Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS

Similar documents
APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

Driveway Permits Following Guidelines PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT LAND USE CONTROLS ECONOMIC DEVELOPMENT

Advanced Transportation Management System (ATMS)

Why A Traffic SOP Project? Keep on Top of Your Agency s Standard Operating Procedures. Public Works Department Traffic Services Division

U.S. 101 / San Mateo County Smart Corridor Project

Traffic Signals Affect Our Everyday Lives

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland:

Adaptive Signal Control Technology Research in Illinois. Kyle Armstrong, Ray Benekohal, Xueying Liu

TROPICAL PARKWAY IMPROVEMENT

Sunrise Project South I-205 Corridor Improvement Project

Guideline For Inspecting and Testing Preemption of Interconnected Traffic Control Signals and Railway Crossing Warning Systems

Development of TSP warrants. to-day variability in traffic demand

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS

Wisconsin Traffic Operations Performance Management System (TOPMS)-Phase 1. Advisory Group Meeting-November 10, 2014

Conclusions & Lessons Learned

Big Data in Transportation: Opportunities and Challenges

Region of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES

Appendix J-12 Adaptive Signal Control Systems

HORIZON 2030: Plan Projects November 2005

Instructions & Guidelines for the Contractor s Performance Evaluation

Metro Blue Line Improvements & Project Update

I-10 KENDALL EXTENSION. Open House

Wisconsin County/City Traffic Safety Commission Guidelines

LOCATION AND DESIGN DIVISION

National Governors Association

Congestion Management Plan Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Volume II: Cost Proposal and Business Information


FLORIDA DEPARTMENT OF TRANSPORTATION

THAT Council adopt the Congestion Management Strategy as outlined in this report

The Cost Savings Potential of Sustainability Practices

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB:

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

2017 Highway Safety Improvement Program Call

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 65 \\ JANUARY Capacity Analysis Webinars. Bus Bike-Rack App HCS Release 7.5

CHATHAM COUNTY ADVANCED TRAFFIC MANAGEMENT SYSTEM AND TRAFFIC MANAGEMENT CENTER STRATEGIC PLAN TRAFFIC MANAGEMENT CENTER IMPROVEMENT OPTIONS

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

CITY OF CLOVIS Traffic Impact Study Guidelines

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

Cross Bore Remediation Program NGA s 2017 Fall Operations Conference. Saadat Khan P.E. October 13 th, 2017

National Traffic Signal Report Card

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

SMARTDOMAINS SMARTINITIATIVES

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

LOCATION AND DESIGN DIVISION

Volume III ARCHITECTURE MAINTENANCE PLAN

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Qualitative Hot Spot Analysis for PM2.5 February 4, 2008

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Geometric Design: Past, Present, and Future

Connected Corridors: I-210 Pilot Integrated Corridor Management System

White Paper April 23, 2018

I. Project Overview and Limits. Project Goal

INTERNAL AUDIT DEPARTMENT Report Number

S-09: Auburn Station Access Improvements

State of Wisconsin Department of Transportation (DOT) Bureau of Information Technology. Telecommunications. Request for Information (RFI)

RAPID INCIDENT SCENE CLEARANCE (RISC)

Apply DynusT Model for Incident Management along Loop 101 Corridor

New Construction Lighting Application. Application Process. Details & Instructions

Woodburn Interchange Project Transportation Technical Report

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

THE USE OF LANE CONTROL SIGNALS AND CHANGEABLE MESSAGE SIGNS ON TEXAS HIGHWAYS

Pennsylvania TESC. 7 December Alan Toppen, P.E.

2015 ATSSA Traffic Expo Report

Selecting Projects for Accelerated Bridge Construction

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual

Draft. 1. For grade crossing warning devices, see Manual Part Recommended Guidelines for Grade Crossing Warning Devices.

Travel Time Reliability in the SLOCOG Region. October 27, 2014 San Luis Obispo Council of Governments Transportation Education Series

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

Interchange Workshop Report (August 2004)

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

Intelligent Transportation Systems Master Plan

Use of TMC Data for Performance Measurement and Improving Operations. National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

INVITATION TO BID ON TOWN PAVING PROJECTS

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

Current Trends in Traffic Congestion Mitigation

Quarterly Capital Progress Update

TRANSPORTATION IMPACT STUDIES

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

September Public Meetings. Developing a Blueprint for the Corridor

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

METRO MANAGEMENT RESPONSES TO FISCAL 2005 FISCAL 2008 STATE REQUIRED PERFORMANCE AUDIT OF THE METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS

TVA Smart Communities

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House

Maximize Transportation System Capacity

Analytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014

Dynamic Lane Merge Systems

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

CURB RAMPS. ADA Compliance Checklist Guidance

Transcription:

Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form GENERAL INSTRUCTIONS APPLICATIONS DUE: FEBRUARY 16, 2016 Please upload applications to the SharePoint site under your Region (https://wisdot.sharepoint.com/sites/dtsd/bto/its-sig/2017/sitepages/home.aspx). Each Region requesting funds from the Stand-alone Signals and ITS Program must submit the following information: Stand-alone Signals and ITS Program Region Ranking Spreadsheet (one per Region) Completed Stand-alone Signals and ITS Program FY17 Project Application Forms (one for each project request) Any supporting materials deemed necessary by the Region FY17 Project Application Form: Each FY17 Project Application Form shall be completed entirely to be considered: Box 1 Fill in those areas that are applicable to your project. Provide a project name to be used consistently when referring to the proposed project. For Name of Road/Intersection, use From-To (South-North or West-East) format for a road segment such as 6th St.-9th St. A proposed project may involve multiple improvement locations; if this is the case, indicate the corridor or the general area of the proposed project. More specific information should be provided in the project description. Box 2 Identify and describe area of improvement needed. Box 3 Describe the project in as much detail as possible. A good, detailed, description explaining how the project will address the identified need(s) is essential for application review and evaluation. Box 4 If your project will be constructed in phases throughout multiple years, then provide the project costs in the appropriate year and describe each in your proposed improvement statement. List major construction items and associated estimates such as new traffic signal installation, intersection channelization. Project expense is considered during the evaluation of the projects. Therefore, ALL COSTS (including design, utilities and R/E) should be provided regardless of whether Program funds will be used for all elements of the project. Box 5 Complete the various questions as they relate to the proposed project. This information will help determine need and may help with ranking of projects among regions. Box 6 Provide contact information for application sponsor s primary contact person. Application must be signed by the regional operations chief to commit funds and certify as to the answers provided in the application. Supporting Materials: Each completed application shall include the following, if applicable: Map of location General Sketch of Project Proposal or site photo(s). An adequate sketch is the minimum requirement. Preliminary plan layout sheets or study reports should be provided if available. Warrant Documentation, required only for proposals to install new traffic signals (example worksheet available upon request. Ref: Manual on Uniform Traffic Control Devices [MUTCD], Part IV, Sec C). Completed Traffic Control Signal Approval Request form DT1199 (Required for all proposals to install new traffic signals on the State Trunk Highway System, including Connecting Highways and ramp terminals). Systems Engineering Analysis. A SEA may need to be completed for certain types of projects funded by this Program. Submittal Instructions & General Questions: Questions on application process and Program contact: David Karnes David.Karnes@dot.wi.gov Bureau of Traffic Operations 433 W. St. Paul Ave, Suite 300, Milwaukee, WI 53203 (414) 220-6804 Submit the application and materials to: Upload all application materials to the SharePoint site under your Region (https://wisdot.sharepoint.com/sites/dtsd/bto/itssig/2017/sitepages/home.aspx). 1 of 5

Wisconsin Department of Transportation (WisDOT) Stand-alone Signals and ITS Program FY17 Project Application Form 1. Project Description PROJECT NAME Aldis Cameras WIS 29 Ramps FILE NAME (AA_BBBB_FY17 Standalone Program App_CCC.docx)* 02_Aldis Cameras WIS 29 Ramps_FY17 Standalone Program App 20160216.docx *File should be named consistently with the following nomenclature: AA=Project Regional Rank; BBBB=Project Name; CCC=Date. NAME OF ROAD/INTERSECTION HWY NO. BUS 51 & WIS 29 Ramp System COUNTY Marathon CITY/TOWN Weston & Rothschild WIS 29 REGION North Central 2. Identification of Needs Identify which area for improvement the need falls under: 1. New Signal Installation Procurement and installation of controllers, bases and signals 2. Signal Replacement Replacement of signals including geometric improvements and upgrades for FY17 construction 3. Signal Rehabilitation Upgrade, install or replace detection, controllers, battery backup, etc. 4. Signal Retrofit Procure and install monotubes, procure and install flashing yellow arrows, safety improvements not requiring major construction and adaptive signal systems. 5. Signal Retiming Data collection, evaluation, prepare signal timing plan, develop and implement corridor coordination plan to support 3 and 5 year timing schedule 6. LED Signal Replacement* Procure and install all materials for annual LED signal 7 year replacement cycle 7. Intersection Communication Design-build and integrate fiber optic links between existing fiber infrastructure and signal systems, or procure and install cellular Ethernet modems 8. ITS Device Lifecycle Replacement Upgrade, install or replace detection, controllers, battery backup, etc. 9. Software Upgrade, install or replace software 10. ITS Device Installation Upgrade backbone fiber network equipment and switches, replace ramp meter LED s, update non standard CCTV s Other *Anticipated improvements are understood for LED Signal Replacement projects. Therefore, it is only necessary to respond to the Project Description (3a) and Existing Conditions (3b) questions in section 3. 3. Proposed Improvements 3a. Project Description In some detail, describe the proposed project and how it will address the identified need. If the project includes multiple proposed improvement locations, identify the locations. This project would install Aldis cameras to detect vehicles, collect volume counts, report data to office remotely and allow for live and recorded video observations. This project will also install communications to make the system functional and to tie the signals to Centracs. The proposed intersections are in a system (SS0120) and are as follows: S0178: Bus 51 & EB WIS 29 ramp S0179: Bus 51 & WB Wis 29 ramp S0217: Bus 51 & Jelnki/Kort St S0503 Bus 51 & Ellen Street 2 of 5

