NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING

Daytona Beach Pier Building Renovation Jun 2010

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

UNDERGROUND SERVICES SECONDARY

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

A. Access doors and frames are part of an access door and frame allowance.

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Trench Duct Class Catalog 5230CT9601R10/08

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems.

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

This translates to well over 30,000 wind turbine step-up transformers of which one of each is installed at the base of each turbine.

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

ELECTRICAL SAFETY INSPECTION REPORT

Installation of CSST Gas Piping Systems

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HVAC DUCTS AND CASINGS

University of Delaware

Standard of Practice - Campus Electrical Distribution System

B. Provide a complete conduit system with associated couplings, connectors, and fittings.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

PTFE Pipe Slide Assemblies

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Diffused Aeration Piping Equipment

SECTION ALUMINUM GATES

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

SECTION HVAC GRAVITY VENTILATORS

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

Division 11 - Equipment Section 11401

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

CEILING & WALL SYSTEMS

ELECTRICAL SAFETY INSPECTION REPORT

PATHWAYS FOR COMMUNICATIONS SYSTEMS

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

SECTION GROUNDING AND BONDING

BEARING METAL STUD FRAMING

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 414/January 2004 INSTALLING SEISMIC RESTRAINTS FOR DUCT AND PIPE

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

4400 Series UPS Seismic Adapter Kit Installation Instructions

WIRING METHODS CHAPTER 38

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

American Metal Specialties, Inc.

SECTION ACOUSTICAL PANEL CEILINGS

SECTION I -- IRONWORK

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems)

Product Specifications MRI Trench Duct

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal.

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)

SECTION ALUMINUM WINDOWS

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

Cable Terminators COMMERCIAL AND INDUSTRIAL FITTINGS: RIGID AND IMC CONDUIT FITTINGS. Applications

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

DARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES

SECTION TURBINE VENTILATORS

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

Section SECTIONAL INSULATED STEEL DOORS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Originally Issued: 03/08/2013 Revised: 03/14/2017 Valid Through: 03/31/2019

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

SECTION DIRECTORIES

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION SEISMIC CONTROL OSHPD

SECTION METAL BUILDING SYSTEMS

Section BUILDINGS, SHELTERS, ENCLOSURES

Transcription:

Details of technical leaflets/write-up on various pieces of equipment. (1) Insulator Designs: The insulators are provided in one, two, three, or four insulator designs per location and spaced to provide both short circuit bracing and required conductor support. Daqo Group is specially designed insulator assembly accomplishes the required loads without being rigidly fastened or welded to the conductor (except the single insulator design). This feature allows the entire insulator assembly to be removed and reinstalled in a one-piece assembly and allows unlimited conductor movement due to thermal expansion without placing lateral stress on the insulator. The number of support insulators is determined by size and weight of the conductor and the rated short circuit value of the bus system. (2) Elbows: Daqo Group can supply elbows designed at any angle of offset. All elbows are CNC plasma cut from flat plates, rolled and welded together to form a mitered joint. All elbows are factory welded to a longer section of bus to complete a shipping section. This feature reduces the amount of on-site weld time. Elbows are designed to accommodate the placement of insulators and custom layout designs. Page 1

(3) Tee-taps: Daqo Group can supply tee taps at any location and with any rating required. The design and construction are typical to elbows. Also all tee taps are fully factory assembled to reduce on-site weld time. Tee taps have various designs based on interfacing equipment, we will design tap bus configuration to match main bus phase centers and the interfacing equipment phase centers. (4) The splice joint assembly contains all fittings necessary for the installer to join two bus sections. Included in the assembly are two split enclosure splice covers with backing strips factory welded, and pre-fitted conductor backing rings for extruded tube size conductors or two-piece splice sleeves for rolled conductors. All components are factory weld prepared for field welding. (5) Typical vibration/earthquake/expansion joint, conductor/enclosure: This type can be used for numerous Page 2

applications. Its main functions are to provide a flexible joint, when the bus system is to be installed in a seismic region that is rated above Zone 2 per Uniform Building Code, and it can be used alone as a thermal expansion joint in a seismic area or, depending on the bus system routing, the joint can be used as a combination of earthquake and expansion at the same location. Each joint of this type contains factory-welded conductor studs for bolting the supplied flexible connectors. The enclosure joint is made up of a bellows assembly, which attaches to factory-welded bellows collars, and an enclosure jumper assembly which consists of factory-welded studs for supplied flexible enclosure connections. This type splice joint may also be used as a removable joint when certain sections, typically in generator or transformer areas, are required to be removable without cutting or welding of the enclosure and conductor to allow for equipment removal or servicing. (6) Splice joint, expansion, conductor/enclosure: This type joint is used only for thermal expansion of the conductor and enclosure. The joint assembly consists of a fully factory-welded enclosure expansion ring and a factory-assembled laminated flexible connector joint for the conductor. The conductor expansion assembly is welded in place typically at a section split which is offset from the enclosure expansion ring. The expansion ring is factory located and welded within a bus section. A laminated flex assembly is provided to compensate for thermal expansion of the conductor. The location will be selected at the time manufacturing drawings are prepared. The conductor joint is factory assembled for field welding to the weld prepared conductor ends. Daqo Group, as a standard practice, does not factory weld the flex joint to one conductor end due to the possibility of damage during installation. (7) Splice Joint, removable, conductor/enclosure: This type joint can be placed at any location along the bus routing for a bus section to be removed without cutting and re-welding the bus conductor and Page 3

