Invitation to Bid for Timber Marking Services

Similar documents
Request For Proposal Of Printing and Design Services. Marketing Department

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

FOREST COUNTY FORESTRY DEPARTMENT 200 EAST MADISON STREET CRANDON, WI /

INVITATION TO NEGOTIATE FLORIDA STATE UNIVERSITY

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

A Vendor s Guide for doing Business with The University of Alabama in Huntsville

GILA RIVER INDIAN COMMUNITY GEORGE WEBB VILLAGE SUBDIVISION INFRASTRUCTURE IFB # ADDENDUM NO. 2 September 14, 2011

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS

Dates/Times: p.m. Pacific Time.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposal For: 2018 American Bar Association Temporary Services

NOTICE OF TIMBER SALE

SPECIFICATION NO. TxDOT * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS

Conflict of Interest Language

NOTICE OF TIMBER SALE

REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO /05. Ref: General Engineering Services

1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately $1.2 million a year.

Sample Timber Sale Agreement

NC State University OESAD GUIDELINES Contract Year

Town of New Gloucester INVITATION TO BID Timber For Sale by Bid. Project Details

SECTION 6.2: CONTRACT MANAGER

For the property described as: Property Owner: Name. Phone Number. Mailing Address. City. Report Year:

Main Building Auditorium

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

Labour Market Development Agreement

UNAVCO, INC. INVITATION FOR BID/IFB (THIS IS NOT AN ORDER)

Delivery of Bid: Bidders are required to complete and submit one (1) original Bid Response Form. Bid form shall be sent in one envelope to:

NOTICE OF ADVERTISEMENT FOR BIDS. Furnishing and Delivery of 5kV Switchgear for Panora Municipal Electrical Utility Panora, Iowa, 50216

REQUEST FOR PROPOSALS

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

School Risk Assessment

INVITATION TO BID-NEW CONSTRUCTION

City of Jacksonville Beach

UNC Chapel Hill Informal Contracting Guidelines

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

REQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

Request for Bid. Handling Hostile Customers: from Verbal Threats to Active Shooter Situations One-day Training March 2017 Lansing or SE Michigan

Tsawwassen First Nation Procurement Policy. February, 2010

Request for Proposal: Controlled System Separation Feasibility Study

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original

LaDouceur Log Jam Harvest

Ohio Public Employees Retirement System. Request for Proposal

SPECIFICATIONS FOR TENDER # SUPPLY OF MCAFEE ANTIVIRUS RENEWAL AND LICENSES FOR WESTERN HEALTH

University of Kelaniya Dalugama, Kelaniya, Sri Lanka Tel , Fax ,

Internal Audit Report. Facilities Services Contract Management

FRAMEWORK TO GUIDE THE DEVELOPMENT OF A FIRST NATION TENDERING POLICY

Casework Technical Support (Social Welfare - Project Management)

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

INVITATION FOR BID IFB For: Record Storage Services. Notice to Prospective Bidders

ANNEX III - BID FORMS

REQUEST FOR PROPOSALS

INVITATION TO BID CITY OF HOPKINSVILLE

BOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018.

Notification of Intent ( amendment 1)- New date

PREQUALIFICATION OF BIDDERS FOR SUPPLY/PROVISION OF GOODS, SERVICES AND WORKS FOR 2016 FINANCIAL YEAR ENDING DECEMBER 2016 CATEGORY CHS/..

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

CITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904)

REQUEST FOR PROPOSAL (RFP)

LEVEL I PREQUALIFICATION DOCUMENTS

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

PUBLIC NOTICE 19 TH STREET PUBLIC PARKING FACILITY INCLUDING MIXED USE DEVELOPMENT SOLICITATION RFQ NO

REQUEST FOR PROPOSALS

LEON COUNTY TAX COLLECTOR OPERATIONS

INVITATION FOR BID. HVAC Equipment Replacement for Black Box Theatre at Nordlof Center. Issued June 14, Name of Bidding Firm:

INVITATION FOR BID. HVAC Equipment Replacement for Nordlof Center Lower Level West. Issued November 8, Name of Bidding Firm:

Facilities Planning and Construction (FP&C)

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

INSPECTION SYSTEM REQUIREMENTS

CITY OF BLUE ASH REQUEST FOR QUALIFICATIONS TO PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR THE DESIGN OF THE

REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids

SCHOOL EQUIPMENT PRODUCTION UNIT

Request for Proposals

BELLOWS FALLS HISTORICAL SOCIETY, INC. Post Office Box 466 Bellows Falls, VT I fax

Request for Proposal

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Market Procedure: Network Control Services

University of Washington. Request for Qualifications. Commissioning Authority Services for

STRATEGIC COMUNICATIONS SERVICES

Invitation to Bid (ITB) Document Management Services ITB No U ADDENDUM NO. 2. Questions and Answers ITB Revisions.

