ARTICLE III Section INDUSTRIAL A DISTRICTS

Similar documents
SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS

ARTICLE 70, Use Regulations Controlling Industrial Zones

SECTION 24 Page 1 of 5. SECTION 24 (By-law 87-67, S.9) RESTRICTED BUSINESS PARK ZONE (B-2)

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10

1. Unless otherwise provided in this Code, all permitted and special exception uses in the C-1 Neighborhood Commercial District.

602 BUSINESS PARK (BP), LIGHT INDUSTRIAL (LI), AND GENERAL INDUSTRIAL (GI) DISTRICTS

SECTION 5 EXCEPTIONS AND MODIFICATIONS

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses:

ARTICLE 4 SUPPLEMENTARY PROVISIONS

Light Industrial (I)

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

Commercial, Residential and Office (CRO) District

10.1 PERMITTED USES SECTION 10 SECTION 10 HIGHWAY COMMERCIAL ZONE (C2) HIGHWAY COMMERCIAL ZONE (C) J.L. Richards & Associates Limited

ARTICLE X TRANSMISSION TOWER REGULATIONS

Section 27 Schedule of Uses by District

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SECTION 832 "C-P" - ADMINISTRATIVE AND PROFESSIONAL OFFICE DISTRICT

Office Building in Powers Avenue Industrial Park

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

3. Lot Size Requirements. Lot size requirements shall be in accordance with Table 1 in Section

SECTION 25 - GENERAL INDUSTRIAL ZONE (M2)

383 (San Joaquin County Supp. No. 87, 4-11)

* Car washes and automobile service stations provided that:

Frontage on US HWY 90

ORDINANCE NO. An ordinance amending Chapter 51, Dallas Development Code: Ordinance No , as

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

CHAPTER AGRICULTURAL ZONES

ORDINANCE #16- PROPOSED ORDINANCE #16-14

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

LYNN BUILDING DEPT. TABLE OF CONTENTS SECTION 1:00 APPLICABILITY PAGE 1 SECTION 2:00 GENERAL DEFINITIONS PAGE 1, 2 & 3

Zoning Permits 11-1 ZONING PERMITS

Zoning Text Amendment

Definitions. The following words and phrases, when used in this article, shall have the following meanings respectively ascribed to them:

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

Fairfield County General Health District Comprehensive Solid Waste Regulations

Workers Compensation Board of Manitoba 2018 Classification Codes and New Business Entry Rates

27,000 sf Warehouse / Office ~ Two Buildings on 2 acres

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

DOUGLAS COUNTY ZONING RESOLUTION Section 13 LI - Light Industrial District 3/10/99. -Section Contents-

CHAPTER COMMERCIAL ZONES

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

H 7033 SUBSTITUTE A AS AMENDED ======== LC003107/SUB A ======== S T A T E O F R H O D E I S L A N D

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

FOR SALE 1330 Harrisburg Pike, Lancaster, PA Manheim Township Retail/Warehouse Building

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee:

CHAPTER 11 L-1 LIGHT INDUSTRIAL ZONE

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

4.2 Temporary Uses, Structures and Buildings

a. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards:

THERFORE, the Board of Supervisors hereby adopts the following amendments to the Zoning Ordinance by adding the following:

Article 6. RESIDENTIAL ZONES

ZONING RESOLUTION OF KNOX COUNTY APPENDIX C SOLAR ENERGY SYSTEM ORDINANCE

Section , Article 4 of the Zoning Ordinance December 14, 2012 Page 1 of 8

Industrial Land Near JAXPORT & ICTF

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

SUMMARY. Specific use standards for urban agricultural uses. Specification of standards for accessory uses and accessory structures.

ARTICLE 11.5 STANDARDS FOR TELECOMMUNICATIONS ANTENNAE AND TOWERS

Zoning Audit and Recommended Zoning Changes

PLAN SUBMISSION, BUFFERING AND SETBACK FROM TRANSMISSION PIPELINES

PLANNING COMMISSION STAFF REPORT

ARTICLE 90. NEWMARKET INDUSTRIAL-COMMERCIAL NEIGHBORHOOD DISTRICT (Article inserted on January 8, 2014) TABLE OF CONTENTS

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

WIND ENERGY CONVERSION SYSTEMS APPLICATION

BAUM INDUSTRIAL PARK DEVELOPMENT, PERFORMANCE AND MAINTENANCE STANDARDS DOCUMENT. October, 1991

PART R3-L ZONE, LOW DENSITY MULTIPLE DWELLING DISTRICT

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Commodore Club Marina

THE ZONING REGULATIONS OF THE CITY OF GREAT BEND TABLE OF CONTENTS. Part I Title and General Provisions Part II Definitions...

