Bioreactor Landfill Design

Similar documents
Leachate Recirculation and Biogas Collection Methodologies in Bioreactors

Lift irrigation Using man or Animal power Using Mechanical or Electrical Power Flow irrigation a)inundation Irrigation b) Perennial Irrigation Direct

Leachate Management Leachate Control and Collection

Landfill Gas Systems

4.8. Subsurface Infiltration

LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E.

4.8. Subsurface Infiltration

Landfill Cover Design and Operation

TECHNICAL MEMORANDUM

Section 8: Amended Soil Mounds. 8. Amended Soil Mounds

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

PROJECT AT THE DENVER

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Bioreactor Landfills An Innovative Technology for Biostabilization of Municipal Solid Waste

Instrumentation and Process Control

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

PERMEABLE INTERLOCKING PAVERS

APPENDIX M LITERATURE REVIEW AND APPLICATION - LANDFILL BIOREACTOR TECHNOLOGY

David Miller, P.E.- Atlanta. The New Coal Ash Regulations Wednesday, May 6, 2015

STATE-OF-THE PRACTICE REVIEW OF BIOREACTOR LANDILLS

Application For Waste Regulation (Check all that apply)

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

High Density Polyethylene (HDPE) Lined Evaporation Ponds

FULL SCALE OPERATION OF A UNIQUE LANDFILL BIOREACTOR: THE CALGARY BIOCELL

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

BENEFITS FROM IMPROVING FLOOD IRRIGATION EFFICIENCY

IMPROVING LANDFILL GAS RECOVERY Recent Evaluations, Results of Large Scale Tests in California, United States

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

10.0 Storm Sewer Systems

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park

RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA

Porous Pavement Flow Paths

Smarter, Cheaper, Ash Pond Dewatering

Infiltration Guidelines

August 15, 2006 (Revised) July 3, 2006 Project No A

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

SWANA - NYS Chapter Landfill/Bioreactor/Leachate Recirculation

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

A-2000 PVC Pipe for Storm Sewers and Drainage

GRAY WATER RECYCLING SYSTEMS

GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION

BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds

ONSITE SEWAGE SYSTEMS*

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

Lecture 19. Landfill hydrology

NOTES ON CORRUGATED PLASTIC PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION

INSTALLATION INSTRUCTIONS

C. Foundation stabilization for pipe and utility structures.

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

(1) All sanitary landfill facilities, at a minimum, shall include the following:

BMP 6.4.4: Infiltration Trench

INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL /

The exam is enclosed with this correspondence. This test emphasizes standard requirements for installing gravity-fed septic systems.

Livestock and poultry producers are seeking. Solid-Liquid Separation. of Animal Manure and Wastewater E

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA

Highway Drainage Importance and Methods P rofessor V irgil Overholt

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

Providing proper drainage system

State-of-the-Practice Porous Asphalt Pavements. Kent R. Hansen, P.E. Director of Engineering National Asphalt Pavement Association

ASSESSMENT OF LEACHATE COLLECTION SYSTEM CLOGGING AT FLORIDA MUNICIPAL SOLID WASTE LANDFILLS

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

TYPICAL INSTALLATION INSTRUCTIONS

LANDSCAPE RETAINING WALLS

Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

Constructed Wetlands

Review of lessons learned Standards 313, 634, 629

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

GRASS-LINED CHANNEL (acre) CODE 840

REROUTING DRAINAGE SYSTEMS

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

4 EXTREME FOUNDATION PANELS

Irrigation Scheduling: Checkbook Method

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Gardening Tips fresh food.. community.. land.. food security. Stewardship. People. learning. living.

