TABLE 3-24 SUMMARY OF EXISTING AMBIENT NOISE MEASUREMENT RESULTS

Similar documents
5.10 HAZARDOUS/REGULATED MATERIALS

Impact Assessment Methodology for the. Somerville Public Library August 4, 2008 Jason Ross, P.E. Harris Miller Miller & Hanson Inc.

1.0 PURPOSE AND NEED

MBTA Green Line Extension Noise and Vibration Technical Report

COMPONENTS OF THE NOISE ELEMENT

DART LRT Rail Operating Facility Phase I Site Selection Study

Attachment E2 Noise Technical Memorandum SR 520

7. BASIC GROUND-BORNE VIBRATION CONCEPTS

9.0 Noise and Vibration

CREATE. Noise and Vibration Assessment Methodology

TABLE OF CONTENTS Chapter 12 Noise

4.7 NOISE FUNDAMENTALS OF NOISE AND VIBRATION

APPENDIX C NOISE STUDY TECHNICAL REPORT

4.10 Noise Setting. a. Overview of Noise and Vibration Measurement

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

3.14 HAZARDOUS/REGULATED MATERIALS

1. Introduction Noise Analysis Results Figures. List of Tables

APPENDIX C NOISE STUDY TECHNICAL REPORT

NORTH GILROY NEIGHBORHOOD DISTRICTS URBAN SERVICE AREA AMENDMENT EIR NOISE AND VIBRATION ASSESSMENT GILROY, CALIFORNIA

Exposition Corridor Transit Neighborhood Plan Draft EIR 4.9 NOISE

Noise measurement and mitigation for urban building foundation excavation

III.I. NOISE AND VIBRATION

4.11 Noise and Vibration

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics

APPENDIX 3.11-A NOISE ANALYSIS DATA

Evaluation of noise impacts associated with a proposed commercial retail project typically includes the following:

Appendix D Environmental Noise Assessment

Recommended Locations for Sound Barriers

APPENDIX C. Environmental Noise Assessment

General Plan Update Workshop #6 Overview of the Kern County General Plan Noise and Safety Elements (Fiscal Impact: None) All S.D.s

4.11 NOISE SOUND FUNDAMENTALS SOUND AND THE HUMAN EAR SOUND PROPAGATION AND ATTENUATION

Peak noise levels during any time period can be characterized with statistical terms.

3.12 NOISE AND VIBRATION ENVIRONMENTAL SETTING ACOUSTIC FUNDAMENTALS

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

12-1 INTRODUCTION 12-2 REGULATORY REQUIREMENTS

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO

10. Noise and Vibration

4. Environmental Analysis of the Proposed Project

Environmental Assessment May 2007

4.3 NOISE Environmental Setting. Fundamentals of Sound and Environmental Noise

11 NOISE INTRODUCTION NOISE FUNDAMENTALS AND TERMINOLOGY

Noise Impact Study for Hyatt House in Davis, California

15.1 INTRODUCTION CONTEXT

4.7 NOISE. Introduction. Decibels and Frequency. Perception of the Receiver and A-Weighting

Introduction. Section 3.10 Noise Fundamentals of Noise. Decibels and Frequency

SAFETY AND NOISE 9. Safety and Noise

PALO VERDE MESA SOLAR PROJECT

Cotton Belt Corridor Regional Rail

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

E. NOISE AND VIBRATION

UAL URBAN AERODYNAMICS LTD

TTM & Residential Development Noise Impact Study City of San Jacinto, CA

FHWA/FTA/FRA Joint Project Procedures. Mark Ferroni Noise Team Leader July 22 25, 2007

SOUND TRANSIT LIGHT RAIL VIBRATION ISSUES AT THE UNIVERSITY OF WASHINGTON

Sound, Noise and Vibration

PRINCIPAL CONCLUSIONS

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

Traffic Noise Analysis

4.5 NOISE EXISTING SETTING TECHNICAL BACKGROUND. Acoustic Fundamentals

12 November Ms. Winnie Lam Project Manager L.F. George Properties 159 El Camino Real Millbrae, CA 94030

TECHNICAL MEMORANDUM. DRAFT Existing Freight Operations along Cotton Belt Corridor between DFW Airport and Plano, TX

SOUND TRANSIT STAFF REPORT MOTION NO. M Link Noise Mitigation Policy

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

The content of this supplement is based upon the that described in our letter of May 28, 2012.