Commodore Club Marina

9.3.9 Industry uses code

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS

Addition to Section 4 - Special Use Regulations

SOIL CONTAMINATION REVIEW QUESTIONNAIRE

Existing Chapter 10 Revised Chapter 10 Adult book stores, subject to the standards set forth in s Adult book stores

CHAPTER 43 WIRELESS TELECOMMUNICATIONS TOWERS

The following materials and documents are required in order for you to obtain a Building Permit:

CHAPTER 12. Accessory Uses and Structures; Fences and Hedges

Planning and Zoning Commission

COUNTY OF CAPE MAY STATE OF NEW JERSEY ORDINANCE NO ESTABLISHING REGULATIONS FOR SMALL WIND ENERGY SYSTEMS AND SOLAR ENERGY SYSTEMS

ORDINANCE # AN ORDINANCE ESTABLISHING REGULATIONS FOR SMALL WIND ENERGY SYSTEMS AND SOLAR ENERGY SYSTEMS

CITY OF CALERA BUSINESS LICENSE FEE CODE SCHEDULE **All licenses issued are required to pay a $10.00 issuance fee in addition to their license fee**

APPLICATION FOR PORCH / DECK PERMIT

Industrial Office/Warehouse

WIND ENERGY CONVERSION SYSTEMS

A. Provide for the appropriate location and development of antennas and towers within the city;

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

ARCHITECTURAL GUIDELINES HAVASU SHORES RV RESORT

Legacy Existing Homes Design Guidelines and Submittal Requirements

"Home occupation" means a use which is clearly incidental and secondary to the residential use of the dwelling or mobile home, and which use:

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Land Use Comparison Chart C - Conservation Zoning District TO: CR- 5 Chiniak Residential 5

Residential Design Standards Draft 9 August 2013

SIGN AREA (SQ. FT.): SIGN DIMENSIONS: STREET FRONTAGE OF PROPERTY (ft):

CHAPTER 5: RESIDENTIAL USE DEVELOPMENT STANDARDS

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Transcription:

ARTICLE III Section 3-130 INDUSTRIAL A DISTRICTS Section 3-130.1 Intent Industrial A Districts make provisions for a wide range of industrial and business uses. However, special review and approval is required in the case of certain potentially hazardous or obnoxious uses or uses of significant impact. Section 3-130.2 Uses Permitted By-Right. Buildings may be erected or used, and a lot may be used or occupied for any of the following purposes (unless prohibited under Section 3-130.4) and no other: 1. General service or contractor s shop, including cabinet making, light metal working, tinsmith, plumbing or similar shop. (10/2/08) 2. Newspaper publishing, job printing or similar establishments. (10/2/08) 3. Commercial greenhouse or nursery. (10/2/08) 4. Wholesale. (10/2/08) 5. Monument engraving sales. (10/2/08) 6. Manufacturing. 7. Processing. 8. Packing. 9. Office Buildings. 10. Public Utility uses. 11. Research laboratories and research facilities. 12. Restaurants and banks. 13. Warehousing, including not limited to temporary storage containers, storage buildings and industrial storage. 14. Retail sales where such sales involve products being manufactured, processed, warehoused, distributed or wholesaled by the principal permitted use. In no case shall such retail sales space exceed fifteen (15) percent of the total floor area of the principle building. (10/2/08) III 130-1

15. Dwellings in conjunction with bona fide agricultural operations or one living quarter of a watchman and or caretaker and his/her family. 16. Above ground radio and television broadcasting stations, towers and accessory structures. (FAA approved) 17. Helicopter landing pad. (FAA approved) 18. Iron, steel or other metal manufacture or processing, drop forging with power hammer, boiler works, heavy weight casting including galvanizing and other treatment. 19. Transfer/distribution facilities. (6/3/04) 20. Accessory uses located on the same lot which are customarily incidental to and associated with the permitted use. (10/2/04) 21. The generation of electricity fueled primary by natural gas by a business organization or public service corporation, as approved by the Massachusetts Energy Facilities Siting Board in accordance with the provisions of section 69J¼ of chapter 164 of the General Laws, including all equipment, buildings and structures associated with such use that are located on the same site as the generating facility, as well as all ancillary transmission and distribution lines, gas pipelines and water mains. All gas and electric lines and water mains associated with this use are permitted as-of-right in all zoning districts through which they must traverse so long as such utility lines obtain all municipal permits, licenses, rights of way or other forms of authorizations that are necessary for their construction and operation; provided, further, for any electric or gas lines that are not located on the site of the generating facility, such lines are permitted as-of-right so long as the local transmission company or distribution utility, as the case may be, agrees to become owner of such facilities, through a pre-construction agreement. (12/03/09) All necessary utility lines that meet the requirements of 3-130.2.21 (12/3/09) 22. Home Occupation (See Section 5-1001) (7/1/10) 23. Marijuana Dispensary, in accordance with Section 4-90 (5/21/14) 24. Large Scale Solar Power Generator, provided that for any such use occupying a footprint of more than 30,000 square feet or occurring within 150 of any residential use, the Planning Board has issued a site plan approval and found that the impact of the facility from abutting properties and public ways will be suitably mitigated. (9/8/15) III 130-2

