TITLE V OPERATING PERMIT STATEMENT OF BASIS

Similar documents
TITLE V OPERATING PERMIT STATEMENT OF BASIS

DRAFT PROPOSED PERMIT. San Diego County Air Pollution Control District Old Grove Rd San Diego, CA (858)

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN:

BOILER/HEATER < 5 MMBTU BACT Size: Small Emitter BACT (PTE < 10 lb/day) BOILER. BACT Determination Information

PUBLIC PARTICIPATION DOCUMENTS For Holland Board of Public Works Holland, Michigan

Statement of Basis for Frederickson Power LP (Frederickson)

Tennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1

502(b)(10) Permit for Part 70 Source

Addendum A: Source Applicable Requirements

STATEMENT OF BASIS. NAICS Description: All Other Miscellaneous Chemical Product and Preparation Manufacturing NAICS Code:

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131

Oklahoma Department of Environmental Quality Air Quality Division

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr

GASP comments regarding Air Quality Plan Approval C - Tenaska Pennsylvania Partners, LLC Westmoreland Generating Station

Air Permitting for Major Sources/Title V (Part 2)

6NYCRR Part 212 Process Operations

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011)

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

Air Pollution Control Program Permits Section

AIR EMISSION PERMIT NO IS ISSUED TO. PowerMinn 9090, LLC 2295 Corporate Boulevard, Suite 222 Boca Raton, FL

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

San Diego County Air Pollution Control District Old Grove Rd San Diego, CA (858) TITLE V OPERATING PERMIT APCD2003-PTO

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013

TECHNICAL EVALUATION AND PRELIMINARY DETERMINATION. Oleander Power Project, L.P. 190 MW Simple Cycle Gas Turbine

Title V. Model General Permit Template SERIES 1 FLARES. Template # SJV-FL-1-1

STATEMENT OF BASIS Dudley Lumber Company, Inc. Salem, Lee County, Alabama Facility Permit No. 206-S003

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT FINAL DRAFT STAFF REPORT PROPOSED AMENDMENTS TO RULE 2020 (EXEMPTIONS) November 18, 2014

STATEMENT OF BASIS. NAICS Description: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing NAICS Code:

PERMIT APPLICATION REVIEW SUMMARY

PSD Background Presentation

The Role of Combined Heat and Power (CHP) in Virginia s Energy Future

AIR QUALITY MANAGEMENT DISTRICT

FERC PDF (Unofficial) 9/29/2014 4:29:38 PM. Title V Permit Modification Addendum Submitted June 23, 2014

Minor Source Permitting Guidance for Facilities Subject To Federal Standards

AIR REGULATION IN SOUTH CAROLINA 3 JUNE 2016

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96

New Source Review (NSR) Program Review Questionnaire May 14, 2003

Permit-by-Rule Notification Form Gas-fired Boiler and Heater

Part 60 vs. Part 75 RATA Testing Requirements. Bob Finken President Delta Air Quality Services, Inc. Orange, California

Original : 2535 I~ C I i!._ ~iughes, NEarJorie. Froo :

UNITED STATES GYPSUM COMPANY BALTIMORE PLANT 5500 QUARANTINE ROAD BALTIMORE, MARYLAND PART 70 OPERATING PERMIT NO.

New Source Review Reform: What Lies Ahead

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

EPA EMISSION RULES - BOILERS

PUBLIC PARTICIPATION DOCUMENTS For DCP Midstream, LP Hamilton Township, Michigan

Review of Xcel Energy's Metropolitan Emission Reduction Alternative Project

OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY AIR CONTAMINANT DISCHARGE PERMIT

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

Air Quality Permit File: TVOP & AR Cambria CoGen Company / Cambria Generation Facility

AIR QUALITY MANAGEMENT DISTRICT

Air Operating Permit Issued in accordance with: 40 CFR Part 70, Chapter RCW, and Chapter WAC

New Nominal 44 MW CoGen Project Massachusetts Institute of Technology Prevention of Significant Deterioration Application (40 CFR 52.

