BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

Similar documents
BULLETIN LICENSED ELECTRICAL CONTRACTORS. SaskPower Electrical Inspections. June 13, Item #1 Arc-Fault Receptacles, CEC Rule (f)

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

CONSULTATION MEETING: Adoption of the 2015 edition of the Canadian Electrical Code

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Basic Requirements for Residential Electrical Installations

CITY OF GRANDE PRAIRIE

Small Wind Turbine Electrical System Considerations

ELECTRICAL BULLETIN

2015 Code Rollout Meeting Q & A

ELECTRICAL BULLETIN

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge

ELECTRICAL CODE TRADE REFERENCE

WITH THE TITLE 24. replacement. story. stories, etc. R disconnects. to, PV. unit and any. supporting frame. conditions. greater than the main

(Condensed from National Electric Code)

Questions & Answers. Amendments to Ontario Electrical Safety Code 23 rd Edition/2002

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

Solar PV System Code Compliance Best Practices, 2017 NEC Updates, and Opportunities for Improvement

Photovoltaic System Inspector Job Task Analysis Guide April 2017

Article 10 - ADMINISTRATIVE SECTION

St. Clair County Electrical Code Regulations

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska

Residential Wiring Guide 11th Edition

Summary of the Changes 2017 National Electrical Code

Specifications for Residential Overhead Electric Service Installation

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Expedited Permit Process for PV Systems Micro-Inverter

Residential Wiring Guide 12th Edition (v.2)

2011 National Electrical Code Update Training. Henrico County Department of Building Construction and Inspections

2011 National Electrical Code Update Training

Canadian Electrical Code, Part I Full Impact Assessment

Hazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

ELECTRIC METERING GENERAL

PV Codes and Standards 101

Manufactured Buildings And The Electrical Code

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics

Installation Address. Postcode. Purpose of the report This form to be used only for reporting on the condition of an existing installation.

Emergency, Legally Required, and Optional Standby Power Systems

RESIDENTIAL BUILDING REQUIREMENTS

Proposals and Process 2017 National Electrical Code

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

Building Regulations; Construction 11

Specifications for Residential Overhead Electric Service Installation

Member Service Electric Wiring Guidelines

NY State Unified Solar Permit

CUSTOMER SERVICE POLICIES

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Bulletin Working space about electrical equipment Rules 2-308, and Issued April 2010 Supersedes Bulletin 2-9-3

Specifications for Residential Underground Electric Service Installation

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

Typical Finished Basement Details

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

Table of Contents. Preface

Micro Hydroelectricity Installer Skills Assessment

PV System Permitting and Inspection. PV Codes and Standards Uniform Solar Energy Code

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code

C&G 2382 BS7671: th Edition IEE Wiring Regulations. 25 Questions

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less)

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

Fairfax County, Virginia

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February

3. GENERAL INFORMATION AND REQUIREMENTS

Electric Service Handbook

UNDERGROUND SERVICES SECONDARY

AORC Technical meeting 2014

Basic Service. This Section provides information regarding a. Introduction

Standard of Practice - Campus Electrical Distribution System

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

Certificate of Compliance

InterNACHI Home Inspection Report Checklist

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

CODE OF ORDINANCES, DENVER, IOWA

ELECTRICAL SAFE WORK PRACTICES

Continuing Certificate of Occupancy Pre-Inspection Checklist

Solar Electric Systems Safety for Firefighters

AS/NZS 3010:2005 AS/NZS

CHAPTER 5 METERING REQUIREMENTS

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN

SECTION BASIC ELECTRICAL REQUIREMENTS

Revisions for the 2011 National Electrical Code - Part 2

ORDINANCE NO. ORD

REQUEST FOR QUOTATION (RFQ)

CAL/OSHA ELECTRICAL HIGH VOLTAGE

Understanding Solar PV Permitting and Inspecting in New York State

TESTING PTE EARTHING

Three-sided barrier compliant to DIN EN ISO Depending on location, design also as wind protection. Clear height (DH) Three-sided barrier

