News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 October to 30 December 2015

Similar documents
News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 April to 30 June 2015

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results.

BAE SYSTEMS Marine Ltd s strategy for the decommissioning of the Barrow nuclear licensed site

New Swedish Regulations for Clearance of Materials, Rooms, Buildings and Land Efraimsson, Henrik Swedish Radiation Safety Authority, SWEDEN

OELG Event Categories

APPLICATION for ISO Certification (All Standards) Contents

The year 2005 was one of significant change for

Radiation Protection of the Public and Protection of the Environment

Transporting radioactive material - Guidance on radiation and contamination monitoring requirements, and determining a Transport Index

ENVIRONMENTAL and SOCIAL RESPONSIBILITY MANAGEMENT SYSTEM REPORT

Radiation

HSE statement on radiation protection advisers

POLICY FOR THE MANAGEMENT OF ABSENCE DUE TO SICKNESS

/ 1 2 ANNUAL REPORT BALANCE RECRUITMENT E N V I R O N M E N T A L

12 WASTE. Introduction. Review of proposed development

Standardised Reporting of Radioactive Discharges from Nuclear Sites

during Normal Operations

A Radiation Protection Perspective- Decommissioning of the Moata Reactor. Biological Shield Dismantling

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

Deloitte Analytics. Data driven approach to a better business

ISO14001 Training. ALPS Electric (Ireland) Ltd.. Rev 08 Updated August Consent of copyright owner required for any other use.

ROMANIA National Commission for Nuclear Activities Control (CNCAN) Report. on in Decommissioning Activities. Dr. Lucian BIRO Director General

Interim Guidance on the Regulation of In-situ Disposals of Radioactive Waste and Residual Radioactive Contamination on Nuclear Authorised Premises

Brad Whitaker, MSPH, CSP HSE Director BOS Solutions

APPLICATION for ISO Certification (All Standards)

The GRS Emergency Centre during the Fukushima NPS Accident: Communicating Radiological Information to the Public

Irish Country Meats Camolin

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

NUCLEAR SAFETY REQUIREMENTS BSR

Environmental Protection Licence 2688

Western Power Distribution Workplan to Improve Connections Performance 2014/ Quotation and Acceptance

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

Office for Nuclear Regulation

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

Pollution & Environmental Harm

RADIOLOGICAL PROTECTION

Category Strategy Overview: Professional Services

MANAGEMENT SYSTEMS QUOTE REQUEST FORM

Construction Environment Management Plan

Guidance for NORM industrial activities on how to comply with the radioactive substances exemption regime

Health & Safety. Report 2011/12

2011 PLAN FOR ENVIRONMENTAL RADIATION SURVEILLANCE NORTH CAROLINA

towards ZERO Information to assist in planning for a zero waste future

Near-surface Disposal Facilities on Land for Solid Radioactive Wastes

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008

Chief Nuclear Inspector s Summary Programme Plan

Measuring Safety Performance

Senior Accounting Officers: A practical guide for tax professionals

THAMES VALLEY POLICE ANNUAL REPORT

C. Kennes - C. Mommaert - M. Van haesendonck (Bel V) H. Libon - A. De Backer (Belgonucleaire) Decommissioning of Belgonucleaire MOX plant

Construction Site Waste Management Process.

Annual Report. December 2010 November Bradley Cole 2/7/2012

ESCI-61 Introduction to Photovoltaic Technology

Farnborough Aerodrome Consultative Committee (FACC) TAG Information Report February 2018

Environmental Management Programme (EMP)

COSBEDO01 - SQA Unit Code F50H 04 Produce and recommend detailed design solutions in built environment design

Linde FUSRAP Site Tonawanda, New York

CONTRACTOR WHS HAZARD STANDARD TRAFFIC MANAGEMENT EXTERNAL USE ONLY

Quality Impact Assessment Procedure. July 2012

Government Decree on the Transport of Dangerous Goods by Air (210/1997; amendments up to 659/2009 included) Section 1 Scope of application (659/2009)

Terms of Reference Governance Committee

ASBESTOS MANAGEMENT PLAN. July Document Version: 1

Operating Requirements Manual 11 October 2015 Version 1

EAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST

OCCUPATIONAL HEALTH. Manager s Guide for Occupational Health

Health and Safety. Health and safety performance. Our safety performance. Process safety

Health and Safety Targets, Measures and Plans Guideline

Mark Ramsay BEng MSc MSRP, CRadP

Administration Division Public Works Department Anchorage: Performance. Value. Results.

