PowerFlex PowerEcho. Annular barrier evaluation services

Similar documents
CEMENT EVALUATION ITS NOT JUST ABOUT A BOND LOG GLEN BENGE SENIOR ADVISOR CEMENTING PRESSURE PUMPING

Acoustics and Ultrasonics for Downhole Oil and Gas Logging

Advances in cement interpretation Results from CO2SINK and CO2CRC IEAGHG 4th Well Bore Integrity Network Meeting Paris, 2008 Mar 18

Well Integrity- Cased Hole Logging and Monitoring

Logging solutions for optimizing field development. Well Evaluation for Coalbed Methane

Cement Plug Placement and Integrity Mechanical Cementing Service

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015

AL BAYAN TECHNICAL EQUIPMENT L.L.C are the authorized distributers of Robertson Geologging in GCC.

Seal 9 barrier verification by xlot and Communication test

Barrier verification and leakage risk. Dave Gardner, IRIS Norwegian Oil and Gas Plug & Abandonment Seminar October 18 th 2017

Integrity management and operational experiences of flexible risers

Frequently Asked Questions

Isolating Potential Flow Zones During Well Construction

Improved depth conversion with FWI a case study

Recommendations to Ensure Proper Cement Placement. Bryce London Tech. Professional-Lead

SteadyState Continuous Flow System

3/5/2014. Key Topics for Consideration

HTHP Gas Production Casing Cementing Michael Davis, SPE, Drill Science Corp.

Optimising Cementing. Rev: /04/01. Author: Peter Aird Ref:

COPYRIGHT PETROSKILLS LLC

Drilling and Evaluation. MR explorer. Magnetic resonance logging service

Drilling-with-Liner (DwL ) System Drill the Undrillable

COMPLETIONS WFXØ VØ-RATED OPENHOLE GRAVEL- PACK SYSTEM

Presented by: J. Daniel Arthur, P.E., SPEC ALL Consulting. Presented at: 23 rd IPEC Conference November 8-10, 2016 New Orleans, Louisiana

Natural Gas A Game Changer

Tubing-Conveyed Perforating Systems

ENDURA DUAL-STRING SECTION MILL. Set a rock-to-rock barrier and know that it s done right. WELL ABANDONMENT

Screenless Sand Control Completions. New dimensions in sand management

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract

Remotely Operated Cementing Methods for Drilling with Liner Installations. Steve Rosenberg, Global Drilling Reliability Manager

Plugs and Profiles. Types Running Pulling Problems

WELL RECORD INSTRUCTIONS (Unconventional Operators only)

Challenges of Cementing Olkaria Geothermal Field

Cased Hole Sand Control Essentials. Fluids, Equipment, Tools, and Displacement Services

Sand control case histories: Shape memory polymers, resins, shunt tubes

screens TM A Weatherford Company MUNI-PAK DESIGN TECHNOLOGY

Saturn 3D radial probe. Enabling, efficient, derisking, and flexible

Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy.

Client Support Laboratory

Petroleum Production Optimization

Practical challenges during high temperature ultrasonic scanning

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications

CT Reverse Circulating - Basics

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

INVESTIGATION RESULTS

SECTION GRAVEL PACKED WATER WELL

Faculty of Science and Technology MASTER S THESIS. Writer: Sondre Sandven

Bi-Directional Static Load Testing of Driven Piles

Application of linear frequency modulated excitation on ultrasonic testing for austenitic stainless steel welds

PERFORATING THE MASONRY WALLS IN REHABILITATION OF MASONRY BUILDINGS USING CENTER CORE METHOD

DOUBLE WALLED PIPING SYSTEMS

WELL CONTROL THE RISING EAST NOVEMBER/DECEMBER INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS Drilling

AADE-05-NTCE-77. Preventing Annular Flow After Cementing: Pulse It! John Aslakson, W&T Offshore; Dale Doherty, BJ Services and Ed Smalley, CTES, L.P.

Ultrasonic testing of adhesive bonds of thick composites with applications to wind turbine blades

FLAIR. Fluid Logging and Analysis in Real Time Service

Handbook of Ground Water Development

Solid-Expandable Systems. The Key to Economical Recovery in Mature Fields

INTERNATIONAL PERFORATING SYMPOSIUM 2014

Cement and Cementing: An Old Technique With a Future?

