UZB: Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Similar documents
PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

Principles for environmental and social responsibility

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

Mining & Communities

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

1 October. Public Information

Environmental and Social Policy

Peru, Guarantee Facility Project

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Declaration on the rights of peasants and other people working in rural areas 1, 2

EBRD Performance Requirement 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

COMPLIANCE APPRAISAL: SUMMARY OF RESULTS

EBRD Performance Requirement 10

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

People s Republic of China: Study of Clean Energy Supply for the Rural Areas in the Greater Beijing Tianjin Hebei Region

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

S u p p l i e r W o r k p l a c e C o d e o f C o n d u c t

GROUP HUMAN RIGHTS POLICY

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT

Sustainable Palm Oil Sourcing Policy

CONSULTATION AND PARTICIPATION PLAN

Technical Assistance Consultant s Report

Social Safeguard Due Diligence Report

PT INDONESIA INFRASTRUCTURE FINANCE (SEMS) Printed from llf website on 16 November 2016.

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

Gender Mainstreaming Plan. Spatial Planning for Protected Areas in Response to Climate Change (SPARC)."

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

MULTILATERAL PROJECT ENVIRONMENTAL AND SOCIAL SAFEGUARDS (ESS) GUIDELINES

Compliance with World Bank s Operational Policy 4.10 on Indigenous People

Quality, trust and social commitment. CaixaBank's Human Rights Policy. May 2017

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

REDD+ Safeguards and Safeguard Information Systems

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Armenia: ENA-Modernisation of Distribution Network Stakeholder Engagement Plan: Draft Final Report

Disclosure & Barring Service (DBS) Check Policy

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Report and Recommendation

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Our Principles of Responsibility. May 2009

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Operational Policy (OP) 4.36 applies to all World

Code of Business Conduct

RESPONSIBLE SOURCING PRINCIPLES

Guidance Note UNDP Social and Environmental Standards (SES) Stakeholder Engagement

PRESIDENT'S OFFICE. No April 1996 NO. 27 OF 1996: NATIONAL EDUCATION POLICY ACT, 1996.

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

Climate Smart Agriculture /Climate Change Adaptation in Simiyu Region, Tanzania

Panama Canal Expansion Program Stakeholder Engagement

ARTICLE 29 DATA PROTECTION WORKING PARTY

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary

Economic and Social Council

THE ENERGY DEVELOPMENT CYCLE

Respecting human rights. Respect is one of BP s values, and guides how we interact with all those who come into contact with our operations.

GUIDELINES FOR THE REALIZATION OF THE RIGHT TO DRINKING WATER AND SANITATION

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Ellesmere College TEACHING POST Application Form

[Extract from HRI/GEN/2/Rev.6]

ORISSA TOURISM DEVELOPMENT CORPORATION LIMITED

Appendix 1: Scoping Techniques

//DATA INNOVATION FOR DEVELOPMENT GUIDE DATA INNOVATION RISK ASSESSMENT TOOL

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

STICHTING OXFAM INTERNATIONAL CODE OF CONDUCT 1. THE NAME OXFAM AND THE OXFAM INTERNATIONAL TRADE MARK

Extract from TAJIKISTAN SPCR October Building Climate Resilience in the Pyani River Basin. Title

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Palm Oil Innovations Group Charter

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

22C Summary of Legislation and Standards Relevant to Labour and Working Conditions

International Covenant on Economic, Social and Cultural Rights

Volume 26 - Issue 05 :: Feb. 28-Mar. 13, 2009 INDIA'S NATIONAL MAGAZINE from the publishers of THE HINDU

Respect Human Rights. February 2009

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

CANDIDATE DATA PROTECTION STANDARDS

International Finance Corporation Activities Related to Indigenous Peoples Issues

CI-GEF PROJECT AGENCY PROJECT SAFEGUARDS SCREENING FORM

STAKEHOLDER ENGAGEMENT INTERVIEW GUIDE

Government of the Union of Myanmar. Telecommunications Sector Reform Project

ACT ON THE STATE ADMINISTRATION SYSTEM ZAKON O SUSTAVU DRŽAVNE UPRAVE

DISASTER RISK REDUCTION AND PREVENTION IN RWANDA

Integrated Safeguards Data Sheet (Initial)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