New Nominal 44 MW CoGen Project Massachusetts Institute of Technology Prevention of Significant Deterioration Application (40 CFR 52.

Update on ICI Boiler MACT

AIR EMISSION PERMIT NO IS ISSUED TO

AIR PERMITS FORM 805 APPLICATION

Additional Information to Supplement PSD Air Permit Application and State Air Facility Permit Application (# /00004)

CISWI and solid-waste-identification rules

El Paso Natural Gas Company (EPNG) Gallup Compressor Station

PRIMARY OR ALTERNATIVE OPERATING SCENARIO

We ll Discuss What are SSM Provisions? Regulatory Changes What can we do to protect ourselves?

SECTION A. Table of Contents Section A. Facility/Source Identification Section B. Table of Contents Site Inventory List #001 #002 #003 #004 #005 #006

Limiting Potential to Emit (PTE) in New Source Review (NSR) Permitting

Environmental and Renewable Energy Regulations

STATEMENT OF BASIS. For the issuance ofdraft Air Permit # 1140-AOP-R4 AFIN: PERMITTING AUTHORITY:

Appendices for Oklahoma s Regional Haze State Implementation Plan

Air Emissions Permitting Considerations for an Integrated Gasification Combined Cycle (IGCC) Unit Potentially Located in the State of Delaware

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry.

Overview. SBEAP Affected sources Compliance requirements Notification, reporting, record keeping Resources

Citations from CRF as required in WV DEP's 45CSR24

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009

Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Final Reconsidered Rules Requirements Summary

11/10/2014 Oklahoma s SIP Submittal Infrastructure Checklist 2010 Primary Sulfur Dioxide (SO 2 ) NAAQS Update 1

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R04-OAR ; FRL Region 4]

Huber Engineered Woods, LLC, TV Page 1 of 7

BACT Determination Information

THE TITLE V PROGRAM - GUIDANCE

YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)

DRAFT Procedures for Quantifying Fugitive VOC Emission Sources at Petroleum Facilities

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

Best Practices Learned from Greenhouse Gas Reporting

BART DETERMINATION REPORT AMERICAN ELECTRIC POWER COMANCHE POWER STATION UNITS 1 AND 2

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. AmeriPride Services Inc

P.O. Box 1276 Westerville, OH (614)

Policy for PSD Modeling District Rule 2410 Guidance for Identifying Sources to be Evaluated for Inclusion in an Increment Assessment

Draft 10/28/13. Guidance for 1-Hour SO 2 Nonattainment Area SIP Submissions October 2013

Encouraging Energy Efficiency through the Clean Air Act

2700 M Street, Suite 302 Bakersfield, California Telephone: Date: SIC CODE: 3241

Michigan Guide to Air Use Permits to Install

Whiting Metals, LLC 2230 Indianapolis Boulevard Hammond, Indiana 46394

Emergency Engine and Turbine Requirements

El Paso Natural Gas Company (EPNG) Leupp Compressor Station

MEMORANDUM June 30, Phillip Fielder, P.E., Permits and Engineering Group Manager

Mercury Reduction Plan Submittal Air Quality Permit Program Minn. R , subp. 3

42 USC 7511a. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

AIR EMISSION PERMIT NO IS ISSUED TO Minnesota Power & Light

PART 70 PERMIT TO OPERATE

ECMPS Reporting Instructions Quality Assurance and Certification

Prevention of Significant Deterioration Permit Application Canal Unit 3

Transcription:

