WHAT IS PRECAST/PRESTRESSED CONCRETE?

Similar documents
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS


1. Cast-in-place concrete is specified in Section

***************************************************************************************************************

WELLS HOLLOWCORE DESIGN DATA

SECTION ARCHITECTURAL CAST STONE

GUIDE SPECIFICATION FOR NICORE PLANK (HOLLOW-CORE SLABS)

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

North Mountain IMS Medical Office Building

SPECIAL SPECIFICATION 4385 Railroad Bridge Construction

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

UNIFIED FACILITIES GUIDE SPECIFICATIONS

DIVISION 03 CONCRETE CONCRETE Maintenance of Concrete

SECTION PLATE CONNECTED WOOD TRUSSES

Project Address: Name of Person Completing Form:

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

1. Section , Concrete Reinforcement and Embedded Assemblies. B. ACI 530/ASCE 5 - Building Code Requirements for Masonry Structures

Table of Contents. Introduction... 2 History of MBI... 2 What Sets Us Apart?... 4 Key to Symbols... 5 Tees... 6 Double Tee Super Tee

A. Submittal Procedures: See Article 13 of the General Conditions.

PREFABRICATED STEEL TRUSS SPECIFICATIONS

A. Product Data: For each type of deck, accessory, and product indicated.

SECTION 034XX Structural Precast Concrete With Commercial Architectural Finish

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

North Mountain IMS Medical Office Building

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage.

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

SECTION COLD-FORMED METAL FRAMING

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

SECTION DECORATIVE METAL FENCES AND GATES

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

A. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section.

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Narrow Modular Pavers (NMP) for Sand-Set Installations

HIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION STRUCTURAL STEEL

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SPECIFICATION FOR REINFORCED SOIL WALL

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Retain "Preinstallation Conference" Paragraph below if Work of this Section is extensive or complex enough to justify a conference.

Daytona Beach Pier Building Renovation Jun 2010

BISON PRECAST FLOORING SPECIFICATION

Aluminum Component Pipe Railings

SECTION DUCTILE IRON PILES

By CTS Cement Manufacturing Corp.

for Mortar-Set Concrete Tiling Installations

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

GUIDE SPECIFICATION FOR STRUCTURAL PRECAST CONCRETE AND STRUCTURAL PRECAST CONCRETE WITH COMMERCIAL ARCHITECTURAL FINISH (CA)

SECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , "Building Code Requirements for Reinforced Concrete".

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

Adjust list below to suit Project. Delete paragraph below if not listing type of members.

SECTION PREFABRICATED PIPE BRIDGE(s)

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

1.1 Related Work Specified in Other Sections (Delete if Not Applicable):

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

Editing notes to assist users are separated from specification text by rows of asterisks. Delete these notes prior to final printing.

A. Coordinate concrete unit masonry (also termed CMU and block ) work with work before and after, especially:

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11.

COMPLETE REVISION May Process Industry Practices Structural. PIP STS03001 Plain and Reinforced Concrete Specification

DIVISION: MASONRY SECTION: CONCRETE UNIT MASONRY REPORT HOLDER: 3B CONSTRUCTION SOLUTIONS, INC.

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION REINFORCING STEEL

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION ROLLER GATES

SECTION EPOXY TERRAZZO

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

A-Series Aluminum Gantry Crane

SPECIFICATION GUIDELINE

SECTION DECORATIVE METAL AND GLASS RAILING

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION EXPANSION CONTROL

SECTION CAST-IN-PLACE CONCRETE

STRUCTURAL DESIGN CRITERIA TABLE OF CONTENTS

SECTION METAL BUILDING SYSTEMS

PRECAST CONCRETE PRODUCTS

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

Corium Brick Rainscreen System Specifications

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

Technical Notes 24G - The Contemporary Bearing Wall - Detailing [Dec. 1968] (Reissued Feb. 1987) INTRODUCTION

14.1 PCI Standard Design Practice

THE SITUATION WITH STEEL DECKS

A. The scope of this standard includes recommendations for the specification of cast-in-place concrete.

B BASF MasterFlow MasterFlow MasterFlow MasterFlow C CGM Grout...8

Transcription:

PRODUCT LOAD TABLES

1

WHAT IS PRECAST/PRESTRESSED CONCRETE? PRECAST/PRESTRESSED CONCRETE is an architectural and structural material possessing great strength. Specifically, PRESTRESSED CONCRETE has unique characteristics that allow pre-determined, engineered stresses to be placed in members to counteract stresses that occur when the unit is subjected to service loads. This is accomplished by combining the best properties of two quality materials: high strength concrete for compression and high tensile strength steel strands for tension. Ordinary Concrete Beam Even without a load, the ordinary concrete beam must carry its own considerable weight. This leaves only a portion of its strength available to resist added loads. Actually, prestressing is quite simple. High tensile strands are stretched between abutments at each end of long casting beds. Concrete is then poured into the forms encasing the strands. As the concrete sets, it bonds to the tensioned steel. When the concrete reaches a specified strength, the strands are released from the abutments. This compresses the concrete, arches the members, and creates a built-in resistance to service loads. Prestressed Concrete Beam Prestressed or pretensioned before it leaves the plant, a slight arch or camber is noticeable. Energy is stored in the unit by the action of the highly tensioned steel which places a high compression in the lower portion of the member. An internal upward force is thereby created which in effect relieves the beam of having to carry its own weight. Under service loads, the bottom of the beam will develop hairline cracks. The internal upward force along the length of the beam counteracts the external service loads applied to the member. WHY USE PRECAST/PRESTRESSED CONCRETE? Rapid Construction Conserves Energy Versatility of Design Precast/Prestressed concrete Precast/Prestressed concrete Precast/Prestressed concrete construction gets the job done sooner. The manufacturing of components can improve the thermal storage potential of a buildings are not only functional but beautiful as well. Numerous precast/prestressed members building. If effectively conserves panel configuration design and site preparation can proceed simultaneously. Early occupancy provides obvious benefits to the client. energy required for heating and cooling. possibilities are available. Resists Fire Column-Free Long Spans Maintenance Free Durability and fire resistance With fewer columns and more Precast/Prestressed concrete mean low insurance premiums usable floor space, prestressed does not require painting and is and greater personnel safety. concrete provides greater free from corrosion. Its durability Those who investigate life cycle freedom for space utilization. extends building life. costing will appreciate prestressed concrete s excellent fire resistance characteristics. 2

