NATIONAL GRID. NTS Shrinkage Incentive Methodology Statement Submitted for Approval

Similar documents
Object: Re: Centrica Storage Limited s response to National Grid Informal Consultation on Exit Capacity Substitution and Revision

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Unaccounted for Gas (UAG) Report

Electricity Network Innovation Strategy

CMP286. Mod Title: Improving TNUoS Predictability Through Increased Notice of the Target Revenue used in the TNUoS Tariff Setting Process.

Electric Forward Market Report

Electricity System Operator Incentives BSUoS Seminar

Gas Network Innovation Strategy

Raynet Software Lifecycle

Open Networks Project

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th

Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps

TERMS OF REFERENCE FOR THE HUMAN RESOURCES COMMITTEE

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

McGraw-Hill Education, Inc. Where We Came From

IAF Advisors Energy Market Outlook Kyle Cooper, (713) , October 31, 2014

5 Star London Hotels - Example Report

Business Practice Manual for The Transmission Planning Process

Energy Market Outlook

Energy Market Outlook

SEPA Direct Debits indicator evolution (Spanish basic indicator vs Euro area)

Tertiary reserve: 15 min 1 h

COURSE LISTING. Courses Listed. with Quality Management SAP ERP. 15 February 2018 (23:55 GMT) SAP01 - SAP SAP01E - SAP Overview

Service Level Agreement Policy. Table of Contents

Energy Market Outlook

Final Flexible Capacity Needs Assessment for 2018

Forecasting for Short-Lived Products

The State of Sustainable Agriculture in the EU

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

Customer Select Supply/Storage. Effective May 2009

Docket Review of Energy Efficiency and Advanced Gas Technology Incentives For 12.5 MW Combined Heat and Power System Supplemental Filing

PJM Roadmap for edart

Italy July August 2016

System Management Action Flagging Methodology Statement

Quality Impact Assessment Procedure. July 2012

Regasification N. Atlantic

Annual Renewable Energy Constraint and Curtailment Report 2016

P295 Submission and publication of Transparency regulation data via the BMRS

I-SEM Interconnectors Project

Leveraging Smart Meter Data & Expanding Services BY ELLEN FRANCONI, PH.D., BEMP, MEMBER ASHRAE; DAVID JUMP, PH.D., P.E.

I-SEM Interconnectors Project

Koeberg Nuclear Power Station. Water Resilience Strategy. Presenter: Velaphi Ntuli Date: 14 February 2018

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Village of Glenview Appearance Commission

Coordinated implementation of the Network Code on Capacity Allocation Mechanisms. Information Memorandum

INTERNATIONAL TRAINING ON THE NATURAL GAS SECTOR. Bratislava, 18th and 19th of September

COURSE LISTING. Courses Listed. with SAP ERP. 18 January 2018 (11:06 GMT)

YWCA 1503 S. Denver Tulsa, Oklahoma 5/18/2010 Performed By

COURSE LISTING. Courses Listed. with Business Intelligence (BI) Crystal Reports. 26 December 2017 (18:02 GMT)

OTA. BT has expanded the staff and managers who look after LLU at the Chester Service Centre and are implementing a parallel Service Centre in Leeds.

IRP 101. Intro to Integrated Resource Planning. Scott Benson Manager, Resource & Transmission Planning. March 23, 2017

PAYROLL-BASED JOURNAL COMPLIANCE GUIDE (A.K.A. YOU WISH PBJ MEANT PEANUT BUTTER & JELLY)

Pacific Coast Oil Trust FEDERAL INCOME TAX INFORMATION

Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market

Evolution of SWIFT pricing. September 2015

Impacts of the EU ETS on Electricity Prices

COURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced

Predictive Conversations

Final 2014 Flexible Capacity Needs Assessment

Renewable Energy in The Netherlands

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

Charles D. Corbin & Gregor P. Henze

ICIS Power Index Analysis 2015 UK energy prices fall further

Internal Medicine Faculty Affairs Staffing Analysis Program & Operations Analysis University of Michigan Health System

EAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST

Environmental Protection Licence 2688

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

BUSINESS PLAN COVER PAGE

BALANCING CODE NO. 1 (BC1)

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

COURSE LISTING. Courses Listed. with Customer Relationship Management (CRM) SAP CRM. 15 December 2017 (12:23 GMT)

Feed Grain Outlook June 2, 2014 Volume 23, Number 33

Project Management. Learning Objectives. What are Projects? Dr. Richard Jerz. Describe or Explain:

Backbone Transportation Service

COURSE LISTING. Courses Listed. 12 January 2018 (08:11 GMT) SAPFIN - Overview of SAP Financials

Pumped hydro Storage Plants

COURSE LISTING. Courses Listed. with Logistics Execution & Warehouse Management SAP ERP. 23 January 2018 (16:50 GMT)

QUICK START GUIDE. SQF Implementation. for.

Bordei Verde. 8 MW Wind Park Romania.

