Bharat Oil & Waste Management Ltd. Oil Refining, Hazardous Waste Management, ewaste Management & Incineration.

Similar documents
LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

Biomass Gasification

Enhanced usage of Alternative Fuels in Cement Industry

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

ARC. CEO, Ulla Röttger

Experiences in using alternative fuels in Europe and Germany

Kazushige KUROSAWA*, Zhibao ZHANG**, and Zhengbing WANG** [Delivered Products & Systems] 1. Introduction. 2. Overview of Nanjing

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

CHAPTER 3 STUDY OF EXISTING COMMON BIO-MEDICAL WASTE TREATMENT FACILITY (CBMWTF)

Multi-Criteria Evaluation of Waste Oil & Petroleum Residues Processing Technologies

Biomass Boiler Emission Abatement Technologies. Simon Wakefield

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA

Hamm MW Pyrolysis Plant. Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials

Major changes proposed in the Bio- Medical Waste Management Rules, 2016 and its likely implication

WASTE INCINERATION PLANTS IN AUSTRIA WITH DATA ON WASTE MANAGEMENT IN VIENNA

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

GEA Niro Spray Drying Absorption. The easy way to clean the flue gas from waste incinerators. engineering for a better world. GEA Process Engineering

Legal Aspects and Process of Biomedical Waste Management Practices in India. *Prakash V **Dr. N. Palaniraj

Cement industry Industrial emissions IPPC

CISWI and solid-waste-identification rules

Bio-medical Wastes Disposal Incinerator Systems - Understanding, Criteria and Analysis For Comparative Selection, By Homi R. Mullan.

A Full Service Environmental Company

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Application of CFB (Circulating Fluidized Bed) to Sewage Sludge Incinerator

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II)

SYNERGIA Waste-to-Energy Research and Technology Council

Technical Session on Healthcare Waste Management - Treatment of infectious and sharp waste -

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

Manufacturer since 1930 s ATI ENVIRONNEMENT. Presentation. Dr. KIM Moody. Oct. 15, 2014

Life Cycle Assessment of RDF Production from Aged MSW and its Utilization System

TiO 2 Chloride Process. Ti-Cons. Dr. Jendro and Partner - Jendro, Weiland and Partner Management Consultants

Why did obsolete pesticides become such a priority in a country as Romania with so many other problems?

A Burning Experiment Study of an Integral Medical Waste Incinerator

Waste to Energy WTERT, N.Y., October 2008

Recycling and Disposal of Thermoset Composites Steve Pickering University of Nottingham

GASIFICATION THE WASTE-TO-ENERGY SOLUTION SYNGAS WASTE STEAM CONSUMER PRODUCTS TRANSPORTATION FUELS HYDROGEN FOR OIL REFINING FERTILIZERS CHEMICALS

Westinghouse Plasma Gasification is the Next Generation of Energy from Waste Technology. USEA Annual Meeting May 30, 2013 Washington, DC

CHAPTER 4 A STUDY ON CONTROLLING POLLUTION IN IRON FOUNDRIES LOCATED IN COIMBATORE DISTRICT OF INDIA

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems

ENVIRONMENTAL REGULATIONS AND MANAGEMENT OF SPENT POT LINING (SPL) WASTE GENERATED FROM ALUMINIUM INDUSTRY. Dr. B. Sengupta

High efficient multi-fuel CYMIC concept for biomass, rejects and coal for Hamburger Hungaria Katriina Jalkanen Valmet Technologies Oy

Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended)

Thermal Treatments. - Incineration -

Technical Description Package Micro Auto Gasification System (MAGS )

Health Care Waste Management - To Reduce the Burden of Disease, Health- Care Waste Needs Sound Management, Including Alternatives to Incineration

HELIOSOLIDS FLUIDIZED BED INCINERATOR

THE INTEGRATED CX SYSTEM FROM SCRAP ACID BATTERIES TO SOFT LEAD AND LEAD ALLOYS

Catalytic Activated Ceramic Dust Filter a new technology for combined removal of dust, NOx, dioxin, VOCs and acids from off gases.

