HYDROLOGIC & HYDRAULIC ASPECTS of the Walnut Street Bridge over the Schuylkill River Philadelphia, PA

Similar documents
Culvert Sizing procedures for the 100-Year Peak Flow

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

Stream Reaches and Hydrologic Units

DIVISION 5 STORM DRAINAGE CRITERIA

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

iswm TM Technical Manual Hydrology:

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Methods of Streamflow Analysis

Project Drainage Report

Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

Hydrologic Calibration:

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Engineering Hydrology Class 3

2

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Municipal Stormwater Ordinances Summary Table

Stormwater Local Design Manual For Houston County, Georgia

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

Uncertainty in Hydrologic Modelling for PMF Estimation

MODEL Stormwater Local Design Manual. City of Centerville

GIS Applications in Water Resources Engineering

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

APPENDIX G HYDRAULIC GRADE LINE

EART 204. Water. Dr. Slawek Tulaczyk. Earth Sciences, UCSC

CEE3430 Engineering Hydrology

HIGHWAY DRAINAGE.

Runoff Processes. Daene C. McKinney

Section 600 Runoff Table of Contents

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

Preliminary Drainage Analysis

Hydrologic Cycle. Water Availabilty. Surface Water. Groundwater

Runoff Hydrographs. The Unit Hydrograph Approach

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

CITY UTILITIES DESIGN STANDARDS MANUAL

Module 3. Lecture 4: Introduction to unit hydrograph

Great Lakes Update. Volume 189: 2013 January through June Summary

Table of Contents. Overview... 1

Norman Maclean Snowmelt Flow rate Storm flows fs (c flow m a tre S

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL

Wastewater Flow Monitoring Services

Measuring discharge. Climatological and hydrological field work

Rhode Island Stormwater Design and Installations Standards Manual

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

Suspended Sediment Discharges in Streams

Biogeochemistry of Wetlands: Wetland hydrology

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

WMS Tools For Computing Hydrologic Modeling Parameters

FIRM NAME DESIGNER: CHECKER: DATE: FPID #: DESCRIPTION: COUNTY: DRAINAGE DESIGN CHECKLIST. Designers Initials. Checkers Initials.

Outlet Flow Velocity in Circular Culvert

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

Understanding. Hydraulics. palgrave macmillan. Les Hamill. University of Plymouth THIRD EDITION

HYDROLOGICAL IMPACTS OF URBANIZATION: WHITE ROCK CREEK, DALLAS TEXAS. Julie Anne Groening Vicars, B.A. Thesis Prepared for the Degree of

Section 2: Watershed Characteristics and Runoff

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Chapter 11 Culverts and Bridges

Gwinnett County Stormwater System Assessment Program

Bexar County Flood Warning System. Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Peak discharge computation

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

Alternative Approaches to Water Resource System Simulation

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

Introduction. Welcome to the Belgium Study Abroad Program. Courses:

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF

Hydrologic cycle, runoff process

Drainage of Highway Pavements

ATTACHMENT 4: Design Calculations and Construction Details

Ch 18. Hydrologic Cycle and streams. Tom Bean

4.1 General Methodology and Data Base Development

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

Lecture 20: Groundwater Introduction

CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater. Hydrologic cycle. Hydrologic cycle cont.

Earth Science Chapter 6 Section 1 Review

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

Chapter 6 DOCUMENTATION OF HYDRAULIC STUDIES SOUTH DAKOTA DRAINAGE MANUAL

Runoff Volume: The Importance of Land Cover

Impact of Rainfall Calculation on Capture Volume

2A Stormwater Regulations and Permitting A. Iowa Drainage Law and Resources 1 B. Regulated Activities 1

Hydraulic Design of Highway Culverts HDS 5 September 1985

the 2001 season. Allison brought high winds and street flooding to Houston, after

GRASS-LINED CHANNEL (acre) CODE 840

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Definitions 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology

THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS. May 3, 2017

Transcription:

HYDROLOGIC & HYDRAULIC ASPECTS of the Walnut Street Bridge over the Schuylkill River Philadelphia, PA J. Richard Weggel CAEE201 Lectures 30 April & 2 May 2007

HYDROLOGY (Natural Science) Study of the waters of the earth Oceanography Meteorology Limnology Potomology Engineering Hydrology Surface water hydrology Ground water hydrology

HYDROLOGIC CYCLE Where water exists on the earth and how it moves from place to place processes Location: Ocean Lakes, rivers, streams Below ground Atmosphere Processes: Precipitation Runoff Evaporation Transpiration Infiltration

