Presentation on Operationalization of Regional Connectivity between Bangladesh, India, Nepal and Bhutan

Similar documents
SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

EXPERT GROUP MEETING ON HARMONIZATION OF RULES AND REGULATIONS FOR FACILITATION OF INTERNATIONAL RAILWAY TRANSPORT 4 th SEPTEMBER, BANGKOK

- Chapter 1 - Introduction

National Trade and Transport Facilitation Monitoring Mechanism (TTFMM)

CE 355. Introduction to Water Transport

Bhutan Status of Cross Border & Transit Transport. 21 st January 2014 Hotel Taj Tashi, Thimphu

Welcome to the presentation of

Trade Logistics Service Liberalization in Bhutan by Mr. Tandin Tshering

Potential and Challenge for the Development of an Aviation Hub in Sri Lanka

2.3 CBTI Development. 1) Asian Highway History of Asian Highway 7)

Trade & Transport Corridors. European Projects & Initiatives

Sustainable Transport Development: Global Mandates & Regional Overview of Transport Development

CHAPTER II. TRANSIT TRANSPORT ISSUES IN LANDLOCKED AND TRANSIT DEVELOPING COUNTRIES

Transportation of export import containers through inland waterways; Challenges & Opportunities

Roles of Dry Ports in Economic Corridors. Transport Division, UNESCAP

Pakistan International Freight Forwarders Association (PIFFA ) Country report

Policies and Issues Relating to the development of Dry Ports

Global Financial Crisis and South Asian Economies: Outlook, Risks and Policy Options

Disentangling transit costs and time in South Asia

Status of Development of Dry Ports in Nepal

Current State and Future development plans in NEA - Republic of Korea - Na, Hee-Seung / ROK

Regional Corridors in South Asia: Regional Cooperation Agenda

CEF Transport Info day 2016 Greece

FREIGHT CORRIDORS AND GATEWAYS: DEVELOPMENT APPROACH AND EVALUATION CRITERIA COMPARISON IN NORTH AMERICA AND THE EUROPEAN UNION

Bangladesh: Transit Fees for Indian Trucks

Embassy of Denmark in Vietnam 2 / 10

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

Study of Trade and Transport Facilitation India-Bangladesh

TEXAS FREIGHT MOBILITY PLAN 2017

The Training Material on Multimodal Transport Law and Operations has been produced under Project Sustainable Human Resource Development in Logistic

International trade and freight by 2050

MAP 21 Freight Provisions and Seaports

TEN-T POLICY REVIEW. UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Geneva, 7-8 September 2010

Pushpa Raj Rajkarnikar*

Status of Dry Ports Development in NEPAL

Global Mandates and Regional Overview of Sustainable Urban Transport Policies, Practices & Systems

National Experience: Mongolia

Status of the Development of Dry Ports in Myanmar

Supply and Demand Analysis

SOUTH CAUCASUS RAILWAY REPORT OF THE DIRECTOR GENERAL OF SOUTH CAUCASUS RAILWAY CJSC VIKTOR REBETS

Transport Terminals: New Perspectives

Activities of the Mongolian National Committee on Trade and Transport Facilitation and Development Program on "Transit Mongol"

UNECE-UNESCAP Project on Developing Euro-Asian Transport Links

Port of Hamburg: Heading into the future with smartport

Greater Tumen Initiative Perspective

Transit Transport Issues in Landlocked and Transit Developing Countries

International and regional corridors and Islamic Republic of Iran Transit Roles and Strategy

DRAFT Multilateral Permits System for International Road Freight Transport on the Asian Highway Network

Handbook for Cross-Border Transport on the Asian Highway Network

Business Process Analysis of Export of Plastic Kitchenware and Tableware from Bangladesh to Bhutan

IATSS Research 35 (2011) Contents lists available at ScienceDirect. IATSS Research

Seminar on Importance of Transport Infrastructure for National Development Chamber of Construction Industry 26th August 2008

Production Networks and Regional Integration: Role of Economic Corridor Case Study of India s Trade in P&C with Southeast Asia