Colorado Oil and Gas Conservation Commission

Water Well Decommissioning Guidelines

Press Release. Rehabilitation of oil pipelines with flexible high pressure pipes

VERIFICATION OF GEOTECHNICAL GROUTING- STRATEGIES AND PLANNING. Michael J. Byle, D.GE, F. ASCE

DESIGN OF WALL THICKNESS AND PREVENTION OF COLLAPSE OF SERVICEABLE LARGE DIAMETER PIPELINES. Lucksyn Avuwha Omidih and Godspower O.

IMPACT ECHO TESTING OF IN-SITU PRECAST CONCRETE CYLINDER PIPE

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Where Intelligence Meets Infrastructure PA AWWA Conference

NDT in Grouted PT Inspection for Bridges

Drilling Optimization Solutions. Created by: Richard M. Burgess Operations Director

Petrotechnical Expert Services. Multidisciplinary expertise, technology integration, and collaboration to improve operations

United Pipeline Systems

Sentinel LNG. Panametrics Ultrasonic Flowmeter for Cryogenic Liquids. GE Sensing & Inspection Technologies. Benefits. Applications

Coiled Tubing for Downhole Applications

Advanced Reservoir Monitoring

Integrity evaluation of concrete by cross-hole sonic logging in Bangladesh

Task 1 For Task 1, the outlet was set as a zero-gauge pressure outlet, which is the same outlet condition as the five smaller pipes.

Vibration Analysis Machinery Inspection & Evaluation Level II

Hydrology. Jürg M. Matter Lamont-Doherty Earth Observatory, The Earth Institute at Columbia University. May 9, 2008

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

Trenchless Pipeline Crossings

PHMSA Requirements for Underground Storage of Natural Gas

FireStorm. Wear-resistant high-impact PDC cutter technology

Rule 326: Mechanical Integrity Guidance

Open Access A Novel Approach to Detect Tubing Leakage in Carbon Dioxide (CO 2 ) Injection Wells via an Efficient Annular Pressure Monitoring

New (? Logging) Developments in Reservoir Monitoring

The Detection and Analysis of Reservoir Dam Crack Depth and Grouting Quality Analysis

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

HOLE CLEANING IN DIRECTIONAL WELLS

Annual Report DrillWell Drilling and Well Centre for Improved Recovery. Established by the Research Council of Norway

Casing Failure Prevention East Texas Gas Producer s Assoc. 9 March 2010

RELIEF WELL SERVICES Solving challenges.

Draft Directive 051. Wellbore Injection Requirements. Contents. Revised edition August 14, Replaces previous edition issued March 1994.

GREEN THREAD Piping Systems

Recent Advances in NDE Technologies for Turbines and Generators

Cementing Tool Supports Cement Plug in Large Diameter Geothermal Well Casing

Thema. Drilling Operations Support and Analysis Service

Performance estimation of a remote field eddy current method for the inspection of water distribution pipes

MetalSkin Cased-Hole Liner System

Evaluation of Ultrasonic Attenuation and Estimation of Ultrasonic Grain Noise in Copper

ADHESIVE CURE MONITORING WITH ACOUSTIC METHOD

Transcription:

PowerFlex PowerEcho Annular barrier evaluation services

Powering Well Integrity Reliable barrier evaluation for assuring well integrity 1

Assuring the integrity of the well from well construction to abandonment is critical to preventing damage to people, the environment, and assets. Catastrophic incidents attributed to the failure of well integrity are the global driver for improvement in the installation and evaluation of barriers. Barrier evaluation must be robust, reliable, and timely in all possible conditions. Only then can it fulfill its critical role in decisions that mitigate risks in current well operations and help improve barrier installation and performance in the next well. 2