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

GILA RIVER FIRE DEPARTMENT REQUIREMENTS

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

NASSAU COUNTY ELECTRICAL PERMIT APPLICATION FOR CONTRACTORS

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

Why Do I Need a Permit? D ID Y OU K N OW? Protects property values. Makes Selling Property Easier. Site Plan Page 2. Plan Requirements Page 2

Transcription:

SaskPower Electrical Inspections BULLETIN 01-2017 February 15, 2017 TO: LICENSED ELECTRICAL CONTRACTORS ELECTRICAL CONSULTANTS AND ENGINEERS SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS Item #1 Superseded Bulletins and Information Items This Bulletin supersedes all previous issued Bulletins. The information contained herein is to be used in conjunction with the 2015 Canadian Electrical Code, Part 1, C22.1-15, and may be amendatory of the 2015 Saskatchewan Interpretations. Please contact your local Electrical Inspector if you have concerns or questions. Item #2 Supplementary Protectors, CEC Rule14-114 Inspectors have encountered supplemental protectors being used as overcurrent devices in industrial control panels and other electrical applications. As a reminder to industry and per Rule 14-114 of the 2015 Canadian Electrical Code, Part 1, supplementary overcurrent protection shall not be used as a substitute for branch circuit overcurrent devices or in place of branch circuit protective devices to protect a circuit. Item #3 Limiting Current Output (Choking) of a Dry Type Transformers 750 V or Less, CEC Rule 26-256 If the secondary conductors or equipment connected to the secondary of the transformer are less than 1.25 x the transformer s rated secondary current, secondary overcurrent (OC)protection is required. See CEC Handbook and rule 14-606(2) for exemption. Primary OC device shall be labelled to indicate the maximum rating of the OC protection. Item #4 Portable Temporary Power Solar Generation Units, CEC Rule 2-024 Solar powered generating units, used for temporary construction power or lighting are required to be approved to a CSA standard by a Saskatchewan recognized Certification Body as per the 2015 Saskatchewan Interpretations. Bulletin 01-2017 Page 1 of 5

Item #5 Disconnects and Bonding Requirements for Oil Well Sites, CEC Rules 10-200 and 14-100 Except for extra low voltage sites (i.e. 12 Volt DC), each oil well site or string of wells, shall be provided with a service entrance rated single point of disconnect and the feeder conductors shall also include a bond conductor sized to Table 16A to safely conduct any fault current back to the source and to ensure the safe operation of the overcurrent devices. Item #6 Adoption of 2018 CEC Wording Maximum Circuit Loading, CEC Rule 8-104(5),(6) & (8) The original wording can be replaced with the following from August 2016 Memorandum of Revision (MOR); (5) Where a fused switch or circuit breaker is marked for continuous operation at 100% of the ampere rating of its overcurrent devices, the continuous load as determined from the calculated load shall not exceed (a) Except as required by item (b), 100% of the rating of the circuit, where the allowable ampacities of conductors are selected in accordance with Section 4; or (b) 85% of the rating of the circuit, where the allowable ampacities of single conductors are selected in accordance with Section 4. (6) Where a fused switch or circuit breaker is marked for continuous operation at 80% of the ampere rating of its overcurrent devices, the continuous load as determined from the calculated load shall not exceed (a) Except as required by item (b), 80% of the rating of the circuit, where the allowable ampacities of conductors are selected in accordance with Section 4; or (b) 70% of the rating of the circuit, where the allowable ampacities of single conductors are selected in accordance with Section 4. (8) deleted Item #7 Corrections to the 2015 Saskatchewan Interpretations 2-014 - Plans and Specifications Please visit www.saskpower.com for the new Renewables Information Check Sheet. This form must be completed and submitted with all renewable energy installation plans. 2-024 - Use of Approved Equipment The approval label for Nemko has changed. Effective immediately the new Nemko symbol will be accepted. All new equipment approved for use in Canada will have one of these symbols. While some products will continue to display the older symbol, it is still accepted but has been discontinued. They will also now be known as NEMKO North America with their head office located in Ottawa, Ontario. These are the newest marks: Bulletin 01-2017 Page 2 of 5