Ports SAILING AHEAD R. Nagesh. SAILING AILING AHEAD

Chapter 1 Introduction

TEXAS FREIGHT MOBILITY PLAN: PRIORITIZING FREIGHT TRANSPORTATION INVESTMENTS

COMPETITIVENESS OF SOUTH ASIA S CONTAINER PORTS

A brief introduction to ECO Activities in the field of Transport

10. HOW CAN SOUTH ASIA PROMOTE ENERGY TRADE 6

PPP in Ports: Indian Experience

Impact of the global maritime container transport on rail traffic in Europe Klaus-Jürgen Uhl, Senior Adviser, MC Mobility Consultants

HSR «EURASIA» DEMAND FOR FREIGHT TRANSIT

A. Background and Context:

Use of ITS technologies for multimodal transport operations River Information Services (RIS) transport logistics services

The Role of Transportation and Logistics in India : Emerging Issues and Prospects

Overview on transport data and MRV potential in Asia

Connecting Europe Facility (CEF) Financing Opportunities

INTRODUCTION OF RAIL TRANSPORTATION BUSINESS SINOTRANS LIMITED 2 JUN 2017

FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 254 MILLION

Concept of Sustainable Transport: Planning and Designing for Sustainable and Inclusive Transportation Systems UNESCAP Transport Division

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods

ADB and Nationally Appropriate Mitigation Actions in transport sector. Nana Soetantri Transport Specialist, RSDD 05 May 2015

The Policy-Related Road Transport Research in MOT

BARCELONA, October 2015

TEXAS FREIGHT MOBILITY PLAN IMPLEMENTATION. AAMPO Technical Advisory Committee (TAC)

INTERNATIONAL BLACK SEA TRANSPORT FORUM 2017

Subregional Meeting on Rail-based Intermodal Transport in Northeast and Central Asia

EUTRAIN Europe Neighbourhood Cooperation Countries (incl. Russia, CIS, Black Sea, Balkan States) 3rd Regional Workshop Moscow, Russia

Trade facilitation as a key to unlocking trade potential along OBOR

THE BALTIC SEA MOTORWAY - RECENT DEVELOPMENT AND OUTLOOK FOR THE FUTURE

Inland Water Transport Sector

Increasing Russia's Transit Potential. Mikhail Goncharov Advisor to President of RZD

TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE

PORT ENERGY OPERATIONS AND CLEAN POWER INVESTMENT ANALYSIS

Rail and Multi-Modal Operations

Competition Issues in the Road Goods Transport Industry in India

The Review of the Capital Plan. A verbal submission to The Select Committee on Budgetary Oversight by the Irish Exporters Association

YOUR GATEWAY TO MOLDOVA AND SOUTHEASTERN EUROPE

North Adriatic Intelligent Transport System Technical seminar

Sabbir Saiyed, PhD., P.Eng. Manager, Transportation System Planning

Transport policy and international goods shipments in the Nordic countries. Summary Memorandum Report 2014:4

IV. IMPROVEMENT OF CROSS-BORDER TRANSPORT BY RAIL TRANSPORT

Ralf-Charley Schultze

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

IPCSA Port Community Systems Port authority perspectives, challenges and expectations

EURO-ASIAN TRANSPORT LINKS

WP 13 Potential for Eurasia landbridge corridors. Adriaan Roest Crollius Panteia / NEA

UKRAINE: KEY FACTS GROWTH DRIVERS PRODUCTION TRADE. Ukraine GDP (current US$): $131,8billion in 2014 by World Bank estimation

Factors Affecting Transportation Decisions. Transportation in a Supply Chain. Transportation Modes. Road freight transport Europe

APPENDIX 1 ROADMAP FOR THE INTEGRATION OF LOGISTICS SERVICES

Transcription:

Presentation on Operationalization of Regional Connectivity between Bangladesh, India, Nepal and Bhutan Presented by Dr. M. Rahmatullah Former Director, Transport UN-ESCAP, Bangkok And currently, Senior Visiting Fellow Centre for Policy Dialogue, Dhaka 1

Presentation Outline Introductory Remarks Objectives of the Research Earlier initiatives Recent initiative: India-Bangladesh Joint Communique Potential Traffic Diversion Scenario Possible Routes for Connectivity Extent of Benefits from Regional Connectivity Challenges in Operationalization of Connectivity A Strategic Framework for Operationalization Concluding Remarks 2

