General Information. How to apply:

Similar documents
SICAL Logistics Limited. Single Window for Integrated Logistics

RECLAMATION OF COAL MINE VOID

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO. 100 TO BE ANSWERED ON PRIVATE FREIGHT TERMINALS

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

PRE FEASIBILITY REPORT

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

EFFECT OF FLY ASH ON THE PROPERTIES OF CEMENT

Max. building height (m)

Study of Pond ASH (BTPS) Use as A Fine Aggregate in Cement Concrete - Case Study

National Aluminium Co. Ltd.

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

INFRASTRUCTURE PROJECTS IN PIPELINE

GLOBAL EXPRESSION OF INTEREST (EOI) FOR BUSINESS CO OPERATION IRON ORE BENEFICIATION PLANT AND PELLET PLANT

TRANSILO : Global Logistics System Innovator. Portable Bulk Supply System

GLOBAL EXPRESSION OF INTEREST ( EOI ) For CONSULTANCY SERVICES TO PROVIDE BASIC ENGINEERING AND PROCESS FOR LUBE OIL BLENDING PLANT

INTERNATIONAL O&M CONFERENCE

U-II : 3.5 MTPA Cement Commissioned : Jan U-I : 3 MTPA Cement Commissioned : 1997

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

Planning and operation of freight terminals for large industrial units - Ports. Presented by Capt. A K Singh CEO Adani Hazira & Dahej Port

A STRONG TURNAROUND UNDER WAY

3 Responsibility Centre COS - CenPEEP 4 Brief scope of work The engagement with NTPC will be in the following steps:

Strategy for Development of Integrated Municipal Waste Management Project

Domestic & Export Cement Market, Transportation Capacity Utilization & Outlook in India

Study of supply chain of primary raw material (bauxite & alumina) of a mining company- a SAP LAP analysis

Mix Design For Concrete Roads As Per IRC

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

INDIAN INSTITUTE OF TECHNOLOGY (INDIAN SCHOOL OF MINES) DHANBAD

EMPANELMENT NOTIFICATION

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

BEST PRACTICES ON ENERGY EFFICIENCY

Hind Energy & Coal Beneficiation (India) Ltd.

MINING & QUARRY PROJECT EXPERIENCE

To Study of Maximum Efficiency Of Power Generation in Thermal Power Plant

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

MMTC LIMITED Core No.1, Scope Complex, 7 Institutional Area, Lodhi Road, New Delhi

Hind Energy & Coal Beneficiation (India) Ltd.

AFD: PUR: UM: ENQ: 02 December 6 th, 2017 PURCHASE INQUIRY FOR MAIDA

SLURRY PIPELINES : ECOFRIENDLY & SUSTAINABLE SOLUTION FOR TRANSPORTATION OF MINERALS

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

India - Europe Automotive Technology Meet

Off Grid Access to Electricity- India s Perspective. Paris, France

MINING IN INDIA 2016

PNEUMATIC CONVEYING. Dense Phase Conveying

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

NTPC SAIL POWER COMPANY LTD (A Joint Venture of NTPC & SAIL) Captive Power Plant -II, D.S.P. Complex, Durgapur , Dist- Burdwan(W. B.

Port of Algoma. Focal Point of the Great Lakes Region

Executive summary. EIA STUDY for 1320MW Coal Based Super-critical Thermal Power Plant at Deosar, District Singrauli, Madhya Pradesh 13-13

JAGGERY FROM SUGARCANE

NEW SUPPLIER REGISTRATION FORM (SRF)

Sardar Sarovar Narmada Nigam Ltd (A wholly owned company of Govt. of Gujarat) (

THE MOELLER DIRECT POT FEEDING SYSTEM FOR A SMOOTH AND CONSTANT PNEUMATIC TRANSPORT OF SECONDARY ALUMINA TO THE ELECTROLYTE CELLS

PLus. Power COALNOMICS POWER PLUS CONSULTANTS State-wise

2 NECESSITY OF THE PROPOSED PROJECT

CONTAINER MARKET IN INDIA 2017

Government of India Ministry of Textiles, Textiles Committee P Balu Road, Prabhadevi Chowk, Prabhadevi Mumbai

Environmental Impact Assessment

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

The Delta Group Of Companies

MBG (formerly known as Maheswari Brothers) is a leading coal trading, Processing& Beneficiation and Logistics service provider.

