Prestressed Concrete Girder Continuity Connection

Similar documents
Flexure Design Sequence

The use of 0.5 and 0.6 in. (13 and 15 mm) diameter

Proposed Modifications to the LRFD Design of U-Beam Bearings

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

BrD Superstructure Tutorial

Prestressed Concrete Structure Tutorial

Elevation. Typical Section

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

Design Aids of NU I-Girders Bridges

HIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup

Bijan Khaleghi, Ph, D. P.E., S.E.

Field and Laboratory Study of the Mn/DOT Precast Slab Span System

Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders

JULY 2014 LRFD BRIDGE DESIGN 5-1

Hyperstatic (Secondary) Actions In Prestressing and Their Computation

Dan Eckenrode Executive Director

DESIGN RECOMMENDATIONS FOR THE OPTIMIZED CONTINUITY DIAPHRAGM FOR PRESTRESSED CONCRETE BULB-T BEAMS

ST7008 PRESTRESSED CONCRETE

Bridge Beams/Girders

ANCHORAGE ZONE DESIGN FOR PRETENSIONED PRECAST BULB-T BRIDGE GIRDERS IN VIRGINIA

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

OPTIMIZED ALTERNATIVE STRUCTURAL FORMS FOR STANDARD HIGHWAY BRIDGE BEAMS WITH HIGHER STRENGTH CONCRETES

Reinforced Concrete Column Design

Route 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech

Appendix D.2. Redundancy Analysis of Prestressed Box Girder Superstructures under Vertical Loads

Precast, prestressed girder camber variability

AASHTOWare BrR 6.8 Steel Tutorial Steel Plate Girder Using LRFR Engine

Innovative Design of Precast/Prestressed Girder Bridge Superstructures using Ultra High Performance Concrete

BRIDGE GIRDERS TECHNICAL GUIDE

Strength Design of Reinforced Concrete Structures

AASHTOWare BrR/BrD 6.8 Reinforced Concrete Structure Tutorial RC5 Schedule Based Tee Example

Assessment of Long-Time Behavior for Bridge Girders Retrofitted with Fiber Reinforced Polymer

V '3«0«***«*»«**'"'*««*»««ft

THEORETICAL AND EXPERIMENTAL STUDY OF UNBOUNDED POST-TENSIONED CONTINUOUS SLAB DECKS CONSISTING OF HIGH STRENGTH SCC

Shear Capacity of Prestressed Concrete Beams

PRESTRESSED AND POST-TENSIONED CONCRETE TABLE OF CONTENTS CHAPTER 12

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems

AASHTOWare BrDR 6.8 Steel Tutorial STL6 Two Span Plate Girder Example

Predicted vs Measured Initial Camber in Precast Prestressed Concrete Girders

THE NEW AASHTO MANUAL FOR BRIDGE EVALUATION 2008

Over the years, the use of precast concrete has taken giant

Continuous for Live Load: A Texas Historical Perspective

Form DOT F (8-72) 4. Title and Subtitle CHARACTERIZATION OF SELF-CONSOLIDATING CONCRETE FOR DESIGN OF PRECAST, PRESTRESSED BRIDGE GIRDERS

Parapet/railing terminal walls shall be located on the superstructure.

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

MIDAS Training Series

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

Full-Depth Precast Concrete Bridge Deck Construction

Analysis and design of balanced cantilever prestressed box girder bridge considering constructions stages and creep redistribution

ABC: Vigas Pretensadas para Puentes Principios Básicos de Diseño. Pre-Stressed Concrete Structures Basic Concepts

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

14.1 PCI Standard Design Practice

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

A Composite Structural Steel and Prestressed Concrete Beam for Building Floor Systems

Analysis of a Severely Skewed Prestressed Concrete Beam Bridge

One-Way Wide Module Joist Concrete Floor Design

PROFESSIONAL DEVELOPMENT SERIES

PRECAST I-GIRDER CRACKING: CAUSES AND DESIGN DETAILS

5.4 Analysis for Torsion

DESIGN OF ADJACENT PRECAST BOX GIRDER BRIDGES ACCORDING TO AASHTO LRFD SPECIFICATIONS

PUNCHING SHEAR STRENGTH OF GFRP REINFORCED DECK SLABS IN SLAB- GIRDER BRIDGES

Introduction to Decks and Deck Systems

Estimating prestress loss in pretensioned, high-strength concrete members

AASHTOWare BrDR 6.8 Prestressed Concrete Design Tool Getting Started

North Mountain IMS Medical Office Building

Lintel Tables Design Notes and Limitations

Bridge Beams. Product brochure

Session 2: Basic Load Rating Calculations

SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE

2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE. Fawaz K. Saraf, P.E.

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

Fundamentals of Post Tensioned Concrete Design for Buildings

CSU GUIDELINES. April 27, 2018 FOR POST-TENSIONED CONCRETE STRUCTURES.