TOTAL STRUCTURES Integrated Medical Services Avondale, Arizona Harrah s Entertainment Corporate Office Las Vegas, Nevada North Mountain Integrated Medical Services Phoenix, Arizona Granite Street Parking Structure Prescott, Arizona Desert Ridge Corporate Center Parking Phoenix, Arizona 3

PREFACE TO PRODUCT LOAD TABLES The following pages contain load tables for the standard products available from Coreslab Structures (ARIZ) Inc. Load capacities are in conformance with the American Concrete Institute "Building Code Requirements for Structural Concrete (ACI 318-05)". However, values given in the tables are intended for preliminary member selections, not final designs. These values assume that the safe superimposed load is composed of 60% dead load and 40% live load. In some cases, loads in excess of those shown can be accommodated by modifying the general parameters such as concrete strength and/or reinforcing patterns. GENERAL NOTATION Width of Precast Depth of Precast Description Section (ft) Section (in) of Section 10DT24 MATERIAL PROPERTIES Concrete: Compressive Strength Final (28-day) = 5000 psi (Precast) = 3000 psi (Topping) At Prestress Release = 3500 to 4000 psi when maximum load is used. Otherwise a lower strength may be sufficient. Normal Weight = 150 pcf 1.5 Modulus of Elasticity = W 33 f ' c DT = Double Tee Slab IT = Inverted Tee Beam LB = ELL Beam Steel: Prestressing Strand: Sizes: 1/2" Diameter Ultimate Strength = 270,000 psi Initial Tension = 70 to 75% of Ult. Strength Modulus of Elasticity = 28,000,000 psi Reinforcing Steel: Bar Sizes: 4, 5 and 6 are A706, Grade 60 Bar Sizes: 7 and larger are A615, Grade 60 FLEXURAL MEMBERS In general, maximum spans shown for the various prestressing conditions will result in an upward camber under dead load, after loss of prestress has occurred. Roof deflection, however, should always be checked. It is recommended that a positive slope always be provided for roofs. Whenever span-to-depth ratio exceeds 30 for double tees a positive roof slope is essential to preclude ponding. Also, see the 2006 Edition International Building Code IBC. Topping Slab Design by Others For composite members, reinforcement (i.e., welded wire fabric or reinforcing bar) is generally required for the structural design of the topping slab. The Engineer of Record should furnish this design. DESIGN RECOMMENDATIONS Maximum Bottom Range of Maximum Precast Tension Stress Span-To-Depth Ratio Double Tee Floor Slabs 12 f ' c 25 to 30 Double Tee Roof Slabs 12 f ' c 35 to 40 Inverted Tee or ELL Beams 6 f ' c 10 to 20 Hollow Core Slabs 6 f ' c 45 to 50 The required depth of a beam or slab is influenced by the ratio of live load to total load. When this ratio is high, deeper sections may be needed. 4

24" DOUBLE TEES FOR FLOOR AND ROOF 24" DOUBLE TEES 10' WIDE 2" 22" 2'-6" 6.25" 10'-0" 5'-0" 3.25" Topping 2" R 2'-6" 4.42" Allowable Superimposed Service Loads, Pounds per Square Foot Non-Composite Span (ft) 50 52 54 56 58 60 62 64 66 68 70 72 Load (psf) 87 79 73 67 62 57 52 48 45 41 38 36 Composite (3¼" Topping) Span (ft) 36 38 40 42 44 46 48 50 52 54 56 58 60 Load (psf) 201 177 158 138 121 104 93 80 68 56 48 40 32 28" 28" DOUBLE TEES 10' WIDE Section 2" 26" 2'-6" 6.25" 6.25" 10'-0" 5'-0" 3.25" Topping 2" R 2'-6" 4.08" Allowable Superimposed Service Loads, Pounds per Square Foot Non-Composite Span (ft) 56 58 60 62 64 66 68 70 72 74 76 78 80 Load (psf) 88 81 75 69 64 60 56 52 48 45 42 39 32 Composite (3¼" Topping) Span (ft) 40 42 44 46 48 50 52 54 56 58 60 62 64 66 Load (psf) 210 186 166 148 132 119 108 96 88 78 68 58 50 42 32" DOUBLE TEES 10' WIDE 32" 2" 30" 2'-6" 6.25" 10'-0" 5'-0" 3.25" Topping 2" R 2'-6" Section Properties Non- Composite Composite A (in 2 ) 475 763 1 (in 4 ) 24799 37247 yb (in) 17.38 20.49 St (in 3 ) 37.45 *10617 Sb (in 3 ) 1427 1818 Normal Weight 49 psf 90 psf (150 pcf) 495 plf 901 plf * At top of precast Properties Non- Composite Composite A (in 2 ) 509 797 1 (in 4 ) 36704 53685 yb (in) 20.29 23.54 St (in 3 ) 4639 *12026 Sb (in 3 ) 1827 2281 Normal Weight 53 psf 94 psf (150 pcf) 530 plf 936 plf * At top of precast Section Properties Non- Composite Composite A (in 2 ) 540 828 1 (in 4 ) 51120 73362 yb (in) 22.81 26.57 St (in 3 ) 5560 *13508 Sb (in 3 ) 2242 2761 Normal Weight 56 psf 97 psf (150 pcf) 562 plf 969 plf * At top of precast 3.75" Allowable Superimposed Service Loads, Pounds per Square Foot Non-Composite Span (ft) 68 70 72 74 76 78 80 82 84 86 88 90 Load (psf) 70 66 61 57 53 50 47 44 41 38 36 34 Composite (3¼" Topping) Span (ft) 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Load (psf) 206 188 170 151 136 123 114 102 92 84 78 71 64 57 49 5