ENVIRONMENTAL MONITORING PROGRAMME

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

BHARAT PETROLEUM CORPORATION LIMITED (A Public Sector Undertaking under the Government of India)

SEABORNE TRADE AND DISTRIBUTION OF CEMENT AND CLINKER. Ad Ligthart Cement Distribution Consultants

Update on the The Environmental Regulations that are under development in Egypt. Afifi A. Afifi, Protrade Co.

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

MCDR INSPECTION REPORT

Technical Presentation on Spent Pot lining Management & Red Mud

Sub: Invitation for Expression of Interest (EOI) (EOI NO.: OIL/NEF/EOI/022/2013)

Advanced Solutions for Aluminum Smelters

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT

CEMENT INDUSTRY PROJECT EXPERIENCE

Validation Report. Report No , Revision April 2007

Embassy of Denmark in Vietnam 2 / 10

Jhabua Power Ltd. NOTICE INVITING BIDS

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED

Rajasthan State Pollution Control Board

A Supply Chain System: the InterBulk Approach - some practical insights & case studies from InterBulk s Asian customers. Shanghai 21 June 2012

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA -

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

Valuepark Terneuzen 1

PRE-FEASIBILITY REPORT

CDM and NAMA in India

ICD/IRUGUR FROM TO 20 40

D I G H I P O R T L I M I T E D

RAILWAYS IN INDIA 2017 Market Analysis, Outlook and Opportunities

IMPLEMENTATION OF ISO 50001:2011 & BEST PROJECTS ON ENERGY THE RAMCO CEMENTS LIMITED JAYANTHIPURAM

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Leasing of Railway Land

DETAILED TENDER NOTICE

VADODARA SMART CITY DEVELOPMENT LTD.

MODULAR BRICKS: COST EFFECTIVE AND ENVIRONMENT FRIENDLY WALLING MATERIAL

NOTICE OF EXPRESSION OF INTEREST (EOI) FOR AVAILING HUMAN RESOURCE CONSULTANCY SERVICES DESIGNING/DEVELOPING OF HR AND ADMINISTRATIVE MANUAL

Additives for a Challenging. Cement Market

Transcription:

General Information Adani Power Maharashtra Limited s (APML) Thermal Power Plant of 3300 MW Capacity (5 x 660 MW) is located in the state of Maharashtra at Tirora near Gondia. All units are with Supercritical Technology, driving efficiency in coal based power generation & with latest technology for environmental management with registration of the plant under CDM by UNFCCC. APML produces approx. 4 Million Tons of Ash annually, out of which 80% is Fly Ash. APML has undertaken numerous initiatives towards Fly Ash utilisation generated during the power generation process and achieved fly ash utilization to the tune of 48% through supply of fly ash to cement plants in the region and other initiatives such as establishment of fly ash brick plant, educating and encouraging local farmers to utilise fly ash in agriculture etc. The plant is equipped with latest pollution control equipment such as high efficiency electrostatic precipitators, dust extraction & Suppression system and 275 M high chimney and ensures that the emissions are within the prescribed permissible limits. Presently APML ash is being utilized in Land development, Ash Dyke Raising, Road/Rail Construction, Brick/Blocks/Tile industries & Cement Industries etc. APML intends to increase its Ash Utilization by inviting Expression of Interest (EOI) from interested parties for: 1. Bulk Transportation through BTAP/BCFC/BCCW rail wagons for cement companies. 2. Setting up Cement, Bricks / Blocks, AAC Blocks, Asbestos Sheet plant and any other Ash based product manufacturing unit nearby Tiroda TPP. 3. Supply of fly ash, pond ash, fine & super fine fly ash for various other applications and to transporters. In order to facilitate bulk transportation of fly ash through Railway wagons, state of art facility for loading of dry fly ash from 6 x 1700 MT silos with underneath railway track has been developed at APML s Tiroda thermal power plant. APML has already supplied fly ash through BCFC rakes to various cement plants in Gulbarga region in trial run. BTAP are side discharge wagons, being widely used for transportation of Alumina powder by Aluminum Industry. These wagon rakes are either owned by Aluminum Industry or are taken on lease from leasing companies. Ministry of Railway vide its circular dated 20-01-2017 has allowed fly ash transportation through BTAP wagons and permissible carrying capacity for fly ash has been fixed to 60.36 tonne per wagon. BCFC/BCCW are bottom discharge wagons being widely used for transportation of cement and fly ash by cement Industry. These wagon rakes are either owned by cement Industry or are taken on lease from leasing companies. Presently Indian Railways has two rakes of BCFC available for bulk transportation of fly ash & cement. For receiving fly ash from BTAP/BCFC/BCCW wagons, cement plants will have to install suitable unloading facility such as compressors and pipe lines from railway siding to fly ash storage silos etc. Interested transporter can also unload fly ash into closed tankers/bulkers through the mobile compressor system from BTAP wagons parked at railway siding. Bulk transportation of fly ash through BTAP/BCFC/BCCW wagons will be cost effective, reduce pollution due large number of bulker movement at loading/unloading points and thus is environment friendly. Information on APML s thermal power plant: How to apply: Sr. No. Particulars Details 1 Location of plant Tiroda, Distt. Gondia, Maharashtra 2 Nearest Railway station and distance Kachewani (1.7 Kms) 3 Installed capacity (MW) 5x660 MW (3300 MW) 4 No. of fly ash silos and capacities 1700x6 MT (10,200 MT) 5 Railway Siding Code PMAM Interested parties may send their Expression of Interest duly filled in the respective formats (Format No 1 to 3) to address mentioned below on or before 1900 hrs. 30 th November, 2017. Vice President (Techno Commercial / Ash Management) Adani Power Maharashtra Limited Plot A-1, Tirora Growth Centre, MIDC Area, Tirora, Dist Gondia 441 911, Maharashtra, India Tel: +91-7198-25 5105, +91-7198-25 5191 Email: cvs.pratap@adani.com Note: -This announcement is not an offer for commitment for fly ash tie-up/agreement Encl : Format No. 1,2 and 3.