This section describes sound and noise in the area of the Proposed Project. The potential noise impacts and alternatives are also discussed.

Appendix G Noise and Vibration Impact Analysis

Dormitory Authority of the State of New York Page 14-1 Staten Island Supreme Courthouse Project Draft EIS

EFFECTS OF HIGH-SPEED RAIL SUBSTRUCTURE ON GROUND- BORNE VIBRATIONS

Cotton Belt Corridor. Area Focus Group (AFG) North Dallas September 11, John Hoppie, Capital Planning

Measure the Crack Instead of Construction Vibrations

Noise Assessments for Construction Noise Impacts

Phil Pogledich, Senior Deputy Counsel, Yolo County; Petrea Marchand, Consero Solutions

Law enforcement on proactive protection of noise and vibration pollution for

I-35 Corridor Segment Committee Bagby Ave. Waco, Texas. March 9, :00 AM to Noon

This page intentionally left blank

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY

Diablo Vista Pumping Plant Replacement Project. Noise and Vibration Analysis. East Bay Municipal Utility District

4.9 NOISE ANALYTICAL METHODS

Noise Assessment Report Main Street, Residential Site Cambridge, ON

4.9. Noise and Vibration

ENVIRONMENTAL NOISE ASSESSMENT

DART s Role in Transit - Oriented Development. Jack Wierzenski,, Director Economic Development & Planning Dallas Area Rapid Transit

GARAGE STRUCTURE VIBRATION TRANSMISSION TO HUMAN OCCUPIED SPACES

Evaluating Ontario Regulations for Siting Turbines. in Context of. Findings from the Health Canada Study

4.7 NOISE Setting

Footfall vibration analysis of a high precision manufacturing facility

3.1 Noise Overlay District

PART 7 - NOISE, SIGNS AND ARTIFICIAL LIGHTING

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

Appendix D Andersen Drive At-Grade Crossing Technical Report on Noise

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE

Noise Control and Impact Assessment at Health Canada

Vibration Generated Due To Pile Driving In Water And Soil

A. INTRODUCTION B. AIRBORNE NOISE

US 53 Noise Mitigation

Sydney Metro City and Southwest Sydney Yard Access Bridge Construction Noise and Vibration Management Plan (CNVMP)

COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS

California High-Speed Train Program FEIR/EIS

Transcription:

Site No. TABLE 3-24 SUMMARY OF EXISTING AMBIENT NOISE MEASUREMENT RESULTS Measurement Location Description Start of Measurement Meas. Time (hrs) Noise Exposure (dba) Date Time Ldn Leq LT-1 Cistercian Abbey Irving 8-31-05 16:00 24 68 -- LT-2 Lofts at Las Colinas Irving 8-30-05 16:00 24 63 -- LT-3 Los Colinas Studio Plus Irving 7-05-06 14:00 24 64 -- LT-4 The Villas at Beaver Creek Irving 8-30-05 17:00 24 56 -- LT-5 Archstone at MacArthur Apartment Homes Irving 8-30-05 15:00 24 58 -- ST-1 Miss Bloomingdale s Academy Irving 9-01-05 8:20 1 -- 60 Source: Harris Miller Miller & Hanson Inc., 2006 Site LT-1: Cistercian Abbey. The Ldn measured at the Abbey was 68 dba. The ambient noise levels were dominated by noise from the John W. Carpenter Freeway (SH 114). Ambient noise levels were monitored for 24 hours. Site LT-2: Lofts at Las Colinas (Lake Carolyn Parkway). The Ldn measured near these multi-family residences was 63 dba. Major noise sources included traffic from Northwest Highway (Spur 348) and other local activities. Ambient noise levels were monitored for 24 hours in front of one of the apartment buildings. The measurement at this location can be used to estimate the existing noise exposure at the new apartment buildings on Lake Carolyn being built to the southeast as well. Site LT-3: Las Colinas Studio Plus (Meadow Creek Drive). The Ldn measured at this hotel was 64 dba. The major noise sources were traffic on Meadow Creek Drive, traffic on Northwest Highway and aircraft arrivals at DFW Airport. Ambient noise levels were monitored for 24 hours in front of the hotel, near Meadow Creek Drive. Site LT-4: The Villas at Beaver Creek (Meadow Creek Drive). The Ldn measured near these multi-family residences was 56 dba. The noise sources included traffic from a nearby parking garage and aircraft arrivals at DFW Airport. Ambient noise levels were monitored for 24 hours behind the residences, on the opposite side of the water channel. Site LT-5: Archstone at MacArthur Apartment Homes (1100 Hidden Ridge Drive). The Ldn measured at these multi-family residences was 58 dba. Existing noise sources included traffic on North Lake College Road, aircraft arrivals at DFW Airport, and exterior air conditioning compressors at the residences. Ambient noise levels were monitored for 24 hours behind the residences. The measurement at this location can be used to estimate the ambient noise at the nearby Mandalay Place residences as well. Site ST-1: Miss Bloomingdale s Academy (Rochelle Boulevard). The Leq measured during a short term measurement at this location was 60 dba. The major sources of existing noise are traffic on Rochelle Boulevard and Transport Boulevard, and cars in the parking lot of the childcare facility. Ambient noise levels were monitored during one peak transit hour period at this location. 3.6 VIBRATION Ground-borne vibration is the oscillatory motion of the ground about some equilibrium position that can be described in terms of displacement, velocity or acceleration. Because sensitivity to vibration typically corresponds to the amplitude of vibration velocity within the low-frequency range Final Environmental Impact Statement 3-59