Nemko North America Inc. Nemko, Canada 303 River Road Ottawa, Ontario, Canada K1V 1H2 Off (613) 737-9680 Fax (613) 737-9691 14-104(1) - Adjustable Overcurrent Devices a) Where the cable ampacity is less than the maximum rating of the adjustable overcurrent (OC) protection devices, the trip settings for the OC protection device shall be documented and on-site for the inspection when available; b) The adjustable OC protection devices including fused disconnecting switches, shall be labelled with a lamacoid plate indicating maximum fuse size or AT (Amp Trip) following the cable ampacity as per Rule 4-004, lamacoid shall read Max A; Do Not Adjust ; and c) Service, feeder and/or branch circuit conductor ampacity markings shall also be required. 24-000 - Classification of Areas Patient Care Areas are defined by the CAN/CSA-Z32 standard and include, but are not limited to, walk-in medical clinics, dental clinics, chiropractic clinics, massage therapy, optometrists and others. The CEC definition of a health care facility was changed to recognize that more and more treatment and testing, previously done in hospitals, is now being done in these facilities and even at home. This means that the specific rooms of a clinic in which treatment is given must be wired in accordance with Section 24 methods. Home dialysis equipment, as an example, will require a single receptacle on a separate circuit wired as per section 24. The receptacle shall be clearly labelled as to its purpose and exempted from arc fault protection under 26-724(f). 26-710(h) - Receptacles Installed in Drawers Receptacles installed in drawers for appliances such as USB chargers, hair dryers, curling irons, food processors, etc. shall be approved as part of the assembly and power shall be disconnected from the receptacle as soon as the drawer begins to close. Circuit shall be AFCI protected and if located within 1.5m of a sink, bath tub or shower stall it shall be GFCI protected. Receptacles shall be tamper resistant. Bulletin 01-2017 Page 3 of 5

26-724 - Branch Circuits for Dwelling Units Arc fault protection as defined in Rule 26-720 is required for all branch circuits in new construction or renovations/additions of dwelling units. Except for receptacles listed in Rule 26-724(f) which includes: a) Bathroom receptacles as per Rule 26-710(f) b) Refrigerator receptacles c) Kitchen counter receptacles d) Island receptacles e) Peninsula receptacles f) A single receptacle for a sump pump/septic pump/condensate pumps that does not supply any other receptacles. A dwelling unit with permanently installed cooking facilities (i.e. gas or electric range, cooktop) is deemed to have a cooking facility and thus requires arc fault protection. An outlet branch circuit type arc fault circuit interrupter may be used (instead of an AFCI breaker) when installed as per Rule 26-724(g). Newly constructed rooms require all receptacles to be arc fault protected, and receptacles added to an existing room shall also require arc fault protection. Cord connected hot plates and/or microwaves do not constitute a cooking facility. 28-104(1) - Motor Supply Conductor Insulation Temperature Supply conductors to a motor connection box shall have an insulation temperature rating equal to or greater than that required by Table 37 (example: heating circulating pumps, automotive car lifts). When there is a discrepancy between the manufacturer and the values in Table 37, the higher value shall be used unless the motor is otherwise marked. Section 64 Renewable Energy Drawings The renewable energy drawings have been updated to show the new grounding and bonding methods as well as to display all the correct code rules and information. Please review the three attached drawings dated November 2016. Item #8 SaskPower Electric Service Requirements Transformer Grounding Balls, SaskPower Electric Service Requirements, 2.3.3 Contractors terminating customer cables onto the utility transformer paddles are reminded that they are to ensure that the grounding balls are left in place or re-installed at the completion of the installation. See attached photo Bulletin 01-2017 Page 4 of 5

