Environmental Protection Licence 2688

Similar documents
WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

Monthly Environmental Data May 2016

Monthly Environmental Monitoring Report

Combined Sewer Overflows July 2012-December 2013

CANADA-WIDE STANDARDS FOR PM & OZONE STATUS OF JURISDICTIONAL IMPLEMENTATION ACTIVITIES MANITOBA

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

Electric Forward Market Report

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Environmental Monitoring Results Summary

Biosolids Monthly Report

JEDDAH INDUSTRIAL CITY

Long-Term Volunteer Lake Monitoring in the Upper Woonasquatucket Watershed

City of Olean Water Filtration Plant

AGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

CLOSURE AND POST-CLOSURE OF LANDFILLS IN MALAYSIA CASE STUDIES

2006 Sulfur Dioxide Summary

AUSTAR COAL MINE AIR QUALITY MANAGEMENT AND MONITORING PLAN

2010 Drinking Water Quality Annual Report

Environment Protection Licence

Understanding the NAAQS and the Designation Process

Hunter Valley Operations. EPL Monitoring Data. Published 17 October 2017 FOR THE MONTH ENDING 30 September Environment Protection Licence 640

SALTON SEA SOLAR PONDS PILOT PROJECT

Excerpt of Thermal Power Guidelines for New Plants

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

Initial Assessment of Climate Change in the Chesapeake Bay Watershed

Appendix 5. Fox River Study Group Interim Monitoring Evaluation

Global Market Pulp Statistics

Physicochemical and microbiological quality of water from a pilot domestic rainwater harvesting facility in Ireland.

Base Metal and Iron Ore Mining

Koeberg Nuclear Power Station. Water Resilience Strategy. Presenter: Velaphi Ntuli Date: 14 February 2018

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Arkansas Water Resources Center

Facility Information Summary AER Reporting Year

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

DRAFT. Facility Information. Facility Information JUN DATE: JUN DATE:

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

5 Star London Hotels - Example Report

Optimizing the Zinc Orthophosphate Dosage in a Full-Scale Distribution System

The Call Center Balanced Scorecard

Waste Discharge Permit Application. for. Commercial, Industrial and Institutional Discharges

Water quality monitoring and assessment: general principles and fitness for purpose

Fertilizer Statistics Overview TANZANIA Edition

Groundwater, Mining and Sustainability in the Tropics :

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore

Air Quality Monitoring Program

STRATFORD MINING COMPLEX Air Quality and Greenhouse Gas Management Plan

Continued Extreme Drought Conditions. April 1, 2015 Snowpack was lowest ever recorded. Impacts and Risk to People and Nature

The Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015

How safe is Beijing s Air Quality for Human Health? Naresh Kumar Θ

Fertility management in organic strawberries

Achieving a cost optimal balance between heat supply efficiency and moderation of demand

Raynet Software Lifecycle

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

Duralie Coal CCC Meeting

New Specialty Crops for California

Cattle Outlook. January, 2018

Climate Change & Urbanization Have Changed River Flows in Ontario

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP

DECREE OF THE STATE MINISTER FOR POPULATION AND ENVIRONMENT NUMBER: KEP-03/MENKLH/II/1991 RE: EFFLUENT QUALITY STANDARDS FOR EXISTING OPERATIONS

Notice of Violations and Intent to File Suit Under the Federal Water Pollution Control Act

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

Technical Memorandum. 201 N. Civic Drive, #115 Walnut Creek, CA Tel: Fax:

IAF Advisors Energy Market Outlook Kyle Cooper, (713) , October 31, 2014

Developing Solutions for the Environmental Challenges to Deploying PV Plants in Desert Areas

Soil Fertility Management The Optimum Nutrient Balance. Stan Lalor Teagasc, Johnstown Castle. ASA Conference 20 Mar 2014, Portlaoise

BOD/COD a Measure of Dairy Waste Treatment Efficiency- A Case Study

Otter Creek Watershed TMDL Project. Stakeholder Meeting June 6, 2013

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

COURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced

CHAPTER-4 WATER RESOURCES

Watershed - Lake Model to Support TMDL Determinations for Lake Thunderbird

CHP Case Studies. Midwest CHP Application Center (MAC) .org (312) University of Illinois at Chicago Energy Resources Center UIC

The Service Desk Balanced Scorecard

Seed potato physiological age and crop establishment

DEALING WITH STRATIFICATION WITHIN A WATER SUPPLY RESERVOIR. Chris Perks. Central Highlands Water

U.S. Farm and Retail Egg Price Relationships to 2005 Changing Share of the Consumer's Egg Dollar

Effectiveness of Coanda Screens for Removal of Sediment, Nutrients, and Metals from Urban Runoff

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA)

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards

Final Report. Lisheen Mine Discharge Limit for Phosphorous in Terms of Irish and EU Legislation. November 2007 PROJECT NO.