Performance Analysis of Cement manufacturing Industry

Hot Gas Filters for Control of Emissions to Atmosphere

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

Filtration Applications for the Refining & Petrochemical Industries

This is a draft revision of the briefing, and any comments are welcome please them to Becky Slater on

Pharmaceutical and Biotechnology Services

Introduction: Thermal treatment

Novel types of equipment for off-gas cleaning

The Chemical Industry and Climate Change. A Snapshot from India

WESTINGHOUSE PLASMA GASIFICATION

Water 2. Compliance 5

Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Final Reconsidered Rules Requirements Summary

Controlling Emissions and Saving Money with Highly Engineered Cartridge Filter Technology

Common Bio Medical Waste Treatment and Disposal Facility for Pimpri Chinchwad Municipal Corporation and adjoining area

Safe Disposal of Secondary Waste

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT

APPROVAL FOR HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT FOR HOSPITALS

WASTE PLASTIC IN SOIL STABILITY AND IN ROAD CONSTRUCTION

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

Construction Waste Minimization and Reuse Management

Operating Experience of Circulating Fluidized Bed Scrubbing Technology in Utility Size Power Plants

Sustainable Solutions In Energy & Environment

Hind Energy & Coal Beneficiation (India) Ltd.

Overview of Wastes Management in Mauritius

SIPAPER Reject Power. Environmental Product Declaration. Pulp and Paper Technologies

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

ABB Measurement & Analytics Monitoring cement plant stack emissions using FTIR

National Aluminium Co. Ltd.

The choice for innovative flue gas treatment. Sorbacal SPS, the most effective calcium sorbent on the market

Company Introduction

Introduction. Ridge Road Transfer Station Ridge Road, Cleveland

INCINERATION. Combustion Efficiency. NACT Incinerators NACT 270. Incinerators. 3 T's Time (of residence) Temperature Turbulence

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Issues in Municipal Waste to Energy

Biogas analysers. Product overview. MRU over 30 years of innovative gas analysis! Biogas, landfill gas, biomethane, coal mine gas, CHP exhaust gas

Dear Friends, Welcome on behalf of EvoCrete & CCL International Ltd.

HAZARDOUS WASTE ( MANAGEMENT, HANDLING AND TRANSBOUNDARY MOVEMENT) RULES 2008 AMENDMENTS MADE THERE OF

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel

C S Bhutoria. Mob: Presented in 7 th International ti Conference Gasification India: 2016 at New Delhi

Co-processing: a hazardous waste incineration option

Waste Wood Legislative Framework

MP-400. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better!

8 th SGC International Seminar on Gasificaton October 15 th -16 th, 2014 Malmö, Sweden

AMEC Case Examples in Project Sustainability

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

An Overview of the SkyMine TM Process. David St. Angelo Vice President Skyonic Corporation Austin, Texas

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

ENERGY AND MATERIALS FROM WASTE AND BIOMASS The role of WTERT France

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

Executive Summary. Consistent with Schedule 3 of the Environmental Assessment Act, IWM is submitting for evaluation this registration document.

Transcription:

Bharat Oil & Waste Management Ltd. Oil Refining, Hazardous Waste Management, ewaste Management & Incineration. By Bharat Manglani (BE-DCE, MS-UMASS, Finance-Harvard) An ISO-9001-2000 Certified Company A Public Enterprise Committed to Environment Protection

Our Vision To be a World Leader in Oil Re-refining, Hazardous & Electronic Waste Management and Incineration setting standards and benchmarks in the industry. BHARAT OIL & WASTE MANAGEMENT LTD. An ISO-9001-2000 Certified Company A Public Enterprise Committed to Environment Protection http:// New Delhi : 011 2981 6466 / 011 41000170

Page 3

PROBLEMS WE SOLVE: 1. Recycle Used Lube Oil & Waste Lube Oil. 2. Hazardous, Electrical/Electronic and Municipal Waste Management. Environment Protection Act Compliance BOC has over 40 years of experience in oil refining, blending of lubricating oil, hazardous waste management and incineration of non-recyclable hazardous waste. Page 4