LANDFILL INSPECTION CHECKLIST

Solar Facilities on Landfills Engineering, Permitting, Construction, and Lessons Learned. Engineering from Site Approval through Construction

Training on Roads for Water and Resilience

Constructed Wetland Pond T-8

Boise City Public Works General Drainage Plan Review Requirements Checklist

FLOWTECH WASTEWATER TRENCH SYSTEMS Manufactured with 100% Recycled Artificial Aggregate

Bioreactor Landfills An Innovative Technology for Biostabilization of Municipal Solid Waste

Closure Plan Brame Fly Ash Pond

Greenfield Pond B Rehabilitation

Soil Permeability Demonstration

Waste Management Control Strategies for Landfills. Robert E. Landreth

PLATON FOUNDATION WRAP

LAT IS ALL we sell in agriculture. Whether

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

Las Pulgas Landfill Phase I Clean Closure Marine Corps Base Camp Pendleton, Ca

Transcription:

Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu

Bioreactor Landfill Design Modern landfill design entails many elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure

Bioreactor Landfill Design The use of bioreactor technology at landfills can impact all of these phases of design. In addition, a design must be provided for the addition of liquids (and perhaps air) into the landfill.

Elements of Leachate Recirculation What to recirculate System Design How much to recirculate In total Over a given period of time Method to recirculate Configuration and spacing of recirculation devices Develop operating constraints of system

Recirculation Amounts How much to recirculate: Typical approach is to add enough liquid to bring the landfilled waste to field capacity. Field capacity is the moisture content that the waste can hold under the influence of gravity.

Recirculation Amounts How much to recirculate: Initial moisture content: 15-25% (wet wt) Field capacity: 35-45% (wet wt) An increase from 20% to 35% in moisture content requires: 55 gallons per ton

Recirculation Rates Large amounts of water are thus required to get the landfill to field capacity What rate do you add the leachate? (i.e. how fast can you add the leachate) Depends on several issues: Meeting regulatory requirements The ability of the landfill and the devices to accept the liquids Limitations on pressure buildup Available liquids supply Operational timeline Minimizing seeps

Impact of Regulations on Determining Recirculation Rates Primary regulatory controlling factor: the requirement to meet less than one foot of head on the liner. For as-built landfills, the leachate collection system can be designed to handle the leachate recirculation rate you need (closer spacings, use of geonets) For retrofit landfills, the rate of leachate recirculation may be limited by the existing design.

Impact of Regulations on Determining Recirculation Rates Assessing impact of leachate recirculation on head on the liner. Predict head assuming that the leachate recirculation rate is equal to the impingement rate into the LCS. Perform the HELP model.

Impact of Regulations on Determining Recirculation Rates Using the HELP model to predict head on the liner: HELP has a feature to recirculate a percentage of the leachate collected in one layer back to another layer HELP also allows the addition of a constant sub-surface inflow into particular layers HELP is limited when in comes to complicated recirculation scenarios

Impact of Regulations on Determining Recirculation Rates Other complicating factors: How do you account for all of the existing moisture storage capacity in the landfill? How do you account for the possible clogging in the leachate collection system?

Ability of Waste and Devices to Accept Leachate It is important to remember that compacted waste is not very permeable, and the recirculation rate might be limited by the waste and the device. Examples: Infiltration ponds at ACSWL: 3,000 5,000 gallons per acre-day Injection lines at ACSWL: 0.005 gpm per ft of injection line per ft of pressure head

Other Factors Affecting Leachate Recirculation Rate Limitations on pressure buildup (slope stability concerns?) Available liquids supply Operational timeline Minimizing seeps

Sizing and Spacing of Devices The sizing and spacing of devices is somewhat limited by the lack of data regarding moisture distribution in operating bioreactor landfills. Methods are available to be estimate the distribution of liquids in landfills. Analytical solutions Numerical modeling

Development of Operating Constraints Operating constraints that should be considered include: Pressures and leachate depths Amount of time any one device is operated Rotation among devices

Liquids Addition Methods How do you get the liquids in? Leachate recirculation systems Surface Systems vs Subsurface Systems Retrofit vs As-built

Liquids Addition Method The method used will depend on several items: Current condition of landfill (new? completed?) Sources of liquids Goals of the owner/operator Available equipment Cost Interference with landfill operations Regulatory concerns

As-Built vs Retrofit As-Built Surface application methods as waste is filled up. Focus on working face. Horizontal trenches buried in the landfill as waste is deposited. Surface systems when complete. Retrofit Surface systems on completed waste fill. Vertical wells. Shallow subsurface horizontal trenches.

