Installation Guide Wall Panels

Similar documents
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

HammerStone Manufactured stone veneers for commercial & residential applications

g e m s t o n e MediaWall

SPECIFICATION GUIDELINE

eldorado stone GEMSTONE CandleWall the most believable architectural stone veneer in the world

Natural Thin Stone Veneer T E C H N I C A L I N F O R M A T I O N G U I D E

MANUFACTURER S SPECIFICATION

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

n o r s t o n e basalt interlocking tiles F i n e N a t u r a l S t o n e V e n e e r s

SECTION MANUFACTURED MASONRY VENEER

Never use wire brushes, acid cleaners, power washers, bleach, paint remover or any other type of concrete cleaner.

About GenStone. Competitive Advantages. How GenStone is Changing the Industry

SECTION CEMENT BOARD SUPPORTED ADHERED MASONRY VENEER. 2. Installation materials including adhesives, mortars, and pointing mortars.

Stonecraft Industies 8300 County Road Holmesville, OH

Gold Bond BRAND Gypsum Sheathing

Application Instructions for Dryvit Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS

Thin Brick Façade. Façades Installation Guide

STORAGE AND TRANSPORTION

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

manufacturer s installation instructions - methods to comply with ASTM C1780

Frequently Asked Questions

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: SUPERWALL MANUFACTURING, INC.

INSTALLATION GUIDE October 21, 2011

TABLE OF CONTENTS OUR COMPANY. OUR PRODUCTS Popular Simulated Stone Styles Limestone - Rustic Ledgestone - Stacked Stone

n o r s t o n e N a t u r a l S t o n e V e n e e r S y s t e m

Vertigo Cladding Board

Installation Guidelines for Adhered Concrete Masonry Veneer

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

DURA TEX SYSTEM WATERPROOF DECK COATING- PLYWOOD SUBSTRATES APPLICATION INSTRUCTIONS. Page 1 of 7

Classic Stone Limited. Location: Timaru, NZ. Classic Stone Cladding System Technical Manual

Associated Spec Consultants, Inc. February 27, 2014 SECTION ARCHITECTURAL COATINGS

Kolorines Glass Mosaic Tiles Project Specification

NOVABRIK MORTARLESS CONCRETE BRICK VENEER SPECIFICATION. MASTERFORMAT SECTION (Mortarless Concrete Brick Veneer)

INSULATED CONCRETE MASONRY UNITS Section 04220

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION:

aquapanel InstallatIon GuIde

3910 E. McKinney Denton, TX P.O. Box Dallas, TX EZ WALL CONCENTRATE, INC

AquaFlash System Installation Guide DS196

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

INSTRUCTIONAL BOOKLET

LP SmartSide Perfection Shingle

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

Caparol System PRO Data sheet

8245 Remmet Ave Canoga Park, CA (888) Installation Instructions - AVM System 700 Under Tile Waterproofing and Anti-Fracture Membrane

Natural perfection in a hand-crafted stone veneer.

New Veneers Allow Greater Flexibility

Se incluyen las instrucciones en español

installation guidelines

Container Installation Guide

McKinnon Materials, Inc th Commerce Park Blvd. Tampa FL, Phone: (813) Fax: (813)

EDGEWATER, FLORIDA JUNE 14, 2010

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: ULTRAKOTE PRODUCTS, LLC

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: SOMAR INDUSTRIES LTD LUCKETT COURT EL PASO, TEXAS 79932

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

Container Installation Guide

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

Planning and installation instructions

MID-RISE DESIGN & CONSTRUCTION

Knauf Makes It Easy to Insulate

The GlasRoc Shaftliner Type X advantage...

Adhered Natural Stone Thin Veneer Installation Guide

SECTION UNIT MASONRY SYSTEM

Mortar I & Mortar II Systems with VeriTru Spacers

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: PROWALL BUILDING PRODUCTS, INC.

SPECIFICATION GUIDE. thin glazed brick

Magnetic Dry Erase Chalk Image Projection Paintable Custom

USG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Data Spec Sheet. 1. Product Name Classic Stone

how to easy! TILE A BATHROOM DIY made Scan here to watch the video HOW TO TILE A BATHROOM

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

Fiber Reinforced Tile and Stone Mortar

BioPrism Solid Surface

The Disclaimer located on the reverse side of the title page of the OAA Rain Penetration Practice Guide applies to each section of the Guide.

ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063

PermaBase BRAND Cement Board

4 EXTREME FOUNDATION PANELS

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION

Assembly Instruction. wedi Fundo Primo Steam Shower System

SECTION INSULATED METAL WALL PANELS. ATAS International, Inc. General Specification for Commercial/Industrial and Architectural Applications

ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER PREFACE

SECTION LATEX-MODIFIED MEDIUM BED MORTAR

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Technical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:

Steps in Building a Shed

SILASEC DESCRIPTION FEATURES AND BENEFITS SURFACE PREPARATION

Section II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6

Corium Brick Rainscreen System Specifications

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

General Applications Before applying, mix the pre-measured catalyst* into Liquid Roof by following label directions.

