SUMMARY OF PROJECT PERFORMANCE

Similar documents
VIE: Proposed Ha Noi Metro Rail Extension Project (Line No.3: Ha Noi Railway Station Hoang Mai Section)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Ex-Ante Evaluation (for Japanese ODA Loan)

The World Bank Ethiopia: Supporting Open Data Initiative (P156400)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Dominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Metro Manila Flood Control Project (II)

Maldives: Employment Skills Training Project

The World Bank Pernambuco Rural Economic Inclusion (P120139)

Euro-Interlocking Handover Workshop

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives 4. Project Description

Prysmian Group ERM Project. A journey

1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH).

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Pakistan: Reproductive Health Project

CDM in Urban Railway Sector and JICA s Cooperation

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2008. Study on the Improvement Project of Rail Freight

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

Project Administration Manual

COMPANY PROFILE 2016

Name Previous Rating Current Rating

FY17-FY18 Audit Plan. Office of Internal Auditing

The World Bank Burkina Faso - Bagre Growth Pole Project (P119662)

Strategy Paper. December Review of the ADB Results Framework

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Metro Link Express for Gandhinagar and Ahmedabad (MEGA) Company Limited (50:50 SPV of GOI and GOG)

ESG Roadshow. Pat Risner Group HSE Officer James Upton Head of ESG Policy and Engagement, Group Governance Elisa Morniroli Manager, Investor Relations

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

USAF CAD/PAD Program Overview CAD/PAD Industrial Summit

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Electric Forward Market Report

REPORT RAPPORT REGIONAL MUNICIPALITY OF OTTAWA CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA CARLETON. Our File/N/Réf Your File/V/Réf.

Sunrise Project South I-205 Corridor Improvement Project

NATIONAL POLICY and STRATEGY

COURSE LISTING. Courses Listed. with SAP Ariba SAP Ariba Procurement. 4 February 2018 (03:51 GMT)

SEPA Direct Debits indicator evolution (Spanish basic indicator vs Euro area)

Papua New Guinea: Coastal Fisheries Management and Development Project

Successful Implementation of Hairatan to Mazar-e-Sharif Railway Project in Afghanistan

GUIDELINES FOR THE VALIDATION OF PROJECT COMPLETION REPORTS AND EXTENDED ANNUAL REVIEW REPORTS

ROMANIA National Commission for Nuclear Activities Control (CNCAN) Report. on in Decommissioning Activities. Dr. Lucian BIRO Director General

Promoting Environmental Flow Management in Asian Rivers: Policy, Cases, and Lessons

2017 Employee Attendance Strategic Plan FMCB January 30, 2017

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Los Angeles 3 rd Regional

EIB actions for Energy Efficiency in the Urban Sector

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

International Registration Plan, Inc. IRP Records Review Best Practice Document

European Freight Forwarding Index

COURSE LISTING. Courses Listed. with Customer Relationship Management (CRM) SAP CRM. 15 December 2017 (12:23 GMT)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Reliability Improvement using Defect Elimination

Delivering End-to-End Supply Chain Excellence

LARNAKA SOLID WASTE MANAGEMENT

Terms of Reference Governance Committee

BUSINESS PLAN COVER PAGE

GRINDROD LIMITED ADDITIONAL INFORMATION FOR ANALYSTS for the year ended 31 December 2016

COURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced

Introduction to Green Purchasing Legislation in Japan

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

Sri Lanka: Skills Development Project

TENDER PROCESS FOR LICENSING THE USE OF ROADS OF THE PUBLIC TRANSPORT SYSTEM OF THE CITY OF SANTIAGO - TRANSANTIAGO

AoC and Organizational Reviews: Supporting ICANN Accountability. ICANN53 24 June 2015

Challenges and Opportunities for Canada s Freight Railways

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP)

DMS VERSUS NMAS ANALYSIS

5 Star London Hotels - Example Report

Maharashtra Project on Climate Resilient Agriculture

FOR OFFICIAL USE ONLY

CONSULTATION AND PARTICIPATION PLAN

Pumped hydro Storage Plants

NHS Highland Internal Audit Report Managing Sickness Absence August 2011

QUICK START GUIDE. SQF Implementation. for.