Request for Proposal (RFP)

There are Four areas in the systems transformation process (1) assessment, (2) planning, (3) implementation, and (4) evaluation.

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET

Request for Proposal & Statement of Qualifications

CITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater

INVITATION FOR BID Bid #872 - Printing Services

AGENDA ITEM NO. June 6, 2017

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

TIMBER SALE GUIDELINES

Transcription:

Invitation to Bid for Timber Marking Services DATE ISSUED: January 2, 2013 PROJECT NAME: Timber Marking 2013 Agreement 4 Pike The State of Ohio, through the Ohio Department of Natural Resources - Division of Forestry (DOF) is requesting proposals for: Timber Marking on Pike State Forest The purpose of this project is to procure timber marking services on Pike State Forest. The Ohio Department of Natural Resources Division of Forestry plans to mark approximately 1,000,000 board feet on 99 acres utilizing contractor services on this contract. PROJECT REQUIREMENTS This section describes the Project and what the Contractor must do to get the job done. It also describes what the Contractor must deliver as part of the completed Project (the "Deliverables"). References to the Ftp site refers to ftp://www.dnr.state.oh.us/forestry/downloads/, under the 2013 Pike folder. Scope of Work. Timber sales that are included in this project are listed below. Pike State Forest Sale ID Estimated Volume No. of Cutting Sections Acres - Total Acres - Thin Acres - Deferment Acres - Shelter Acres - CC Special Instructions PI B28 1,000,000 3 99 89 10 Minimum 50ft trail buffer. Layout of state forest harvest units including the following: Attendance in a preseason marking meeting between DOF and contractor(s) Cutting Section and retention area boundary marking Shapefiles of expected boundaries are provided On-ground situation shall prevail (conform to marked property boundaries and use DOF SMZ policy) Special details may be listed for each sale Individual tree marking for deferment, shelterwood, and thinning sales. GPS data for boundaries of all cutting sections Inventory raw data

100% tally on thinning/selection sales Point-sample cruise on clearcut, shelterwood, and deferment sales Inventory provide calculated, summarized per cutting section and sale. Format shall be electronic. Contractor may use Division of Forestry s template or provide their own mutually agreeable solution. GPS data of cruise point locations All field work shall conform to the guide Marking Timber Sales on Ohio State Forests listed as a on the Division of Forestry s FTP site. Tree paint (gun-type) shall be provided by the Division of Forestry at designated field locations. Maps and shapefiles are provided on the FTP site. Project Duration All deliverables shall be submitted to the project representative by 8/31/2013. Up to 3 month extension may be granted by the Chief of the Division of Forestry if at least 75% of the project is complete. The contracting firm may not bid or work as subcontractor on another service contract during the extension period. Payment Structure The Contractor will be paid as proposed on the Cost Summary Form after the Ohio Department of Natural Resources, Division of Forestry approves the receipt of all deliverables. Payments may be delayed for processing for up to ten (10) business days after submittal for quality control verification, see Timber Marking 2013 Agreement 4 Pike on the Division of Forestry s FTP site. Once submitted for payment, there may be a delay of up to thirty (30) days for processing. Bid Requirements Contractor shall mail attachments 1, 2, and 3 in an envelope to: Division of Forestry, 345 Allen Avenue, Chillicothe, OH, 45601. Envelope should clearly be marked on the front as Timber Marking 2013 Agreement 4 Pike. If the bidder wishes to be considered for the 5% Buy Ohio preference pursuant to ORC 125.09 and 125.11 they must complete the forms at http://thinkohiofirst.ohio.gov/ and submit a copy with their bid. Project staff members shall meet the requirements below. The staffing plan (attachment 3) should be submitted with the bid. The state may request additional information from the contractor as verification.