Urban Greening and the UHI: Seasonal Trade-offs in Heating and Cooling Energy Consumption in Manchester, UK

Sewage Treatment Plant Performance Report

RAINWATER HARVESTING FOR DOMESTIC CONSUMPTION IN BANGLADESH

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

% Change. Total. Total Retail Sales Index* Estimate ($M)

Recalibration of the Phosphate Market

Overview of the Surface Hydrology of Hawai i Watersheds. Ali Fares Associate Professor of Hydrology NREM-CTAHR

Analysis of Ambient Air Pollution and Determination of Air Quality Status of Udaipur, Rajasthan, India

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS

SUDAN: Blue Nile State

Session D Range Management/Outreach Grenade Range Management Using Lime to Transform Explosives

DWQMS Form Sault Ste. Marie DWS Annual & Summary Reports 2016

Overview of the New Zealand Natural Capital Assessment May 2014

Organics Collection Program and Yard Material Pile Collection Update

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Transcription:

Perilya Environmental Protection Licence 2688 Licensee Perilya Broken Hill Limited (PBHL) Address Wentworth Rd, Broken Hill, NSW, 2880. Environmental Protection Licence 2688 (Southern Operations) Link to Environmental Protection Licence http://www.epa.nsw.gov.au/prpoeoapp/viewpoeolicenc e.aspx?docid=31560&sysuid=1&licid=2688 Reporting period December 2017 Date report published on website Environmental Protection Licence 2688 Dust Monitoring Perilya Broken Hill Limited (PBHL) has nine (9) dust monitoring points located around the Southern Operations site (Figure 1). A summary of Environmental Protection Licence (EPL) 2688 conditions is shown in Table 1. Figure 1. Location of the EPL 2688 dust monitoring points associated with Perilya s Southern Operations. December 2017 page 1 of 8

Table 1. Summary of the EPL 2688 conditions for the dust monitoring points. Dust Monitoring Points: EPL 2688 Conditions Condition Licence Requirement Licence Point 3,4,5,6,7,8,9,10,11 Pollutant/s Particulates (deposited matter) Total Lead Unit of measure Sampling Method Monitoring frequency Data Reporting Grams per square meter per month (g/m 2 /month) AM-19 Every 30 days ± two days Monthly Dust Monitoring Point Results December 2017 particulates deposited matter and total lead results are presented in Table 2. Results of laboratory analyses were received by Perilya on the 29/12/2017. Table 2. December dust monitoring point results. Licence Point Particulates deposited matter (g/m 2 /month) Total Lead (g/m 2 /month) 3 8.8 0.530 4 3.1 0.150 5 2.9 0.220 6 14.0 0.300 7 1.4 0.068 8 2.6 0.028 9 1.1 0.050 10 1.9 0.028 11 4.3 0.140 * No result (NR) due to sample bottle broken due to suspected vandalism Ambient Air Monitoring EPL 2688 requires two (2) ambient air monitoring sites, both located on the Southern Operations lease (Figure 2). PBHL currently uses high volume air samplers (HVAS) for the ambient air monitoring program. The HVAS operate (sample) for 24 hours every six (6) days. December 2017 page 2 of 8

Figure 2. Locations of the ambient air monitoring points associated with EPL 2688. Table 3 provides a summary of EPL 2688 conditions. Table 3. Summary of the EPL 2688 conditions for the ambient air monitoring points. Ambient Air Monitoring Points: EPL 2688 Conditions Condition Licence Requirement Licence Point 12 and 13 Pollutant/s Total Suspended Particulates Total lead (Pb) Unit of measure Micrograms per cubic meter (µg/m 3 ) Sampling Method AS 3580.9.15:2014 AS/NZS 3580.9.3:2015 Monitoring frequency Data Reporting Every six days for 24 hours Every 6 days December 2017 page 3 of 8