Leachate Recirculation Methods Leachate (or other liquids) can be added to the waste in a variety of methods. Surface application Systems prior to capping Systems after caps have been in place Subsurface application Horizontal trenches or galleries Vertical wells Combination systems

Methods of Surface Application of Leachate Direct Wetting of the Working Face Leachate can be sprayed or pumped onto the waste as it is tipped and compacted. Provides good means of moisture distribution. Potential concerns: Working conditions Exposure to workers Runoff

Methods of Surface Application of Leachate Spray or Drip Irrigation Leachate can be dripped or sprayed onto the waste or an area of daily or intermediate cover. Depending on weather conditions, spray irrigation provides a means of achieving large evaporation rates. This may be counterproductive depending on the needs of the landfill. Potential concerns: Exposure to workers (spray) Runoff Recirculation limited to dry weather

Methods of Surface Application of Leachate Infiltration Ponds An area can be excavated or bermed off and leachate can be ponded. Provides an easy method for attaining good moisture distribution (in area under ponds). Potential concerns: When evaporation and infiltration are less than rainfall and runoff, water accumulates. Floating waste. Interference with operations.

Methods of Surface Application of Leachate Leach Fields Leach Field Geomembrane Cap System MSW

Methods of Surface Application of Leachate Trenches Geomembrane Trenches MSW

Methods of Subsurface Application of Leachate Subsurface methods are often preferred because: The allow moisture distribution within the waste. Leachate can be added under pressure to achieve better distribution. They can be operated under wet weather conditions.

Subsurface Methods Vertical Injection Wells Vertical Injection Wells Horizontal Trenches Horizontal Trench Buried Infiltration Galleries

Focus on Two Subsurface Methods Horizontal Trenches Shallow systems Deep systems Vertical Injection Wells Large diameter systems Small diameter systems

Shallow Horizontal Trenches 1. Existing Landfill at Grade 50+ ft MSW Liner and Leachate Collection System

Shallow Horizontal Trenches 2. Excavate Trench and Install Bedding and Pipe 3-15 ft MSW Liner and Leachate Collection System

Shallow Horizontal Trenches 3. Backfill MSW Liner and Leachate Collection System

Shallow Horizontal Trenches 4. Additional Trenches 50 200 ft MSW Liner and Leachate Collection System

Shallow Horizontal Trenches 5. Recirculate MSW Liner and Leachate Collection System

Shallow Horizontal Trenches 5. Recirculate MSW Liner and Leachate Collection System

Deep Horizontal Trenches 1. Install Horizontal Trenches on Lower Lifts 50 200 ft 15 ft Liner and Leachate Collection System

Deep Horizontal Trenches 2. Continue Installing MSW Liner and Leachate Collection System

Deep Horizontal Trenches 3. Continue Installing Liner and Leachate Collection System

Deep Horizontal Trenches 4. Recirculate Leachate Liner and Leachate Collection System

Deep Horizontal Trenches 4. Recirculate Leachate Liner and Leachate Collection System

Materials of Construction Preferred piping material is HDPE Typical pipe size is 3 to 4 inches (perhaps larger if gas collection is desired) Typical trench width is 3 to 5 ft Typical hole diameter (3/8 ¾ inch) Bedding materials: Chipped tires Stone Other? (crushed brick, crushed glass) None?

Construction Issues Where do you construct the pipe? Issues from excavation of waste Odors Exposed garbage Disruption of operations Who performs the construction? Where do you stop perforations? How can you minimize future seepage? How do you connect pipe up in the future?

