SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

Similar documents
SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

SECTION HANGERS AND SUPPORTS FOR PLUMBING

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

E. Manufacturers Standardization Society of the Valve and Fittings Industry:

E. Manufacturers Standardization Society of the Valve and Fittings Industry:

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Daytona Beach Pier Building Renovation Jun 2010

University of Delaware

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

SECTION METAL FLOOR PLATE STAIRS

SECTION FACILITY STORM DRAINAGE

Fig. 1 - Standard Clevis Hanger

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

City of Winnipeg BASES, HANGERS AND SUPPORTS Section NEWPCC - Pump Well Isolation Page 1 of 6 Tender No June 2003

Design & Construction Standards, Revised January

Daytona Beach Pier Building Renovation Jun 2010

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION PLUMBING PIPING SYSTEMS

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION NON-PENETRATING PORTABLE ROOFTOP SUPPORTS AND WALKWAYS. For best results, display hidden notes to specifier.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

PIPE AND TUBE RAILINGS

SECTION HVAC INSULATION

SECTION PLUMBING SUPPORTS AND ANCHORS. A. Furnish sleeves and hanger inserts to General Contractor for placement into formwork.

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems.

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION TURBINE VENTILATORS

SECTION HVAC DUCTS AND CASINGS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Diffused Aeration Piping Equipment

SECTION 07530CP EPDM MEMBRANE ROOFING

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

DARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES

SECTION ACOUSTICAL PANEL CEILINGS

SECTION METAL BUILDING SYSTEMS

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

SECTION SEISMIC CONTROL OSHPD

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

SECTION COLD-FORMED METAL FRAMING

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

TOLCO Fire Protection Support Systems. Pipe Hangers Supports Seismic Bracing. UL Listed FM Approved for Fire Sprinkler Installations

SECTION ALUMINUM STORM WINDOWS

CONSULTANT PROCEDURES & DESIGN GUIDELINES Electrical Manholes and Handholes UNIVERSITY OF MISSOURI

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Smarter. Safer. Leaner.

A. Access doors and frames are part of an access door and frame allowance.

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

Attachment A-Flagpole(s) Specifications

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

UNIFIED FACILITIES GUIDE SPECIFICATIONS

1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION FACILITY WATER DISTRIBUTION

Fig Beam Clamp Retaining Strap (B-Line B3367)

Materials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available.

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SECTION TAPPING SLEEVES AND VALVES

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

American Metal Specialties, Inc.

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION PRE-ENGINEERED BUILDING INSULATION

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

BEARING METAL STUD FRAMING

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

Transcription:

SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work to adjacent construction. 1.2 REFERENCES A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping B. ASME B31.5 (American Society of Mechanical Engineers) - Refrigeration Piping C. ASME B31.9 (American Society of Mechanical Engineers) - Building Services Piping D. ASTM F708 - Design and Installation of Rigid Pipe Hangers. E. MSS SP58 (Manufacturers Standardization Society of the Valve and Fittings Industry) - Pipe Hangers and Supports - Materials, Design and Manufacturer. F. MSS SP69 (Manufacturers Standardization Society of the Valve and Fittings Industry) - Pipe Hangers and Supports - Selection and Application. G. MSS SP89 (Manufacturers Standardization Society of the Valve and Fittings Industry) - Pipe Hangers and Supports - Fabrication and Installation Practices. H. NFPA 13 (National Fire Protection Association) - Installation of Sprinkler Systems. I. NFPA 14 (National Fire Protection Association) - Installation of Standpipe and Hose Systems 1.3 SUBMITTALS A. Refer to Section 01 33 00 - Submittal Procedures. B. Shop Drawings: Indicate system layout with location and detail of trapeze hangers. C. Product Data: Submit manufacturers catalog data including load capacity. D. Design Data: Indicate load carrying capacity of trapeze, multiple pipe, and riser support hangers. E. Manufacturer's Installation Instructions: Submit special procedures and assembly of components. February 2018 Page 1 of 8 2018 FDG Section 22 05 29

F. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. 1.4 QUALITY ASSURANCE A. Perform work in accordance with applicable code for piping support and in conformance with NFPA 13 and 14 for support of sprinkler piping and standpipes. B. Maintain one copy of each document on site. 1.5 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years documented experience. B. Installer: Company specializing in performing Work of this section with minimum three years documented experience. 1.6 PRE-INSTALLATION MEETING A. Section 01330 - Administrative Requirements: Pre-installation meeting. B. Convene minimum one week prior to commencing work of this section. 1.7 FIELD MEASUREMENTS A. Verify field measurements prior to fabrication.warranty B. Section 01770 - Execution Requirements: Product warranties and product bonds. C. Provide five year manufacturer warranty for pipe hangers and supports. PART 2 - PRODUCTS 2.1 PIPE HANGERS AND SUPPORTS A. Manufacturers: 1. Superstrut 2. Unistrut 3. Fee and Mason 4. B-Line 5. or equal B. Building Services piping include domestic water, sanitary sewer, storm drainage and condensate drainage piping: 1. Conform to ASME B31.9. February 2018 Page 2 of 8 2018 FDG Section 22 05 29