7.1 Transmission of Prestress (Part I)

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Forensic Testing of Post Tensioned Concrete Girders

EXPERIMENTAL AND ANALYTICAL INVESTIGATION OF FULL-DEPTH PRECAST DECK PANELS ON PRESTRESSED I-GIRDERS

Connections between precast girders and cap beam

Cracks and Crack Control in Concrete Structures

French bridges experiences from prefabricated deck elements. Stockholm, march 4th, 2009

Sabah Shawkat Cabinet of Structural Engineering 2017

Stability of Precast/Prestressed Concrete Bridge Girders

AASHTOWare Bridge Rating/DesignTraining. STL8 Single Span Steel 3D Example (BrR/BrD 6.4)

AASHTO LRFD. Reinforced Concrete. Eric Steinberg, Ph.D., P.E. Department of Civil Engineering Ohio University

Fundamentals of Prestressed Concrete Bridge

STEEL DECKS FOR RAIL BRIDGES

111 MORGAN ST. Ryan Friis

Part B: Design Calculations

CAMBER CONTROL IN SIMPLY SUPPORTED PRESTRESSED CONCRETE BRIDGE GIRDERS

THE DESIGN OF LONG CANTILEVER BEAM USING POST-TENSIONED TENDONS IN KUMJUNG STADIUM

Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway

North Mountain IMS Medical Office Building

ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT

Finite Element Simulation of Cantilever Construction Structure

16. Design of Pipeline Structures.

UNIVERSITI PUTRA MALAYSIA EVALUATION OF EFFECTIVE SECTION FOR STANDARD PRESTRESS CONCRETE SECTIONS UNDER FLEXURE AHMAD ROSLI BIN ABDUL RAHMAN

Transcription:

Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status of Report: Final Abstract: Guidelines for simple span members made continuous in Multi-span bridges. This guideline and its sample details may be used when designing for continuity. The PCI New England Technical committee has recommended that strand extensions be used to make the positive moment connection in beams. If a State Standard exists it will take precedence over these guidelines and details. Number of Pages: 6 PCI cannot accept responsibility for any errors or oversights in the use of this material. The user must recognize that no guidelines or regulations can substitute for experienced judgement. This guideline is intended for use by personnel competent to evaluate the significance and limitations of its contents and able to accept responsibility for the application of the material it contains. 1

The design of simple-span members made continuous in multiple span bridges shall be in accordance with the following: 1. Application of Loads: Members shall be assumed to act as simple-spans for the application of the prestressing forces, member dead load and non-composite dead loads. Continuous members shall be assumed to carry the superimposed dead loads, live loads and time-dependent effects (creep and differential shrinkage). 2. Positive Moment Connection: Provide a positive connection at interior supports sufficient to develop, as a minimum, a moment equal to 1.2* Mcr (+) of the composite section. The positive moment connection shall be made by extending the prestressing steel beyond the member ends. Diaphragm ties within 6 of the bottom bulb shall be assumed to contribute to the positive moment connection if properly engaged by transverse ties. The connection capacity shall be determined using the method outlined in Chapter 4 of FHWA-RD-77-4, End Connections of Pretensioned I-Beam Bridges. This method is summarized below. check. The connection shall be designed by the working stress method with an ultimate strength Working Stress Design: f ps = L e - 8.25 0.228 150 ksi, for L pb 8.25 f ps = A ps = L e - L pb L pb - 8.25 + 0.228 0.472 M - A s f y (jd ps + d - d ps ) f ps jd ps 150 ksi, for L pb > 8.25 2

Ultimate Strength Check: L e -8.25 f pu = for L pb 8.25 0.163 L e - L pb f pu = + L pb - 8.25 for L pb > 8.25 0.163 0.337 A ps f pu + A s f y a = 0.85 f ' cb M u = 0.9 [A ps f pu (d ps - a / 2 ) + A s f y (d - a / 2 )] A ps d ps d A T A s 6" (TYP) Figure 1 Connection Reinforcement Location 3

For the diaphragm ties to be effective in determining the positive moment capacity, it is necessary for transverse reinforcement, A T, to be extended into the diaphragm from the girder section at the lower corners and enclosed by the diaphragm ties. The required transverse reinforcement shall be determined by AASHTO 8.16.6.4, Shear Friction. a = depth of compression stress block b = compression flange width per AASHTO 8.10 d = distance from the extreme compressive fiber to the centroid of the diaphragm tie d ps = distance from the extreme compression fiber to the centroid of the strand f ' c = compressive strength of deck concrete f ps = allowable working stress per strand f pu = stress of strand at general slip (defined as measureable slip) f y = diaphragm tie yield stress jd ps = internal moment arm = 0.94d ps (approximates T-Beam with low percentage of reinforcing steel) A ps = required area of embedded strand A s = area of diaphragm ties within 6 of the bottom bulb A T = area of transverse reinforcement L e = total embedment length of strand L pb = prebend length of embedded strand (9 ) M = design moment 1.2 M cr M u = ultimate moment capacity of connection 3. Negative Moment Connection: The amount of negative moment reinforcing steel required in the deck shall be determined by assuming the member to be a rectangular section with a compression block width equal to the bottom flange width of the member. Both top and bottom mats of deck slab reinforcing steel within the effective flange width shall be included in calculating the moment capacity of the section. 4. Time-Dependent Effects: Time-dependent effects shall be accounted for using the method outlined in the PCI Journal, April 1969, Design of Continuous Highway Bridges with Precast, s. These effects may be neglected if provisions are made in the contract to ensure that the concrete members cure for a minimum of 60 days prior to the application of additional dead loads, and only with the approval of the Design Chief. For simple-span members made continuous in multiple span bridges, consideration shall be given to the placement of temporary diaphragms near the ends of members at piers in order to provide stability until the final end diaphragms are cast-in-place at the same time as the deck slab. 4