge materials from lagoons/back bays to be stored in a Contained Disposal Facility (CDF). The City owns 4 sites, 2 in the very deep south end, one near 34 th Street (Site 83) and one under Route 52 Causeway (Route 52 CDF). Maintenance dredging mainly utilized Site 83 due to its size and location and the fact that it already existed. City dredging projects occurred about every 7-10 years.

Dredging Since 2000s 2002 to 2003 - Mobile Dredging and Pumping Company Clubhouse Lagoon South Harbor Sunny Harbor Venetian Bayou Carnival Bayou Total Cubic Yards 28,770 Cubic Yards 51,605 Cubic Yards 23,960 Cubic Yards 18,195 Cubic Yards 28,490 Cubic Yards 151,020 Cubic Yards Total Cost $1,499,093.22 Note: Dredge Material to Site 83

Dredging Since 2000s (Continued) 2005 - Mobile Dredging and Pumping Company Northpoint Lagoon 16,750 Cubic Yards Total Cost $488,244.00 Note: Dredge Material to Egg Harbor Township Site Currently Full

Dredging Since 2000s (Continued) 2012 to 2014 Hydro-Marine Construction Company Clubhouse Lagoon, Approximately 65,000 Bluefish Lagoon, Cubic Yards South Harbor, Sunny Harbor, and a Portion of Venetian Bayou Total Cost $1,832,667.71

Dredging Since 2000s (Continued) The last dredging contract for the lagoons/back bays was awarded to Hydro Marine and was permitted and designed by Duffield Associates in 2010-2014. The contract was cut short due to a lack of available volume at Site 83 and anywhere else. There were also other issues at Site 83. The last contract left about 44,000 cubic yards of material un-dredged near West 16 th Street and about 16,000 cubic yards in Snug Harbor. It is likely that these volumes have increased as they represent pre-sandy estimates.

Condo Associations/Private Areas

Dredging Sites Site 83 250,000 Cu. Yd. Capacity (Approximately 13 acre site)

Site 83 Ongoing Work

Route 52 7,000 Cu. Yd. Capacity (Less than 1 acre site) Dredging Sites (Continued - Route 52)

Lagoon/Back Bay Sites: (Listed in order from North to South) Northpoint Lagoon City of Ocean City Snug Harbor Snug Harbor Association Glen Cove City of Ocean City Carnival Bayou State of NJ Venetian Bayou State of NJ Sunny Harbor City of Ocean City South Harbor City of Ocean City (Including: Marcus, Tonga, Midway, Salvador, Cayman, Verde, and Pitcairn) Bluefish Lagoon City of Ocean City Clubhouse Lagoon City of Ocean City Waterview Blvd. City of Ocean City

North End to 3 rd Street/Northpoint Lagoon/Marine Village Harbor/Navigable Route

3 rd to 8 th Street/Bay Front Condos/ Navigable Route

Glen Cove/Snug Harbor/ Navigable Route Snug Harbor Glen Cove

Carnival Bayou & Venetian Bayou (16 th to 18 th Streets)

Sunny & South Harbor/ Navigable Route

Clubhouse Lagoon/Bluefish Lagoon Bluefish Lagoon Site 83

Waterview Boulevard

Preparing for Dredging The following funds were part of the 2015-2019 adopted Capital Plan for dredging: Year Budgeted 2015 $5,000,000 2016 $3,000,000 2017 $1,000,000 2018 $1,000,000 Total $10,000,000 Total Capital Plan 2015-2019 = $79,616,300 Dredging makes up approximately 12.6% of the entire 5 Year Capital Plan and is the largest financial commitment the City has ever made towards dredging.

Current Activity Contracts in Place Surveying/Permitting: $24,460 Sampling/Testing/ Reporting: $426,778 $154,095. 96 (spent to date) $272,682.04 (available) Tipping Fee at Disposal Site: $500,000 Site 83 - Material Removal: $2,689,000 Total = $3,640,238

Material to be Removed Site 83: 50,000 cubic yards of dredge material (Under current contract) Note: Total estimated material North to South of the City excluding channels and private boat slips is approximately 300,000 cubic yards. If private boat slips are included the estimate could realistically approach 500,000 cubic yards.