2.2 ACCESSORIES Stanford University Facilities Design Guidelines 2. Hangers for Pipe Sizes ½ to 1-1/2 inch: Malleable iron or Carbon steel, adjustable swivel, split ring. 3. Hangers for Cold Pipe Sizes 2 inches and Over: Carbon steel, adjustable, clevis. 4. Hangers for Hot Pipe Sizes 2 to 4 inches: Carbon steel, adjustable, clevis. 5. Hangers for Hot Pipe Sizes 6 inches and Over: Adjustable steel yoke, cast iron roll, double hanger. 6. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods. 7. Multiple or Trapeze Hangers for Hot Pipe Sizes 6 inches and Over: Steel channels with welded spacers and hanger rods, cast iron roll. 8. Wall Support for Pipe Sizes to 3 inches: Cast iron hooks. 9. Wall Support for Pipe Sizes 4 inches and Over: Welded steel bracket and wrought steel clamp. 10. Wall Support for Hot Pipe Sizes 6 inches and Over: Welded steel bracket and wrought steel clamp with adjustable steel yoke and cast iron roll. 11. Vertical Support: Steel riser clamp. 12. Floor Support for Cold Pipe: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support. 13. Floor Support for Hot Pipe Sizes to 4 Inches: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support. 14. Floor Support for Hot Pipe Sizes 6 inches and Over: Adjustable cast iron roll and stand, steel screws, and concrete pier or steel support. 15. Copper Pipe Support: Copper-plated, carbon steel ring. A. Hanger Rods: Galvanized or Cadmium plated steel rod, threaded at both ends, threaded on one end, or continuous threaded with double lock nut. 2.3 INSERTS A. Inserts: Malleable iron case of galvanized outside and steel shell inside and expander plug for threaded connection with lateral adjustment, top slot for reinforcing rods, lugs for attaching to forms; size inserts to suit threaded hanger rods. 2.4 FLASHING A. Metal Flashing: 22 gage thick galvanized steel. B. Metal Counter-flashing: 20 gage thick galvanized steel. C. Lead Flashing: 1. Waterproofing: 5 lb./sq. ft sheet lead 2. Soundproofing: 1 lb./sq. ft sheet lead. D. Flexible Flashing: 47 mil thick sheet butyl compatible with roofing. February 2018 Page 3 of 8 2018 FDG Section 22 05 29

E. Caps: Steel, 22 gage minimum; 16 gage at fire resistant elements. 2.5 EQUIPMENT CURBS A. Fabrication: Welded 18 gage galvanized steel shell and base, mitered 3 inch cant, variable step to match root insulation, factory installed wood nailer. 2.6 SLEEVES A. Sleeves for Pipes Through Non-fire Rated Floors: 18 gage thick galvanized steel. B. Sleeves for Pipes Through Non-fire Rated Beams, Walls, Footings, and Potentially Wet Floors: Steel pipe or 18 gage thick galvanized steel. C. Sleeves for Pipes Through Fire Rated and Fire Resistive Floors and Walls, and Fire Proofing: Prefabricated fire rated sleeves including seals, UL listed. D. Sleeves for Round Ductwork: Galvanized steel. E. Sleeves for Rectangular Ductwork: Galvanized steel or wood. F. Stuffing and Fire-stopping Insulation: Glass fiber type, non-combustible. G. Sealant: Acrylic. 2.7 PIPE STANDS A. General Requirements for Pipe Stands: Shop- or field-fabricated assemblies made of manufactured corrosion-resistant components to support roof-mounted piping. B. Compact Pipe Stand: One-piece plastic unit with integral-rod roller, pipe clamps, or V-shaped cradle to support pipe, for roof installation without membrane penetration. C. Low-Type, Single-Pipe Stand: One-piece [plastic] [stainless-steel] base unit with plastic roller, for roof installation without membrane penetration. D. High-Type, Single-Pipe Stand: 1. Description: Assembly of base, vertical and horizontal members, and pipe support, for roof installation without membrane penetration. 2. Base: [Plastic] [Stainless steel]. 3. Vertical Members: Two or more cadmium-plated-steel or stainless-steel, continuousthread rods. 4. Horizontal Member: Cadmium-plated-steel or stainless-steel rod with plastic or stainless-steel, roller-type pipe support. February 2018 Page 4 of 8 2018 FDG Section 22 05 29