Technical Notes 28 - Anchored Brick Veneer, Wood Frame Construction Rev August 2002

RADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems

ECO OUTDOOR INSTALLATION TIPS WALLING RANDOM ASHLAR MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU

Transcription:

Installation Guide Wall Panels Jointless or Dry-Stacked Installation (Read Prior to installation) The MStone system is a jointless / dry-stacked installation where panels and corners fit tightly together without grouted joints. Materials Weather resistant Barrier: (where required) All exterior surfaces require a water/weather resistant barrier before installing MSTONE Panels. This barrier must meet local building codes, UBC standard Code 141 regarding waterproof building paper or asphalt saturated building felt. Rigid noncorrosive flashing is required for exterior wall use. Lath or Wire Mesh: (Where required) Install a 2.5 lbs. diamond mesh expanded metal lath or an 18 gauge woven wire mesh: Exterior applications will require a galvanized metal lath, however a non-galvanized black metal lath may be used for interior applications. Overlap lath sides by not less than 3/8 in. and lath ends by not less than 1 in. Attach the lath using galvanized nails or staples 6 in. on center and 16 in. Horizontally, penetrating studs to a minimum of 1 in. Continuously wrap metal lath a minimum of 16 in. around all outside and inside corners. Scratch coat: Apply a ½ in. thick scratch coat of mortar over the metal lath. Use a toothed scraper, notched trowel or small piece of lath to lightly rake horizontal grooves in the scratch coat, and allow the mortar to set. Mortar should be mixed to a firm but workable consistency. MStone systems recommends type n or s mortar combined with a bonding agent** (see architecture specification document for additional information). It is recommended that the scratch coat dry for at least 24 hours. Certain weather conditions may require that the scratch coat is moistened prior to the installation of the MSTONE panels. ** Integral bonding agent meeting ASTM C 9322 or ASTM C 1059 type ii. Refer to manufacturers instructions for mix ratio. Tools -Masonry Trowel -Wheel Barrow -Buckets -Masonry Hammer -Dust Mask -Tuck Pointer -Whisk Broom -Sponge -Water -Chalk Line -Plumb Bob -Circular Saw With Carbide or Diamond Tip Blade -Gloves -Pneumatic stapler Or screw gun -Safety Glasses -Finishing Trowel -Grout Bag -Stapler -Metal Shears -Utility Knife -Measuring Tape -Level -Concrete Hoe -Wet Saw With Carbide or Diamond Tip Blade 1

Installation Guide Wall Panels Estimating Stone Quantities Needed Panels (flats) and Corners can be used for all installations. Panels are applied to the flat wall surface and are ordered per piece. Each piece is one square foot (6 x 24 ). Corners are applied to outside or inside corners and are ordered in square feet. Each corner comes in two pieces, 6 x 8 and 6 x 16 with the twocombined equaling one square foot. Estimating Work Sheet Doors/ Windows Project Sq. Footage Openings Sq. Footage Adjusted Project Sq. Footage 2 1. Determine the total project square footage by multiplying the length by the height of each surface area to be covered and then deduct the area of all openings such as doors and windows. Lineal Footage of Corners 2 Sq. Footage of Corners 10% 2. Determine the lineal footage of corner stones needed for the project by measuring the lineal feet of corner areas to be covered including. Don t forget to include any doorways, indents, notches, etc that will require corners. 3. Determine the square footage of corners required for the project by multiplying the lineal footage of corner stones by two. (One lineal foot of corners equals two square feet of MSTONE corner panels). Adjusted Project Sq. Footage Corner Sq. Footage Sq. Footage of Panels to Order 4. Subtract the corner square footage from the total project square footage (point 1). This will give you the square footage of panels (flats) required. However, some extra quantities of flats is desirable for best fitting and for cutting and trimming. 5. Add 5-10% extra as a buffer 2