Our Contribution to Protect Mother Nature Since 1978, Bharat Oil Company (I) Regd. Has: Refined 78 Million Liters of Used Oil. Produced 58 million Liters of Neutral - 100 Engine Oil; 17 million Kg of Asphalt used in constructing roads and pavements. Helped save US $26 million in export bills to Indian Government and Indians. Saved Mother Nature - Saved Around 780 million acre land & equivalent water from contamination. Created Skilled Employment in Technology, Research, Sales and Administration. Page 5

Refining Plant: #1 unit in India to operate acid-free thin film deep, thin film vacuum technology. Fractional distillation technology. Hydrofinishing reducing sulphur and metal ions below 10 ppm. Completely Automatic with Safety Interlocks. On-site Laboratory & Research Lab. Produce ASTM/ISI grade lubricants. Page 6

Lab & Storage: On-site Laboratory & Research Lab. 2 million (20 Lacs) liter storage. Page 7

Incinerator: Rotary Kiln Incinerator with Primary & Secondary Chambers heating up to 1400c. Thermic Fluid Heater. Spray Drier, Venturi, Lime & Activated Carbon Scrubber and De-Gasser. Real-time sensors for Cox, Sox, Nox. Remote Video viewing of waste management and monitoring of emissions. On-site Secured Landfill. Picture showing the Venturi, Scrubber, Secondary Chamber. Rotary Klin is center bottom of the Incinerator Page 8

Statutory Norms By CPCB 1. Twin chamber concept. 2. Temperatures : Primary 850 ± 50 o C, Post combustion Chamber 1050 1200 o C. 3. Gas Residence time : Post combustion chamber min 2 seconds. 4. TOC of slag / ash less than 3% OR LOI of less than 5% of dry wt. of material. 5. Emission standards set by CPCB : Particulates 50 mg/nm 3, HCl 50 mg/nm 3 NO2 400 mg/nm 3 SO 2 200 mg/nm 3 TOC 20 mg/nm 3 CO 100 mg/nm 3 HF 4 mg/nm 3 Dioxins / Furans 0.1 Ng /NM 3. Page 9

HW Management / Incineration Page 10

Gas Cleaning System Spray Driers followed by Venturi and Cyclone followed by Three Stage scrubbing system : Lime Activated Carbon Caustic solution Trapping of fine particulate matter and neutralization of acidic fumes are done here. Carry-over moisture is removed from flue gasses by cyclonic type droplet separator and demister. Ceramic rings are used for packing. Page 11

CHWTSDF Facility at Kanpur-Dehat Road, Kanpur, UP. Secured Landfill with Dual Composite HDPE Liner having 2mm thickness; Landfill capacity: 550,000 MT. Incinerator: Rotary Klin Incinerator 2MT/hr with Primary, Secondary, Spray Drier, Cyclones, Gas Scrubbing, Venturi, Bag Filter & ID Fan, Continuous Emission Monitoring. Treatment Area. Storage for Hazardous Waste. Laboratory, Weighbridge/s, Vehicle Cleaning. Ground Water, Soil and Air Monitoring. Page 12

Landfill Cell# 1 Dual HDPE 2mm Liner Kanpur-Dehat TSDF Secured Landfill with Dual Composite HDPE Liner having 2mm thickness; Site Landfill capacity: 450,000 MT. Page 13

Weight Bridge On-site Weight Bridge with Max Capacity of 80 MT/Truck Load Page 14

Hazardous Waste Storage Area On-site Weight Bridge with Max Capacity of 80 MT/Truck Load Page 15

Laboratory Page 16

Integrated HW & ewaste Facility at Mauza Mukimpur, Roorkee, Uttarakhand. Fully Operational since July 2010. Secured Landfill with Dual Composite HDPE Liner having 1.5mm thickness; Landfill capacity: 600,000 MT. Incinerator: Rotary Klin Incinerator 12,000MT/year with Primary, Secondary, Spray Drier, Cyclones, Gas Scrubbing, Venturi, Bag Filter & ID Fan, Continuous Emission Monitoring. HW Storage and Treatment Area. Laboratory, Weighbridge, Vehicle Cleaning. Electrical and Electronic Waste Management. Page 17

E-Waste Management: Waste Separation. Repair, Recycle, Donate usable parts/components. De-soldering. Component Separation and re-use. Plastics: Recycled to plastic industry. Metal: Recycled to Metal Industry. Shredding and Chopping, Separation based on density Metal Separation using magnetic field and eddy current. Page 18