AND SITE LICENSING OF THE EPR FOR THE HINKLEY POINT C PROJECT

COSCCOMO01 - SQA Unit Code FM74 04 Maintain health, safety and welfare systems in construction contracting operations management

Principles for the Assessment of Prospective Public Doses arising from Authorised Discharges of Radioactive Waste to the Environment

Climate Action Planning at Rice University. Richard R. Johnson Admin. Center for Sustainability and Energy Management 27 April 2016

COSCCOMO01 (SQA Unit Code - HA32 04) Maintain health, safety and welfare systems in construction contracting operations management

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT

Waste Business Monitor The only source of "real time" trend data analysing global waste plant developments

Environmental Regulator's RWA Syllabus mapped to PHE's RPTS courses. RPTS coverage EA. No

Radioactive Substances Regulations Environmental Permit Application for Hinkley Point C

WHS Management Plans

Electric Forward Market Report

Scott Hockly. Environmental Management of an Inner City Roading Project

HEALTH AND SAFETY 45% 25% 56 Johnson Matthey / Annual Report & Accounts SUSTAINABLE TECHNOLOGIES for today and for the future

Radiation Protection Adviser (RPA) Register

NHSLA Risk Management Standards for NHS Trusts Providing Community Services 2011/12

European Radiation Protection Legislation and Initiatives

Comments, Complaints & Compliments policy

Public Information Centre. Welcome!

Construction Waste Measurement Guide

Environmental Conditions Laboratories (for commercial use) Group

IAEA Perspective on Management of NORM Waste

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

Designer and CDM Co-ordinator Guidance

EAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST

ARIS 9.6 Roadmap and Future Directions

Environmental Policy and Guide December 2010

Stakeholder Concerns An International Perspective

PRODUCT HSE: Clauses HSE Technological purchase

Transcription:

Environment, Safety&Health Quarterly Performance Report Reporting period: 1 October to 30 December 2015 Welcome to AWE s fourth quarterly performance report for 2015. This document is designed to inform you the local and wider public of our management of the environment, safety and health at our sites in Aldermaston and Burghfield. The safety of our employees, our community and the protection of our environment is and will always be our highest priority. News this quarter AWE s demolition activities continue as part of our ongoing decommissioning work at both Aldermaston and Burghfield from 2014 to 2025. To support this programme and as part of the site modernisation plans, work to demolish the Burghfield boilerhouse started in June 2015. The boilerhouse presented a number of challenges involving legacy contamination. Nearly 4,000 tonnes of waste was removed during the demolition, with over 97% of the waste diverted from landfill (82% recycled and 15% reused on site). This included 166 tonnes of heavy fuel oil which was all sent for recycling. Non-hazardous concrete from the demolition was crushed and reused on site for ground reinstatement. AWE Head of Environment, Peter Caddock, said: I am very pleased to see how well this project was managed from an environmental point of view. This demonstrates how, by competent AWE staff working closely with our contractors, we can not only manage our environmental risks responsibly but also deliver a positive outcome with mutual cost and environmental benefits. Demolition of the building was successfully completed on schedule with no environmental impact, and the site returned to a brownfield site. 1

Public dose data AWE monitors discharges of radioactive material from its sites and assesses the impact these could have on the local environment and the public. The table below shows the rolling annual dose to members of the public from Aldermaston and Burghfield discharges. The calculated doses represent minute fractions of the dose constraint set by the Environment Agency of 500 μsv per year for a nuclear site. The assessment concludes that there is no hazard to the public. Public Dose Assessment Discharge Aldermaston Burghfield Guidance Levels Q4 2015 Jan 2015 to Dec 2015 Q4 2015 Jan 2015 to Dec 2015 Atmosphere Less than Less than 0.04 μsv 0.12 μsv 0.0001 μsv 0.0001 μsv 500 μsv Trade Effluent 0.003 μsv 0.011 μsv N/A N/A 500 μsv Aldermaston Stream 0.0001 μsv 0.0004 μsv N/A N/A 500 μsv Refer to list of definitions of units of measurement at the end of this report. Putting doses into context 135g bag of Brazil nuts if eaten Chest x-ray Transatlantic flight CT scan of the head UK average annual radiation dose AWE Key Performance Indicator for Maximum Individual Dose CT scan of the chest Average annual radon dose living in Cornwall AWE Company Annual Dose Limit Whole body CT scan UK Annual Dose Limit for Nuclear Workers Dose in microsieverts 5 µsv 20 µsv 70 µsv 1400 µsv 2700 µsv 4000 µsv 6600 µsv 7800 µsv 10000 µsv 10000 µsv 20000 µsv How we report incidents on our sites It is important that we know when things do not go to plan so that we can investigate and put things right. Anyone working on AWE sites or carrying out company business off site are required to capture incidents on a dedicated reporting system. These incidents are referred to as Abnormal Events. We believe that lessons can be learnt from even the most minor incidents and those lessons can help prevent more occurrences from happening in the future. With this in mind, we also have a system called Assurance Observation Reports which allow people to engage and capture conversations around safety on a daily basis. 2