Introductory Remarks Surface transport network in South Asia still continue to remain fragmented, despite existence of basic infrastructure & facilities. At present, goods are transshipped at the border between trucks. No inter-country freight train except a passenger train between Dhaka-Kolkata. Rail wagons are pulled by Indian Locos up to the border and Bangladesh Locos pull these to destinations inside. NE-India, virtually a landlocked territory; and traffic from NE-India is required to travel 1400-1650 km to reach Kolkata Port. If transit is allowed, distances would be around 450-700 km. 3 Before 1947 trade from NE-India used to pass through, territories of what is now Bangladesh

Introductory Remarks Rail and IWT transit across the then East Pakistan continued till 1965 and then suspended. Only IWT transit restored in 1972 after liberation of Bangladesh but not railway. Consequences of poor connectivity are huge for BD as well. A 20 container takes at least 30 days to move between New Delhi and Dhaka, and costs around US$2500, but by rail it could reach in 4-5 days, and cost around US$850. 4 Due to lack of transport integration, logistic costs in South Asia are very high and range between 13-14% of the commodity value, compared to 8% in USA. Intra-regional trade in SAARC around 5% only, compared to 26% in ASEAN, 58% in EU, and 62% in NAFTA. Improved connectivity could enhance intra-regional trade.

Objectives of the Research Long Term Objective is to open up mindsets of political leaders /policy makers and civil society members, regarding actions needed for operationalization of regional connectivity. India-Bangladesh Joint Communique of January 2010 set the tone for actions. But progress in the implementation of the decisions made is very slow. Present research study therefore, focuses on actions in terms of identification of priority routes and facilitation measures needed for connectivity and suggest a strategic framework. 5

Earlier Initiatives Towards Regional Connectivity ESCAP Initiatives UN-ESCAP took pioneering efforts for AH (1959) and TAR (1960). Network Agreements of AH and TAR were signed by 28 countries out of 32, but operationalization of network could not take place in the absence of agreements on movement of vehicles and trains. Initiatives also needed to complete TAR missing links (see Map). 6 SAARC Initiatives As part of SRMTS, 10-road corridors, 5-Rail, 2-IWT corridors, 10- Maritime and 16 Aviation Gateways, for regional transport connectivity identified. But implementation of SRMTS recommendations is slow due to lack of political commitments.

Map 1: Asian Highway Route Map Kabul Islamabad New Delhi Kathmandu Chaba har Karac hi Dhak a Tam u Mumbai 7

Map 2: Trans-Asian Railway Mongla 8

Recent Initiatives: India-Bangladesh Joint Communique Joint Communique- Agreement included: 9 Use of Mongla and Chittagong sea ports by India, Bhutan and Nepal. Use of Rohanpur-Kathihar-Rauxal-Birgunj BG rail link for Nepal s third country trade movement through Mongla Port and for Bangladesh s bilateral trade movement. Construction of Akhaura-Agartala rail link. Designating and developing Ashuganj as a new port of call and transshipment port, with onward road connectivity to Tripura. Allowing bilateral container traffic between India and Bangladesh to be carried by both rail and IWT.

Potential Traffic Diversion Scenario Due to geographical proximity, and convenience of existing transport connectivity, two of the recent studies assumed that around 35% of traffic from Assam, 50% from Meghalaya could be diverted through Bangladesh (see Map-3) On same logic, there is potential for 100% diversion of inter-state and international traffic from Monipur, Mizoram, Nagaland and Tripura, through Bangladesh to Kolkata region, and to BD ports. Due to cost savings, 50% Nepalese and 100% of Bhutanese international traffic could also get diverted to Mongla Port. 10 Studies further revealed that estimated total transit traffic could be around 18 million tons, of which about 16 million could be interstate and 2 million international traffic through BD ports.

11 Map 3: Transport Connections of Bangladesh to NE-Indian States

Possible Routes for Connectivity Sub-committee -1 of High-level Core Committee of Government of Bangladesh(GOB) for transit issues, initially identified 17 routes for regional connectivity based on analysis of major routes identified by SRMTS of 2006. Out of 17 routes, breakdown was :Road routes -7, rail routes-7 and IWT routes-3. CPD- SACEPS study of 2011, selected 13- routes out of 17 as priority routes for quick development and operationalization. 12 Note: For details please see Table-1 and route maps.