Section 3-130.3 Uses Permitted by Special Permit 1. Lumber yards, fuel storage plants, truck terminals, motor vehicle storage yards (i.e. school buses, tow truck operations but not including junk yards and auto sales), and contractor yards. (City Council) (1/19/06) 2. Wood/Stump Reclamation Facility (City Council) (12/15/88) a. Special Permit shall be for two (2) years. b. No part of the operation shall be visible from the road or and residence. c. All requirements of the Department of Environmental Quality Engineering (D.E.Q.E.), Health Board, Conservation Commission, and Article IV, Section 4-120 of the General Regulations shall be complied with. d. The Health Department shall monitor the operation if any violations are found, the permit shall be revoked immediately pending investigation by the City Council. e. The owner of the operation shall acquire a bond, to be filed with the treasurer and City Clerk, in the amount equal to removal costs of six (6) months storage of stumps, logs, mulch, sawdust, and firewood on the property. 3. Dimensional Special Permit for the rear and side yard requirements found in Section 3-130.6, numbers 2, 3, and 4 provided adjoining areas have been previously developed by the creation of lots and the construction of buildings for structures with side, and rear yards generally smaller than is prescribed by the Westfield Zoning Ordinance, (Zoning Board of Appeals) (11/19/90) An application for a Dimensional Special Permit for a use or structure that also requires an additional Use Special Permit and/or Site Plan Approval shall be heard by the same Special Permit granting authority at the same time and as part of the Use Special Permit and/or Site Plan Review. (10/7/04) 4. Any use otherwise permitted (either By-Right or by Special Permit) in this district involving a building or buildings with a cumulative total floor area equal to or greater then 100,000 square feet. This requirement applies to both new uses and buildings, and to alterations/extension/expansions of existing uses and buildings whose cumulative total square footage meets or exceeds these thresholds. (Planning Board) (10/02/08) 5. Motor Vehicle Sales or Rental Agency. (City Council) (6/3/04) 6. Commercial earth removal (Planning Board) (See Section 5-20) (9/15/05) III 130-3

7 Processing, reprocessing, remanufacturing, reclamation and/or recycling of construction (including but not limited to road and bridge) materials, building materials and/or demolition materials such as, but not limited to, lumber, asphalt, brick and concrete. (City Council) (9/15/05) 8. Any use otherwise permitted (either By-Right or by Special Permit) in this district that will discharge a cumulative total of more then 25,000 gallons per day of waste into the city's sanitary sewer system, or any use categorized as a Significant Industrial User (SIU). This shall apply to both new uses and to any alteration, extension or expansion of an existing use which would result in a cumulative total of more than 25,000 gallons per day of waste being discharged into the city's sanitary sewer system, or any use categorized as a Significant Industrial User (SIU). (Planning Board) (10/2/08) 9. Truck and/or heavy motorized equipment repair shop or body shop, or truck tire recapping and retreading facility. This section shall not permit the aforementioned used for or upon vehicles registered as either passenger or livery vehicles with the Massachusetts Department of Transportation. This section shall permit the incidental sale of parts or equipment as needed in the normal conduct of business for the above listed uses, but does not permit the retail sale or rental of vehicles, machinery, parts, or equipment. (Planning Board) (6/7/2012) 10. Commercial kennel, or veterinary hospital (Planning Board) (12/3/09) 11. Home Based Business (See Section 5-100.1) (7/1/10) 12. The manufacture of plastic products by extrusion, molding or other means of manipulating pre-manufactured plastic materials (Planning Board) (6/10/14) 13. Place of amusement, recreation or assembly (i.e., convention center, sports arena) on a lot not less than 2 acres in size (Planning Board) (11/26/14) Section 3-130.4 Prohibitions. Within any Industrial A zone no buildings shall be erected, altered or enlarged and no land shall be used for the following: 1. Abattoir 2. Ammonia, chlorine or bleaching powder manufacture. 3. Asphalt manufacturing or refining 4. Automobile service station, gas station (except as an accessory use to an industrial concern), auto body repair shop, frame shop, brake and muffler shop. 5. Celluloid manufacture (except in isolated, fire-resisting buildings). III 130-4