Railway Interface Planning Scheme Rules (RIPS Rules)

Brad Whitaker, MSPH, CSP HSE Director BOS Solutions

CIRCULAR GENERAL PROVISIONS

INTEGRATED URBAN RESOURCE MANAGEMENT A NEW APPROACH

Report and Recommendation of the President to the Board of Directors. Proposed Grant Nepal: Water Resources Project Preparatory Facility

Frequently Asked Questions on Metro s MicroTransit Pilot (MTP)

Global Market Pulp Statistics

COURSE LISTING. Courses Listed. with SAP S/4HANA. 24 December 2017 (16:15 GMT)

Global Procurement: Our Sustainability Policy

TERMS OF REFERENCE FOR THE HUMAN RESOURCES COMMITTEE

NOT PROTECTIVELY MARKED. This paper is presented in line with the internal audit contract with Scottish Police Authority

PAYROLL-BASED JOURNAL COMPLIANCE GUIDE (A.K.A. YOU WISH PBJ MEANT PEANUT BUTTER & JELLY)

Bangladesh: Second Small-Scale Water Resources Development Sector Project

SANGUINE TECHNO - COMMERCIAL SOLUTIONS

Business Practice Manual for The Transmission Planning Process

PROCUREMENT PLAN. Consulting Services

METRO MANAGEMENT RESPONSES TO FISCAL 2005 FISCAL 2008 STATE REQUIRED PERFORMANCE AUDIT OF THE METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS

BOARD OF REGENTS AUDIT/COMPLIANCE AND INVESTMENT COMMITTEE 3 STATE OF IOWA FEBRUARY 6-7, 2013 INTERNAL AUDIT REPORTS ISSUED

Facilities Management. FM Key Performance Indicators

Project Management. Learning Objectives. What are Projects? Dr. Richard Jerz. Describe or Explain:

Ex-ante Project Evaluation

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Payroll Source 2013 Download or Read Online ebook payroll source 2013 in PDF Format From The Best User Guide Database

Voisey s Bay Project Update

Transcription:

Additional Financing of Ha Noi Metro Rail System Project (Line 3: Nhon Ha Noi Station Section) (RRP VIE 40080) A. Background SUMMARY OF PROJECT PERFORMANCE 1. The Ha Noi Metro Rail System Project (Line 3: Nhon Ha Noi Station Section) was approved on 29 March 2011 with financing of $293.0 million from ADB s ordinary capital resources (OCR). 1 It became effective on 23 March 2012. The project will develop a 12.5 kilometer (km) 2 dual-track rail line between Nhon and the main railway station in Ha Noi. The Ha Noi People s Committee (HPC) is the executing agency (EA) and Ha Noi Metropolitan Railway Management Board (MRB) is the implementing agency (IA). 2. The project is cofinanced by Agence Française de Développement or ( 110 million), Direction Générale du Trésor or DGT of France ( 250 million), and the European Investment Bank or ( 73 million). The Project has nine civil works and four equipment packages. ADB will finance the construction of the tunnel section and four underground stations. 3 Financing of other works, equipment, and consulting services, will be supported by the cofinanciers. 4 In October 2014, the original closing date was extended by 2 years from 30 June 2016 to 30 June 2018 due to delay in finalization of detailed design, and resettlement activities. B. Performance of the Project 3. The project performance is generally not performing well, based on Operations Manual (OM) criteria for processing additional financing. 5 Procurement process for both the ADB financed component and other components, financed by other cofinanciers, were one to three years behind schedule. Although there is satisfactory compliance in safeguards covenants, the EA failed to comply with the loan covenant on the submission of annual audited project financial statements. 4. The project is assessed in the following aspects. (i) (ii) Delivery of expected outputs. The delivery of metro rail line 3 is delayed by three years compared to the original schedule. The major reasons for the delayed delivery are slow progress in the land acquisition and resettlement activities, delayed, start-up delays encountered by civil works contractors. Implementation progress. Project implementation performance over the past three years is rated as below satisfactory with only about 15% of overall physical progress. Currently, there are four ongoing works packages: elevated sections, elevated stations, infrastructure works of the Depot, and architectural works of the Depot. Procurement for the ADB financed package for tunnel and underground 1 ADB. 2011. Report and Recommendation on the President to the Board: Proposed Loan to the Socialist Republic of Viet Nam for the Ha Noi Metro Rail System Project (Line 3: Nhon Ha Noi Station Section). Manila. 2 3.5 km underground, 8.5 km elevated, and 0.5 km on a transition ramp. The project works include a depot with ancillary buildings at Nhon, elevated viaducts, a transition tunnel portal, bored tunnels, and 12 stations. 3 the original project, ADB will finance two contracts, one jointly with Agence Française de Développement (design, supply, and install of the 3 rd rail system). In October 2014, ADB approved the change in financing plan. ADB will finance only the underground tunnels and stations. 4 The project will likewise finance the electrical and mechanical railway systems. The project also includes support for detailed design,, construction supervision, design verification, project management, and capacity development. 5 ADB. 2011. Additional Financing. Operations Manual. OM H5/OP. Manila (para. 3).

