Mr. Rajesh Kumar Sethi Chair, CDM Executive Board UNFCCC Secretariat 16 th December 2008

Similar documents
VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

Subject: Answer to Request for review Saldanha Small Hydroelectric Project (1526)

Overview of CDM Documentation and Procedures

Bulgarian JI Guidelines. 2006, September

VALIDATION REPORT. KKK Hydro Power Limited Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW)

Response to requests for review Aços Villares Natural gas fuel switch project (0474)

The Austrian JI/CDM Programme

DRAFT TEXT on CMP 12 agenda item 4 Matters relating to the clean development mechanism. Draft decision -/CMP.12

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

CDM Guide Book for Oil & Gas Sector. Ariesta Ningrum GGFR Workshop September 19-20, 2006 Jakarta - Indonesia

Climate Financing CDM and NAMA in Rwanda

Validation Report. Abonos Colombianos SA.

UK CCS Programme and CCS Transboundary Developments

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

SUBMISSION TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE (UNFCCC) SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE (SBSTA)

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

Validation Report. Datang Zhangzhou Wind Power Co., Ltd. VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project.

-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China

Report No: QT-CDM /11

Memorandum of Understanding on cooperation regarding Clean Development Mechanism project activites and climate policy issues.

VALIDATION REPORT VIETNAM CARBON ASSETS LTD

Carbon Finance Opportunities for Africa. Maputo, 11 June 2009 Dr Charlotte Streck

CDM projects development activities in India. Vivek Kumar TERI 26 July 2005

VALIDATION REPORT VIETNAM CARBON ASSETS LTD

Analysis and Evaluation of CDM Potential of Biomethanation Sector in India

Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project

Zafarana Wind Power Plants AS CDM Projects. Eng. Rafik Youssef Georgy Consultant, NREA

VALIDATION REPORT. Liaoning Changtu Quantou Wind Power Project in China. REPORT NO REVISION NO. 03 Deleted: 2

Guidance Note on Accounting for Self- generated Certified Emission Reductions (CERs) (Issued 2012)

We think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion.

CDM Regulations. 2.1 Introduction. 2.2 Regulatory Process

Carbon Resource Management Ltd. IN CHINA. 2008, October May 0624

Procedures and Criteria for Screening, Evaluating and Approving CDM Projects: A Case Study in Kazakhstan

Your reference/letter of Our reference/name Tel. extension/ Fax extension Date/Document Page.

Validation Report. Report No , Revision April 2007

INTERNATIONAL STANDARD

DRAFT UNFCCC/CCNUCC Page 1

THE GOLD STANDARD POA RULES AND GUIDANCE ANNEX F (GSV2.2)

A/R Methodological tool. (Version 01)

CDM Experience: QUEZON CITY (PAYATAS) Controlled Disposal Facilities

Investment Opportunities in the Carbon Sector. Michiel Tijmensen - Risk Manager December

Report of the Assessment of Market-based Measures

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

CDM FOR RENEWABLE ENERGY DEVELOPMENT BHUTAN S EXPERIENCE

VERIFICATION REPORT VEJO GUSIS,UAB

(20-MW Geothermal Power Generation)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

The Project Design Document

Determination Report

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY

REPORT OF THE THIRTY-SIXTH MEETING OF THE AFFORESTATION AND REFORESTATION WORKING GROUP

Validation Report. BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil. Report No , September 8

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

Annex 2 PROCEDURES FOR THE SUBMISSION AND CONSIDERATION OF A PROPOSED NEW SMALL SCALE METHODOLOGY. (Version 03) I. BACKGROUND

VALIDATION REPORT. Río Luis In Ecuador. Energyhdine C.A. Report No CCL0105/RLSHP/ Revision No 03, 12/11/2012

Training programme GHG emission trends and projections

HIGH-LEVEL MEETING ON INTERNATIONAL AVIATION AND CLIMATE CHANGE

Climate Change Mitigation through the Carbon Finance Support Facility (CFSF) in the Philippines

Challenges for CDM in India Experience from GTZ

CDM Programme of Activities Call for Public Inputs

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

Decision 19/CMP.1 Guidelines for national systems under Article 5, paragraph 1, of the Kyoto Protocol

Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh

Large-scale Consolidated Methodology Waste energy recovery

CLEAN DEVELOPMENT MECHANISM EXECUTIVE BOARD PROPOSED AGENDA AND ANNOTATIONS. Twenty-third meeting

Validation Report. Equipav S. A. Açúcar e Álcool. Validation of the Equipav Bagasse Cogeneration Project (EBCP) 23/12/2005

Response to the Request for Review BK Energia Itacoatiara Project

Lessons Learned from Country-based practical experience on NAMAs in Cambodia

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS

NOTIFICATION United Nations Climate Change Conference, Bonn 3 to 14 June 2013

The Clean Development Mechanism. Martin Hession - CDM Executive Board Member -DECC UK

" Working Paper Guidance on Criteria for Baseline Setting and Monitoring "

Conclusions and Recommendations Third meeting of inventory lead reviewers Bonn, Germany April 2005

CDM Opportunities; Swine Farms in Brazil

Validation Report. Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil. Report No , Revision 01 B.