Bangladesh: Water Resources Planning Organization (WARPO)

Stakeholder Engagement Plan Code Of Practice

IMPLEMENTATION GUIDELINES FOR THE PRINCIPLES ON FREEDOM OF EXPRESSION AND PRIVACY

Creating an inclusive volunteering environment

AGRICULTURE AND RURAL DEVELOPMENT

Whistle-blowing. Policy and Procedure

RECRUITMENT AND APPOINTMENTS POLICY

Transcription:

Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program (RRP UZB 44483) Ethnic Minority Planning Framework May 2011 UZB: Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program Prepared by the Republican Road Fund, Ministry of Finance of the Republic of Uzbekistan The ethnic minority planning framework is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff, and may be preliminary in nature.

ABBREVIATIONS ADB APs AEM CoM DI EA EMA EMDP EMPF GRC IMA IPSA IP LARP MFF NGO PIP PFR PLARC PMU PSC RRF RU SIA SPS ST Asian Development Bank Affected Persons Affected Ethnic Minority Cabinet of Ministers Design Institute Executing Agency External Monitoring Agency Ethnic Minority Development Plan Ethnic Minority Planning Framework Grievance Redress Committee Internal Monitoring Agency Initial Poverty and Social Analysis Indigenous People Land Acquisition and Resettlement Plan Multi Financing Facility Non-government Organization Project information Pamphlet Periodic Financing Request Provincial Land Acquisition and Resettlement Committee Project Management Unit Project Supervision Consultant Republican Road Fund under Ministry of Finance of Uzbekistan (Road Fund) Republic of Uzbekistan Social Impact Assessment Safeguard Policy Statement Safeguard Team

A. Background and Context ETHNIC MINORITY PLANNING FRAMEWORK 1. The proposed second CAREC Corridor 2 Road Investment Program will increase domestic and international trade. The outcome will be improved road connectivity, safety, and effective management of the Uzbekistan section of CAREC Corridor 2. The outputs will be (i) about 236 km of the reconstructed road section of CAREC Corridor 2; and (ii) implemented road system sustainability plans, which relate to road safety and asset management. The investment program will finance three separate projects. The outputs under each project will be as follows. 2. Project 1. Outputs are categorized under the following: (i) (ii) Road development. The output will be about 74 km of the reconstructed road section of the A373 (between Km 116 and Km 190). The investment will upgrade the existing four-lane section with an international design within the existing rightof-way. The cost includes civil works and specialized consulting services, including experts to help with construction supervision and due diligence for, and preparation of, subsequent tranches. Road system sustainability. The output will be improved road safety management, including (a) a developed national road infrastructure safety strategy and road safety checklist, guidelines, and measures improving road safety management; (b) a developed road safety action plan for all road sections under the first and second investment programs; (c) installed solar road signs for the A373 Kamchik Pass section; and (d) a developed and implemented road safety capacity development program for RRF and Uzavtoyul; and public awareness programs. 3. Project 2. The outputs will be the reconstructed section of about 87 km of the A380 highway (between Km 228 and Km 315), strengthened capacity of RRF to manage road assets, the piloting of the introduction of road-user charges on the reconstructed road section of project 1, and implementation of a road safety action plan for projects 1 and 2 of the second investment program. 4. Project 3. The outputs will be the reconstructed section of about 75 km of the A373/4R112 highway (between Km 0 and Km 75), updated road asset management plans, and an implemented road safety action plan. Improvement of cross-border facilities to shorten the processing time at Osh at the Kyrgyz Republic border is covered under the Japan Bank for International Cooperation funding. 5. Road rehabilitation under all three tranches is not expected to adversely affect any indigenous peoples/ethnic minority as defined in ADB Safeguard Policy Statement (SPS) on Indigenous Peoples (June 2009). The program areas in Fergana valley are fairly homogeneous in ethnic composition. All will benefit from the opportunities provided by road up-grading and improvements. 6. This Ethnic Minority Planning Framework (EMPF) has been prepared on the basis of ADB Safeguard Policy Statement (2009) and Safeguard Requirements 3: Indigenous Peoples (SPS Appendix 3). It is to guide the preparation of future projects in which may affect any ethnic minorities located on other road tranches under the Program.