Facility Name: Title V Permit No.: Permit Application Nos.: Site ID: Equipment Address: Goal Line, L.P. APCD2016-TVP-00043 APCD2016-APP-004597 APCD1992-SITE-08447 555 North Tulip Street Escondido, CA 92025 Facility Contact: Robert Mason, Plant Manager Contact Phone: (760)738-4999 Permit Engineer: Nick Horres Date Completed: August 23, 2017 1.0 Purpose/Introduction This statement of basis describes an initial Title V permit covering a stationary natural gas-fired combustion turbine permitted under District permit APCD2001-PTO-911504 and associated equipment. The basis for submittal under Title V is that the facility is subject to the acid rain program under Title IV of the federal Clean Air Act (CAA) which requires Title V permitting pursuant to 40 CFR 70.3. 2.0 Background This is the initial application for a Title V permit; however, this facility has been in operation for a number of years operating under an exemption from the acid rain program which no longer applies to the facility due to a change in operating hours and contractual arrangement with the utility. The title V application was submitted on August 8, 2016. The acid rain permit application was submitted on February 29, 2016. 3.0 Facility Description This facility is not a major source for any pollutants. The facility consists of one cogeneration gas turbine powering a generator and producing steam for use in a steam turbine and for use as process steam by an adjoining ice rink and one auxiliary boiler. The gas turbine is a GE LM6000 model rated at 42.4 MW with a maximum heat input of 404.8 MMBtu/hr HHV. The turbine utilizes water injection and selective catalytic reduction (SCR) with ammonia injection for emission control. Steam is also produced

using the waste heat which is partially used to drive a steam turbine, producing a total maximum of 49.8 MW for the gas turbine and steam turbine combined. The turbine is also equipped with a NOx and O 2 CEMS for monitoring of emissions. The auxiliary boiler has a maximum heat input of 14.6 MMBtu/hr. It is fired with natural gas and equipped with a low NOx burner for emission control. Permit Number APCD2001-PTO-911504 APCD1999-PTO-960443 Source Category Turbine Electric and Steam Generation Boiler Steam Generation 4.0 Emission Changes There are no emission changes as part of this permit action since it is an initial permit. The current potential to emit for the facility is described in the tables below. Gas Turbine Potential to Emit (PTE) Pollutant lb/hr lb/day Tons/yr NOx 25 253.5 46.3 CO 22.7 545 99.5 VOC 0.85 20.4 3.7 SOx 0.85 20.4 3.7 PM 2.7 64.1 11.7 Boiler Potential to Emit (PTE) Pollutant lb/hr lb/day Tons/yr NOx 0.53 12.8 2.3 CO 0.54 13.0 2.4 VOC 0.37 8.8 1.6 SOx 0.03 0.7 0.1 PM 0.11 2.6 0.5 Facility Potential to Emit (PTE) Pollutant lb/hr lb/day Tons/yr NOx 25.5 266 48.6 CO 23.2 558 99.9 VOC 1.2 29 5.3 SOx 0.9 21 3.8 PM 2.8 67 12.2 5.0 Title IV (Acid Rain) and Title V Permitting The facility is subject to the acid rain provisions under District Rule 1412 and Title IV of the Federal CAA, as given at 40 Code of Federal Regulation (CFR) 72.6(a). Under the

acid rain program, an affected source (a term specifically defined in Title IV of the CAA, and which applies to this facility) is subject to Title V permitting pursuant to District Rule 1401 and 40 CFR 70.3(a)(4). The facility became a newly affected facility under the acid rain program due to no longer meeting the definition of a qualifying facility described in 40 CFR 72.2. The acid rain permit is incorporated into the Title V permit in Section II.D and the renewal period will match that of the Title V permit. 6.0 Applicable Requirements 6.1 Summary by Pollutant Turbine Pollutant Primary Limiting Regulation(s) NOx Rule 20.2 (NSR); Rule 69.3.1; 40 CFR 60 Subpart GG SO2 Rule 20.2; Rule 62; Rule 53; 40 CFR 60 Subpart GG VOC Rule 20.2; CO Rule 20.2; (AQIA only) PM10 Rule 20.2; Rule 53 Toxic Pollutants Rule 1200 Boiler Pollutant Primary Limiting Regulation(s) NOx Rule 69.2; SO2 Rule 62; 40 CFR 60 Subpart Dc VOC None CO Rule 69.2 PM10 Rule 52 Toxic Pollutants Rule 1200 6.2 Discussion The above table summarizes those rules on which the permit conditions are based. The permittee must comply with the most stringent requirement, as cited in the permit, which also serves as the compliance measure for the less stringent requirements. District Prohibitory Rules (52, 53, 62) All three of these rules contain general prohibitory emission requirements for PM 10 and SOx that apply to wide categories of equipment. Permit conditions specifying the use of