of most concern for environmental vibration (roughly 5-100 Hz), velocity is the preferred measure for evaluating ground-borne vibration from transit projects. The most common measure used to quantify vibration amplitude is the peak particle velocity (PPV), defined as the maximum instantaneous peak of the vibratory motion. PPV is typically used in monitoring blasting and other types of construction-generated vibration, since it is related to the stresses experienced by building components. Although PPV is appropriate for evaluating building damage, it is less suitable for evaluating human response, which is better related to the average vibration amplitude. Thus, ground-borne vibration from transit trains is usually characterized in terms of the smoothed root mean square (rms) vibration velocity level, in decibels (VdB), with a reference quantity of one micro-inch per second. VdB is used in place of db to avoid confusing vibration decibels with sound decibels. Figure 3-20 Typical Ground-Borne Vibration Levels and Criteria Figure 3-20 illustrates typical ground-borne vibration levels for common sources as well as criteria for human and structural response to ground-borne vibration. As shown, the range of interest is Final Environmental Impact Statement 3-60

from approximately 50 to 100 VdB, from imperceptible background vibration to the threshold of damage. Although the approximate threshold of human perception to vibration is 65 VdB, annoyance is usually not significant unless the vibration exceeds 70 VdB. 3.6.1 Ground-Borne Vibration Criteria The FTA ground-borne vibration impact criteria are based on land use and train frequency, as shown in Table 3-25. There are some buildings, such as concert halls, recording studios and theaters that can be very sensitive to vibration but do not fit into any of the three categories listed in Table 3-25. Due to the sensitivity of these buildings, they usually warrant special attention during the environmental assessment of a transit project. Table 3-26 gives criteria for acceptable levels of ground-borne vibration for various types of special buildings. TABLE 3-25 GROUND-BORNE VIBRATION IMPACT CRITERIA Ground-Borne Vibration Impact (VdB re 1 micro inch/sec) Land Use Category Frequent Events 1 Infrequent Events 2 Category 1: Buildings where low ambient vibration is essential for interior operations. 65 VdB 3 65 VdB 3 Category 2: Residences and buildings where people normally sleep. 72 VdB 80 VdB Category 3: Institutional land uses with primarily daytime use. 75 VdB 83 VdB 1 Frequent Events is defined as more than 70 vibration events per day. Most rapid transit projects fall into this category. 2 Infrequent Events is defined as fewer than 70 vibration events per day. This category includes most commuter rail systems. 3 This criterion limit is based on levels that are acceptable for most moderately sensitive equipment such as optical microscopes. Vibration sensitive manufacturing or research will require detailed evaluation to define the acceptable vibration levels. Ensuring lower vibration levels in a building often requires special design of the HVAC systems and stiffened floors. Source: Federal Transit Administration, May 2006 It should also be noted that there are separate FTA criteria for ground-borne noise, the rumble that can be radiated from the motion of room surfaces in buildings due to ground-borne vibration. Such criteria are particularly important for underground transit operations. However, because airborne noise tends to mask ground-borne noise for above ground (i.e. at-grade or elevated) rail systems, ground-borne noise criteria are not applied to this project. Final Environmental Impact Statement 3-61