B. Minorities-related Legislation 7. The minorities-related legislation of the Republic of Uzbekistan (RU) comprises relevant non-discrimination and human rights provisions contained in, as follows: (i) (ii) (iii) the Constitutional Law of Uzbekistan; the international documents ratified or signed by the RU; and the national laws emanating from constitutional law and international documents. 8. The 1992 Constitution proclaims the equality of all Uzbekistani national irrespectively to their ethnic origin and language they speak (Art. 8). 9. The State undertakes the duty `to guarantee the respectful attitude towards the languages, customs, and traditions of the nationalities (natsii) and ethnicities (narodnosti), which dwell on its territory, and to provide conditions for their development'. Those laws ban the establishment and activities of the entities propagating religious and ethnic hatred, including social organizations (Art. 3 of the Law on Social Organizations), religious communities (Art. 5 of the Law on the Freedom of Conscience and Religious Organizations), and mass media (Art. 6 of the Law on Mass Media). The most important are the relevant articles of the Law on the State Language, Law on Education, Law on Religion, Labor Code, and the provisions of the Criminal, Criminal Procedural, and Administrative codes, qualifying the legal responsibility for violation of the provisions of the above laws. C. Policy Framework 10. This Ethnic Minority Planning Framework (EMPF) is intended to guide the preparation of future projects and future tranches in the event of any positive or/and adverse impacts on ethnic minorities under the Program. The Framework presents the policy and procedures for the preparation of an Ethnic Minority Development Plan (EMDP) in accordance with the ADB's SPS Safeguard Requirement 3 on Indigenous Peoples (June 2009). 11. The need for an EMDP will depend on the nature and scale of the project impacts and sensitivity of ethnic minority issues. Based on the Initial Poverty and Social Assessment prepared in every project a requirement for preparing Ethnic Minority Development Plan will be identified. An EMDP would be required if the impact is "significant" which means (i) adverse impacts on customary rights of use and access to land and natural resources; (ii) negative effects on the socioeconomic and cultural integrity; (iii) effects on health, education, livelihood, access to the project benefits, and social security status; and (iv) other impacts that may alter or undermine indigenous knowledge and customary institutions. An Ethnic Minority categorization checklist to be used in the EM screening exercise during the project preparation stage is provided. 12. The framework is based on the overall national development strategies and ADB's policy on indigenous peoples. The principal objectives are to design and implement projects in a way that fosters full respect for Indigenous Peoples identity, dignity, human rights, livelihood systems, and cultural uniqueness as defined by the Indigenous Peoples themselves. This is undertaken so that they (i) receive culturally appropriate social and economic benefits, (ii) do not suffer adverse impacts as a result of projects, and (iii) can participate actively in projects that affect them. 2

13. If the impacts are insignificant and limited and specific actions in favor of ethnic minorities can ensure appropriate mitigations and benefits, it can be integrated in the land acquisition and resettlement plan (LARP) of the project and/or some measures which are compatible with project implementation such as involving EM in scheme selection, provide opportunities to engage in community-based construction and management schemes. 14. The EMDP will set out the measures whereby the borrower/client will ensure (i) that affected Ethnic Minority receives culturally appropriate social and economic benefits; and (ii) that when potential adverse impacts on Ethnic Minority are identified, these will be avoided to the maximum extent possible. 15. Where this avoidance is proven to be impossible, based on meaningful consultation with indigenous communities, the EMDP will outline measures to minimize, mitigate, and compensate for the adverse impacts. The level of detail and comprehensiveness of EMPs (annex to this appendix) will vary depending on the specific project and the nature of impacts to be addressed. The borrower/client will integrate the elements of the EMP into the project s design. D. Procedures for Ethnic Minority Development Planning (EMDP) Preparation 16. An EMDP will be prepared as follows: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) Screening the potential impacts of project activities on the Ethnic Minority; the EA will conduct a field-based social impact assessment (SIA) with subjects as recommended in the Annex to Appendix 3 of ADB Safeguard Policy Statement (2009); review policy/guidelines regarding EM undertake meaningful consultation with the affected EM and provide the opportunity to the EM to participate in the selection of technically and economically feasible alternatives; prepare and disclose an EMDP, including documentation of the consultation process in accordance to the EMPF and ADB SPS SR 3 (2009); prepare beneficial, mitigation and capacity building measures as relevant based from the SIA results; prepare an action plan (in addition to the LARP) for legal recognition of customary rights and territories for project activities involves involuntary land acquisition; if physical displacement from traditional or customary lands should occur, prepare an action plan for attaining broad community support of the project; establish grievance and redress mechanism for the EM; and prepare an appropriate budget and a mechanism for monitoring, reporting and evaluation of the EMDP. 17. In the case of future tranches with impact on indigenous people, a satisfactory EMDP will be prepared and posted on ADB website prior the appraisal of the respective Project Financing Requests (PFRs). The EMDP policy and measures must comply with ADB's SPS Safeguard Requirement 3 on Indigenous Peoples (June 2009) and approved EMPF. E. Consultation, Disclosure and Institutional Framework 18. For the preparation of a project's EMDP, the EA through the Safeguard Team (ST) under the PMU will have overall coordination, planning, implementation and financing responsibilities. 3