Powering Performance PowerFlex* annular barrier evaluation service delivers the most comprehensive and reliable evaluation of pipe and cement sheath behavior in the industry. PowerFlex service a powerful combination By simultaneously acquiring ultrasonic pulse-echo measurements and flexural wave imaging, PowerFlex service provides a high-resolution map of pipe thickness and cement with full azimuthal coverage. The measurement of third-interface echoes (TIEs) by PowerFlex service uniquely images the outer wall for pipe standoff. This innovative combination of measurements enables precise, reliable evaluation of all cement types and weights, particularly for identifying and qualifying debonded cement, and excels at barite sag evaluation. PowerEcho* service is a targeted approach for wells with less-complex completions. PowerEcho service a single straightforward measurement For more conventionally constructed wells but also performing in all cement types and weights PowerEcho service delivers a high-resolution map of pipe thickness and cement from its powerful pulse-echo measurement. 3

2 more powerful With new transducer technology and innovative processing software and firmware, PowerFlex and PowerEcho services deliver high-resolution information where conventional technology cannot perform. All mud weights Up to 19 ppg Casing sizes 4½ to 22 in Casing wall thickness.2 to 1.5 in Any cement Ultralight to heavyweight slurries 4

Powering Drilling Decisions Use PowerFlex annular barrier evaluation service when you need the industry s best wellsite answers, available within 2 hours of pulling out of hole. PowerFlex service Conventional tool 12 hours saved Evaluate and take action Reduce evaluation uncertainty Increase confidence in decisions Cut logging time up to 5% Simultaneously conduct casing inspection and cement evaluation Monitor drill wear and evaluate burst pressure Eliminate fluid swapping before logging 11,5 Superior acquisition efficiency reduced logging time by 12 hours. 12,5 13,5 117 8 14,5 15,5 16,5 17,5 18,5 75 8 97 8 5 PowerFlex service simultaneously evaluated cement and drill wear for four liner sizes in a single decent at doubled logging speeds that saved 12 hours on a deepwater drillship.

Casing centralizers Depth, m Gamma Ray Amplitude Impedance gapi 75 6 db.5 Ultrasonic Casing Collar Log Average Wave Amplitude Mrayl 8 Average Cement Acoustic Impedance Average Flexural Attenuation Average TIE Annular Thickness Mrayl 8 4 db/m 9 Attenuation Thickness in 2 Ultrasonic Casing Caliper TIE Velocity Solid-LiquidGas TIE Relative Bearing VDL U Image Orientation, º R D L 9 18 27 U 36 TIE Relative-Bearing VDL Powering Cementing Decisions 25 in 5 db 7 in 3 3,75 % 1 1,2 m/s 2,2 Liquid channel 3,76 3,77 3,78 No centralizers Run PowerFlex or PowerEcho service to conduct a comprehensive analysis for cementing diagnosis and improvement. Confirm and improve Reliable visualization of the cement to confirm azimuthal placement of cement 9 5 /8adequate -in casing pipe centralization absence of channels 3,79 Information to improve the next well s cement placement cement quality pipe centralization 3,8 3,81 Low side of borehole 3,83 Centralizers 3,82 3,84 Casing centralization percentage TIE cement velocity close to expected value and slowness from ultrasonic cement analyzer 3,85 PowerFlex service delivers high-quality cement maps even in difficult environments of heavy mud, thick and large casings, and light cement and valuable information on pipe standoff and its effect on cement placement. 6

Powering Interpretation Decisions Comprehensively evaluate both the cement sheath and pipe condition with novel processing, visualization, and interpretation workflows in the Techlog* wellbore software platform. Detailed and reliable diagnosis of cement and pipe behavior informs decisions across the life of the well, from drilling through abandonment. Diagnose and understand Integrated cement evaluation with Invizion* well integrity services Pipe standoff and casing contact points Microannulus diagnosis Leak path analysis Pipe inspection for burst and collapse conditions Barite sag evaluation Trapped gas in the annulus Conventional technology PowerFlex and PowerEcho services Cement Acoustic impedance 8 Mud Acoustic impedance 2.5 Cement Acoustic impedance 8 6 2 6 Where conventional processing is limited by incomplete knowledge of mud properties, PowerFlex and PowerEcho services novel inversion-based processing eliminates the need for mud information to deliver reliable mud and cement answers. Mrayl 4 2 Mrayl 1.5 1.5 Mrayl 4 2 7