E. High-Type, Multiple-Pipe Stand: Stanford University Facilities Design Guidelines 1. Description: Assembly of bases, vertical and horizontal members, and pipe supports, for roof installation without membrane penetration. 2. Bases: One or more; plastic. 3. Vertical Members: Two or more protective-coated-steel channels. 4. Horizontal Member: Protective-coated-steel channel. 5. Pipe Supports: Galvanized-steel, clevis-type pipe hangers. F. Curb-Mounting-Type Pipe Stands: Shop- or field-fabricated pipe supports made from structural-steel shapes, continuous-thread rods, and rollers, for mounting on permanent stationary roof curb. 2.8 PIPE POSITIONING SYSTEMS A. Description: IAPMO PS 42, positioning system of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications. 2.9 EQUIPMENT SUPPORTS A. Description: Welded, shop- or field-fabricated equipment support made from structural carbonsteel shapes. 2.10 MISCELLANEOUS MATERIALS A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized. B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications. 1. Properties: Nonstaining, noncorrosive, and nongaseous. 2. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength. PART 3 - EXECUTION 3.1 INSTALLATION 3.2 INSERTS A. Provide inserts for placement in concrete forms. B. Provide inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams. C. Provide hooked rod to concrete reinforcement section for inserts carrying pipe over 4 inches (100 mm). February 2018 Page 5 of 8 2018 FDG Section 22 05 29

D. Where concrete slabs form finished ceiling, locate inserts flush with slab surface. E. Where inserts are omitted, drill through concrete slab from below and provide through-bolt with recessed square steel plate and nut recessed into and grouted flush with slab. 3.3 PIPE HANGERS AND SUPPORTS A. Support horizontal piping as scheduled. B. Install hangers to provide minimum ½ inch space between finished covering and adjacent work. C. Place hangers within 12 inches of each horizontal elbow. D. Use hangers with 1-1/2 inch minimum vertical adjustment. E. Support horizontal cast iron pipe adjacent to each hub, with 5 feet maximum spacing between hangers. F. Support vertical piping in accordance with the California Plumbing Code G. Where several pipes can be installed in parallel and at same elevation, provide multiple or trapeze hangers. H. Support riser piping independently of connected horizontal piping. I. Provide copper plated hangers and supports for copper piping. Cush clamps or felt lined galvanized J-hangers acceptable. J. Design hangers for pipe movement without disengagement of supported pipe. K. Prime coat exposed steel hangers and supports. Hangers and supports located in crawl spaces, pipe shafts, and suspended ceiling spaces are not considered exposed. 3.4 EQUIPMENT BASES AND SUPPORTS A. Provide housekeeping pads of concrete, minimum 3-1/2 inches thick and extending 6 inches beyond supported equipment. B. Provide templates, anchor bolts, and accessories for mounting and anchoring equipment. C. Construct supports of steel members or steel pipe and fittings. Brace and fasten with flanges bolted to structure. D. Provide rigid anchors for pipes after vibration isolation components are installed. 3.5 FLASHING A. Provide flexible flashing and metal Counter-flashing where piping and ductwork penetrate weather or waterproofed walls, floors, and roofs. February 2018 Page 6 of 8 2018 FDG Section 22 05 29

B. Flash vent and soil pipes projecting 12 inches minimum above finished roof surface with lead worked 1 inch minimum into hub, 8 inches minimum clear on sides with 24 x 24 inches sheet size. For pipes through outside walls, turn flanges back into wall and caulk, metal counter-flash, and seal. C. Flash floor drains in floors with topping over finished areas with lead, 10 inches clear on sides with minimum 36 x 36 inch sheet size. Fasten flashing to drain clamp device. D. Seal floor, shower and mop sink drains watertight to adjacent materials. E. Provide acoustical lead flashing around ducts and pipes penetrating equipment rooms for sound control. F. Provide curbs for mechanical roof installations 14 inches minimum high above roofing surface. Flash and counter-flash with sheet metal; seal watertight. Attach Counterflashing mechanical equipment and lap base flashing on roof curbs. Flatten and solder joints. G. Adjust storm collars tight to pipe with bolts; caulk around top edge. Use storm collars above roof jacks. Screw vertical flange section to face of curb. 3.6 SLEEVES A. Set sleeves in position in forms. Provide reinforcing around sleeves. B. Size sleeves large enough to allow for movement due to expansion and contraction. Provide for continuous insulation wrapping. C. Extend sleeves through floors 1 inch above finished floor level. Caulk sleeves. D. Where piping or ductwork penetrates floor, ceiling, or wall, close off space between pipe or duct and adjacent work with stuffing, fire stopping insulation and caulk airtight. Provide close fitting metal collar or escutcheon covers at both sides of penetration. E. Install chrome plated steel or stainless steel escutcheons at finished surfaces. 3.7 SCHEDULES PIPE SIZE (Inches) MAX. HANGER SPACING (Feet) DIAMETER (Inches) ½ to 1-1/4 6.5 3/8 1-1/2 to 2 10 3/8 2-1/2 to 3 10 1/2 4 to 6 10 5/8 8 to 12 14 7/8 February 2018 Page 7 of 8 2018 FDG Section 22 05 29

14 and over 20 1 PVC (All Sizes) 6 3/8 C.I. Bell and Spigot (or No-Hub) 5 3/8 And at Joints END OF SECTION February 2018 Page 8 of 8 2018 FDG Section 22 05 29