28" 28" DOUBLE TEES 12' WIDE 2" 26" 3'-0" 5.75" 12'-0" 6'-0" 3.25" Topping 3'-0" Section Properties Non- Composite Composite A (in 2 ) 535 865.926 1 (in 4 ) 36580.04 52230.87 yb (in) 20.9576 24.27 St (in 3 ) 5194.28 *14002.87 Sb (in 3 ) 1745.43 2152.08 Normal Weight 46 psf 75 psf (150 pcf) * At top of precast 3.75" Allowable Superimposed Service Loads, Pounds per Square Foot Non-Composite Span (ft) 60 62 64 66 68 70 72 74 76 78 80 82 84 Load (psf) 94 88 83 76 70 64 58 53 48 44 39 35 32 Composite (3¼" Topping) Span (ft) 42 44 46 48 50 52 54 56 58 60 62 64 66 Load (psf) 194 174 154 134 124 107 94 82 70 62 53 49 42 50" 50" DOUBLE TEES 8' WIDE 2" 48" 2'-0" 10" 8'-0" 4'-0" No Topping 2'-0" Section Properties Non-Composite A (in 2 ) 960 1 (in 4 ) 22500 yb (in) 30.6 St (in 3 ) 11634 Sb (in 3 ) 7376 Normal Weight 125 psf (150 pcf) 1000 plf Contact Coreslab Structures for allowable loading conditions with these deep double tee sections. 6" 6

PRESTRESSED INVERTED TEE BEAMS Non-Composite IT Beam - 12 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 26IT24 6.9 5.6 4.7 3.9 3.3 2.8 26IT28 9.5 7.8 6.5 5.4 4.6 3.9 3.4 26IT32 12.6 10.3 8.6 7.3 6.2 5.3 4.6 4.0 3.5 26IT36 16.2 13.2 11.0 9.3 7.9 6.8 5.9 5.2 4.6 4.0 3.6 26IT40 20.0 16.4 13.8 11.6 9.9 8.6 7.4 6.5 5.7 5.1 4.5 26IT44 24.3 20.0 16.7 14.1 12.1 10.5 9.2 8.0 7.1 6.3 5.6 26IT24 24 469 26IT28 28 519 26IT32 32 569 26IT36 36 619 26IT40 40 669 26IT44 44 719 Composite IT Beam - 12 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 26IT23 12.0 9.9 8.2 7.0 5.9 5.1 4.5 3.9 3.4 26IT27 15.0 13.0 10.8 9.2 7.8 6.8 5.9 5.2 4.6 4.0 3.6 26IT31 18.9 15.8 13.2 11.1 9.5 8.2 7.2 6.3 5.6 4.9 4.4 26IT35 22.5 19.3 16.2 13.7 11.7 10.1 8.9 7.8 6.9 6.1 5.5 26IT39 27.5 22.6 18.9 16.0 13.7 11.9 10.4 9.1 8.1 7.2 6.4 26IT43 30.4 25.3 21.2 18.0 15.4 13.3 11.6 10.2 9.1 8.1 7.2 26IT23 23 456 26IT27 27 506 26IT31 31 556 26IT35 35 606 26IT39 39 656 26IT43 43 706 7

PRESTRESSED INVERTED TEE BEAMS Non-Composite IT Beam - 16 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 26IT28 9.3 7.6 6.3 5.3 4.5 3.8 3.3 26IT32 12.6 10.3 8.6 7.2 6.1 5.3 4.5 3.9 3.5 26IT36 16.3 13.4 11.1 9.4 8.0 6.9 6.0 5.2 4.6 4.0 3.6 26IT40 20.0 16.4 13.6 11.5 9.8 8.5 7.4 6.4 5.7 5.0 4.5 26IT44 23.8 19.5 16.3 13.8 11.8 10.2 8.8 7.7 6.8 6.1 5.4 26IT48 27.9 22.9 19.1 16.2 13.9 12.0 10.4 9.1 8.1 7.2 6.4 26IT28 28 575 26IT32 32 625 26IT36 36 675 26IT40 40 725 26IT44 44 775 26IT48 48 825 Composite IT Beam - 16 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 26IT27 15.5 12.9 10.8 9.1 7.8 6.7 5.8 5.1 4.5 4.0 3.6 26IT31 19.4 16.2 13.5 11.5 9.8 8.5 7.4 6.5 5.7 5.1 4.5 26IT35 23.1 19.8 16.5 14.0 12.0 10.4 9.0 7.9 7.0 6.2 5.6 26IT39 27.7 23.7 19.8 16.8 14.4 12.4 10.9 9.5 8.4 7.5 6.7 26IT43 32.0 27.3 22.9 19.4 16.6 14.4 12.6 11.0 9.8 8.7 7.8 26IT47 36.9 31.2 26.1 22.1 19.0 16.4 14.4 12.6 11.2 10.0 8.9 26IT27 27 563 26IT31 31 613 26IT35 35 663 26IT39 39 713 26IT43 43 763 26IT47 47 813 8