Announcement of Class and Component Prices United States Department of Agriculture

Brand Plan Sample Template. Akademia Marketingu Farmaceutycznego

Operations Management

Highway Cost Index Estimator Tool Final report PRC 17-73

Achieving a cost optimal balance between heat supply efficiency and moderation of demand

SIKKERHEDSGUIDE NØDUDGANGE HJERTESTARTER SAMLINGSSTED

What tools can we use to help us decide when to enter and when to exit a hedge? (Or, or for that matter, when to enter and exit any trade.

CHP Case Studies. Midwest CHP Application Center (MAC) .org (312) University of Illinois at Chicago Energy Resources Center UIC

CENTRAL DATA SERVICES PROVIDER ANNUAL CHARGING STATEMENT. For the period 1 st APRIL st MARCH 2019

Predictive Safety s Fatigue Management System: Benefits Realization Report

FINANCE AND STRATEGY PRACTICE CFO EXECUTIVE BOARD. Safeguarding Supply. Protecting the Enterprise from Unforeseen Supply Chain Risks

rotarian 2018 Media Kit the Audience 2 Circulation Demographics Publisher s Statement Open Rates... 4 Ad Specifications.. 5 Printing Specifications

I-SEM Business Liaison Group NEMO. 09 November2017

European Freight Forwarding Index

Heating the University of Glasgow with river sourced heat pumps. Adam McConkey Andrew Poon-King Zhibin Yu

Panorama WRHA Public Health Staff Development December 10 & 11,

New Specialty Crops for California

ANNUAL QUALITY REPORT

Transmission Charging Methodologies Forum & CUSC Issues Steering Group. 10 th January 2018

Transcription:

NATIONAL GRID NTS Shrinkage Incentive Methodology Statement Submitted for Approval April 2016

ABOUT THIS DOCUMENT This document describes the methodology that National Grid Gas plc ( National Grid ) in its role as holder of the Gas Transporter Licence in respect of the NTS ( the Licence ) employs to calculate specific components within the shrinkage incentive scheme. This Shrinkage Incentive Methodology Statement will be effective for Formula Year 2017/18. This document has been published by National Grid in accordance with Special Condition 3D of the Licence. If you require further details about any of the information contained within this document or have comments on how this document might be improved please contact Chris Aldridge, Commercial Operations team on 01926 654253 or at Chris.Aldridge@nationalgrid.com or at: Commercial Operations National Grid House Warwick Technology Park Gallows Hill Warwick CV34 6DA Version 1 Page 2

Contents ABOUT THIS DOCUMENT GENERAL INFORMATION PRINCIPLES BASELINE VOLUMES COMPRESSOR FUEL USE UNACCOUNTED FOR GAS CALORIFIC VALUE SHRINKAGE ENERGY EFFICIENCY VOLUMES APPENDIX A SHRINKAGE COST TARGET OVERVIEW APPENDIX B TIMELINE Version 1 Page 3

GENERAL INFORMATION National Grid Gas plc ( National Grid ) is the owner and the operator of the gas National Transmission System (NTS) in Great Britain. The NTS plays an important role in facilitating the competitive gas market and helps to provide the UK with a secure gas supply. It is a network of pipelines, presently operated at pressures of up to 94 barg, which transports gas safely and efficiently from coastal terminals and storage facilities to exit points from the system. Exit points are predominantly connections to gas Distribution Networks (DNs), but also include storage sites, and direct connections to power stations, large industrial consumers and other systems, such as interconnectors to other countries. These operations are undertaken to meet the needs of the companies that supply gas to domestic, commercial and industrial consumers and to power stations. These activities incur shrinkage operating costs managed by NGG as the Shrinkage Provider. This publication sets out the methodology that National Grid in its role as holder of the Gas Transporter Licence in respect of the NTS ( the Licence ) employs to calculate specific components within the shrinkage incentive scheme. Details of National Grid and its activities can be found on its internet site at www.nationalgrid.com. An electronic version of this publication can be found at the following internet page: http://www2.nationalgrid.com/uk/industry-information/gas-systemoperator-incentives/nts-shrinkage Version 1 Page 4

PRINCIPLES This methodology statement is an enduring statement and, in accordance with Special Condition 3D of the licence, prior to any modification National Grid shall consult interested parties and furnish Ofgem with a report detailing representations and proposed modifications for approval. Notwithstanding the process to modify the Methodology Statement, National Grid has undertaken a full review of the Methodology Statement to be implemented from April 2017. The changes made reflect our recommendations and the feedback from interested stakeholders providing support for these recommendations. The review document and conclusions report can be found at http://www2.nationalgrid.com/uk/industry-information/gas-system-operatorincentives/nts-shrinkage/ The diagram in Appendix A illustrates how shrinkage incentive targets are calculated and highlights the specific elements that are calculated using this methodology. The relevant shrinkage incentive parameters specified within the licence will be calculated by following this methodology statement for each Formula Year. The values calculated for each component will be published on National Grid s website within the following timescales (where t-1 and t+1 relate to the year preceding and following the relevant Formula Year): Quarterly baseline volumes: June, September, December and March (all t-1); and Efficiency volume targets: July t+1 (following close out of outturn data, calculation and audit). The timescales of when each parameter is calculated and published for any Formula Year are shown in Appendix B. Version 1 Page 5