pipeline quality natural gas as fuel for both the turbine and boiler ensures compliance with the requirements of these rules. District Prohibitory Rules (69.2, 69.3 and 69.3.1) These rules contain equipment specific prohibitory requirements for gas turbine engines (69.3 and 69.3.1) and boilers (69.2). Each applicable emission standard, monitoring, maintenance and recordkeeping requirement is stated in the Appendix A of the Title V permit. Rule 20.2 New Source Review The gas turbine engine was subject to new source review (NSR) when it was installed. The turbine was determined to meet best available control technology requirements and applicable emission limits are specified in the Appendix A permit conditions. Condition 3 of the Permit APCD2001-PTO-911504 incorporated into this permit in Appendix A limits aggregate emissions from the stationary source to below all major source thresholds. Condition 9a of APCD2001-PTO-911504 replaced a similar previous condition and is designed to limit NOx emissions during startup and shutdown when steady state BACT emission limits do not apply. Rule 1200 Toxics District Rule 1200 is a local-only enforceable rule that regulates emissions of toxic air contaminants based on allowable increases in health risk from projects that emit these air contaminants. Applicable requirements of Rule 1200, including limits on ammonia slip, are specified in the District-only enforceable section of the permit. 40 CFR 60 Subpart Dc (NSPS for small steam generating units) NSPS subpart Dc sets SOx and PM10 emission limits for the auxiliary boiler and these requirements are met through the use of natural gas as fuel and District preconstruction review and permit conditions ensuring that the boiler is only capable of combusting, and only does combust, natural gas as fuel. 40 CFR 60 Subpart GG (NSPS for stationary gas turbines) NSPS subpart GG specifies NOx and SOx emission limits for the gas turbine. The NOx emission limit is stated in permit condition 9b of APCD2001-PTO-911504 and

compliance is measured with a certified CEMS. The permit requires using pipeline natural gas for fuel to ensure compliance with SOx emission limits. 7.0 Monitoring, Recordkeeping and Reporting Pursuant to NSR and District Rule 69.3.1, the turbine is required to be equipped with a CEMS to measure emissions of NOx and O2 in addition to the requirement to measure operational parameters including water injection rate and ammonia flow rate to the SCR. These monitoring systems also fulfill monitoring requirements of 40 CFR 60 subpart GG. Monitoring requirements are specified in the existing District Permits incorporated into the Title V permit along with additional Title IV Acid Rain permit requirements added to the Title V permit that apply pursuant to District Rule 1421. Both the turbine and boiler are source tested on an annual basis to ensure emissions of NOx and CO (boiler and turbine) and ammonia (turbine only) comply with the emission requirements of the permit. The accuracy of the CEMS system is also tested using a relative accuracy test audit (RATA) conducted according to the frequencies defined in 40 CFR part 75. The facility initially applied to modify permit conditions to only require the use of part 75 procedures for CEMS certification; however, after review the District determined it was appropriate for the RATA to also ensure the accuracy of the CEMS for measuring concentration based (ppmvd NOx corrected to 15% O2) and mass emission based (Pounds NOx/hour) to show continuous compliance with the BACT NOx emission limits. Compliance Assurance Monitoring (CAM) under 40 CFR Part 64 does not apply to any of the emission units covered by this permit because permit conditions ensure that this is not a major source of any pollutants. 8.0 Permit Shield In accordance with District Rule 1410(p) and 40 CFR Part 70.6(f), a permit can include a provision precluding the permittee from enforcement action for certain requirements that either do not apply or that are superseded by another requirement to which the permittee is subject, as stated in the permit. A permit shield, if granted, is limited as given by the aforementioned regulations. A permit shield was requested by the applicant for a variety of requirements that are subsumed by more stringent requirements. These requests are analyzed below.