TSP (µg/m³) Perilya Environmental Protection Licence 2688 HVAS Results Total suspended particulate (TSP) and total lead results are presented in Table 4. Monthly averages for TSP and total lead for the previous 12 months are shown in Figure 3 and Figure 4 respectively. The final set of results for December s ambient air monitoring, were received on the 23/01/2018. Table 4. December HVAS TSP and total lead results. Licence Point Pollutant No. times measured in the month Min. Mean Median Max. 12 TSP (µg/m 3 ) 5 26.0 72.2 32.0 217.0 Total Lead (µg/m 3 ) 6 0.1100 0.312 0.195 0.830 13 TSP (µg/m 3 ) 6 21.0 136.7 30.0 618.0 Total Lead (µg/m 3 ) 6 0.0270 0.667 0.101 3.200 200 Annual monthly average TSP (previous 12 months) 180 160 140 120 100 80 60 40 20 0 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Date 12 13 2688 Average Figure 3. Average TSP results for the 12 months up to and including December. December 2017 page 4 of 8

Total Lead (µg/m³) Perilya Environmental Protection Licence 2688 Annual monthly Total Lead average (previous 12 months) 2.000 1.800 1.600 1.400 1.200 1.000 0.800 0.600 0.400 0.200 0.000 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Date Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 12 13 2688 Average Figure 4. Average total lead results for the 12 months up to and including December. Water Quality PBHL has two (2) licenced discharge points for surface waters, Licence Point 1 and Licence Point 2 (Figure 5). A summary of the licence conditions relating to discharges of waters from these two points is shown in Table 5. A diversion drain was constructed in the last quarter of 2016 to ensure that water from Railway Town could pass through the Perilya Operation without being contaminated by mine water. A mechanism was installed to allow harvesting of this run off from residential areas when site water storage is low and the capture will benefit the operation. Figure 5. Location of the EPL2688 licenced discharge points. December 2017 page 5 of 8

Table 5. Summary of the EPL 2688 conditions for licenced surface waters discharge points. Condition Water EPL 2688 Conditions Licence Requirement Licence Points 1 and 2 Pollutant Unit of measure Sampling method Monitoring frequency Point 1 Point 2 Data reporting Limits Point 1 Volume Point 2 Discharge Arsenic (As) Copper (Cu) Lead (Pb) Oil and Grease Arsenic Cadmium Calcium Conductivity Copper Lead Molybdenum Oil and Grease ph Sulphate Total Suspended Solids Total Dissolved Solids Zinc milligrams per litre (mg/l) ph in ph scale Grab sample Daily during discharge Daily during discharge All data reported 912 megalitres (ML) per year Must not occur unless more than 75 millimetres of rain falls in Broken Hill within the previous three days 0.5 mg/l 0.5 mg/l 0.1 mg/l 10 mg/l ph 6.5-8.5 Total Suspended Solids (TSS) Zinc (Zn) 50 mg/l 15 mg/l December 2017 page 6 of 8

Water Quality results Licence Points 1 and 2 did not discharge during December. Blasting PBHL has four (4) blast monitors associated with the Southern Operations (Figure 6). A summary of EPL 2688 conditions for blasting is provided in Table 7. Figure 6. Location of EPL2688 blast monitors. December 2017 page 7 of 8

Table 7. Summary of EPL 2688 conditions for blasting. Condition Licence Points Pollutant/s Unit of measure Blasting EPL 2688 Conditions Licence Requirement 9B Westside Drive, Broken Hill NSW, 2880. 1A Wentworth Road (Nursing Home), Broken Hill, NSW 2880. Gaffney Street (private residence), Broken Hill, NSW. 53 Rainbow Avenue, Broken Hill, NSW 2880. Ground Vibration Millimetres per second (mm/s) Sampling method AS 2187.2-2006 Monitoring frequency Data Reporting Date results received Limits Between 2340h to 0630h Between 2340h to 0630h duration greater than five seconds Between 0630h and 2340h 95% of blasts Between 0630h and 2340h All blasts All blasts Immediately following each blast Two (2) millimetres per second (mm/s) One (1) one millimetre per second (mm/s) Five (5) millimetres per second (mm/s) Ten (10) millimetres per second (mm/s) Blasting Results A total of 19 production blasts were conducted during December (Table 8). All blasts were within licence conditions. Table 8. December blast vibration results for EPL 2688. Licence Point Parameter (mm/s) No. times measured in the month Min. Mean Median Max. Wentworth Road* Blast Vibration 19 0.317 0.417 0.350 0.865 Rainbow Ave Blast Vibration 19 0.350 0.797 0.461 2.619 Westside Dr Blast Vibration 19 0.350 0.615 0.350 2.103 Gaffney St Blast Vibration 19 0.350 0.374 0.350 0.800 *Wentworth Road site formally known as Nursing Home Complaints No complaints were received under EPL 2688 during December 2017. December 2017 page 8 of 8