HYDROLOGIC CYCLE

PRECIPITATION Geographic Distribution of Rainfall National Weather Service collects rainfall data all around the United States Rain gages Daily accumulations Recording gages Radar Current precipitation rates STP = storm total precipitation - for a time period

STANDARD RAINGAGE - ACCUMULATION

RECORDING RAIN GAGE Weighing type

RADAR REFLECTIVITY PROPORTIONAL TO RAINFALL INTENSITY

MEAN ANNUAL RAINFALL IN THE UNITED STATES

100-YEAR, 30 MINUTE RAINFALL

RAINFALL STATISTICS FOR THE PHILADELPHIA AREA Depth-Duration-Frequency Data - Philadelphia PA 8 100 yr 7 50 yr 6 25 yr Depth (inches) 5 4 3 10 yr 5 yr 2 yr 1 yr 2 1 0 10 100 1000 10000 Duration (minutes)

TIME OF CONCENTRATION The time it takes for water to flow from the farthest reach of a watershed to the point where discharge is measured. For times greater than the time of concentration all of the watershed is contributing to the discharge. Rainfall durations equal to or greater than the time of concentration give maximum flows.

A WATERSHED, ISOCHRONES & RUNOFF HYDROGRAPH

HYDRAULICS (Engineering Science) Moving water around (controlled flows) Pipe flow Free surface flow (open channels)

OPEN CHANNEL FLOW Overland flow sheet flow Channel flow Manning s equation for open channel flow V = velocity n = roughness coefficient R = hydraulic radius S = slope A = flow area WP = wetted perimeter Conservation of mass V = R = 1.49 n A WP Q = VA R 2 / 3 S 1/ 2

SOME n VALUES

TRAVEL TIME t = x V (x) Travel time = distance/velocity Note: Velocity can depend on where you are along the channel, x

HIGHWAY DRAINAGE Remove water from a roadway. Convey it to a stream or storm drain Reroute flow in a natural or man-made water course to accommodate a street or highway bridges culverts

DRAINAGE (continued) Lateral (overland flow) from roadway to shoulder/gutter Longitudinal along shoulder/gutter to water course or storm drain inlet or scupper Open channel flow Manning s equation

ROADWAY CROSS-SECTION (SHOWING SLOPES)

RAINFALL STATISTICS FOR THE PHILADELPHIA AREA Depth-Duration-Frequency Data - Philadelphia PA 8 100 yr 7 50 yr 6 25 yr Depth (inches) 5 4 3 10 yr 5 yr 2 yr 1 yr 2 1 0 10 100 1000 10000 Duration (minutes)

TYPICAL CURB SECTION

ASSIGNMENT Calculate how much water a bridge scupper must handle if it drains a ½ of the length of a bridge span 123 feet long. (Calculate for a 30 minute rainfall duration having return periods of 2, 5, 10, 50 and 100 years.) Calculate how much water a gutter can carry if it is filled as shown on the preceding slide and the slope is 2.14%

THE SCHUYLKILL RIVER Navigable river up to Fairmount Dam Tidal up to Fairmount Dam Drainage area above Fairmount Dam = 1,893 mi 2 Flood stage = 11.0 feet Maximum stage = 17.0 feet (4 Oct 1869)

LOOKING NORTH TOWARD CHESTNUT STREET BRIDGE

LOOKING NORTH TOWARD MARKET STREET BRIDGE

LOOKING SOUTH FROM WALNUT STREET SOUTH STREET BRIDGE

WALNUT STREET BRIDGE Navigation lights needed Channel center (360 green) Piers (180 red) Minimum clearance for ship passage (20.2 feet required, 34.9 feet provided) Tides: range = 5.2 feet Floods 50-year +13.5 feet above datum 100-year +15.75 feet above datum

SCHUYLKILL RIVER WALNUT STREET BRIDGE PIERS

NAVIGATION LIGHTS MARKING PIERS AND CHANNEL

STREAM GAGING Measurement of discharge at a location on a stream Development of a relationship between an easily measured variable and discharge Rating curve (Stage v. Discharge) Field measurements during floods to establish relationship Extrapolation to extreme events

SCHUYLKILL RIVER CROSS-SECTION @ WALNUT STREET ( v ) 0 v.2 + v average = 2 0.8 LOGARITHMIC VELOCITY DISTRIBUION

PRICE CURRENT METER VELOCITY MEASUREMENTS

RATING CURVE - SCHUYLKILL RIVER @ PHILADELPHIA 20 18 STAGE (feet above datum) 16 14 12 10 8 6 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 DISCHARGE (cfs)