PRESTRESSED ELL BEAMS Non-Composite ELL Beam - 12 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 19LB24 5.9 5.2 4.5 3.8 3.4 3.0 2.6 19LB28 7.6 6.9 6.2 5.5 4.8 4.2 3.6 3.0 2.4 19LB32 9.2 8.5 7.8 7.0 6.3 5.6 5.0 4.5 3.9 3.4 2.8 19LB36 11.1 10.2 9.4 8.5 7.7 6.8 6.2 5.6 5.0 4.4 3.8 19LB40 13.0 12.0 10.9 9.9 8.8 7.8 7.2 6.5 5.9 5.2 4.6 19LB44 14.9 13.8 12.6 11.5 10.3 9.2 8.5 7.7 7.0 6.3 5.6 19LB24 24 384 19LB28 28 434 19LB32 32 484 19LB36 36 534 19LB40 40 584 19LB44 44 634 Composite ELL Beam - 12 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 19LB23 5.8 5.3 4.8 4.3 3.8 3.3 2.9 2.4 19LB27 7.5 6.9 6.2 5.6 5.0 4.5 4.1 3.6 3.2 19LB31 8.8 8.1 7.4 6.7 6.1 5.4 4.9 4.5 4.1 3.6 3.2 19LB35 10.5 9.7 8.9 8.1 7.3 6.5 6.0 5.5 5.0 4.5 4.1 19LB39 12.3 11.3 10.4 9.5 8.5 7.6 7.0 6.5 5.9 5.3 4.8 19LB43 14.2 13.1 12.0 10.9 9.8 8.7 8.1 7.5 6.9 6.4 5.8 19LB23 23 375 19LB27 27 425 19LB31 31 475 19LB35 35 525 19LB39 39 575 19LB43 43 625 9

PRESTRESSED ELL BEAMS Non-Composite ELL Beam - 16 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 19LB28 7.7 7.1 6.4 5.8 5.1 4.5 3.8 3.2 19LB32 9.4 8.7 8.0 7.3 6.6 5.9 5.1 4.4 3.6 2.8 19LB36 11.6 10.7 9.8 8.9 8.0 7.1 6.4 5.8 5.1 4.4 3.8 19LB40 13.5 12.4 11.4 10.3 9.3 8.2 7.5 6.8 6.2 5.5 4.8 19LB44 15.6 14.4 13.1 11.9 10.6 9.4 8.7 7.9 7.2 6.5 5.8 19LB48 17.6 16.2 14.8 13.4 12.0 10.6 9.8 9.0 8.2 7.4 6.6 19LB28 28 462 19LB32 32 512 19LB36 36 562 19LB40 40 612 19LB44 44 662 19LB48 48 712 Composite ELL Beam - 16 inch Ledge Span(ft) 20 22 24 26 28 30 32 34 36 38 40 19LB27 7.4 6.8 6.1 5.4 4.8 4.3 3.9 3.5 3.0 19LB31 9.1 8.3 7.6 6.9 6.2 5.6 5.1 4.5 3.9 3.3 19LB35 10.9 10.1 9.2 8.4 7.6 6.8 6.2 5.7 5.2 4.7 4.2 19LB39 12.8 11.8 10.8 9.8 8.8 7.9 7.3 6.8 6.2 5.7 5.2 19LB43 14.8 13.6 12.4 11.3 10.1 9.0 8.4 7.8 7.2 6.6 6.0 19LB47 16.7 15.3 14.0 12.7 11.4 10.1 9.4 8.7 8.0 7.3 6.6 19LB27 27 454 19LB31 31 504 19LB35 35 554 19LB39 39 604 19LB43 43 654 19LB47 47 704 10

PRESTRESSED JUMBO INVERTED TEE BEAMS Non-Composite Jumbo IT Beam - 12 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 32IT24 5.8 5.0 4.3 3.6 3.2 2.9 2.5 2.2 32IT28 8.6 7.5 6.4 5.4 4.8 4.3 3.7 3.2 2.8 2.5 2.2 32IT32 11.2 9.8 8.5 7.2 6.5 5.8 5.1 4.4 3.9 3.4 3.0 32IT36 14.2 12.6 11.0 9.4 8.5 7.6 6.7 5.8 5.2 4.7 4.2 32IT40 17.6 15.6 13.6 11.6 10.5 9.4 8.3 7.2 6.6 6.0 5.4 32IT44 20.8 18.4 16.1 13.8 12.5 11.2 9.9 8.6 7.8 7.1 6.4 32IT24 24 625 32IT28 28 700 32IT32 32 775 32IT36 36 850 32IT40 40 925 32IT44 44 1000 Composite Jumbo IT Beam - 12 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 32IT23 6.0 5.2 4.5 3.8 3.4 3.0 2.6 2.2 1.9 32IT27 9.0 7.9 6.8 5.8 5.2 4.6 4.0 3.4 3.0 2.7 2.4 32IT31 11.4 10.1 8.8 7.6 6.8 6.1 5.3 4.6 4.2 3.8 3.4 32IT35 14.8 13.1 11.4 9.8 8.8 7.9 6.9 6.0 5.4 4.9 4.4 32IT39 18.0 15.9 13.9 11.9 10.7 9.6 8.5 7.4 6.7 6.0 5.4 32IT43 21.4 19.0 16.6 14.2 12.9 11.6 10.3 9.0 8.2 7.4 6.6 32IT23 23 606 32IT27 27 681 32IT31 31 756 32IT35 35 831 32IT39 39 906 32IT43 43 981 11