How we report on our industrial safety performance Certain Abnormal Events are automatically reported to the Health and Safety Executive (HSE) under the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR). RIDDOR is the statutory legislation that requires employers, and other people who are in control of work premises, to keep records of certain Abnormal Events. The table under shows the breakdown of RIDDOR reportable events that have occurred on AWE sites during this quarter. The number of RIDDOR events reported during the preceding 12-month period appears in the chart below. October 2015 A colleague slipped on a manhole cover sustaining a fractured ankle. Reportable as an absence greater than seven days A contractor sustained a fracture to the ankle exiting a works vehicle. Reportable by their employer as an absence greater than seven days A colleague suffered an electric shock. Reportable as an absence greater than seven days November 2015 A colleague moving access steps experienced back pain. Reportable as an absence greater than seven days December 2015 A security officer tripped and fell sustaining a fractured elbow. Reportable by their employer as a major injury These events have been fully investigated and actions taken to help prevent recurrence. 4 RIDDOR Total Reportable Incidents by number of events in month and rolling 12-month rate 0.20 0.18 Number of incidents 3 2 1 0.16 0.14 0.12 0.10 0.08 0.06 0.04 Rolling 12-month rate per 100,000 hours worked 0.02 Target = Zero 0 Number of incidents in month Rolling 12 month rate Dec 14 Jan15 Feb 15 Mar 15 Apr 15 May 15 Jun 15 Jul 15 Aug 15 Sept 15 Oct 15 Nov 15 Dec 15 0 0 0 0 0 1 1 1 1 0 3 1 1 0.06 0.05 0.05 0.05 0.05 0.06 0.07 0.07 0.08 0.06 0.06 0.05 0.06 0.00 3

How we drive improvement in our performance AWE is committed to a continuous programme of improvement, and as part of further learning we also use the United States Occupational Safety and Health Administration (OSHA) system when applying a classification code to injury and illness related Abnormal Events. The chart below shows AWE s performance for all OSHA recordable events by Contract Year. 0.90 OSHA Total Recordable Incident Rate (TRIR) by Contract Year and Contract Year 16 to the end of December 2015 0.80 0.70 OSHA TRIR per 200,000 hours worked 0.60 0.50 0.40 0.30 0.20 Trend over time 0.10 0.00 Target = Zero CY9 CY10 CY11 CY12 CY13 CY14 CY15 CY16 to date TRI Rate 0.79 0.60 0.73 0.64 0.68 0.46 0.44 0.54 How we report on our nuclear safety performance In addition to reporting events to the HSE under the RIDDOR regulations, as a nuclear licensed site, AWE has also set criteria for which incidents must be reported to its nuclear regulator, the Office for Nuclear Regulation (ONR). Events reported to the ONR during the current reporting period are listed in the table on page 5. Where applicable, an indication of the International Nuclear and Radiological Events Scale (INES) rating, given to the event, is also listed. The INES scale is used by nuclear operators to give a common international standard for comparison of nuclear events; these events are rated on a scale of one to seven. Those coded as zero are deemed below the scale and to have had no safety significance. Those coded TBC are subject to findings of ongoing investigations. 4