Since EM issues are sensitive, the social development specialist of ST-PMU will work with local community organizations such as Makhalla Committees, or local NGO for planning and implementation of the EMDP. 19. The EMDP will be prepared in full consultation with the affected ethnic minority groups. The consultations will be clearly and thoroughly documented. The mitigation measures and strategies will be presented to them in community level workshops for their inputs before being finalized. The EMDP and PIB will be translated into the local/em language(s) prior to implementation and EMDP will be disclosed on ADB's website. 20. For project activities that might increase the vulnerability of the EM, the EA will seek the consent of affected EM communities in form of board community support through meaningful consultations with affected individuals and/or their recognize representatives as specify in Appendix 3 of ADB SPS (2009). 21. The existing ethnic minority development institutions and organizations will be involved in the implementation of the EMDP and resolution of any dispute arising out of the implementation process. When there is a need of EMDP, the EA will ensure that an adequate budget will be provided. This will be included in the LAR cost and EDMP would be integrated in the LARP. F. Grievance Redress Mechanism 22. A grievance redress mechanism will be developed for addressing the grievances/complaint from the affected ethnic minority (AEM). The procedure of grievance redress will be incorporated in the Project Information Pamphlet (PIP) to be distributed prior to implementation. In order to prevent grievances rather than to redress these through a process to avoid lengthy redress process, participatory consultation with affected households will be undertaken during project planning and implementation stages. This will involve the following steps: (i) (ii) (iii) Resolution of complaints will be attempted at the representative project office with the involvement of the project supervision consultant (PSC), safeguard team (ST), local NGO, leaders of the affected Mahallas or the local executive body. In absence of a settlement, AEMs may lodge a complaint with the District/Oblast Khokimiyat and receive a reply within 15 days. AEMs will have the right to take the dispute to an appropriate court of law if they do not accept the District/Oblast Khokimiyat s decision. Grievance Resolution Process 1. Complaints resolution will be attempted at town/district (Rayon) level of grievance and redress committee with the involvement of the PSC/ST, NGO, leaders of the affected Mahallas and Khokimiyat (the local executive body) 2. In absence of a settlement, AEMs may lodge a complaint to District/Oblast Khokimiyate and get a reply within 15 days 3. If the District/Oblast Khokimiyate decision is unacceptable to the AEMs, then they may approach the appropriate court of law for its resolution. 4

G. Monitoring and Evaluation 23. The implementation of the EMDP will be monitored. The EA will establish a monitoring system involving EA staff, Councils of Rural Communities, makhalla committees, and EM groups, to ensure participatory monitoring arrangements. A set of monitoring indicators will be determined during EMDP implementation. Project supervision and monitoring consultants will carry out external monitoring. Appropriate monitoring formats will be prepared for internal and external monitoring and reporting requirements. 24. For project with significant adverse impacts on ethnic minorities, a qualified and experienced external experts or qualified NGO will be engaged by the EA to verify monitoring information of the EMDP. The external experts will advise on compliance issues and if any significant issues are found, the EA will prepare a corrective action plan or an update to the approved EMDP. The EA requires implementing the corrective actions and following up these actions to ensure their effectiveness. 25. Several key indicators and topics for monitoring and evaluation of EMDP are (i) process of the consultation activities; (ii) appropriateness of affected assets valuation and compensation disbursement; (iii) implementation of relocation process, when applicable; (iv) current condition of social, cultural, political and economic status of the EM in comparison with pre project condition; (v) status of vulnerable people as identified in the SIA; (vi) any disadvantaged conditions to the EM that was not anticipated during the preparation of EMDP that required corrective actions; and (vii) grievance redress issues. H. Financial Requirements 26. Costs related to the implementation of the EMDP will include the costs of any compensation for temporary and permanent land use as addressed in the Resettlement Framework. Other costs include the salaries and travel costs of the ST social development expert, or experts on Ethnic Minority who will monitor the implementation of the EMDP are included in the provision of services for ST. 27. Detailed surveys will be carried out at the design stage of projects by the ST or minority experts and the profile of the affected ethnic minority will be known with more accuracy. 28. In the case of future tranches with significant impact on indigenous peoples/ ethnic minorities, the respective future Project Financing Requests (PFRs) will include the cost for implementing an EMDP. I. Ethnic Minority Categorization/Checklist (screening) 29. Annex 1 shows the initial screening/checklist for impact on ethnic minority. 5