Table 1 Mandatory Requirements MANDATORY REQUIREMENTS 1. Minimum qualifications will be for at least one employee serving in a managerial function to meet the eligibility requirements for the Society of American Foresters Certified Forester program. In addition all other employees or subcontractors expected to work independently shall meet one of the standards below: -Possess a 4-yr degree in a natural resources field -Possess a 2-yr degree in forestry, forest technology, or similar degree -Have at least 5 years experience in mensuration of eastern hardwoods Post-Bid Package Service Contractor Requirements The state intends to issue a letter of intent to sign a contract with the service provider that meets the minimum bid requirements and submits the lowest total bid. Prior to signing an agreement the contractor must provide the following information to the state s project representative. Requirements and forms for these items are listed on the Division s FTP site. Proof of Insurance Standard Affirmation and Disclosure Form After providing the required documentation the state will sign a personal service agreement with the prospective contractor. The contractor should plan on at least 3 weeks for the agreement to be finalized, more time will be necessary if the appropriation request must be presented to the Ohio Controlling Board. A boiler-plate contract is located on the Division of Forestry s FTP site as an example. In addition the contractor must register as a vendor in the State of Ohio s Accounting System Vendor file. See http://ohiosharedservices.ohio.gov/home.aspx Bidding Policy The act of bidding indicates an implied commitment to sign a service contract. If the successful bidder declines or is unable to sign a contract for the above-mentioned project, the bidder may have bids for future projects rejected for at least one (1) year from the bid opening date at the discretion of the Chief of the Division of Forestry. The State reserves the right to negotiate terms prior to contract award and reserves the right to refuse any or all bids.

Project Designation: Timber Marking 2013 Agreement 4 Pike Ohio Department of Natural Resources Division of Forestry 345 Allen Avenue Chillicothe, Ohio 45601 Firm name and billing address: ATTACHMENT ONE BID FORM Bid Opening: January 23, 2013 at 2:30 P.M. Business location(s) of employees or subcontractors to work on the project: Contact information for the Firm s project manager:

ATTACHMENT TWO COST SUMMARY FORM Cost must be in U.S. dollars Invoices are to be submitted after each timber sale completion and must be preceded by task deliverables. DESCRIPTION Price Price to mark cutting section boundaries, perform all GPS data collection, mark all individual trees required, perform all timber cruising, and analyze and compute all data. Timber Marking 2013 Agreement 4 Pike

ATTACHMENT THREE Staffing Plan MUST BE SUBMITTED WITH BID Contractor shall list all personnel that are expected to work on the project. Alternate personnel may only be used with prior written approval of the State s project representative. Prospective contractors may develop their own form that includes the same information (e.g., resumes and project staffing charts). Subcontractors should be listed. Use multiple sheets if necessary. Project Manager SAF Certified Forester # (not required) If no SAF CF #, then list post-secondary education and employment history that meets the minimum requirements: Field Staffperson SAF Certified Forester # (not required) If no SAF CF #, then list post-secondary education and employment history that meets the minimum requirements: Field Staffperson SAF Certified Forester # (not required) If no SAF CF #, then list post-secondary education and employment history that meets the minimum requirements:

Invitation to Bid for Timber Marking Services DATE ISSUED: January 2, 2013 PROJECT NAME: Timber Marking 2013 Agreement 5 Tar Hollow and Richland Furnace The State of Ohio, through the Ohio Department of Natural Resources - Division of Forestry (DOF) is requesting proposals for: Timber Marking on Tar Hollow and Richland Furnace State Forests The purpose of this project is to procure timber marking services on Tar Hollow State Forest and Richland Furnace State Forest. The Ohio Department of Natural Resources Division of Forestry plans to mark approximately 753,000 board feet on 153 acres utilizing contractor services on this contract. PROJECT REQUIREMENTS This section describes the Project and what the Contractor must do to get the job done. It also describes what the Contractor must deliver as part of the completed Project (the "Deliverables"). References to the Ftp site refers to ftp://www.dnr.state.oh.us/forestry/downloads/, under the 2013 Tar Hollow and Richland Furnace folder. Scope of Work. Timber sales that are included in this project are listed below. Tar Hollow and Richland Furnace State Forest No. of Cutting Sections Acres - Total Sale ID Estimated Volume Acres - Thin Acres - Deferment Acres - Shelter Acres - CC Special Instructions Use a trail buffer of 50ft on deferment and shelterwood sections, 75 ft on clearcut section, and none required TH C18 500 MBF 4 38 22 19 on the thinning RF C4 253 MBF 3 57 17 Layout of state forest harvest units including the following: Attendance in a preseason marking meeting between DOF and contractor(s) Cutting Section and retention area boundary marking Shapefiles of expected boundaries are provided