2 (iii) (iv) (v) (vi) stations was completed and contract awarded in October 2015. Procurement for electrical and mechanical equipment as well as implementation of the capacity building program for the EA and IA is still ongoing. The detailed progress of each package and completed training programs are detailed in Annex 1. Compliance with environmental safeguard policy requirements. The construction sites and workers facilities are clean and secured. Disposal sites for hazardous materials are properly maintained. The workers use proper protective equipment. Noise levels generated by project vehicles were monitored. One accident in the construction site was reported in May 2015 involving the collapse of a crane boom. 6 Because of this, ADB requested the EA to strongly cause all contractors to comply with the environmental management plan requirements and take preventive and corrective actions, including conduct of regular safety training. Compliance with social safeguard policy requirements. ADB approved an updated resettlement plan for the depot and access line in February 2014. Compensation payments were completed in January 2015. ADB concluded that EA complied with the consultation and grievance redress processes and enforcement of the land recovery, and implemented the compensation and assistance program for the affected households in accordance with the updated Resettlement Plan requirements. The updated resettlement plan for the underground section was approved by the Government and cleared by ADB in August 2015. 7 Execution of the current project s gender action plan is delayed due to the late mobilization of the IA s full-time gender specialist in July 2015. The updated resettlement plans include gender-disaggregated data. The design of the stations and depots include women-friendly features, such as safe lighting, separate male and female toilets, and video surveillance. Children-friendly access, paths and facilities are incorporated in the design. A stakeholder s communication strategy action plan will be implemented in 2016 to improve dissemination of project information to the public. Management of Risks. Project risks were assessed during preparation of the proposal for additional financing. The project is technically feasible and economically viable, and has been accorded a high priority by the government. The project is still not financially sustainable and requires continuity of operating subsidy guaranteed by the government. Due to the need for substantial government subsidy, the project s financial sustainability is considered as the highest risk. This risk will be mitigated by developing and implementing a financial management and sustainability action plan as a financial covenant under the additional loan. Furthermore, as the EA has not submitted the annual audited financial statement for FY2012, FY2013 and FY2014, 8 no disbursements for consulting services financed under the additional loan will be allowed until the said audited financial statements have been submitted. Additionally, the EA s capacity to implement and monitor a complex, large-scale project needs to improve. The EA will require continuous support from the loan consultants in 6 The accidental collapse of a crane boom and dropping its load motorbikes caused minor injuries to two motorbike riders, damaged their motorbikes, a construction fence, advertising panels, an electric pole, and telecom and electric cables. The works contract is under non-adb financing. 7 Updated Resettlement Plan for the underground sections. (http://www.adb.org/projects/documents/vie-ha-noi-metro-rail-line-3-nhon-ha-noi-station-underground-section-aug- 2015-rp). 8 Fiscal year is calendar year.

3 (vii) project implementation and monitoring. 9 Other risks identified are summarized in the risk assessment and risk management plan. 10 Performance rating. As of 15 October 2015, the project performance rating is rated actual problem due to slow physical progress, very low disbursement, and non-submission of EA s audited financial statements. 11 To comply with the financial covenant, the EA is expected to mobilize an external independent auditor by March 2016, confirming that the audit will cover the project period from FY2012 to 2014. 12 C. Cost Overruns 5. In 2009, the approved feasibility study estimated the overall project cost at 895.4 million ($990.5 million). 13 However, project cost increased due to project implementation delays caused by detailed design changes, civil works contractual issues, removal of existing utility lines, and resettlement plan implementation, and in March 2012, the detailed design consultant financed by DGT upgraded the project cost to 1,194.1 million ($1,375.7 million) 14. To cover the financing gap, the government approved the revised project outlines on 5 and 23 December 2014, and authorized increases in official development aid financing. 15 Additional loans from ADB and CTF in the amount of $114.8 million, from in the amount of 69.0 million ($75.9 million equivalent), from DGT in the amount of 85.0 million ($93.5 million equivalent), and from in the expected amount of 70.0 million ($77.0 million equivalent) are envisaged to ensure that the project will be completed in 2019, and help achieve the economic development objectives in the government s master urban transport plan for Ha Noi. 16 D. Conclusion 6. The Ha Noi Metro Rail System Project (Line 3: Nhon Ha Noi Station Section) will construct the first underground rail tunnel in Ha Noi. Due to the remaining period for implementation, and considering the project s complexity, close coordination and monitoring is required between the EA, contractors and consultants, ADB, and other cofinancier. 9 financed the project management consultants (PMS Phase 1) until September 2015. However, will not be able to provide continuous support, Government requested from ADB to support the engagement of the loan consultant, PMS Phase 2, under the proposed additional financing. 10 Risk Assessment and Risk Management Plan (accessible from the list of linked documents in Appendix 2). 11 The rating will remain until the contract for the underground section is awarded. 12 will finance the services of the external independent auditor. 13 An August 2015 exchange rate of 1.00 = $1.1 has been used to convert financial figures for the overall project, including cofinancing to be provided in euros. The current project used a February 2011 exchange rate of 1.00 = $1.30 for the overall project cost, including the cofinancing amounts in euros, which were equivalent to $1,077.2 million. 14 The civil works costs may still rise because houses and buildings above the tunnel section may prove to be obstacles. Before tunnel boring starts, the contractor will conduct a preliminary assessment of any obstacles and develop a detailed work plan including schedule, costs, and actions for land acquisition and resettlement. 15 Approved by Prime Minister as shown in Ref. No.: 2322/QD-TTg and Ref. No.: 2486/QD-TTg. 16 Approved by Prime Minister as shown in Decision No.90/2008/QD-DTG.