BASELINE VOLUMES The forward baseline volume comprises the forecast volumes for CFU, UAG and CV shrinkage, as detailed below. These will be calculated in advance of each quarter. Compressor Fuel Use CFU forward baseline volumes (for gas and electricity) will be calculated, in June t-1, using forecast St. Fergus flows and the relationship between historical annual average of daily St. Fergus flows and total annual CFU volume. Step 1 Calculate the exponential relationship (least error fit) between historical annual average flow at the St. Fergus aggregated system entry point (ASEP) and annual total CFU (gas equivalent) using data from 2009/10 to the latest data available for a full incentive year (inclusive). Step 2 Insert the forecast St. Fergus flows for the following year, as published in the Future Energy Statement, into the exponential relationship identified in step 1, to calculate the annual CFU forward baseline volume. Step 3 Calculate the ratios of quarterly outturn CFU to annual outturn CFU for the previous full Formula Year and use these ratios to pro-rate the annual CFU forward baseline volume into quarterly CFU forward baseline volumes. Step 4 Split the quarterly CFU forward baseline volumes between gas and electricity, based on electric drives operations consistent with prevailing electric drive commissioning programme. These forward baseline targets will not be updated throughout the year. Unaccounted for Gas and Calorific Value Shrinkage Calculate combined UAG and CV Shrinkage forward baseline volumes in June, September, December and March t-1 as the daily average of the outturn combined UAG and CV Shrinkage volumes for the 150 calendar days (up to and including the final calendar day of the month prior to publication of the relevant statement) multiplied by the number of days for the relevant quarter. Version 1 Page 6

ENERGY EFFICIENCY VOLUMES The volume variances described in this section will be used to determine the adjustment to the shrinkage cost target. Energy Efficiency Variance for Compressor Fuel Usage (EEVCFU t ) The CFU efficiency volume variance will be calculated following the relevant Formula Year, using actual St. Fergus flows and the relationship between historical annual average of daily St. Fergus flows and total annual CFU volume. Step 1 Insert the outturn St. Fergus flows into the St. Fergus/CFU relationship identified in June of the Formula Year prior to the relevant Formula Year to calculate the annual CFU efficiency volume target. Step 2 Calculate the residuals of the historical fit used in Step 1 as residual (year x) = outturn CFU (year x) historical fit (year x), where outturn CFU (year x) = total annual CFU volume for year x, x = years used in setting baseline for relevant Formula Year, historical fit (year x) = result of inserting the annual average of daily St Fergus flows for year x into the exponential relationship used for setting baselines for the relevant Formula Year. Step 3 Calculate the upper and lower tolerances as upper tolerance = average of positive residuals calculated in step 2, lower tolerance = average of negative residuals calculated in step 2. Step 4 Calculate EEVCFU = { (target + upper tolerance) outturn if outturn > target + upper tolerance, { (target + lower tolerance) outturn if outurn < target + lower tolerance, { 0 (zero) otherwise, where outturn = total annual CFU volume for relevant Formula Year, target = as calculated in Step 1, upper and lower tolerances = as calculated in Step 3. Version 1 Page 7

Energy Efficiency Variance for Calorific Value Shrinkage (EEVCVS t ) The CV Shrinkage efficiency volume variance will be calculated following the relevant Formula Year t as follows. Step 1 Calculate (a) rolling 3 year average up to and including year t-1 = average annual outturn CV Shrinkage over years t-3, t-2 and t-1, (b) rolling 3 year average up to and including year t-2 = average annual outturn CV Shrinkage over years t-4, t-3 and t-2. Step 2 Calculate tolerance band top = maximum of (a) and (b) above, tolerance band top = minimum of (a) and (b) above. Step 3 Calculate EEVCVS = { tolerance band top outturn if outturn > tolerance band top, { tolerance band bottom outturn if outturn < tolerance band bottom, { 0 (zero) otherwise, where outturn = total annual CV Shrinkage for relevant Formula Year, tolerance band top and bottom = as calculated in Step 2. Version 1 Page 8

APPENDIX A SHRINKAGE COST TARGET OVERVIEW Version 1 Page 9

APPENDIX B - TIMELINE Year Ahead Delivery Year Year After Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Q2 Q3 Q4 Q1 Calculate and publish baseline volume for Q2 (all volume components) and CFU for other quarters Calculate and publish baseline volume for relevant quarter (UAG and CV Shrinkage added to already published CFU values) Reference Period Delivery Quarter Calculate adjusted target volume ( using efficiency targets for CFU and CV Shrinkage) Audit all calculated / published baseline volumes Publish audit results Version 1 Page 10