On-ground situation shall prevail (conform to marked property boundaries and use DOF SMZ policy) Special details may be listed for each sale Individual tree marking for deferment, shelterwood, and thinning sales. GPS data for boundaries of all cutting sections Inventory raw data 100% tally on thinning/selection sales Point-sample cruise on clearcut, shelterwood, and deferment sales Inventory provide calculated, summarized per cutting section and sale. Format shall be electronic. Contractor may use Division of Forestry s template or provide their own mutually agreeable solution. GPS data of cruise point locations All field work shall conform to the guide Marking Timber Sales on Ohio State Forests listed as a on the Division of Forestry s FTP site. Tree paint (gun-type) shall be provided by the Division of Forestry at designated field locations. Maps and shapefiles are provided on the FTP site. Project Duration All deliverables shall be submitted to the project representative by 8/31/2013. Up to 3 month extension may be granted by the Chief of the Division of Forestry if at least 75% of the project is complete. The contracting firm may not bid or work as subcontractor on another service contract during the extension period. Payment Structure The Contractor will be paid as proposed on the Cost Summary Form after the Ohio Department of Natural Resources, Division of Forestry approves the receipt of all deliverables. Payments may be delayed for processing for up to ten (10) business days after submittal for quality control verification, see Timber Marking 2013 Agreement 5 Tar Hollow and Richland Furnace on the Division of Forestry s FTP site. Once submitted for payment, there may be a delay of up to thirty (30) days for processing. Bid Requirements Contractor shall mail attachments 1, 2, and 3 in an envelope to: Division of Forestry, 345 Allen Avenue, Chillicothe, OH, 45601. Envelope should clearly be marked on the front as Timber Marking 2013 Agreement 5 Tar Hollow and Richland Furnace. If the bidder wishes to be considered for the 5% Buy Ohio preference pursuant to ORC 125.09 and 125.11 they must complete the forms at http://thinkohiofirst.ohio.gov/ and submit a copy with their bid. Project staff members shall meet the requirements below. The staffing plan (attachment 3) should be submitted with the bid. The state may request additional information from the contractor as verification.

Table 1 Mandatory Requirements MANDATORY REQUIREMENTS 1. Minimum qualifications will be for at least one employee serving in a managerial function to meet the eligibility requirements for the Society of American Foresters Certified Forester program. In addition all other employees or subcontractors expected to work independently shall meet one of the standards below: -Possess a 4-yr degree in a natural resources field -Possess a 2-yr degree in forestry, forest technology, or similar degree -Have at least 5 years experience in mensuration of eastern hardwoods Post-Bid Package Service Contractor Requirements The state intends to issue a letter of intent to sign a contract with the service provider that meets the minimum bid requirements and submits the lowest total bid. Prior to signing an agreement the contractor must provide the following information to the state s project representative. Requirements and forms for these items are listed on the Division s FTP site. Proof of Insurance Standard Affirmation and Disclosure Form After providing the required documentation the state will sign a personal service agreement with the prospective contractor. The contractor should plan on at least 3 weeks for the agreement to be finalized, more time will be necessary if the appropriation request must be presented to the Ohio Controlling Board. A boiler-plate contract is located on the Division of Forestry s FTP site as an example. In addition the contractor must register as a vendor in the State of Ohio s Accounting System Vendor file. See http://ohiosharedservices.ohio.gov/home.aspx Bidding Policy The act of bidding indicates an implied commitment to sign a service contract. If the successful bidder declines or is unable to sign a contract for the above-mentioned project, the bidder may have bids for future projects rejected for at least one (1) year from the bid opening date at the discretion of the Chief of the Division of Forestry. The State reserves the right to negotiate terms prior to contract award and reserves the right to refuse any or all bids.

ATTACHMENT ONE BID FORM Bid Opening: January 23, 2013 at 2:45 P.M. Project Designation: Timber Marking 2013 Agreement 5 Tar Hollow and Richland Furnace Ohio Department of Natural Resources Division of Forestry 345 Allen Avenue Chillicothe, Ohio 45601 Firm name and billing address: Business location(s) of employees or subcontractors to work on the project: Contact information for the Firm s project manager:

ATTACHMENT TWO COST SUMMARY FORM Cost must be in U.S. dollars Invoices are to be submitted after each timber sale completion and must be preceded by task deliverables. DESCRIPTION Price Price to mark cutting section boundaries, perform all GPS data collection, mark all individual trees required, perform all timber cruising, and analyze and compute all data. Tar Hollow C 18 Richland Furnace C 4 Contract Total -

ATTACHMENT THREE Staffing Plan MUST BE SUBMITTED WITH BID Contractor shall list all personnel that are expected to work on the project. Alternate personnel may only be used with prior written approval of the State s project representative. Prospective contractors may develop their own form that includes the same information (e.g., resumes and project staffing charts). Subcontractors should be listed. Use multiple sheets if necessary. Project Manager SAF Certified Forester # (not required) If no SAF CF #, then list post-secondary education and employment history that meets the minimum requirements: Field Staffperson SAF Certified Forester # (not required) If no SAF CF #, then list post-secondary education and employment history that meets the minimum requirements: Field Staffperson SAF Certified Forester # (not required) If no SAF CF #, then list post-secondary education and employment history that meets the minimum requirements: