Zafarana Wind Power Plants AS CDM Projects. Eng. Rafik Youssef Georgy Consultant, NREA

Similar documents
ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & ENERGY

The Austrian JI/CDM Programme

ELE-DG-E-1986 Manager of Wind Energy Applications PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Overview of CDM Documentation and Procedures

Egyptian Renewable Energy plan

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

CDM projects development activities in India. Vivek Kumar TERI 26 July 2005

Climate Financing CDM and NAMA in Rwanda

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

sustainable Energy Deployment in Egypt

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

Ex-Ante Evaluation (for Japanese ODA Loan)

Renewable Energy Projects and potentials in Mauritius

Investment Opportunities in the Carbon Sector. Michiel Tijmensen - Risk Manager December

FFU PhD Workshop, 30 th November 2009: The deployment of renewable energies in China and its implications for climate protection

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

Memorandum of Understanding on cooperation regarding Clean Development Mechanism project activites and climate policy issues.

Martina Bosi International Energy Agency (IEA)

CDM FOR RENEWABLE ENERGY DEVELOPMENT BHUTAN S EXPERIENCE

Egypt s Renewable Energy Revolution

The Joint Crediting Mechanism (JCM) Current

A. M. Monsurul Alam Director. Department of Environment Ministry of Environment and Forests

Procedures and Criteria for Screening, Evaluating and Approving CDM Projects: A Case Study in Kazakhstan

CDM Experience: QUEZON CITY (PAYATAS) Controlled Disposal Facilities

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004

(20-MW Geothermal Power Generation)

Challenges for CDM in India Experience from GTZ

We think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion.

CDM Guide Book for Oil & Gas Sector. Ariesta Ningrum GGFR Workshop September 19-20, 2006 Jakarta - Indonesia

Emissions trading in a policy stew: a case study on China s CDM wind power projects

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

The Project Design Document

WORLD BANK CARBON FINANCE UNIT 2011 ANNUAL MEETING CPF TRANCHE I PIPELINE CARBON PARTNERSHIP FACILITY 1

Sustainable Development Benefits of CDM Projects

Bulgarian JI Guidelines. 2006, September

Clean Development Mechanism. Lessons learned and future directions. Martin Hession CDM Executive Board

An Introduction to Offsets

Methodological tool Tool to calculate the emission factor for an electricity system

Overview of the CDM in the agriculture sector

Carbon Finance Opportunities for Africa. Maputo, 11 June 2009 Dr Charlotte Streck

TOTORAL WIND FARM PROJECT

Feasibility study of wastewater treatment with anaerobic digester at starch processing plant in Tay Ninh, Vietnam. Report

Co-Benefit Approach in JICA

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

Sectoral Approaches - Enel Presentation

Carbon Resource Management Ltd. IN CHINA. 2008, October May 0624

Validation Report. Datang Zhangzhou Wind Power Co., Ltd. VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project.

DRAFT TEXT on CMP 12 agenda item 4 Matters relating to the clean development mechanism. Draft decision -/CMP.12

Uy Kamal Deputy Director, Ministry of Environment Cambodia

Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project

Analysis and Evaluation of CDM Potential of Biomethanation Sector in India

Case Study: CDM and Small Scale projects. Accessing Carbon Finance February 5, 2007 Bishkek, Kyrgyzstan

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS

The Clean Development Mechanism. The world s first carbon crediting mechanism

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

Challenges for a Spanish utility in the procurement of CO 2 emissions

THE CLEAN DEVELOPMENT MECHANISM

Mr. Rajesh Kumar Sethi Chair, CDM Executive Board UNFCCC Secretariat 16 th December 2008

CDM Regulations. 2.1 Introduction. 2.2 Regulatory Process

Afforestation/reforestation CDM projects: the examples of India and China

CDM Opportunities in Agriculture Sector. October 30, Beijing Zarina Azizova World Bank Carbon Finance Unit

CDM in India, Challenges and Success. by Pamposh Bhat Head, CDM-India, New Delhi Dec 23,06 EPCO, Bhopal,M.P

Gold Standard A new way to facilitate sustainable development in rural areas in Africa Africa Carbon Forum, 19 April 2012 Morten Pedersen, NIRAS

CDM Developments in India & Challenges Ahead. Pamposh Bhat Head, GTZ CDM - India Indo German Energy Programme Bureau of Energy Efficiency

Report No: QT-CDM /11

Mr. Gary Sigel, Partner, Southern Energy Partners;

Climate Change Mitigation through the Carbon Finance Support Facility (CFSF) in the Philippines

Large-scale Consolidated Methodology Waste energy recovery

Market Mechanism Group / Institute for Global Environmental Strategies (IGES)

VALIDATION REPORT. Liaoning Changtu Quantou Wind Power Project in China. REPORT NO REVISION NO. 03 Deleted: 2

Stabilization and the Energy Sector. Geoffrey J. Blanford, Ph.D. EPRI, Global Climate Change EPRI Washington Climate Seminar May 18, 2010

Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh

Your reference/letter of Our reference/name Tel. extension/ Fax extension Date/Document Page.

Annex 2 Recommendations for the revision of definition of Small Scale Project Activities

Energy Efficiency Policy in Egypt

The Austrian JI/CDM Programme

Status of the CDM. Karla Solís, Eng.D. Team Lead Regional Collaboration Centre St. George s. CDM Regional Collaboration Centre, St.