4 Annex 1 Table 1: List of Works Contract Milestone Dates Contract Descrtiption Finance Source Contractor Contract No. Contract Date Status CP01: Elevated Section - Line DAELIM (Korea) 4/2014/HD-TCXD 11 Apr 2014 Ongoing CP02: Elevated Stations POSCO (Korea) 13/2013/HD-TCXD 14 Aug 2013 Ongoing CP03: Design, Construction of ADB JV HYUNDAI 30 Oct 2015 Awarded ground Section and Stations (Korea) & GUELLA (Italy) CP04: Depot Infrastructure VINACONEX 18/2010/HD-TCXD 22 Sep 2010 Ongoing (Viet Nam) CP05: Depot Architectural Works HANCORP 12/2012/HD-TCXD 24 Oct 2012 Ongoing (Viet Nam) CP06: Design, Supply, and Installation of R.S., Power Supply, OCC/SCADA, signalling and Telecommunication DGT CP07: Design, Supply, and Installation of Electromechanical Equipment CP08: Design, Supply, and Install the 3rd Rail System CP09: Design, Supply, and Installation of Auto Fare Collection System DGT CS1: Design and Supervision (LS) DGT SYSTRA CS2: Project coordination COTEBA/Artelia Assistance (Environmental Monitoring) CENMA CS3.IC2-1a1: Verification of Documents of CP4 CS3.IC2-1b1: Verification of Documents of CP5 CS3.IC2-1b2: Verification of and Appraisal of Tendering Documents CS3.IC2-1b2: Verification of Documents of CS3.IC2-1b3 (Phase 1) Support for Investment Owner on Project Management CS3.IC 2-1b3 (Phase 2) Project Management Support CS4.IC2-2 Verification and Certification of System Safety Design Design 01-TVTHDA-T1 22 Nov 2007 Ongoing 10/2009/HDKT/HTKT- TVDP 05/2012/HDTV-QTMT 12 Nov 2009 Completed 27 Jun 2012 Completed VICCD 01/2010/HD-TVFL1 9 Feb 2010 Completed TRICC 05-2011/HD-TCTT 30 Jun 2011 Completed TEDI 08/2011/HD-TVTT 14 May 2011 Completed SENER 02/2012/HD-TVTT 11 Apr 2012 Ongoing IDOM (Spain) 01/2013/HDTV-HTQLDA 30 Jan 2013 Completed ADB APAVE BV 01/2014/HDTV-KT& CNATHT 01/2014/PLHDTV-KT& CNATHT 17 Jan 2014 30 Jul 2014 Ongoing Ongoing

5 Table 2: Completed List of Trainings for MRB Training Course Date International Procurement/ FIDIC 1 May 2013 International Procurement/ FIDIC 2 May 2013 Tunneling and TBMs May 2013 Urban Railways Signaling and CBTC Systems Jun 2013 Environmental Monitoring Infrastructure Projects Jun 2013/Aug 2014 Rolling Stock in Railway Projects Jul 2013 Project Planning (Basic Level) Jul 2013/Oct 2014 Resettlement Monitoring in Infrastructure Projects Dec 2013/Aug 2014 Gender Action Plan Policies Mar 2014/Dec 2014 Project Planning (Intermediate Level) May 2014 Project Planning (Advance Level) May 2014 Metro Operation and Maintenance ADB s Communication Policy Training Recruitment and Administration of Loan Consulting Services Jun 2014 Jul 2015 Sep 2015