PRESTRESSED JUMBO INVERTED TEE BEAMS Non-Composite Jumbo IT Beam - 16 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 32IT28 8.2 7.2 6.2 5.2 4.6 4.1 3.5 3.0 2.7 2.4 2.2 32IT32 11.2 9.8 8.5 7.2 6.5 5.8 5.1 4.4 3.9 3.4 3.0 32IT36 14.6 12.8 11.1 9.4 8.5 7.6 6.7 5.8 5.2 4.7 4.2 32IT40 18.0 15.9 13.8 11.8 10.7 9.6 8.5 7.4 6.7 6.0 5.4 32IT44 21.6 19.2 16.8 14.4 13.0 11.7 10.3 9.0 8.2 7.4 6.6 32IT48 25.4 22.5 19.6 16.8 15.2 13.7 12.1 10.6 9.7 8.7 7.8 32IT28 28 758 32IT32 32 833 32IT36 36 908 32IT40 40 983 32IT44 44 1058 32IT48 48 1133 Composite Jumbo IT Beam - 16 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 32IT27 8.8 7.7 6.6 5.6 5.0 4.5 3.9 3.4 3.0 2.7 2.4 32IT31 11.8 10.4 9.1 7.8 7.0 6.2 5.4 4.6 4.2 3.8 3.4 32IT35 15.0 13.3 11.6 10.0 9.0 8.1 7.1 6.2 5.6 5.0 4.4 32IT39 18.6 16.4 14.3 12.2 11.1 10.0 8.9 7.8 7.0 6.3 5.6 32IT43 22.2 19.6 17.1 14.6 13.2 11.9 10.5 9.2 8.4 7.6 6.8 32IT47 26.0 23.0 20.1 17.2 15.6 14.1 12.5 11.0 10.0 9.1 8.2 32IT27 27 740 32IT31 31 815 32IT35 35 890 32IT39 39 965 32IT43 43 1040 32IT47 47 1115 12

PRESTRESSED JUMBO ELL BEAMS Non-Composite Jumbo ELL Beam - 12 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 25LB24 5.0 4.0 3.8 3.2 2.8 2.5 2.1 1.8 25LB28 7.2 6.3 5.4 4.6 4.1 3.7 3.2 2.8 2.5 2.2 2.0 25LB32 9.4 8.3 7.2 6.2 5.6 5.0 4.4 3.8 3.4 3.1 2.8 25LB36 12.0 10.6 9.2 7.8 7.0 6.3 5.5 4.8 4.3 3.9 3.5 25LB40 14.8 13.0 11.3 9.6 8.7 7.8 6.9 6.0 5.4 4.9 4.4 25LB44 17.0 15.0 13.1 11.2 10.1 9.1 8.0 7.0 6.3 5.6 5.0 25LB24 24 538 25LB28 28 613 25LB32 32 688 25LB36 36 763 25LB40 40 838 25LB44 44 913 Composite Jumbo ELL Beam - 12 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 25LB23 5.4 4.7 4.0 3.4 3.0 2.7 2.3 2.0 25LB27 7.6 6.6 5.7 4.8 4.3 3.9 3.4 3.0 2.6 2.3 2.0 25LB31 10.0 8.8 7.6 6.4 5.7 5.1 4.4 3.8 3.4 3.1 2.8 25LB35 12.4 10.9 9.4 8.0 7.2 6.5 5.7 5.0 4.5 4.0 3.6 25LB39 15.2 13.4 11.7 10.0 9.0 8.1 7.1 6.2 5.6 5.0 4.4 25LB43 17.8 15.8 13.8 11.8 10.7 9.6 8.5 7.4 6.7 6.0 5.4 25LB23 23 519 25LB27 27 594 25LB31 31 669 25LB35 35 744 25LB39 39 819 25LB43 43 894 13