USGS Water Level (Stage) Data Schuylkill River @ Philadelphia

USGS Stream Discharge Data Schuylkill River @ Philadelphia

HEADER FROM USGS DATA SHEET SCHUYLKILL RIVER @ PHILADELHIA # U.S. Geological Survey # National Water Information System # Retrieved: 2006-11-09 21:38:03 EST # # ---------------------WARNING--------------------- # The data you have obtained from this automated # U.S. Geological Survey database have not received # Director's approval and as such are provisional # and subject to revision. The data are released # on the condition that neither the USGS nor the # United States Government may be held liable for # any damages resulting from its use. # # More data may be available offline. # #For more information on these data, contact Pennsylvania NWISWeb Data Inquiries. # This file contains the annual peak streamflow data. # # This information includes the following fields: # # agency_cd Agency Code # site_no USGS station number # peak_dt format YYYY-MM-DD # peak_va Annual peak streamflow value in cfs # peak_cd Peak Discharge-Qualification codes (see explanation below) # gage_ht Gage height for the associated peak streamflow in feet # gage_ht_cd Gage height qualification codes # year_last_pk Peak streamflow reported is the highest since this year # ag_dt Date of maximum gage-height for water year (if not concurrent with peak) # ag_tm Time of maximum gage-height for water year (if not concurrent with peak # ag_gage_ht maximum Gage height for water year in feet (if not concurrent with peak # ag_gage_ht_cd maximum Gage height code # # Sites in this file include: # USGS 01474500 Schuylkill River at Philadelphia, PA

PORTION OF DATA TABLE USGS DATA FOR SCHUYLKILL RIVER @ PHILADELPHIA # agency_cd site_no peak_dt peak_tm peak_va peak_cd gage_ht 5s 15s 10d 6s 8s 27s 8s USGS 1474500 1869-10-04 135000 2,7 17 USGS 1474500 3/1/1902 98000 2,7 14.8 USGS 1474500 3/28/1932 33300 10.27 USGS 1474500 8/24/1933 96200 14.7 USGS 1474500 9/30/1934 44800 11.3 USGS 1474500 7/9/1935 82000 14.1 USGS 1474500 1/3/1936 49600 11.7 USGS 1474500 12/20/1936 17100 8.6 USGS 1474500 9/21/1938 37700 10.66 USGS 1474500 2/3/1939 42400 11.08 USGS 1474500 3/15/1940 49600 11.72 USGS 1474500 11/15/1940 22300 9.22 USGS 1474500 8/9/1942 71500 13.1 USGS 1474500 12/30/1942 47800 11.36 USGS 1474500 11/9/1943 45200 11.19

EXTREME EVENTS FLOODS Largest flow in any given water year (Annual maximum) N largest flows in N years (Extreme values) Statistical analysis Assign probability to a measured flood (plotting position formula) Probability that a given discharge will occur or be exceeded in any year, P(X x)

PLOTTING POSITION FORMULA What is the probability that the largest flood in 100 years will be equaled or exceeded in a year? P = 1 = 100 0.01 The #1 flood in 100 years. In general, P( X x) = r N + 1 r = rank (1 = biggest, 2 = second biggest, etc.) N = number of years of record

PORTION OF RANKED DATA TABLE SCHUYLKILL RIVER @ PHILADELPHIA 76 YEARS OF DATA Q (cfs) Rank P(X>x) 135000 1 0.01299-2.22660 103000 2 0.02597-1.94356 98000 3 0.03896-1.76287 96200 4 0.05195-1.62625 94600 5 0.06494-1.51461 92500 6 0.07792-1.41919 90100 7 0.09091-1.33518 89800 8 0.10390-1.25966 82000 9 0.11688-1.19071 79000 10 0.12987-1.12701

ANNUAL PEAK FLOWS - SCHUYLKILL RIVER @ PHILADELPHIA 1,000,000 PEAK DISCHARGE (cfs) 100,000 10,000-2.5-2 -1.5-1 -0.5 0 0.5 1 1.5 2 2.5 P(X>x)

ANNUAL PEAK FLOWS - SCHUYLKILL RIVER @ PHILADELPHIA 1,000,000 100-YEAR FLOOD Q = 141,400 cfs PEAK DISCHARGE (cfs) 100,000 50-YEAR FLOOD Q = 122,600 cfs y = 41814e -0.5237 x 10,000-3 -2-1 0 1 2 3 P(X>x)