Grounding Balls Item #9 SaskPower Electric Service Requirements Use of 400A Self-Contained Sockets SaskPower will be limiting the use of the 400 A self-contained meter sockets in urban, commercial, and residential applications. The 400 A self-contained meter socket limits the ability of SaskPower operating staff to isolate metering for individual customer installations. There will be several alternate options for 400 A urban commercial services. Please coordinate installation with SaskPower District staff prior to installation. Item #10 SaskPower Electric Service Requirements Marking Requirements in Commercial Rental Units (CRU s) SaskPower will now require standard meter marking when multiple meters are grouped together in an electrical room, or with a multi-gang meter socket. Each meter will be required to be marked to indicate the address or unit number to ensure customers are correctly billed and connections / disconnections can be done safely. Marking will be required to be on the cover of the meter socket and on the interior of the meter socket enclosure. It will be permanent, weather and ultraviolet resistant, with a minimum height of 50 mm (2 ). Item #11 SaskPower Electric Service Requirements 5 Jaw S3 Form Socket Requirements All single phase 3 wire services exceeding 200A will require a 5 jaw 3S form meter socket with provision for a test switch, and NO circuit closer. A 400A self-contained meter socket (if allowed) will need to incorporate a 5 Jaw 3S form socket with a test switch mounting plate, and NO circuit closer. Provided by the Electrical Inspections Offices of SaskPower Bulletin 01-2017 Page 5 of 5

Electrical Inspections Solar Installation Rule 64-208 Location requirements for Class A, B, C modules. Rule 64-210 Wiring Method for PV Systems (DC wiring). Rule 64-222 Bonding requirements to be detailed in the PV Module Installation manual. Solar Array Customer owned meter. Rule 10-204 - Neutral shall be isolated in the socket. See Appendix B notes for all applicable Rules. Rule 84-030 - Install a permanent, weatherproof warning label indicating Warning Interconnected System at the utility meter and the utility disconnect. Install a permanent, weatherproof, legible diagram of the interconnected system at the utility disconnect. Net Combiner Box Disc Sw. Inverter SW. Rule 64-060(12) Disconnecting means for PV combiner. Rule 64-060(10) & 84-024(1)(i) Marking requirements (combiner). Rule 64-218 Requirements for PV system rapid shutdown. Rule 64-200(2) Marking required (Rapid Shutdown). Rule 64-212 Colour coding of PV DC conductors. Rule 64-214 Overcurrent protection for apparatus and conductors. Rule 64-060 Requirements for all disconnecting means. Rule 64-200 Marking Requirements for PV Disconnect. Rule 64-064 Grounded PV systems 50 Volts or greater require ground fault protection. Rule 64-066 Requirements for ungrounded systems. Rule 64-068 Grounding and bonding requirements for grounded systems (Appendix B, Figure 15). Rule 64-216 PV systems 80 Volts or greater require DC Arc Fault Protection. Rule 64-106 & 2-024 A -Interactive inverter for interconnection to the supply authority is to be specifically approved for the purpose and so marked. Rule 64-060 Requirements for all disconnecting means. Rule 84-024 Must be located within sight of and 9 meters of the equipment and readily accessible. Rule 84-030 & 84-024(1)(i) Marking requirements. Rule 6-206 - If the panel is installed outdoors, it must be in a weatherproof enclosure and may serve as the utility disconnect; however, it must be readily accessible, lockable and clearly labeled. Rule 64-112 - Maximum size of overcurrent device and location of it in the electrical panel (bottom). Note: 1. All the required labels and diagrams must be installed before the installation will be approved. All labels and diagrams installed outdoors and exposed to the weather shall meet the requirements listed in the Saskatchewan Interpretations under Rules 64-072, 64-074, & 64-200 for marking, warning labels, notices and diagrams. 2. All wiring must be done by a licensed Saskatchewan Electrical Contractor and be covered by an appropriate electrical permit. Homeowner Permits are not allowed. 3. It is the responsibility of the Electrical Contractor to arrange for an inspection 2 weeks prior to requesting a network service connection. 4. When Network ing is installed, the Local must approve all connection diagrams before the installation begins. 5. All renewable energy installations require electrical construction plans to be submitted to Electrical Inspections and reviewed before approval will be granted. See Rule 2-014. November 2016