3b. Existing Conditions Describe the existing conditions of the existing infrastructure. For example, type and age of current infrastructure; what is its current condition? There have been complaints about the current signal operations at these signals. This system is over 45 miles from the Wisconsin Rapids office, making it difficult to observe traffic operations. There is not enough staff in Ops to do traffic counts manually and it is expensive to use consultants. 3c. Project Performance Goals and Objectives Describe the proposed project performance goals and objectives. How will project success be determined? Goal: Retime (or review) signalized intersections every 3 to 5 years. Objective: Collect traffic counts before signal re-timing and observe after changes are made to verify good operations. 3d. Mobility Improvements In some detail, describe the anticipated mobility improvements of the proposed project and how they will be measured (i.e. detection will be used to determine before and after peak hour delay). The signals have not been retimed lately. The cameras will allow new counts to be taken so timing plans can be updated. Video capabilities will allow verification of operational improvements. 3e. Operations and Maintenance Impacts In some detail, describe how this project will efficiently use or reduce operations and maintenance funds. Count data and video capabilities will mean a reduction in unnecessary use of resources required to either sit at the intersection to manually count vehicles or to observe operations and flow. 3f. Energy and Environmental Impacts In some detail, describe the anticipated energy and environmental impacts of the proposed project. There will be some improvement as energy usage from state vehicles for field visits (electricians and engineers) will decrease. 3 of 5

3g. Safety Improvements In some detail, describe the anticipated safety improvements of the proposed project. Safety concerns raised by citizens can be reviewed immediately. Remotely observing traffic reduces risk to employees in the field. During an incident or weather event, the cameras could provide situational awareness. 3h. Additional Justification Provide additional detail that should be considered during the evaluation of this project. This may include the consequences of what would happen should the project not be implemented. Fish-eye detection can supplement or backup the existing in-ground detector loops. 4. Project Cost Estimate project costs in today s dollars: FY17 FY18 FY19 FY20* Design: Real Estate: (Note: real estate acquisition funds are NOT included in this appropriation, other funding sources need to be identified in the space below) Construction Items (Include Construction Engineering and Contingencies): (Note: up to 50% of the geometric improvements needed can be funded by this appropriation ) Let construction Installation via procurement contracts State furnished materials 80,000 Other Costs: **TOTAL COST = 80,000 * The program does not extend passed FY18, however for planning purposes please include potential projects for FY20 which could be funded through a reauthorization of this program or an alternate funding source. ** The project sponsors will be responsible for any project costs in excess of the approved appropriation funding amount. Appropriation funds must be encumbered during the FY identified. 4 of 5

5. Additional Project Information Is this specific project addressed through PDS within the next 6 years? YES NO Performance measures: does this project help with achieving WisDOT s performance goals? Refer to http://dotnet/mapss/index.htm Mobility: Delivering transportation choices that result in efficient trips and no unexpected delays. Accountability: The continuous effort to use public dollars in the most efficient and cost-effective way. Preservation: Protecting, maintaining and operating Wisconsin's transportation system efficiently by making sound investments that preserve and extend the life of our infrastructure, while protecting our natural environment. Safety: Moving toward minimizing the number of deaths, injuries and crashes on our roadways. Service: High quality and accurate products and services delivered in a timely fashion by a professional and proactive workforce. Is this project listed as a strategic objective in the State Traffic Operations Program Plan (STOPP)? Refer to \\Mad00fph\n4public\BHO\meetingminutes\bto\stopp\ Select all that apply: Mobility Accountability Preservation Safety Service YES NO If yes, what section of the STOPP? Timeline Steps in process Months (MM/YY MM/YY) Anticipated Quarter of Encumbrance Anticipated Required Resources (Reg PDS, Reg OPS (eng, electricians), consultant contract, electrical contractors, etc.) 1. Design 7/16-2/16 Vendor, Reg Ops 2. Real Estate Acquisition n/a 3. Procurement 7/16-3/17 Q1 Reg Ops 4. Construction 3/17-6/17 Vendor, Reg Ops 5. Other 6. Contact Information and Signature PRIMARY CONTACT NAME Lindsey Heineck REGION NCR EMAIL ADDRESS Lindsey.heineck@dot.wi.gov SIGNATURE OF OPERATIONS SUPERVISOR Kelly A. Laabs SIGNATURE OF OPERATIONS CHIEF Jeffrey Hess REVISED DRAFT 10/31/2015 TITLE CE Trans TELEPHONE 715-421-7300 DATE 2/13/2016 DATE 2/15/2016 5 of 5