PRESTRESSED JUMBO ELL BEAMS Non-Composite Jumbo ELL Beam - 16 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 25LB28 7.0 6.1 5.2 4.4 3.9 3.5 3.1 2.6 2.4 2.2 2.0 25LB32 9.2 8.1 7.0 6.0 5.4 4.8 4.2 3.6 3.2 2.9 2.6 25LB36 12.0 10.6 9.2 7.8 7.0 6.3 5.5 4.8 4.3 3.8 3.4 25LB40 14.8 13.0 11.3 9.6 8.7 7.8 6.9 6.0 5.4 4.8 4.2 25LB44 17.0 15.0 13.1 11.2 10.1 9.1 8.0 7.0 6.3 5.6 5.0 25LB48 19.2 17.0 14.8 12.6 11.4 10.3 9.1 8.0 7.2 6.5 5.8 25LB28 28 642 25LB32 32 717 25LB36 36 792 25LB40 40 867 25LB44 44 942 25LB48 48 1017 Composite Jumbo ELL Beam - 16 inch Ledge Span(ft) 28 30 32 34 36 38 40 42 44 46 48 25LB27 7.6 6.6 5.7 4.8 4.3 3.8 3.3 2.8 2.5 2.2 2.0 25LB31 10.0 8.8 7.6 6.4 5.7 5.1 4.4 3.8 3.4 3.1 2.8 25LB35 12.6 11.1 9.6 8.2 7.4 6.6 5.8 5.0 4.5 4.0 3.6 25LB39 15.6 13.8 12.0 10.2 9.2 8.2 7.2 6.2 5.6 5.1 4.6 25LB43 17.8 15.8 13.8 11.8 10.7 9.6 8.5 7.4 6.7 6.0 5.4 25LB47 20.0 17.7 15.4 13.2 11.9 10.6 9.3 8.0 7.4 6.8 6.2 25LB27 27 623 25LB31 31 698 25LB35 35 773 25LB39 39 848 25LB43 43 923 25LB47 47 998 14

PRESTRESSED SUPER JUMBO INVERTED TEE BEAMS Non-Composite Super Jumbo IT Beam - 12 or 16inch Ledge 7" 24" 7" 12, 16", 18", 20", 24" or 28" 28 or 32" 12" or 16" 38SJIT24 24" 775 38SJIT28 28" 875 38SJIT30 30" 925 38SJIT32 32" 975 38SJIT36 36" 1075 38SJIT40 40" 1175 38SJIT44 44" 1333 38SJIT48 48" 1433 38" ALLOWABLE SUPERIMPOSED SERVICE LOAD, KIPS PER LINEAL FOOT Span(ft) 36 38 40 42 44 46 48 50 52 54 56 58 60 38SJIT24 4.66 4.10 3.65 3.24 2.88 2.58 2.32 2.07 1.80 - - - - 38SJIT28 6.90 6.13 5.50 4.87 4.33 3.90 3.46 3.15 2.86 2.60 - - - 38SJIT30 7.37 6.83 6.02 5.33 4.76 4.25 3.92 3.39 3.06 2.72 2.37 - - 38SJIT32 9.37 8.03 7.25 6.51 5.91 5.30 4.75 4.34 3.93 3.45 3.12 2.82 2.57 38SJIT36 12.13 10.86 9.72 8.73 7.87 7.15 6.48 5.97 3.45 5.50 4.47 4.15 3.83 38SJIT40 14.81 13.15 11.73 10.58 9.56 8.65 7.80 7.12 6.50 5.95 5.45 4.98 4.59 38SJIT44 16.86 14.95 13.40 11.98 10.82 9.76 8.85 8.05 7.38 6.73 6.17 5.67 5.17 38SJIT48 19.22 17.11 15.25 13.68 12.37 11.21 10.15 9.25 8.43 7.73 7.12 6.55 6.00 ¾" Composite Super Jumbo IT Beam - 12 or 16 inch Ledge 3¼" or 4" 13", 17", 19", or 23", or 27" 27", 29" or 32" 12" or 16" 76" for 3¼" Thick Topping 88" for 4" Thick Topping 7" 24" 7" 38SJIT25 25" 800 38SJIT29 29" 900 38SJIT31 31" 950 38SJIT35 35" 1050 38SJIT39 39" 1208 38SJIT43 43" 1308 38SJIT45 45" 1358 38SJIT48 48" 1433 15 38" ALLOWABLE SUPERIMPOSED SERVICE LOAD, KIPS PER LINEAL FOOT Span(ft) 36 38 40 42 44 46 48 50 52 54 56 58 60 38SJIT25 6.96 6.70 5.90 5.36 4.82 4.35 3.95 3.65 3.22 3.00 - - - 38SJIT29 9.90 8.85 7.91 7.10 6.36 5.75 5.20 4.75 4.28 3.89 - - - 38SJIT31 11.12 9.92 8.34 7.85 7.30 6.43 5.83 5.29 4.82 4.35 4.02 3.62-38SJIT35 13.27 11.80 10.59 9.51 8.57 7.70 6.97 6.41 5.76 5.29 4.89 4.42-38SJIT39 15.62 13.62 12.33 11.12 9.98 8.98 8.17 7.50 6.83 6.25 5.70 5.23-38SJIT43 18.60 16.10 14.36 12.60 11.49 10.30 9.25 8.51 7.77 7.10 6.43 5.90-38SJIT45 20.20 18.13 16.12 13.82 12.48 10.99 9.92 8.98 8.30 7.50 6.96 6.39-38SJIT48 22.57 19.90 17.95 16.16 14.30 12.98 11.04 10.07 9.17 8.42 7.72 9.03 -