When a landfill is retrofitted with horizontal trenches, multiple trenches are constructed at one depth across the landfill The trenches are buried as deep as possible so they may be operated under pressure without risk of surface seeps

Installation of deep horizontal trench and piping at retrofit bioreactor landfill

As-Built System

As-Built System

As-built systems: Liquid addition devices are installed in the waste as the landfill is filled up.

Exploring Crushed Glass as a Drainage Media

Clay plug.

Vertical Injection Wells Two major types Large diameter wells Small diameter wells Many of the early leachate recirculation attempts used large diameter wells Most new designs use small diameter wells

Potential Disadvantage of Vertical Wells The greatest hydraulic pressure will be at the bottom of the well. This might result in more leachate distribution on the bottom of the landfill.

Vertical Injection Cluster Wells Use multiple small diameter wells. Since more wells are needed, installation must not be cost prohibitive.

Installation of Small Diameter Recirculation Wells: Direct Push Technology

Installation of Small Diameter Recirculation Wells: Open Flight Auger

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Review of Bioreactor Landfill Foundations Design Elements Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Review of Bioreactor Landfill Foundations Liner systems Design Elements Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Slope stability concerns Landfill Gas Well LCRS Liner

Slope stability concerns Landfill Gas Well LCRS Liner

Slope stability concerns Landfill Gas Well LCRS Liner

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system

Gas Generation is Enhanced Bioreactor Landfill Gas Volume Traditional Landfill 0 10 20 30 40 Time (Years)

Traditional Gas Collection Systems Vertical gas wells are most common method of gas collection at Landfills

Problems Encountered in Wet Landfills Wet landfills, either bioreactors or ones that have received large amounts of rainfall, sometimes have problems with gas collection.

Vertical Wells Flood Leachate in a landfill will migrate to the path of least resistance. A zone of leachate penetrated by a vertical hole may drain into the holes. Gas moving in the direction of the hole may bring leachate with it.

Collection from Recirculation It is may be very difficult to collect gas from leachate recirculation devices (vertical wells, horizontal trenches). Devices is Difficult

Important Note Gas will flow in the direction of least resistance. The path of least resistance is not through saturated waste.

Options for Collecting Gas in Bioreactors Let s look at several options for collecting gas from bioreactors 1. Don t recirculate until after closure 2. Use leachate collection system 3. Let the cap serve as a primary gas collector 4. Smart of use of leachate recirculation devices

Landfill gas generation and flow Vertical gas collection wells Geomembrane cap Horizontal gas collection wells Leachate wet well Landfill gas pressure MSW Landfill Leachate collection pipe Geomembrane liner

Delay Leachate Recirculation One option would be to delay any leachate recirculation until after the landfill has reached final grade. Traditional systems (with modifications) can then be used. The operating years, however, are often the time when leachate recirculation has been as a leachate management strategy.

Use Leachate Collection System The leachate recirculation system can successfully used as a gas collection system. The driving force of gas out of the landfill is pressure. If the pressure in the leachate collection system is near atmospheric, gas will migrate in that direction.

MSW LCS Liner

Design Considerations The landfill should be designed from the beginning with the idea of collecting gas from the leachate collection system

Leachate wet well To flare Gas flow MSW Landfill Leachate clean-out line Leachate level Leachate collection pipe Pump

Leachate wet well To flare Gas flow MSW Landfill Leachate clean-out line Minimum leachate level Leachate collection pipe

Capping Systems for Gas Collection Use a cap system with a geomembrane as a gas collector. Composite liner Buried geomembrane Exposed geomembrane

Geomembranes for Gas Collection

Geomembrane MSW LCS Liner

Creative Use of Leachate Recirculation Devices Use leachate recirculation devices as gas collectors, but don t count on them as primary collectors. Exception: Horizontal trenches on the surface of the landfill. Also, use unused recirculation devices as gas collectors to collect gas being produced from other recirculated areas.

Review of Bioreactor Landfill Design Elements Foundations Liner systems Leachate collection systems Stormwater control systems Slope stability considerations Leachate management systems Gas extraction systems Capping and closure Leachate recirculation system