ABNORMAL EVENT All events occurred at AWE Aldermaston unless specified otherwise Protecting our environment In order for AWE to operate our sites and perform our role in national defence, we are required to hold a number of permits, authorisations, registrations, licences and consents. We have to apply to the appropriate regulators in order to be granted these permits, authorisations, registrations, licences and consents (jointly termed permits). Environmental events notified to the Environment Agency All events occurred at AWE Aldermaston unless specified otherwise. Initial/ Provisional INES Rating Final INES Rating October 2015 Source became separated from its container 0 N/A December 2015 Following a review, the configuration of a bank of filters was found to be outside operational requirements 0 TBC October 2015 A plutonium result (200 nbq/m³) for a High Volume Air Sampler was recorded between 1 October and 15 October 2015 from AWE Aldermaston. It exceeded the notification level of 100 nbq/m³. It should be noted that whilst the level required us to investigate the event and notify the Environment Agency and the MOD, the estimated dose was very small and not at a level that would pose any harm to the public or the environment. The findings from the investigation concerning the source of the plutonium were inconclusive on this occasion. November 2015 No events notified to the Environment Agency. December 2015 On 16 December 2015, AWE received a Sample Notification Letter from the Environment Agency relating to a routine regulatory sample taken at AWE Burghfield on 8 December 2015. The letter stated that the suspended solids permit limit had been exceeded (245mg/l) against the permit limit of 100mg/l. We have responded to the Environment Agency stating that we have investigated the exceeded limit and believe it was caused by heavy rainfall washing solids through the network, and the samplers not being able to collect a representative sample. We are awaiting a response from the Environment Agency. 5

Waste minimisation As part of AWE s commitment to protecting the environment, we have a long-term vision to become a zero-controlled waste-to-landfill organisation, details of which are given in AWE s Annual Review of Sustainability 2011-12 (available on AWE s website). To that end, there is a drive towards minimising waste and avoiding landfill wherever possible. AWE monitors diversion from landfill, for which a target of 80% has been set for Controlled, and Construction and Demolition waste. Controlled Waste Normal operational waste but excluding radioactive (RA), Explosive, and Construction and Demolition Construction and Demolition Waste Commonly rubble and soil but excludes Controlled, RA and Explosive waste Reused An item to be reused on site, or resold to be reused in its original condition Recycled An item that can be broken down and made into something else Recovered Where waste is burnt and energy recovered, or waste is used in land remediation Disposed Where waste is not reused, recycled or recovered Below are the performance statistics for this quarter. Diverted from Landfill % Reused % Recycled % Recovered % Total diverted from landfill % Disposed Controlled 2.9% 48.9% 28% 79.8% 20.2% Construction 0% 97.2% 0.2% 97.4% 2.6% 6

Community concerns At AWE, we believe in being a good neighbour. It is important to us that people living near our sites have the utmost trust in our organisation. AWE s process for handling community concerns requires us to respond to them effectively and appropriately on a 24/7 basis. Any concerns raised broadly fall into six main categories: noise, traffic, light, water, pollution and other. A community concern is initially assessed in terms of criteria such as severity, safety implication, complexity, impact, and the need and possibility of immediate action. This includes an assessment to determine whether the concern is a complaint and whether it is associated with AWE operations or not. A community complaint is defined as an expression of dissatisfaction with AWE, however expressed, whether justified or not. We are proud of the strong relationships we continue to build with the community, and are currently supporting a number of local projects including the Tadley First Responders, and Basingstoke s Shopmobility. The majority of our circa 6,000 staff and contractors, who are themselves part of the local community, live within a 10-mile radius of AWE. 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 Target = Zero 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 Number of valid complaints Community Complaints by Calendar Year Total in year 30 37 25 10 11 7 3 4 1 Burghfield 2 1 4 3 3 0 0 1 0 Aldermaston 28 36 21 7 8 7 3 3 1 For more information, contact: enquiries@awe.co.uk List of acronyms and definitions of scientific terms: AWE: Sievert: millisievert (msv): microsievert (µsv): Atomic Weapons Establishment A measure of radiation dose received by a person One thousandth of a Sievert One millionth of a Sievert CY16 (Contract Year 16): The period from 1 April 2015 to 31 March 2016 7

Reporting period: 1 October to 30 December 2015 MG/34076/PJD If you require this in an alternate format; such as large print, on alternative paper, or electronically, please contact the Media Group Graphics Team 0118 082 5249 who will be happy to help. British Crown Owned Copyright 2016/AWE AWE Aldermaston, Reading, Berkshire, RG7 4PR 8