TABLE 3-26 GROUND-BORNE VIBRATION IMPACT CRITERIA FOR SPECIAL BUILDINGS Type of Building or Room Ground-Borne Vibration Impact Levels (VdB re 1 micro-inch/sec) Frequent Events 1 Infrequent Events 2 Concert Halls 65 VdB 65 VdB TV Studios 65 VdB 65 VdB Recording Studios 65 VdB 65 VdB Auditoriums 72 VdB 80 VdB Theaters 72 VdB 80 VdB 1 Frequent Events is defined as more than 70 vibration events per day. Most transit projects fall into this category. 2 Infrequent Events is defined as fewer than 70 vibration events per day. This category includes most commuter rail systems. 3 If the building will rarely be occupied when the trains are operating, there is no need to consider impact. As an example consider locating a commuter rail line next to a concert hall. If no commuter trains will operate after 7 pm, it should be rare that the trains interfere with the use of the hall. Source: Federal Transit Administration, May 2006 3.6.2 Existing Vibration Conditions Because there are no significant sources of existing vibration along the Irving Line of the Northwest Corridor, vibration measurements for this project focused on characterizing the vibration propagation properties of the soil at representative locations along the corridor. Three vibration testing sites, at the locations shown in Figure 3-21, were selected to represent the range of soil conditions in areas along the corridor that include a significant number of vibration-sensitive receptors. At each of these sites, ground-borne vibration propagation tests were conducted by impacting the ground and measuring the input force and corresponding ground vibration response at various distances. The resulting force-response transfer function can be combined with the known input force characteristics of the DART light rail vehicle to predict future vibration levels at locations along the Project Corridor. Site V-1 was located adjacent to the Lofts at Las Colinas along Lake Carolyn Parkway. The vibration measurements at this site are representative of the areas along the southeastern portion of the alignment. Site V-2 was located in the parking lot of the Cool River Café, at the northeast corner of Hidden Ridge Road and MacArthur Boulevard. The vibration measurements at this site are representative of the areas along the northwestern portion of the alignment. Site V-3 was located at the Archstone at MacArthur Apartment Homes, adjacent to MacArthur Boulevard. The vibration measurements at this site are representative of the multi-family residences at the Archstone at MacArthur Apartment Homes and the singlefamily homes at Mandalay Place. Final Environmental Impact Statement 3-62

N MACARTHUR BLVD VALLEY VIEW LN Cabell Dr DFW International Airport CARBON RD BELT LINE RD Belt Line Road UV114 PRESIDENT GEORGE BUSH TPKE V-3?? JOHN CARPENTER FWY Carpenter Ranch North Lake College V-2 H I DDEN RIDGE DR ROYAL LN V-1? RIVERSIDE DR North Las Colinas Farmers Branch &- 348 LUNA RD Dallas Legend? 35E Vibration Measurement Location Proposed Station Proposed LRT Line to Irving/DFW Carrollton-Farmers Branch LRT Line HARRY HINES BLVD ESTERS RD UV 161 NORTHGATE DR Lake Carolyn ROCHELLE BLVD CALIFORNIA CROSSING RD South Las Colinas (deferred) NORTHWEST HWY ") 12 ") 12 Bachman WEB CHAPEL RD ROCHELLE RD BELT LINE RD IRVING BLVD STORY RD Irving E AIRPORT FWY MACARTHUR BLVD N O' CONNOR RD BNSF RR JOHN CARPENTER FWY University of Dallas TOM BRANIFF DR UV 183 UV 354 GRAUWYLER RD Loop 12 (deferred) STOREY LN &- 482 E lm Fork Trinity River</FNT> REGAL ROW 35E DENTON DR UV 354 Source: HMMH, 2005 Figure 3-21 NW Corridor LRT Line to Irving/DFW 0 2,000 4,000 8,000 Environmental Impact Statement Feet Vibration Measurement Locations