Electrical Inspections Wind Turbine Installation Rule 84-030 - Install a permanent, weatherproof warning label indicating Warning Interconnected System at the utility meter and the utility disconnect. Install a permanent, weatherproof, legible diagram of the interconnected system at the utility disconnect. Net Rule 64-304 - U/G cable rated at 90ºC with an ampacity of not less than 125% of the rated turbine output current. JB Rule 64-300 A plaque with specific instructions for disabling the turbine (shunting, braking, etc.) must be installed at or adjacent to the turbine. Sw. Inverter SW. Rule 64-312 - Grounding and bonding requirements for the tower or structure. Rule 64-310 Rated for 125% of the full load current. Clearly and permanently labeled and installed not more than 9m from the turbine tower. Rule 2-024 - ALL equipment must display approval markings. Rule 64-068 Grounding and bonding requirements (Appendix B, Figure 15). Customer owned meter. Rule 10-204 The neutral must be isolated in the socket. Rule 84-022 - Must be outside, accessible, lockable, weatherproof and clearly labeled as Disconnect. Rule 6-206 - If the panel is installed outside, it must be in a weatherproof enclosure. In an outside location the breaker may serve as the utility disconnect, but it must be accessible, lockable and clearly labeled. Rule 64-112 - Note maximum size of overcurrent device allowed and placement of it in the electrical panel (bottom). Note: 1. All labels and diagrams must be installed before the installation will be approved. All labels and diagrams installed outdoors and exposed to the weather shall meet the requirements listed in the Saskatchewan Interpretations under Rule 64-074. 2. All wiring must be done by a licensed Saskatchewan Electrical Contractor and be covered by an appropriate electrical permit. Homeowner Permits are not allowed. 3. It is the responsibility of the Electrical Contractor to arrange for an inspection 2 weeks prior to requesting a network service connection. 4. When Network ing is installed, the Local must approve all connection diagrams before the installation begins. 5. All renewable energy installations require electrical construction plans to be submitted to Electrical Inspections and reviewed before approval will be granted. See Rule 2-014. November 2016

Electrical Inspections Rural Wind Turbine Installation (option) Rule 84-030 - Install a permanent, weatherproof warning label indicating Warning Interconnected System at the utility meter and the utility disconnect. Install a permanent, weatherproof, legible diagram of the interconnected system at the utility disconnect. Grounding System by Rule 64-304 - U/G cable rated at 90ºC with an ampacity of not less than 125% of the rated turbine output current. JB Rule 64-300 A plaque with specific instructions for disabling the turbine (shunting, braking, etc.) must be installed at or adjacent to the turbine. Sw. Inverter SW. Rule 64-312 - Grounding and bonding requirements for the tower or structure. Rule 64-310 Rated for 125% of the full load current. Clearly and permanently labeled and installed not more than 9 m from the turbine tower. Rule 2-024 - ALL equipment must bear approval markings. Rule 64-068 Grounding and bonding requirements (Appendix B, Figure 15). Customer owned meter. Rule 10-204 - The neutral must be isolated in the socket. Table 19 Approved service entrance cable c/w protective bond as per Rule 10-814 Rule 84-022 - Must be outside, accessible, lockable, weatherproof- clearly labeled as Disconnect. Rule 6-200 - Must be service entrance rated equipment. Rule 10-204 The neutral must be isolated. Farm Service Center - Note: The breaker on the pole does not satisfy Rule 84-022. Note: 1. All labels and diagrams must be installed before the installation will be approved. All labels and diagrams installed outdoors and exposed to the weather shall meet the requirements listed in the Saskatchewan Interpretations under Rule 64-074. 2. On services above 400 Amp - the labels required by Rule 84-030 will need to be installed at the meter and at the main switch. 3. All wiring must be done by a licensed Saskatchewan Electrical Contractor and be covered by an appropriate electrical permit. Homeowner Permits are not allowed. 4. It is the responsibility of the Electrical Contractor to arrange for an inspection 2 weeks prior to requesting a network service connection. 5. When Network ing is installed, the Local must approve all connection diagrams before the installation begins. 6. All renewable energy installations require electrical construction plans to be submitted to Electrical Inspections and reviewed before approval will be granted. See Rule 2-014. November 2016