Validation Report. Usina Nova América S/A. Validation of the. Nova América Bagasse Cogeneration Project (NABCP) 2005, December 13

Emissions trading in a policy stew: a case study on China s CDM wind power projects

The Voluntary Carbon Market: Status & Potential to Advance Sustainable Energy Activities

Framework Convention on Climate Change

November 2009 Updated up to the results of the EB50

GOLD STANDARD PASSPORT

Carbon Footprint Standard Qualification Requirements. 3 January Issue 1.1

Validation Report. Monte Rosa S.A. Validation of the Monta Rosa Bagasse Cogeneration Project. Report No , Revision 0 20/12/2005

Belarus. Carbon Finance for New Projects A Primer

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS

São Paulo, 26 September Dear Mr. Philipsen, Mr. Maldonado and Mr. Becker,

The Austrian JI/CDM Programme

FRAMEWORK CONVENTION ON CLIMATE CHANGE - Secretariat CONVENTION - CADRE SUR LES CHANGEMENTS CLIMATIQUES - Secrétariat

Overview of the CDM in the agriculture sector

Comparison of admission rates to neonatal units between PO screening and non-po screening Units

VERIFICATION REPORT OF THE LUGOUHE HYDROPOWER PROJECT IN SICHUAN PROVINCE, CHINA

Analysis of the flexible support mechanisms in the Directive on the promotion of the use of energy from renewable sources

AN ASSESSMENT OF SUCCESS OF CLEAN DEVELOPMENT MECHANISM OF KYOTO PROTOCOL IN CLIMATE CHANGE MITIGATION AND SUSTAINABLE DEVELOPMENT

The Clean Development Mechanism: Special Considerations for Renewable Energy Projects

GOLD STANDARD VERIFICATION REPORT

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1

THE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT

Transcription:

Mr. Rajesh Kumar Sethi Chair, CDM Executive Board UNFCCC Secretariat CDMinfo@unfccc.int 16 th December 2008 Dear Mr. R. K. Sethi, Re: Request for review for request for registration of Ceran's 14 de Julho Hydro Power Plant CDM Project Activity (UNFCCC Ref. no. 1829) SGS has been informed that the request for registration of the CDM project activity Ceran's 14 de Julho Hydro Power Plant CDM Project Activity (UNFCCC Ref. no. 1829) is under consideration for review because three requests for review have been received from members of the Board. The requests for review are based on the reasons outlined below. SGS would like to provide an initial response to the issues raised by the request for review: Request for clarification to the DOE/PP: Request for Review 1-3, Issue 1: The DOE should justify why the sensitivity of the investment cost to the IRR, which is a key parameter to the investment analysis, has not been carried out in the sensitivity analysis. SGS Response to Issue 1: As requested a sensitivity of the investment cost was made showing that the IRR is still lower than the benchmark value (Ref 4): Investment Variation Variations Thousand R$ in August 2003 IRR Projected Situation 203,306.56 11.59% -5% 193,141.23 12.49% -10% 182,975.90 13.47% 5% 213,471.89 10.77% 10% 223,637.22 10.01% After sensitivity analysis the maximum IRR is 13.47% if the investment costs are reduced by 10%. However, the most likely scenario is that the investment costs increase instead of decrease, and in this case the IRR will then be lower than expected for this project activity and also lower than the benchmark of 20.87%. The parameters used in the sensitivity analysis are considered correct because they represent the investment costs, the revenue of the project and related costs that can directly affect the internal rate of return. Through the sensitivity analysis the maximum internal rate of return obtained is 13.47%, still lower than the benchmark of 20.87%. The assumptions and the spreadsheet calculation were provided, recalculated by the assessment team and were considered correct (/Annex 1/). The conclusion is that after sensitivity analysis including the investment cost, the project activity is not financially attractive. SGS United Kingdom Ltd, SGS House, 217-221 London Road, Camberley, Surrey GU15 3EYTel +44 (0)1276 697877Fax +44(0)1276 697833 Registered in England No. 1193985 Rossmore Business Park, Ellesmere Port, Cheshire CH65 3EN www.sgs.com Member of SGS Group (Société Générale de Surveillance)

Request for Review 1-3, Issue 2: Further clarification is required on how the DOE has validated the common practice analysis, in particular, the selection of similar project activities. SGS Response to Issue 2: Similar projects were presented in the PDD and validated during the validation process. The hydro plants described in the PDD were considered similar to the project activity and 6 plants were analyzed. Considering the proposed range for similar projects, there are 6 hydro plants in the region: - Hydro plant Castro Alves with 130MW excluded because this is a CDM project activity requesting registration; - Hydro plant Jacuí with 180MW cannot be compared with project due to the size of the reservoir and power density is lower than 4W/m2; - Hydro plant Passo Real with 158MW cannot be compared with project because this is not a run-ofriver plant as Castro Alves and due to the size of the reservoir and power density is lower than 4W/m2; - Hydro plant Dona Francisca with 125MW cannot be compared with project due to the start date before the Kyoto Protocol and the size of reservoir with a power density lower than the project; - Hydro plant Monte Claro with 130MW excluded because this is a registered CDM project activity; - Hydro plant 14 de Julho with 100MW excluded because this is the project activity; Data source used for the common practice analysis: ANEEL, http://www.aneel.gov.br/area.cfm?idarea=15 (Brazilian Electricity Regulatory Agency). The common practice analysis is based on the Brazilian electricity sector. The source of data presented was checked. There are similar hydropower plants but with different characteristics. The distinction between the project activity and similar projects identified was proven. The project activity cannot be considered as common practice. Request for Review 1-3, Issue 3: The DOE is requested to provide reliable evidence that the CDM was considered prior to the project start date and that continuing and real actions were taken to secure the CDM status for the project activity in parallel with its implementation (EB 41, Annex 46, paragraph 5). The response should provide a detailed timeline of project implementation. SGS Response to Issue 3: The reliable evidence that the CDM was considered prior to the project start date and that continuing and real actions were taken was provided. The additional information provided and verified also attends the paragraph 5, EB 41, Annex 46 approved after submission of the request for registration. Chronological History for the Project activity 1. Communication between CPFL and CarboNetwork technical proposal as requested by CPFL to develop the feasibility study for the several opportunities of GHG reduction in the activities of CPFL. 2. CDM Consideration evidence - CPFL Board Resolution Nº2001022/CPFL; Report Nº 0/T 31/07/01. This document considers to contract a Consulting Company to structure a financing derivative (CERs) qualified to be internationally transacted from Greenhouse Gases (GHG) avoided emissions in the activities of CPFL. This means that the business activities create opportunities of Greenhouse Gases (GHG) Reduction Projects development. Additionally, these projects can also improve the 18/07/2001 31/07/2001