enclosure. The removable joint is used typically in areas where periodic access to other equipment is required. The removable section is typical in design to the vibration/earthquake/expansion joint, 2H. The change made to the removable section is the enclosure jumpers are typically rigid bar. (8) Typical generator termination: Because the transition requirement from the generator bushing terminations to the isolated phase bus connection varies by generator manufacturer and whether the machine type is combustion or steam turbine driven. The generator manufacturer determines the isolated phase bus starting point. Dago Goup designs the terminal interface and line/neutral compartments to suit your specific application. Fiberglass or aluminum barriers are provided to separate phases internally. Ground pads are provided on the end of the enclosure. If the generator manufacturer supplies the terminal compartment, Daqo Group will supply all necessary components to complete the generator/bus duct interface. (9) Typical Bus End Seal Assembly: This type seal assembly is used at any terminal point where it is desired to restrict the exchange of air between equipment. The bus end seal also provide a positive seal for pressurized or farced-air cooled bus systems and a seal for hydrogen leakage. (10) Typical Wall/Floor Seal Assembly: This type seal assembly is used to seal any bus duct penetration through a wall or floor that is non-fire rated. The seal assembly incorporates all components of the bus end seal assembly, 5A, to seal the interior of the duct. A two-piece (split horizontally across phase), three-phase, Page 4

aluminum wall/floor plate seals the wall/floor opening. All required fasteners and gasketing materials are supplied. The design of the seal assembly, by utilizing an insulating flexible bellows, allows the enclosure to pass through the wall/floor penetration ungrounded to provide a continuous current path in the enclosure. The bellows also allow for misalignment through the wall penetration. (11) Seal assembly, fire-stop, three-hour rated, three phase: This type seal assembly is used when there is a requirement for fire protection. The fire-stop design and components are typical to the Wall/Floor seal assembly except a Dow Corning material. The wall plate is designed to mount directly to building steel framing or concrete wall, therefore the fire-stop is not supplied with a wall frame. Daqo Group can supply the fire-stop with or without the internal fire seal components depending on your specific requirements. The fire-stop plate-to-seal wall opening would be supplied in either case. (12) Steel support structures: Daqo Group can design and manufacture bus duct support structures to meet any code requirement or application. We has many standard support structures in the single-column, two-column, three-column, four-column, knee brace trapeze, and bridge-type designs. Support placement is generally required at 20 to 30 intervals. All support materials are ASTM A-36 and all fasterners are per Page 5

ASTM A-325 and hot dipped galvanized. Anchor bolts are assumed by others unless otherwise specified. Ⅰ) Duct support, two columns, three-phase: This type support is the most widely used for outdoor duct support applications. This support is supplied with two main supporting columns which are connected to a single horizontal cross member. Ⅱ) Duct support, four columns, three-phase: This type support is designed to support a three-phase duct at a horizontal elbow. The support provides full support under the entire elbow area. Design is typical to the two-column supports. Ⅲ) Duct support, knee brace, three-phase: This support is designed to support the duct from an existing wall or other structure. The support is generally used around main set-up transformer areas, mounted to a firewall, where support foundation areas are limited. Ⅳ) Duct support, trapeze, three-phase: This support is designed to support the duct from overhead. The design is simply an inverted two-column support which is anchored or welded to existing building steel or concrete structures. This support is for indoor use where wind loading is not a factor. Ⅴ) Duct support, three columns, three-phase: This type support is typical in design to the four-column support and is typically used in elbow areas. Ⅵ) The saddle assembly is designed to fasten the IPB to the steel support structure and keep this entire bus system isolated from the steel and ground. This lower cost assembly contains a set of two aluminum support brackets which are field welded to the bus enclosure once the duct is in its proper location. A set of two 5kv insulators are supplied that connect the support brackets to the steel support structure. All associated stainless steel fastening hardware is provided to complete the assembly. Duct support, saddle assembly, single phase, clamp type (factory welded): This saddle assembly is designed to function the same as the field-welded assembly, however, totally factory welded to reduce on-site welding time. The clamp type assembly requires only to be bolted to the supporting steel and clamped around the bus enclosure. A set of two 5kv insulators are supplied that connect the support brackets to the steel support structure. All associated stainless steel fastening hardware is provided to Page 6

complete the assembly. (13) Cubicles, P.T./Surge Protection: Daqo Group standard, free-standing, single-phase cubicle can be fitted with many different types of components to meet your specification. The standard cubicle includes: 3 draw out, keyed lock type potential transformer drawers, 3 indoor type potential transformers with fuses, one lightning arrester, one surge capacitor, one current limiting resistor, IPB connection and primary bus bar, all P.T., S.C., and L.A. primary, secondary, and grounding wiring factory installed and continuous ground bus system. All bus bar and wiring are copper with silver-plated contact surfaces. The rear compartment has bolted removable covers for access to the cabinet interior. Page 7