Response to requests for review Aços Villares Natural gas fuel switch project (0474)

Subject: Answer to Request for review Saldanha Small Hydroelectric Project (1526)

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

PRELIMINARY OVERVIEW OF CLIMATE FINANCE SITUATION IN THE MENA REGION AND LOOKING FORWARD

Legal and Institutional issues in CDM

Renewable Energy Auctions: An Overview of Design Options

Prospects and Economics of integrating Wind Energy into the Lebanese Electricity System. Hassan Harajli UNDP CEDRO Project

Tunisia. National Agency for Energy Conservation (ANME)

VALIDATION REPORT LIAONING KANGPING 24.65MW WIND FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

Vietnam Renewable Energy development project to 2030 with outlook to 2050

Experience of JCF in developing CDM projects

Accounting standards for methane emissions: taking stock of existing offset programs

Current Status of CDM Implementation in Indonesia

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES

Wind Power at a Distance: A Voyage around the Globe, the US and Africa

K. J. Sreekanth, 2 S. Jayaraj, 3 N. Sudarsan 1, 2, 3 Department of Mechanical Engineering, National Institute of Technology, Calicut , INDIA

Project design document form for CDM project activities (Version 05.0)

The Voluntary Carbon Market: Status & Potential to Advance Sustainable Energy Activities

Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT

Validation Report. Report No , Revision April 2007

MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT

Transcription:

Zafarana Wind Power Plants AS CDM Projects Eng. Rafik Youssef Georgy Consultant, NREA ا

ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & ENERGY Egyptian Electricity Holding Company Nuclear Materials Authority Rural Electrification Authority Nuclear Power Plants Authority Hydro Power Projects Execution Authority New & Renewable Energy Authority Atomic Energy Authority

12.2% Hydro Power 1.8% Wind 33% Combined Cycle 4% Gas 49% Steam

NREA and WIND ENERGY ACTIVITIES IN EGYPT The New & Renewable Energy Authority (NREA) was established in 1986 to act as the national focal point to introduce and promote renewable energy technologies in Egypt for different applications particularly electricity generation. The previous preliminary studies and measurements have proven that Suez Gulf area is one of the best all over the world to produce wind electricity. In March 2003, a Wind Atlas for Suez Gulf was issued to assess the available potentials in the area which indicated that it can host up to 20,000MW installed capacities of wind farms.

Resource Assessment Wind Atlas of Gulf of Suez, 2003 Wind Atlas of Egypt, 2005

RE CDM Projects in Egypt Project Title/ Project Type Annual CERs (t CO 2 e) Project Location (City/ Governorat e) Project Proponent Cooperating Donor Organization Zafarana 120MW Wind Power Plant 249,000 Zafarana/ Suez NREA JBIC / Japan Zafarana 120MW Power Plant 225,000 Zafarana/ Suez NREA DANIDA/ Denmark Zafarana 85MW Wind Farm Plant 155,313 Zafarana/ Suez NREA Spain Zafarana 80MW Wind Power Plant 163,000 Zafarana/ Suez NREA KfW/Germany Zafarana 140MW Wind Power Plant 250,000 Zafarana/ Suez NREA DANIDA/ Denmark KfW/Germany

Develop the Project Idea Note (PIN). The DNA in the host country issues the Letter of No- Objection. Issue the Letter of Non-Diversion. Start to develop the Project Design Document (PDD). Singing Emission Reduction Purchase Agreement (ERPA) between the project participants. Choose a Designated Operational Entity (DOE) to validate the PDD. Request for registration at the EB. Project implementation and monitoring. Select a DOE to verify and certify the emission reductions. Issuance of the CERs.

PDD & Additionality No incentives for wind power generation. Wind is more capital intensive. Low price for natural gas. Result: Currently wind generated KWh cost cannot compete with thermal generated KWh cost. Wind cannot be viewed as BAU leading to : WIND NEED for CDM SUPPORT TO BE IMPLEMENTED.

Determining Operating Margin. Less than 20% generation comes from hydro. More than 80% from thermal Power Plants. Wind will replace thermal generation mix of Combined Cycle, Steam Turbines and Gas Turbines. A conservative approach.

Combined Margin The project will affect Operating margin and build margin. Combined Margin Operating Margin x n Build Margin 1n n has been chosen to be 0.75%. Again complying with the new CDM / EB directives.

Application of the CDM cycle: 1- Developed the Project Idea Note (PIN). 2- The Egyptian DNA issued the Letter of No-Objection. 3- Issued the Letter of Non-Diversion. 4- Singing Emission Reduction Purchase Agreement (ERPA) between the NREA & KFW. 5- Prepared the Project Design Document (PDD). 6- Chose a Designated Operational Entity (DOE) to validate the PDD.

Barriers and Lessons Learned Modifying the Baseline Methodology and as a result the need to update the PDD. OM & BM calculations and selection of power station is somewhat controversial The Addtionality tool has been changed to be with more demanding rules which need more documents and evidences to be proved.

Barriers and Lessons Learned (cont.) Difficulty in reconciliation of CDM rules with Egyptian regulations. Limited number of DOEs and consequent delays in finalizing validation and verification process. Multidisciplinary experience is needed in local CDM experts.

Conclusion At 10 US$ per ton CO 2 & around 0.56kg CO 2 avoided emissions per KWh produced from thermal power stations -Wind produced KWh will have a bonus of around 3.2 piaster which cannot close the gap between wind and thermal generation. CDM cannot solely make uncompetitive projects economically attractive. Rather, CDM can make near economic projects feasible or more attractive. CDM has so far contributed positively in assisting wind project development in Egypt & it is hoped to continue on supporting ambitious national RE projects.