Powering Abandonment Decisions Clearly understand annulus hazards and behavior prior to abandonment, especially in older wells where critical information is unavailable. Without this informed basis, pipe retrieval and barrier removal or placement can default to time-consuming and costly trial and error. Illuminate and optimize Evaluation to optimize casing retrieval intervals of barite sag pipe standoff behavior for precisely placed cut decisions and contact points Understanding of the annular condition to improve the operational safety of barrier retrieval or placement identify trapped gas evaluate casing cement diagnose formation creep evaluate pipe condition prior to retrieval confirm presence or absence of channels Abandonment process improvement cement placement quality interval selection for barrier placement PowerFlex service s 3D TIE output provides a clear image for P&A casing cutting operations of the perfectly centralized inner (gray) and outer (red) casings. 8

PowerFlex Measurement Specifications Mechanical Specifications Output Logging speed, ft/h [m/h] 4 to 4,5 [122 to 1,372] Depth of investigation, in [cm] Casing and annulus: 3 [7.62] Horizontal resolution, 5 or 1 Vertical resolution, in [cm].6 to 6. [1.52 to 15.24] Casing thickness Range, in [cm].15 [.38] to 1. [2.54] Accuracy, % ±2 Resolution, in [cm].2 [.5] Acoustic impedance Range, Mrayl to 1 Acoustic impedance, cement bond to casing, flexural attenuation, Variable Density* log (VDL) of annulus waveform, solid-liquid-gas map of annulus material, hydraulic communication map, casing rugosity image, internal radius image, casing thickness image Accuracy, Mrayl <3.3 Mrayl: ±.5, >3.3 Mrayl: ±15% Resolution, Mrayl ±.2 Flexural attenuation Range, db/m to 2 Accuracy, db/m 5 Resolution, db/m 1 Mud type or weight limitations Combinability All types including weights up to 19 ppg Bottom only, combinable with most wireline tools Some combinations may reduce logging speed, which is also resolution dependent. Consult planning software to model the logging scenario. Temperature, degf [degc] 35 [177] Pressure, psi [MPa] 2, [138] Casing size min., in [cm] 4½ Min. ID: 4 [1.16] Casing size max., in 16 Outside diameter, in [cm] 33/8 [8.57] Length, ft [m] 14.58 [4.44] Weight, lbm [kg] 299 [135.6] High-pressure versions available. Successfully logged in 185/8-in casing in certain nonattenuative mud conditions. Without rotating sub. PowerFlex service with sub option.

PowerEcho Measurement Specifications Mechanical Specifications Output Acoustic impedance, cement bond to casing, rugosity image, internal radius, casing thickness Logging speed, ft/h [m/h] 6 to 13, [183 to 3,962] Depth of investigation Casing-to-cement interface Horizontal resolution, 5 or 1 Vertical resolution, in [cm].6 to 6. [1.52 to 15.24] Casing thickness Range, in [cm].15 [.38] to 1. [2.54] Accuracy, % ±2 Resolution, in [cm].2 [.5] Acoustic impedance Range, Mrayl to 1 Accuracy, Mrayl <3.3 Mrayl: ±.5, >3.3 Mrayl: ±15% Resolution, Mrayl ±.2 Flexural attenuation Range, db/m Not available Accuracy, db/m Not available Resolution, db/m Not available Mud type or weight limitations All types including weights up to 19 ppg Temperature, degf [degc] 35 [177] Pressure, psi [MPa] 2, [138] Casing size min., in [cm] 4½ Min. ID: 4 [1.16] Casing size max., in 22 Outside diameter, in [cm] 33/8 [8.57] Length, ft [m] 14.58 [4.44] Weight, lbm [kg] 299 [135.6] High-pressure versions available. Without rotating sub. Combinability Bottom only, combinable with most wireline tools Some combinations may reduce logging speed, which is also resolution dependent. Consult planning software to model the logging scenario. PowerEcho service with sub option.

PowerFlex PowerEcho For more information and to read case studies, visit slb.com/power *Mark of Schlumberger. Copyright 217 Schlumberger. All rights reserved. 17-TP-3214