6. Commercial coal yard, coal storage or commercial salt storage. 7. Creosote manufacturing. 8. Distillation of coal, wood or bones. 9. Fertilizer or potash manufacturing or refining. 10. Glue or size manufacturing or process involving recovery from fish or animal offal. 11. Gypsum, cement, plaster or plaster of paris manufacturing. 12. Incineration of infectious and biogenetic research material and no other incineration except where required by State Regulation. (12/12/88) 13. Leather processing. 14. Linoleum manufacturing. 15. Paint manufacture. 16. Paper manufacture. 17. Plastic manufacture. (6/10/14) 18. Gas manufacture. 19. Quarry. 20. Rubber, cauotshouc or gutta percha manufacture from crude or scrap material. 21. Sewage disposal plant, except where controlled by the municipality. 22. Soap manufacture. 23. Stockyard. 24. Sulphurous, sulfuric, nitric or hydraulic acid manufacture. 25. Tar distillation and tar roofing manufacture. 26. Facilities utilizing or disposing or chemical, low level radioactive waste or any other hazardous waste disposal. III 130-5

Section 3-130.5 Residential Restriction. No building or other structure shall be erected, altered or used, and no land shall be used or occupied for residential purposes, except where subdivision plans or individual building lots existed, and were duly recorded or registered prior to the enactment of this amendment. The dwelling or dwellings of caretakers or watchmen located on the premises where such use is incidental to the principal permitted use are exempt from the above provisions. Section 3-130.6 Area and Height Regulations. Every building shall comply with the following area, yard and height regulations: 1. Building Area and Coverage. Minimum lot size in an Industrial A zone shall be one (1) acre. Not more than fifty (50) percent of the area of each lot may be occupied by buildings. 2. Front Yard. there shall be a setback on each street on which a lot abuts which shall be not less than twenty (20) feet and each lot shall have a minimum frontage of one hundred fifty (150) feet at the street line. 3. Side Yard. There shall be two (2) side yards neither less than fifteen (15) feet. 4. Rear Yard. There shall be a rear yard on each lot which shall be not less than twenty-five (25) feet in depth or the height, of the building, whichever is greater. Where a rear yard abuts a railroad right-of-way, the rear lot line shall be deemed to be the center line of the railroad right-of-way for the purpose of this paragraph 4. 5. Height. No buildings or structures shall exceed sixty (60) feet in height. Buildings or structures located within the designated Airport Landing Zone, height will be whichever is the most restrictively regulated. The Planning Board may issue a Special Permit permitting heights in excess of the maximum permitted. (2/24/03) Section 3-130.7 - Performance Standards. Any uses permitted in Industrial A Districts must also conform to all of the performance standards contained in Article IV, Section 4-120. Section 3-130.8 - Special Regulations. In order to encourage sound and attractive industrial development, the following special requirements shall apply: 1. (reserved for future use 9/16/03) 2. A buffer planting strip not less than twenty (20) feet in width, as defined in Article II- Section 2-20.01, shall be provided along each side or rear property line which directly abuts another existing residential property or residential district in either this city or an adjoining municipality. The Special Permit and/or Site Plan III 130-6

Approval granting authority may waive this requirement if in its opinion a suitable substitute is provided. (10/2/08) 3. Off-street parking, off-street loading and special requirements related to highway frontage described in Article VII, shall apply in Industrial A Districts. 4. A minimum of ten (10) percent of the required front yard shall be maintained with grass and live shade trees and ornamental shrubs with adequate spaces being left unpaved for their growth. 6. All projects shall be reviewed by the Permit Granting Authority as to the potential for groundwater contamination. If the Permit Granting Authority after consultation with the Board of Health or any other entity that it deems appropriate determines that the project use has potential it shall prescribe on appropriate groundwater management program. This program may include the installation of groundwater monitoring wells and a regular testing procedure. The Permit Granting Authority reserves the right to withhold any and all permits until such groundwater management programs have been approved. (10/4/90) 3-130.3 (3) added second paragraph (10/07/04) 3-130.3 (6), (7), added (09/15/05) 3-130.3, revised (01/19/06) 3-130.3 (8), added (01/19/06) 3-130.1, 3-130.2, 3-130.3, amended (10/02/08) 3-130.3 (4), (8) amended (10/02/08) 3-130.8 (2) amended (10/02/08) 3-130.2 (21) added (12/03/09) 3-130.3 (10) added (12/03/09) 3-130.2 (22) added (07/01/10) 3-130.3 (11) added (07/01/10) 3-130.3 (9) added (06/07/12) 3-130.2 (23) added (05/21/14) 3-130.3 (12) added, 3-130.4 (17) amended (06/10/14) 3-130.3 (13) added (11/26/14) 3-130.2 (24) added (09/08/15) III 130-7