Table 1: Details of the 13 Routes Analyzed Sl No. A. Road routes 7 Nos. 1 Road route -1: Agartala-Akhaura LCS-Paturia Ferry- Benapole/Petrapole-Kolkata 2 Road route -2: Agartala-Akhaura-Chittagong Port 3 Road route -3: Silchar-Sutarkandi-Chittagong Port 4 Road route -4: Silchar-Sutarkandi-Paturia Ferry- Benapole/Petrapole-Kolkata 5 Road route -5: Guwahati-Dawki/Tamabil-Chittagong Port 6 Road route-6: Kathmandu-Kakarvita-Phulbari/Banglabandha-Mongla Port 7 Road route-7: Thimphu-Phuentsholing/Jaigan-Burimari-Mongla Port Sl No. B. Rail routes 5 Nos 8 Rail route -1: Silchar-Mahisassan/Shahbazpur-Dhaka ICD - Darsana-Kolkata 9 Rail route -2: Silchar-Mahisassan/Shabazpur-Chittagong Port 10 Rail route -3: Agartala-Akhaura LCS Dhaka ICD(Dhirasram)-Darsana/Gede- Kolkata 11 Rail route -4: Agartala-Akhaura-Chittagong Port 12 Rail route-5: Birgunj-Katihar-Rohanpur- Khulna-(by road) Mongla Port 13 C. IWT route-1 No. 13 IWT route: Kolkata-Raimongal-Mongla-Narayanganj-Ashuganj-by road to Agartala

14 Map of Road Route 1: Kolkata-Petrapole/ Dhaka-Akhaura/Akhaura

15 Map of Road Route 2: Agartala-Akhaura- Chittagong

16 Map of Road Route 3: Silchar-Sutarkandi- Chittagong Port

17 Map of Road Route 4: Silchar-Sutarkandi- Dhaka-Benapole/Petrapole-Kolkata

18 Map of Road Route 5: Samdrup Jonkhar (Bhutan)-Shillong-Sylhet-Chittagong

19 Map of Road Route 6: Kathmandu- Kakarvita/Banglabandha-Mongla/Chittagong

20 Map of Road Route 7: Thimpu-Phuentsholing/ Jaigaon- Burimari-Mongla/Chittagong

21 Map of Rail Route 1: Silchar-Mahisasan/ Bangabandhu Bridge-Darsana/Gede-Kolkata

22 Map of Rail Route 2: Silchar- Mahisasan/Shabazpur-Chittagong Port

23 Map of Rail Route 3: Agartala-Dhaka- Bangabandhu Bridge-Darsana/Gede-Kolkata

24 Map of Rail Route 4: Agartala-Akhaura- Chittagong Port

25 Map of Rail Route 5: Birgunj-Katihar- Rohanpur-Mongla Port

26 Map of IWT Route 1: Kolkata-Mongla-Ashuganj- Akhaura (by road) as a Multimodal Route

Extent of Benefits from Regional Connectivity 27 Main benefit would be cost saving in moving goods along shorter routes through Bangladesh vs. existing longer routes through chicken-neck. Costing by CPD-SACEPS study was done for moving each ton of cargo along different routes as well as through the nodes (border points, transshipment points, sea ports, ferry points, etc.) Detail costing along identified shorter routes vs existing longer routes revealed that savings could range between 12 % to 80% depending on routes used (see Table-2 below).

Table-2: Comparison of Transport Costs- Proposed vs. Existing Routes Name of the Corridor Transport Costs (US$/Ton) Proposed Corridor Existing Route Costs Saving (US$/Ton) % Road Corridor 1: Sutarkandi Benapole 25.80 38.52 12.72 33% Road Corridor 2: Akhaura Benapole 21.94 42.00 20.06 48% Road Corridor 3: Tamabil Chittagong 28.87 32.91 4.04 12% Road Corridor 4: Sutarkandi Chittagong 21.67 46.57 24.90 53% Road Corridor 5: Akhaura Chittagong 14.88 50.05 35.17 70% Road Corridor 6: Banglabandha Mongla 86.72 121.45 34.73 29% Road Corridor 7: Burimari - Mongla 24.54 27.79 3.25 12% Rail Corridor 1: Shahbazpur - Darshana 20.73 47.87 27.14 57% Rail Corridor 2: Shahbazpur - Chittagong 18.48 56.13 37.65 67% Rail Corridor 3: Akhaura - Darshana 16.41 54.00 37.59 70% Rail Corridor 4: Akhaura - Chittagong 12.52 52.05 49.53 80% Rail Corridor 5: Rohanpur - Mongla 29.62 27.76-1.86 --- IWT Corridor : Raimangol - Ashuganj 25.21 50.08 24.87 50% 28 Total 13 routes covering 3-modes