PRESTRESSED SUPER JUMBO ELL BEAMS Non-Composite Super Jumbo ELL Beam - 12 or 16 inch Ledge 7" 24" 7" 12", 16", 18", 20", 24", or 28" 28 or 32" 12" or 16" 31" 31SJLB24 24 687 31SJLB28 28 787 31SJLB30 30 837 31SJLB32 32 887 31SJLB36 36 987 31SJLB40 40 1087 31SJLB44 44 1216 31SJLB48 48 1316 ALLOWABLE SUPERIMPOSED SERVICE LOAD, KIPS PER LINEAL FOOT Span(ft) 36 38 40 42 44 46 48 50 52 54 56 58 60 31SJLB24 4.47 3.95 3.50 3.12 2.81 2.51 2.26 2.03 1.84 1.66 1.50 31SJLB28 6.58 5.86 5.22 4.67 4.20 3.79 3.43 3.17 2.82 2.57 2.34 2.13 1.93 31SJLB30 7.90 6.98 6.23 5.61 5.05 4.56 4.12 3.76 3.42 3.11 2.86 2.62 2.40 31SJLB32 9.01 8.00 7.10 6.45 5.80 5.23 4.76 4.35 3.96 3.62 3.33 3.04 2.79 31SJLB36 12.07 10.72 9.56 8.56 7.75 7.00 6.29 5.72 5.21 4.77 4.35 4.00 3.68 31SJLB40 14.03 12.46 11.16 10.01 9.05 8.16 7.38 6.72 6.12 5.58 5.15 4.72 4.32 31SJLB44 16.18 14.38 12.85 11.53 10.46 9.43 8.56 7.77 7.10 6.52 5.96 5.46 5.05 31SJLB48 18.50 16.37 14.59 13.06 11.88 10.77 9.72 8.88 8.12 7.43 6.82 6.08 5.78 Composite Super Jumbo ELL Beam - 12 or 16 inch Ledge ½" 3¼" or 4" 8", 12", 16 20", 24" or 28" 48.5" 24" 7" 31SJLB20 20 587 31SJLB24 24 687 31SJLB28 28 787 31SJLB32 32 887 31SJLB36 36 987 31SJLB40 40 1087 31SJLB44 44 1216 31SJLB48 48 1316 12" or 16" 31" ALLOWABLE SUPERIMPOSED SERVICE LOAD, KIPS PER LINEAL FOOT Span(ft) 36 38 40 42 44 46 48 50 52 54 56 58 60 31SJLB24 4.00 3.52 3.17 2.84 2.62 7.34 2.07 1.86 1.73 - - - - 31SJLB28 5.83 5.14 4.62 4.14 3.72 3.32 2.97 2.70 2.55 2.35 2.17 2.00-31SJLB30 8.12 7.28 6.53 6.14 5.65 5.05 4.28 3.86 3.52 3.24 2.90 2.69-31SJLB32 10.30 9.12 8.23 7.38 6.55 5.95 5.44 4.95 4.45 3.65 3.59 3.24-31SJLB36 12.65 11.25 10.00 8.85 8.08 7.23 6.55 6.33 5.27 4.74 4.28 3.93-31SJLB40 15.32 13.67 12.22 11.00 9.87 8.89 8.00 7.18 6.68 6.14 5.52 5.04-31SJLB44 17.67 15.77 14.07 12.67 11.42 10.22 9.28 8.42 7.67 6.97 6.41 5.89 5.42 31SJLB48 19.97 17.82 15.92 14.32 12.92 11.67 10.67 9.62 8.33 8.03 7.42 6.88 6.22 16

PRODUCT ASSEMBLIES 18

GUIDE SPECIFICATIONS 1. GENERAL 1.01 DESCRIPTION A. Work Included: These specifications cover precast and precast/prestressed structural concrete construction, including product design not shown on contract drawings, production, transportation, erection, and other related items such as anchorage, bearing pads, storage and protection of precast concrete. B. Related work specified elsewhere: 1. Cast-in-place concrete. 2. Structural steel. 3. Miscellaneous steel. 4. Waterproofing. 5. Sealants and caulking. 6. Painting. 7. Inserts and fittings to be installed by other trades. 1.02 QUALITY ASSURANCE A. Producer qualifications: Certified by the PCI (Precast/Prestressed Concrete Institute) Plant Certification Program at the time of bidding. Certification shall be in the product groups and categories reflecting the scope of the project. B. Erector qualifications: Qualified by the PCI Field Qualification Program and regularly engaged in the erection of structural precast concrete for at least 5 years. C. Welder qualifications: Qualified within previous 12 months in accordance with AWS D1.1 and AWS D1.4. D. Testing: In general compliance with testing provisions in PCI MNL-116, Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products. E. Requirements of regulatory agencies: All local codes plus the following specifications, standards and codes are a part of these specifications. 1. ACI 318 Building Code Requirements for Structural Concrete. 2. AWS D1.1 Structural Welding Code Steel. 3. AWS D1.4 Structural Welding Code Reinforcing Steel. 4. ASTM Specifications As referred to in Section 2. Products. 1.03 SUBMITTALS A. Erection drawings: The producer shall prepare and submit to the general contractor erection drawings for approval. 1. Erection drawings shall be complete and show all dimensions, connections, member identification marks, and related details necessary to facilitate correct field placement. 2. The general contractor shall be responsible for checking the erection drawings to ensure their conformance with the overall building dimensions and resolving any conflicts between the precast/prestressed concrete work, his work, and that of other trades prior to his approval of the drawings. 3. The producer shall not proceed with production prior to approval of drawings by the general contractor, the architect, and the engineer. B. Product design criteria: 1. Loadings for design: a. All dead and live loads as specified on the contract drawings. b. All other specific member loads, where applicable. c. Initial handling and erection stress limits. 2. As directed in the contract documents, design calculations of products shall be performed by a registered engineer experienced in precast/prestressed concrete design. 3. Design shall be in accordance with the applicable codes. C. Permissible design deviations: 1. Design deviations will be permitted only after the architect/engineer s written approval. Such deviations may also include connections, inserts, etc., enabling producers to best adapt their procedures. The producer s proposed design shall be supported by complete design calculations and drawings. 2. Any design deviations shall provide an installation equivalent to the basic intent without incurring additional cost to the owner. D. Test reports on concrete and other materials upon request. 1.04 PRODUCT STORAGE, HANDLING, AND DELIVERY Precast concrete members shall be lifted and supported during processing, storage, and transporting operations only at the lifting or supporting points, as shown on the erection drawings, and with suitable lifting devices A. Storage: 1. Store all units off ground. 2. Place stored units so that identification marks are discernible. 3. Stack so that lifting devices are accessible and undamaged. B. Handling and Delivery: 1. Transportation, site handling, and erection shall be performed with acceptable equipment and methods, and by qualified personnel. 2. PRODUCTS 2.01 MATERIALS A. Portland cement: ASTM C 150 Type II or III. B. Other cementitious materials: 1. Fly ash or natural pozzolans: ASTM C 618. C. Admixtures: 1. Air-entraining admixtures: ASTM C 260. 2. Water reducing, retarding, accelerating, high range water reducing admixtures: ASTM C 494 or C 1017. 3. Calcium chloride or admixtures containing chlorides shall not be used. D. Aggregates: ASTM C 33 or C 330. E. Water: Potable (see ACI 318). F. Reinforcing bars: 1. Deformed billet-steel: ASTM A 615. 2. Deformed low-alloy steel: ASTM A 706. 19