Facts and Environment Compliances: Licensed by UP State Pollution Control Department, CPCB and Ministry of Environment to operate a used oil refining plant and as an incinerator. Licensed by UP State Pollution Control Department for operating an Incinerator. Licensed by UKEPCB, Dehradun for Secured Landfill, Incinerator for HW and ewaste Recycling/Management at Roorkee TSDF. Approved by Ministry of Environment & Forest TSDF Facilities in Sahibabad (Gzb, UP), Kanpur-Dehat, UP, Roorkee, Uttarakhand, Haridwar, Uttarakhand. Dedicated fleet of trucks, vehicles to serve our customers in 1 day notice. #1 in India to introduce and successfully operate acid-free re-refining of lube oils. Is in a position to compete with any multi-national company in the field of refining lube oils, hazardous, electronic and municipal waste management on quality, efficiency, customer service & operating cost. Page 19

Team Naresh Manglani, Founder & Managing Director B Com; MBA; Over 30 years experience in managing large business; Responsible overall management. Haresh Manglani B Com; Over 26 years experience in managing large business; Co-founder/VP-Sales Construction Vertical. P P Sethi, General Manager, Administration B.A. 35 years experience in Ministry of Defence and Sports as Admin Head. Ramesh Srinivasan, DGM MA, LLB, 27 years experience in Management Operations at IFFCO. Responsible for Sales & After Sales Support. B T Manglani, Chairman BE Civil; Retired Superintendent Engineer, DDA, 35 years experience managing over 1000 employees; Responsible for Finance, Strategy and Legal. Bharat Manglani, Director (Strategy & Technology) BE (Delhi College of Engg, 1986), MSEE (UMASS, 1989), Finance (Harvard, 2003). 18 years experience; Founded netguru and took public on NASDAQ; Founded SuitableMatch.com, FootPath, Inc. in USA. Technology Pioneer, World Economic Forum, Switzerland, 2000 and 2001. Prakash Sarssar, Sales Manager BBA, 9 years experience having worked for netguru India, SuitableMatch.com, FootPath India. Responsible for Office Operations, Sales Support and Corporate Sales. Attorney Moni Cinmoy LLB, MLB, Practicing attorney with Delhi High Court with over 16 years experience. Responsible for environmental compliances and contracts. Rajender, Procurement Manager BA, 12 years experience with Bharat Oil in Plant Operations, Procurement of Used Oil and Sales of Lube Oil. Page 20

Our Values Honesty with customers, employees and suppliers. Best Quality, Reliability, Professionalism and Customer Service at Most competitive prices. Relentless commitment to improve the environment, trees, water, earth, air and sky. Reliability: Honoring every commitment we make. Transparency of operations with customers, suppliers and the community. We Provide Statutory Compliance: Complete compliance & Disclosures of CPCB/SPCB rules/procedures. Professionalism: Most professional, convenient, reliable & customer oriented service at most competitive prices with the sole objective of making our customers successful better and faster at lower costs. Trustworthy Relationship: Our Main Assets Customer, Employees and Supplier Relationships. One Stop Solution: Offer Complete Waste Management Solutions Consulting, Hazardous Waste, Municipal Waste and ewaste. Monitoring: Real-time live status and monitoring of waste management. Page 21

What you could loose by not doing business with BOC You could loose time, money, reputation and credibility by compromising purely on costs!!! What you get is what you pay for! Waste may be disposed off unsafely defeating your social/moral objectives. Supplier s Logistics and management may be cumbersome and unprofessional forcing you to depute your personnel thus costing you time and delays. Pollution compliance may be incomplete, forged or non-compliant. This can be a big liability during annual audits. Suppliers may have poor response time or make false promises. Page 22

Questions? Please feel free to email, phone or write if any questions: 1. More technology process details are at: Email: sales@bharatoil.com. 2. Sales & Logistics: L-5, Central Market, Lajpat Nagar II, New Delhi 110024, India. Tel: 011-2981-6466, 011-41000710, Fax : 011-2981-6466. Page 23