company financial results (Annex 2). 3. Report from Carbo Network: Volume I, CPFL in the context of Climate Change; Volume II, Project eligibility criteria; Volume III, Brazilian scenario to characterize the baseline scenario in CPFL; Volume IV, Preliminary estimative of the carbon credit in CPFL through CDM. 4. Actualization of the information about the opportunities to obtain carbon credits by CPFL, issued by SinerConsult consider the opportunity to obtain carbon credits in the CPFL activities including the potential hydro plants projects Castro Alves, Monte Claro, 14 de Julho among others (Annex 7). 5. The BNDES Board of Directors approved the financing contract for CERAN: construction of Project HPP 14 de Julho, HPP Monte Claro and HPP Castro Alves. 6. The 2003 CPFL Annual Report shows that CPFL was looking for the carbon credit sales of its projects. CPFL was in the process of signing a cooperation agreement with IUEP - International Utility Efficiency Partnerships to find opportunities for carbon sales for its projects, including HPP 14 de Julho, HPP Monte Claro and HPP Castro Alves (Annex 3). April 2002 November 2002 08/12/2003 2003 7. Start date of the project activity construction beginning. 01/10/2004 8. Proposal for the commercialization and development of the Carbon Credit Projects of CERAN, including hydro plants Monte Claro, 14 de Julho and Castro Alves (proposal issued by consultant company Ecoinvest). 9. Proposal from EcoSecurities with the intention to be the CER buyer (CDM Emission Reduction Agreement proposal from EcoSecurities (Draft ERPA). (Annex 4) 10. Exceptional circumstances and unforeseen geological conditions including rock burst phenomena occurred, stopped the construction. The ANEEL (Brazilian Electricity Regulatory Agency) notified CERAN that the construction was stopped by notification TN n o 215/2005 11. Proposal from EcoSecurities with the intention to be a consultant and CER buyer. The proposal considers the development of CERAN s CDM projects (Annex 8). 12. Proposal from EcoSecurities with the intention to be a consultant. The proposal considers the development of CERAN s CDM projects (Annex 5). 13. CERAN requested IUEP to present a proposal for HPPs projects. IUEP presented its proposal and a draft Contract with conditions to develop the 3 HPPs together as a single program of investment. 14. In spite of the Executive Managers of CERAN had suggested to contract the three projects at the same moment, not necessary with the same Consultant, the CERAN board of Directors in its 49 th meeting approved to contract a Consultant for develop initially only the Carbon Credit Project Activity for Hydro Power Plant Monte Claro. March 2005 24/06/2005 July 2005 14/07/2005 24/07/2005 25/07/2005 28/07/2005 15. After negotiation the EPC contractor agreed to restart the construction. 01/10/2005 16. The amendment contract was signed between CERAN and EPC Contractor. New schedule established in 01/10/2005 was confirmed by EPC Contractor. 17. CERAN asked IUEP to revise its proposal, only for projects HPP Castro Alves and HPP 14 de Julho. IUEP presented its proposal and a draft Contract with conditions to develop the 2 HPPs together. 18. Negotiation between CERAN and IUEP to develop the projects HPP Castro Alves and 14 de Julho. 01/11/2005 21/12/2005 27/12/2005

19. C-Trade consultants visited the HPP 14 de Julho and HPP Castro Alves. 22/02/2006 20. C-Trade and CERAN was still in negotiation to develop the projects 14 de Julho and Castro Alves. 16/05/2006 21. The 2006 CPFL annual report confirmed that CERAN intention to develop the CDM projects 14 de Julho and Castro Alves. The project HPP Monte Claro was developing in parallel by another consultant company. This project is already registered by the CDM EB (Annex 6). 22. C-TRADE was contracted in February 2007 to develop the project HPP Castro Alves. 2006 February 2007 23. Lumina Engenharia was contracted to develop the project HPP 14 de Julho. 28/06/2007 24. Validation proposal signed with SGS. 12/09/2007 25. Start of the validation global stakeholder consultation. 11/10/2007 26. Submission of request for registration. 25/04/2008 HPP plants 14 de Julho, Castro Alves and Monte Claro are mentioned together several times in the timeline above because CERAN is complex with 3 Hydro Power Plants but every project was developed in a separate PDD (individual CDM project). SGS opinion is that the timeline of Ceran s 14 de Julho Hydro Power Plant CDM Project Activity is in accordance with applicable procedures and requirements and reflects the real data and steps of the implementation of the project. Request for Review 1-3, Issue 4: The start date of the project activity should be as per the CDM glossary of terms. SGS Response to Issue 4: Start date of the project activity presented in the PDD and confirmed during validation assessment (Ref.11 of the validation report): 01/10/2004, start date of the construction. CDM glossary of terms: The starting date of a CDM project activity is the earliest date at which either the implementation or construction or real action of a project activity begins. The start date of the project activity is in according to CDM glossary of terms because represents the start of project implementation/construction. Ref.11 of the validation report is a letter stating the immediate start of the construction of hydropower plant 14 de Julho. With the explanation provided above, we hope that all concerns of the EB have been addressed. We do however apologize if this was not sufficiently clear from the validation report. Fabian Goncalves (+55 11 5504-8887) will be the contact person for the review process and is available to address questions from the Board during the consideration of the review in case the Executive Board wishes. Yours sincerely, Irma Lubrecht Fabian Goncalves Technical Reviewer Lead Assessor Irma.lubrecht@ir-on.nl Fabian.Goncalves@sgs.com T: +31651851777 T: +55 11 3883 8887

Encl: - Annex 1 - Sensitivity analysis - Annex 2 - CDM consideration - CPFL Board Resolution N 2001022 - Annex 3 - Annual Report 2003 - Annex 4 - CERAN 3 hydro plants ERPA (PF) - Annex 5 - CERAN 3 hydro plants EDGE proposal (PF) - Annex 6 - Annual Report 2006 - Annex 7 - CERAN 3 hydro plants EDGE proposal - 2 PDDs (PF) - Annex 8 - Information update of the opportunities of CERs acquisition by CPFL