Testing There are 3 levels of testing to allow the material to be moved and used as a beneficial reuse material: Commercial grade least stringent. Residential grade typically required for most uses. This level is required for use in Wildwood. Sub Aqueous (Underwater) grade most stringent, used for wetlands enhancement projects.

Testing (Continued) Testing is required in two phases: 1. The material must be tested prior to dredging; and 2. The material must be tested prior to removal from the CDF to be transported offsite.

Types of Dredging Mechanical: Typically small areas, small lagoons and areas around docks. Costs about $29 per cubic yard based on latest bids. Dredging can occur between July 1 and December 31 of each calendar year. Removal varies as to the percent content of water. Material weighs less and occupies less volume when dry. Mechanical dredging inherently dewaters during the process and takes less time to dry. Hydraulic: Hydraulic dredging is the most cost effective method of dredging provided that a larger volume of dredging is available to reduce the cubic yard cost by spreading the cost out over a larger volume. Costs vary per volume but typically have costs around $10 per cubic yard. Dredging can occur between July 1 and December 31 of each calendar year. Removal varies as to the percent content of water. Material weighs less and occupies less volume when dry. Since hydraulic dredging is about 90% water, dewatering and drying takes much longer than mechanical.

Future Costs of Emptying Site 83: Construct a temporary road to Site 83 about $700,000 250,000 +/- cubic yards of material over $10,000,000 based on recent bids Cost to further test material - $300,000

Potential Temporary Road to Site 83 Site 83 Potential Road

Avenues Pursued: Scenario 1: Use of existing, active, upland disposal site (used within last 5 years). Dredged material is not contaminated, very fine sand, high organics. NO Scenario 2: Use of abandoned, inactive, upland disposal site (not used within last 5 years, revegetated with phragmites). Dredged material is not contaminated, silt and very fine sand, high organics. NO Scenario 3: Use of abandoned, inactive, upland disposal site (not used within last 10-15 years, revegetated with native grasses). Dredged material is not contaminated, silt and very fine sand, high organics. NO Scenario 4: Use of on-beach disposal. Dredging limited to certain times of year. Dredged material is not contaminated, clean sand with size distribution suitable for beach nourishment. NO Scenario 5: Use of on-beach disposal. Dredging limited to certain times of year. Dredged material is not contaminated, silt and fine sand, high organics, fine size distribution makes time on beach short. NO Scenario 6: Creation of salt water wetlands. Dredged material is not contaminated, silt and fine sand, high organics. NO

Avenues Pursued (Continued): Scenario 7: Creation of upland habitat. Dredged material is not contaminated, silt and fine sand, high organics. NO Scenario 8: Creation of underwater habitat. Dredged material is not contaminated, silt and fine sand, high organics. NO Scenario 9: Use of active, upland disposal site with management. Use of material for clean land fill, municipal landfill cover, etc. Material trucked from disposal site to point of use. Dredged material is not contaminated, silt and fine sand, high organics. NO Scenario 10: Use of offshore disposal with barge. No unusual attempts made to contain the material. Dredged material is not contaminated, silt and fine sand, high organics. NO Scenario 11: Use of offshore disposal with barge. Material is disposed at given location, area is later covered with clean sand. Dredged material is not contaminated, silt and fine sand, high organics. NO Scenario 12: Use of on-beach disposal into geo-tubes. Dredging limited to certain times of year. Dredged material is not contaminated, silt and fine sand, high organics. Geo-tubes used for dune core and to fortify beach structures. NO

Courses of Action The City is pursuing both short term and long term solutions to alleviate the dredging situation for lagoons/back bays including emptying a portion of Site 83 (currently under contract). The City is pursuing permits to construct a temporary road to Site 83 to fully empty it. The City has partnered with the City of Wildwood to accept the material to be used for capping a dormant landfill. From the most recent bids on Back Bay Dredging, the lowest base bid received was for $2,632,425.00 which would dredge approximately 72,200 cubic yards of dredge material. Current available capital for 2015 is $2,287,948.62.