Preparation of Surface 1. Clean. Always make sure that the surface that MSTONE will be applied to is clean. 2. Weather resistant Barrier: (where required) All exterior surfaces require a water/weather resistant barrier before installing MSTONE panels. This barrier must meet local building codes, UBC standard Code 141 regarding waterproof building paper or asphalt saturated building felt. Rigid noncorrosive flashing is required for exterior wall use. 3. Lath or Wire Mesh: (Where required) Install a 2.5 lbs. diamond mesh expanded metal lath or an 18 gauge woven wire mesh: Exterior applications will require a galvanized metal lath, however a non-galvanized black metal lath may be used for interior applications. Overlap lath sides by not less than 3/8 in. and lath ends by not less than 1 in. Attach the lath using galvanized nails or staples 6 in. on center and 16 in. horizontally, penetrating studs to a minimum of 1 in. Continuously wrap metal lath a minimum of 16 in. around all outside and inside corners. 4. Scratch coat: Apply a ½ in. thick scratch coat of type n or s mortar with a bonding agent over the metal lath. Use a toothed scraper, notched trowel or small piece of lath to lightly rake horizontal grooves in the scratch coat. Allow scratch coat dry for at least 24 hours. 5. MSTONE Panel: Always make sure that the back of each MSTONE panel is clean and free from stone dust. This can easily be done by wiping the back of the panel with a damp rag. Cutting MSTONE panels will create dust and should be worked on outside. Clean the back of all panels after cutting them. Only cut MSTONE Panels with a wet saw. Note: Mortar should be mixed to a firm but workable consistency. MStone systems recommends type n or s mortar combined with a bonding agent*** (see architecture specification document for additional information). It is recommended that the scratch coat dry for at least 24 hours. Certain weather conditions may require that the scratch coat is moistened prior to the installation of the MSTONE panels. ** Integral bonding agent meeting ASTM C 9322 or ASTM C 1059 type ii. Refer to manufacturers instructions for mix ratio. For a warrantied installation we recommend laticrete products and installation. Visit our www.mstonesystems.com for more information or call 1-866-698-5066 Installation of MSTONE Panels: 1. Always follow and check your local Building code requirements. MStone should only be applied to structurally sound surfaces incorporating good building practices. Please note that the assistance of a professional contractor or engineer may be needed to evaluate your installation or the soundness of your installation back up wall. A contractor or engineer can also provide important information regarding local building codes, seismic building codes, institutional building codes, and installations 3

2. Install the Corner Pieces First Start from the bottom and work up. The corner pieces come in 8 and 16 lengths. You should alternate these in opposite directions on the corner. It is also recommended to lay out the MStone Panels to make sure that the pattern will meet your needs. 3. Apply Mortar. Using a mason s trowel, cover the entire back of all panels completely with a ½ thick, even layer of mortar. 4. Secure the Stone to the Wall. The stone needs to be pressed firmly against the scratch coated wall to ensure a sound bond. It is suggested to keep the stonework free from mortar dropping and mortar smears as much as possible. Mortar droppings can be removed with a damp cloth. 5. Wetting the Stone and Substrate. Under certain conditions, the stone and substrate may need to be wetted. If the stone is being Installed onto a very hot /dry surface or in a hot/dry climate, the stone and wall surface should be wet to prevent excessive absorption of moisture from the mortar. This can be done by spraying water on the wall surface and back of stone. 6. Lay the Panels in an Offset Fashion. I.e. different lengths of panels and staggered joints as this will reduce the appearance of the vertical joints. 7. For Cold Weather Situations. Applications should be protected from temperatures below freezing, so the mortar may set up property as recommended in section 2101.3 Cold-weather construction of the international Building Code. 8. Cleaning. After 36 hours, it is suggested to wet the stonework down with water and then apply a mild cleaning detergent with a soft bristle brush to remove any dirt or mortar smear left from the installation. Do not use any type of acid. Completion 1. Stone is a natural product that breaths. It does absorb oil, water and other substances that are in contact with the stone. Sealing is not necessary but may be desirable for attaining deeper and enhanced colors. Sealants are recommended for interior use where water, oil, or food stuffs maybe in contact with the stone. 2. The sealer should be tested on small loose trial pieces prior to a large area application. 4

Exterior Framed Back Up Wall (Includes wood stud and steel stud framing Fig.1) An exterior sheathing is required to provide a base for the application surface. This sheathing must meet local building codes for use as an acceptable exterior product which can include plywood, green treated plywood, and rigid composite board, and flush metal siding. Cover sheathing with weather resistant vapor barrier. Figure 1 1. Sheathing 2. Weather Resistive Barrier 3. Galvanized Metal Lath 4. Mortar 5. MStone Panels 5

New Concrete Masonry Wall (Includes new concrete block or newly poured concrete wall Fig.2) No special preparation is required for a concrete block wall. When working with a poured concrete wall, it is important to take extra time to examine the entire surface as it may have areas of form release agents on the concrete surface. To remove this oil, apply and etch areas with muriatic acid, rinse thoroughly and/or score the area with a wire brush. After these surfaces are cleaned, rinsed and allowed to dry, the MSTONE material can be installed directly to the concrete wall. Existing Concrete Masonry Wall (Includes sealed/painted concrete or brick work Fig.2) Sandblast the surface to remove any paint or sealer. Rinse thoroughly. Once the surface has dried, MSTONE material can be applied directly to the clean surface. If this application is not reasonable, another option is to apply expanded metal lath to the painted or sealed surface with concrete screws or nails. Figure 2 1. Mortar applied directly to untreated masonry, concrete or block. 2. MStone Panels 6

Rigid insulation (See Fig.3) Install the expanded metal lath as specified by the manufacturer s insulated Forms. Concrete fasteners that secure the expanded metal lath to the wall need to be long enough to penetrate clear through the insulation and secure into the cured poured concrete wall. Apply 1 2 thick scratch coat. Figure 3 1. Rigid Insulation Board 2. Weather Resistive Barrier 3. Galvanized Metal Lath 4. Mortar 5. MStone Panels * substrates and job conditions will vary greatly from site to site, therefore it is the responsibility of individual project engineers to review and approve the suitability of mechanical anchors (wall ties) and the structural integrity of surfaces to be veneered 7