1. Request: Rule 69.3(b)(2)(ii) and (d) and 69.3.1(b)(3)(i) and (d)(1) This request is for a permit shield from prohibitory rule emission limits for NOx that are less stringent than the BACT NOx emission limit described in the permit for the gas turbine. The District agrees with this request in part noting that Rule 69.3.1(b)(3)(i) is actually an exemption from meeting emission limits during startups and, therefore, a shield from this requirement is counter-intuitive. Granted permit shield: Rule 69.3.1(d)(1) and Rule 69.3(d)(1). 2. Request: 40 CFR 60.332(a)(1), 60.334(j)(1)(iii)(A) This is a request for a permit shield from the NSPS subpart GG NOx emission limit (based on turbine efficiency, 118 ppmvd corrected to15% O 2 ) that is less stringent than the BACT NOx emission limit, except that it applies at all times including during startup and shutdown. After review, the District does not consider this requirement to be fully subsumed by the BACT NOx emission limit because there are operating scenarios, such as the turbine being called to run consecutive, short periods of time (< 2 hours), that would result in operation not being subject to the BACT NOx emission limit. Permit shield not granted from this requirement. 3. Request: 40 CFR 60.333 The request is for a shield from fuel sulfur content limits contained in NSPS subpart GG due to this requirement being subsumed by more stringent requirements. The District agrees with granting a permit shield from this requirement, although notes that the most stringent requirement is the BACT imposed limit to use only pipeline quality natural gas (not Rule 62). Granted permit shield: 40 CFR 60.333. 4. Request: Condition 9, 40 CFR 60.13(a), 40 CFR 60.334(b)(1) These are requests for permit shield from CEMS requirements including those contained in 40 CFR Subpart 60 and a corresponding permit condition. The District agrees with the proposal that the CEMS will be certified to part 75 requirements and has updated the District permit incorporated into the Title V permit in appendix A. However, the District does not agree with granting a permit shield because the equipment is complying with the Part 60 requirement by complying with the alternative Part 75 CEMS certification requirements rather than subsuming Part 60 CEMS certification requirements. Permit shield not granted from this requirement. 5. Request: District Rule 69.3.1(f)(2) This is a request from the requirement to use a prescribed test method to measure HHV and LHV content of the fuel. The District does not agree with this request for a permit

shield because the facility complies with the rule using records provided by the fuel provider which is allowed by the rule. Permit shield not granted from this requirement. 6. Request: 40 CFR 60.334(j)(5) and 40 CFR 60.7(d), 40 CFR 60.7(c) This request is for a permit shield from the requirement to submit CEMS reports for excess emissions and monitor downtime and to only submit summary reports when the excess emissions make up less than 1% of total operating time and monitor downtime of less than 5% of total operating time. The District does not agree with this request because the rule cited as subsuming these requirements, District Rule 19.2, does not apply to the gas turbine. Permit shield not granted from these requirements. 7. Request: District Rule 68(b)(3) and 68(d) (Auxiliary Boiler) This request is for a permit shield from the NOx emission limits of Rule 68 that would apply to the auxiliary boiler. However, the boiler has a maximum heat input of < 50 MMBtu/hr and is not subject to the rule and, therefore, there is no subsumed requirement and no need for a permit shield. Permit shield not granted from these requirements. 9.0 Outside Review In accordance with District Rule 1415, the District is submitting the proposed draft permit for public notice and review by EPA Region 9 and affected states, including Tribes. 10.0 Conclusions/Recommendations The source is expected to comply with all applicable requirements including those cited in the current District permit as well as those under District Rule 1401 and Title V. Therefore, once the public notice and comment response requirements of District Rule 1415 are fulfilled and assuming no substantive issues are raised requiring further analysis, the recommendation of this report is for the subject initial Title V permit to be issued.