Wildwood Landfill Wildwood Landfill

Courses of Action (Continued) The City is pursuing permits for a grant received from National Fish and Wildlife for wetlands enhancement. This project will hopefully allow us to restore wetlands shorelines to 1977 boundaries provided that the dredge material meets the sediment testing required from NJDEP. It is hopeful that with our matching amount we can replace about 150,000 cubic yards of marsh line eroded since 1977. We have a 2 year window from June 1, 2015 to complete this. We have been working closely with the State and Federal regulators to provide a plan that can be permitted and constructed. This has required several revisions to accommodate the comments of the regulators and we are close to submitting a final permit application package. The City is also pursuing various partnerships and relationships to dredge on a macro scale, find and develop a common location to take dredge materials. This includes pursuing local uses for the material that may have unforeseen benefits such as agricultural uses, fill material, and dune core construction. The City is pursuing the feasibility and likelihood of receiving permits to expand the Rt. 52 CDF which offers a huge benefit of having both barge access and highway access for filling and emptying. The major current drawback is that the size is prohibitive to allow any worthwhile dredging operation. The City is participating in a dredging working group committed to revising regulations, assisting other municipalities and counties with a united front, and finding a common solution that can be sustained at a reasonable cost.

Beach vs Bay Why is the beach on a dredging schedule and not the Bay? Federally Funded (The entire beachfront is covered by Army Corp agreements at either 8.75% or 12.5% City cost share)

South End Spoil Sites Along Intercoastal Waterway (The 2 southernmost CDFs are full and out of reach for most back bay and lagoon dredging) Intercoastal Waterway South End Spoil Site 70,000 Cu. Yd. Capacity (6.5 acre site) South End Spoil Site 45,000 Cu. Yd. Capacity (6 acre site)

Avalon Temporary Road Temporary Road

Concerns & Restrictions Moving Forward Unless regulations are changed the same difficulties being experienced right now will continue and the high cost of dredging lagoons/ back bays will continue to rise. By observation, it can be seen that areas recently dredged have been filling in at a more rapid pace than expected. This is likely due to several factors such as post Sandy conditions that have gone unaddressed or even unnoticed; recent bridge construction throughout the area may cause changes in velocity and direction of tidal flows. Major concerns are escalating costs and regulations that drive up the costs.

Concerns & Restrictions Moving Forward (Continued) We need to plan for today as well as the next 50 years. There are many restrictions holding us back. State and Federal regulations currently treat Ocean City s back bay dredging similar to Northern NJ (Industrial Areas). Requiring all dredging to occur between July 1 and December 31 is a restriction due to winter flounder prohibitions. There is a chance that this restriction will be lifted but it cannot be assumed this will happen. There may be other species where restrictions will still be required.

Options for the Future The City is exploring all options for dredging including sustainable CDF emptying, finding a sustainable beneficial reuse of dredge material that is feasible, and determining a cost sharing plan that is fair and equitable for all users. Find alternate dredge disposal areas such as sub aqueous dredge holes that can be filled to a beneficial level. Continue to seek partners to receive the material such as solar farms, landfills, abandoned quarries, fill material for low lying areas, sod farm topsoil replenishment, wetlands enhancement, thin layer disposal, dune core construction, sacrificial beach fill to name a few. We would like to develop a County wide dredging or even a state wide dredging plan where the State or Federal Government obtains permits for the municipalities and assists in paying for the costs.

Summary Significant Costs to the City; Road blocks to using grant funds to provide relief using the spray method of dredging; Dredging lagoons/back bays was not an issue prior to rules and regulations being put in place. Increased rules and regulations have squeezed budgets and have increased the cost of dredging activities state wide; The current issue is a lack of available empty space in our current CDF s and the need to empty the CDF s to create the area; and The time restrictions further increase the costs and increase the overall length of time to accomplish basic dredging needs.

City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting Presentation found online: http://www.ocnj.us/mayor/