Format No.1 Expression of Interest for Issue of fly ash from Tiroda in BTAP/BCFC wagons 1. Name of the cement Industry 2. Address : 3. Classification of the Company : Public Limited / Private Limited / Partnership Firm Others (please specify) 4. Contact details : I. Name: II. III. Tel No IV. Fax No.: V. Mobile No VI. Email ID: 5. Installed capacity of Cement Plant: 6. Types of the cement being manufactured: I. PPC Tonne per annum II. OPC Tonne per annum. III. Any other cement Tonne per annum 7. Fly ash requirement on daily/ annual basis: 8. Present mode of transportation of fly ash: trucks/ tankers/ bulkers 9. Fly ash storage silo capacity: Number of silos / Capacity 10. Railway siding facility: 11. Nearest Railway station where fly ash rake can be placed and its distance Name of railway station and Distance km 12. Willing to develop unloading facility of fly ash from BTAP/BCFC wagons: Yes / No. 13. If Yes, how many rakes per month can be taken and Which Type?: 14. Whether willing to enter into MoU : If yes, Period of MoU years 15. Willing to purchase/ take on lease BTAP/BCFC wagons: Yes/ No 16. Any other information, which may be want to share in the EOI.

Format No. 2 Expression of Interest for Setting up Cement, Bricks / Blocks, AAC Blocks, Asbestos Sheet plant and any other Ash based product manufacturing unit nearby Tiroda TPP. 1 Name of Company 2 Address 3 Contact Person 4 Designation 5 Contact No. 6 Email ID 7 Website 8 Core area of expertise 9 Date of Incorporation 10 GST No. 11 CIN No. 12 PAN No. 13 Shareholding Pattern 14 Annual Turnover 15 No. of Plants 16 Installed Capacities 17 Proposed Project 18 Type of Plant 19 Proposed Capacity 20 Mode of Project implementation Full Ownership or Joint Venture 21 Electricity Requirement (MW) 22 Water Requirement (CUM/Day) 23 Ash Requirement (MT/Day) 24 Land Requirement (Acre) 25 Estimated Investment (Rs. Cr.) (Details should be attached) 26 Expected Date of Operation 27 Any other information, which may be want to share in the EOI

Format No.3 Expression of Interest for Supply of fly ash, pond ash, fine & super fine fly ash for various other applications and to transporters 1 Name of Company 2 Address 3 Contact Person 4 Designation 5 Contact No. 6 Email ID 7 Website 8 Core area of expertise 9 Date of Incorporation 10 GST No. 11 CIN No. 12 PAN No. 13 Shareholding Pattern 14 Annual Turnover 15 No. of Plants 16 Installed Capacities 17 Ash Requirement (MT/Day) 18 Type of Ash Required 19 Mode of Transportation 20 Present Source 21 Present Landed Cost (Rs. Per MT) 22 Any other information, which may be want to share in the EOI Material Freight