GUIDE SPECIFICATIONS 2.01 MATERIALS (continued) A. Welded wire reinforcement: 1. Welded plain steel: ASTM A 185. 2. Welded deformed steel: ASTM A497. B. Prestressing strand: Uncoated, 7 wire strand, ASTM A 416 Grade 270. C. Anchors and inserts: 1. Materials: a. Structural steel: ASTM A 36. b. Carbon steel plate: ASTM A 283. c. Bolts: ASTM A 307 or A 325. d. Welded headed studs: ASTM A-108. e. Deformed bar anchors: ASTM A 496 or A 706. 2. Finish: a. Shop primer: Manufacturer s standards. b. Hot dipped galvanized: ASTM A 123. c. Zinc-rich coating: DOD-P-21035, self-curing, one component, sacrificial. J. Grout: 1. Cement grout: Portland cement, sand, and water sufficient for placement and hydration. 2. Non-shrink grout: Premixed, packaged ferrous or nonferrous aggregate shrink-resistant grout. K. Bearing pads: 1. Neoprene: Conform to Division II, Sect. 18 of AASHTO Standard Specifications for Highway Bridges. 2. Random oriented fiber reinforced: Shall support a compressive stress of 3000 psi with no cracking, splitting or delaminating in the internal portions of the pad. 3. Duck layer reinforced: Conform to Division II, Sect. 18.10.2 of AASHTO Standard Specifications for Highway Bridges or Military Specification MIL-C- 882D. 4. Plastic: Multimonomer plastic strips shall be nonleaching and support construction loads with no visible overall expansion. 2.02 CONCRETE MIXES A. 28-day compressive strength: 5000 psi min. B. Prestress release strength: 3000 psi min. C. Non-prestress stripping strength: 2500 psi min. 2.03 PRODUCTION A. Production tolerances shall comply with PCI MNL-116. B. Finishes: 1. Standard underside: Resulting from casting against approved forms using good industry practice in cleaning of forms, design of concrete mix, placing and curing. Small surface holes caused by air bubbles, normal color variations, normal form joint marks, and minor chips and spalls shall be tolerated, but no major or unsightly imperfections, honeycomb, or other defects shall be permitted. 2. Standard top: Result of vibrating screed and additional hand finishing at projections. Normal color variations, minor indentations, minor chips and spalls shall be permitted. No major imperfections, honeycomb, or defects shall be permitted. C. Patching: Shall be acceptable providing the structural adequacy and appearance of the product are not impaired. D. Openings: Openings shall be located and field drilled or cut by the trade requiring them after the precast/prestressed concrete products have been erected. Openings shall be approved by the architect/engineer and coordinated with the producer before drilling or cutting. 3. FIELD EXECUTION 3.01 ERECTION A. General contractor shall be responsible for: 1. Providing suitable access to the building, proper drainage and firm, level bearing for the hauling and erection equipment to operate under their own power. 2. Providing true, level bearing surfaces on all field placed bearing walls and other field places supporting members. 3. Placement and accurate alignment of anchor bolts, plates or dowels in column footings, grade beams and other field placed supporting members. 4. All shoring, ir required, for composite beams and slabs. B. Installation: Installation of precast/prestressed concrete shall be performed by the producer or a competent erector. Members shall be lifted by means of suitable lifting devices at points provided by the producer. Temporary shoring and bracing, if necessary, shall comply with producer s recommendations. C. Alignment: Members shall be properly aligned and leveled as required by the approved erection drawings. Variations between adjacent members shall be reasonably leveled out by jacking, loading, or any other feasible method as recommended by the producer and acceptable to the architect/engineer. 3.02 FIELD WELDING Field welding is to be done by certified welders using equipment and materials compatible with the base material. Methods shall be in accordance with AWS D1.1 and AWS D1.4. 3.03 ATTACHMENTS Subject to approval of the architect/engineer, precast/prestressed concrete products may be drilled or shot provided no contact is made with the prestressing steel. Should spalling occur, the repair of the spall shall be the responsibility of the trade doing the drilling or the shooting. 3.04 INSPECTION AND ACCEPTANCE Final inspection and acceptance of erected precast/prestressed concrete shall be made by the architect/engineer within a reasonable time after the work is completed. 20