Project Title: ANNEX 1 Initial Screening for Impact on Ethnic Minority at Project Preparation Stage Subproject Name: Location: KEY CONCERNS (Please provide elaborations on the Remarks column) YES NO NOT KNOWN Remarks A. Indigenous Peoples Identification 1. Are there socio-cultural groups present in or use the project area who may be considered as "tribes" (hill tribes, schedules tribes, tribal peoples), "minorities" (ethnic or national minorities), or "indigenous communities" in the project area? 2. Are there national or local laws or policies as well as anthropological researches/studies that consider these groups present in or using the project area as belonging to "ethnic minorities", scheduled tribes, tribal peoples, national minorities, or cultural communities? 3. Do such groups self-identify as being part of a distinct social and cultural group? 4. Do such groups maintain collective attachments to distinct habitats or ancestral territories and/or to the natural resources in these habitats and territories? 5. Do such groups maintain cultural, economic, social, and political institutions distinct from the dominant society and culture? 6. Do such groups speak a distinct language or dialect? 6

KEY CONCERNS (Please provide elaborations on the Remarks column) YES NO NOT KNOWN Remarks 7. Has such groups been historically, socially and economically marginalized, disempowered, excluded, and/or discriminated against? 8. Are such groups represented as "Indigenous Peoples" or as "ethnic minorities" or "scheduled tribes" or "tribal populations" in any formal decisionmaking bodies at the national or local levels? B. Identification of Potential Impacts 9. Will the project directly or indirectly benefit or target Indigenous Peoples? 10. Will the project directly or indirectly affect Indigenous Peoples' traditional socio-cultural and belief practices? (e.g. child-rearing, health, education, arts, and governance) 11. Will the project affect the livelihood systems of Indigenous Peoples? (e.g., food production system, natural resource management, crafts and trade, employment status) 12. Will the project be in an area (land or territory) occupied, owned, or used by Indigenous Peoples, and/or claimed as ancestral domain? C. Identification of Special Requirements Will the project activities include: 13. Commercial development of the cultural resources and knowledge of Indigenous Peoples? 14. Physical displacement from traditional or customary lands? 7

KEY CONCERNS (Please provide elaborations on the Remarks column) YES NO NOT KNOWN Remarks 15. Commercial development of natural resources (such as minerals, hydrocarbons, forests, water, hunting or fishing grounds) within customary lands under use that would impact the livelihoods or the cultural, ceremonial, spiritual uses that define the identity and community of Indigenous Peoples? 16. Establishing legal recognition of rights to lands and territories that are traditionally owned or customarily used, occupied or claimed by indigenous peoples? 17. Acquisition of lands that are traditionally owned or customarily used, occupied or claimed by indigenous peoples? Decision on Screening After reviewing the answer above, the PMU/ST Social Development Specialist agree that the project: Should be categorized as an A project, an Ethnic Minority Development Plan (EMDP) is required. Should be categorized as a B project, a specific action favorable to ethnic minority is required and addressed through a specific provision in RRP and in related plans such as a Resettlement Action Plan, a Gender Action Plan or a general Community Participatory Plan Should be categorized as a C project, no EMDP or specific action required Prepared By: Signature: Name: Position: Date: Verified by: Signature: Name: Position: Date: 8