Challenges in Operationalization of Connectivity Both infrastructure and facilitation measures are essential for operationalization of connectivity. Chapter-9 of present Research study provided a list of priority infrastructures which require up-gradation. Resources required for priority infrastructure improvement in Bangladesh alone comes to US $ 6.33 billion. Besides Indian LOC of $ 1.0 billion, another US $ 5.33 billion is required, of which only a fraction is in the pipe line. Mobilization of such huge resources over a short period of 5-7 years, is a big challenge. 29

A Strategic Framework for Operationalization Various elements for operationalization of connectivity may be put together broadly under 3 groups, namely: a. Priority routes identified and fully developed; b. Transit Transport Framework Agreement fully developed and adopted together with protocols; 30 c. An institutional set-up at the regional level in place for transit operation.

A Strategic Framework for Operationalization Regarding development of priority routes- comprehensive improvement will take around 3-5 years, for which huge resources need to be mobilized. Regarding development of transit framework agreement, most involved countries (India and Bangladesh) need to request, perhaps Asian Development Bank (ADB) for technical assistance for drafting the agreement. 31 Representative of member countries should be involved in drafting the agreement, and the protocols to increase ownership. Regarding institutional set-up, ADB could again be requested to organize a Regional Transit Secretariat in the most involved transit country, Bangladesh, to provide a venue for discussion on draft agreement, its adoption and its operation.

A Strategic Framework for Operationalization During drafting of transit agreement, it should become clear where protocols are to be developed. ADB could again be requested for technical assistance for drafting the protocols, involving in the process, experts from contracting parties. 32 Once draft protocols are ready, Regional Transit Secretariat could convene discussion meetings for negotiations and subsequent adoption by ministerial level meeting.

A Strategic Framework for Operationalization 33 Regarding transit charges and fees, Article V of GATT 1994 provides for freedom of transit of goods, vessels and vehicles across territory of another WTO member. Under WTO provisions, transit country can charge for the use of the infrastructure, and transport services, in the form of tolls and transport fares, which are known as transit charges. Article V, however, refers to only through transit i.e. Transit in GATT context normally involves at least three states/countries. In case of Indian transit traffic, only two countries are involved, as traffic is originating in India and also terminating in India, after transiting through Bangladesh. As such, it is a special type of transit facility that Bangladesh has agreed to provide to India, on a bilateral basis.

A Strategic Framework for Operationalization 34 Regarding transit charges and fees (contd.): Another issue is that NE-India, although not a landlocked territory, still its trade wants to transit through Bangladesh. But why? It is because there would be considerable transport costs savings(refer to Table-2). Who should then get this benefit of savings? Should it be only Indian traders? Should Bangladesh not get a share as well? This issue needs to be sorted out bilaterally, and amount to be shared may be termed as transit fees. In addition to cost savings there would be considerable time savings too, which Indian traders will get. This issue has not been covered by this study.

Concluding Remarks Transit traffic from NE-India, Nepal and Bhutan would find it attractive to transit through Bangladesh, and use its ports, as the savings for each ton of diverted traffic could range between 12% to 80% depending on the route being used. Potential transit and international traffic could be around 18.00 million tons of which inter-state would be around 16.00 million tons and international (including Nepal & Bhutan), around 2.00 million tons. Railway and IWT shall have to carry most of the transit traffic. Initially Bangladesh road transport system can perhaps carry around 10% of the diverted traffic. 35 Bangladesh will need around 3-5 years to put its transport system in full gear to carry entire transit traffic, say from 6 th year.

Concluding Remarks Bangladesh shall have to invest more than US$ 6.0 billion to improve its transport system to create enough capacity to carry transit traffic, besides taking care of its own growth. For carrying high value transit traffic, instead of providing transshipment service from border to border, which may not be cost-effective, Bangladesh road transporters could float a joint venture trucking company ( JVTC). For details, please see the research paper. Finally, in view of large potential savings by India, ranging between 12% to 80% per ton of cargo movement, negotiation should be held with India to share part of the savings as transit fees, besides payment of transit charges for use of infrastructure and transport services. 36

Thank You for Your Kind Attention 37