To Study of Maximum Efficiency Of Power Generation in Thermal Power Plant

Similar documents
Steam Power Station (Thermal Station)

Welcome to. Kendal Power Station

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

POWER PLANT- BOILER OPERATIONS SIMULATOR

Performance Optimization of Steam Power Plant through Energy and Exergy Analysis

COAL WATER SLURRY FUEL Alternate Fuel for Thailand

Module 2: Conventional Power Generation I

Gas turbine power plant. Contacts: Mail: Web:

Energy Audit of 250 MW Thermal Power Stations PTPS, Panipat

Consider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT

a. The power required to drive the compressor; b. The inlet and output pipe cross-sectional area. [Ans: kw, m 2 ] [3.34, R. K.

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

Chapter 2.6: FBC Boilers

SUMMER 15 EXAMINATION

Feedwater Heaters (FWH)

CHAPTER 4 STEAM TURBINE and CYCLE HEAT BALANCE

Retrofit of Rodenhuize 4 power station: The Max Green and Cold Back-up-projects

Course 0101 Combined Cycle Power Plant Fundamentals

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 06, 2016 ISSN (online):

New 790-Megawatt Unit. Council Bluffs Energy Center

AQCS (Air Quality Control System) for Thermal Power Plants Capable of Responding to Wide Range of Coal Properties and Regulations

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM IV (ME-41, 42,43 & 44)] QUIZ TEST-1 (Session: )

Chapter 9: Applications of the Laws of Thermodynamics

5. Steam Turbine Performance

Kalex Kalina Cycle Power Systems For Use as a Bottoming Cycle for Combined Cycle Applications

Lünen State-of-the-Art 813MW Coal-Fired USC Boiler with High Efficiency and Flexibility

Towards New Milestones In CFB Boiler Technology CFB 800MWe

Chapter 8. Vapor Power Systems

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+,

Steam Turbine Performance Improvements Through R&M

Coal-Fired Boiler Optimization

Carrington Power Station

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines

AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to

COURSE TITLE : POWER PLANT INSTRUMENTATION COURSE CODE : 5215 COURSE CATEGORY : E PERIODS/WEEK : 4 PERIODS/SEMESTER: 52 CREDITS : 4

High Bridge Combined Cycle Plant

2. TECHNICAL DESCRIPTION OF THE PROJECT

Circulating Fluidized Bed Technology Towards 800 MWe Scale Lagisza 460 MWe Supercritical CFB Operation Experience

Chapter Two. The Rankine cycle. Prepared by Dr. Shatha Ammourah

Efficiency improvement of steam power plants in Kuwait

KEPCO KEPRI Kim eui hwan

CFB HOT WATER. Energy-saving,Efficient, Environmental

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

Biomass Electricity. Megan Ziolkowski November 29, 2009

1 st Renewable Energy Technologies, LP. Organic Rankine Cycle

EFFECT OF AMBIENT TEMPERATURE, GAS TURBINE INLET TEMPERATURE AND COMPRESSOR PRESSURE RATIO ON PERFORMANCE OF COMBINED CYCLE POWER PLANT

Sustainable Solutions In Energy & Environment

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW.

SUPERCRITICAL COAL FIRED POWER PLANT

Dust Recycling System by the Rotary Hearth Furnace

Babcock Borsig Steinmüller GmbH. Bełchatów - Retrofitting the EU s Largest Power Plant Site

Preparatory study for Steam Boilers Ecodesign

ES Fluid & Thermal Systems Page 1 of 6 STEAM TURBINE LABORATORY

Your partner for the right solution

Samcheok Green Power 4 x 550 MW e Supercritical Circulating Fluidized-Bed Steam Generators in South Korea

Biomass Boiler Emission Abatement Technologies. Simon Wakefield

Post Combustion CO 2 Capture Scale Up Study

Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi

Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency

CEYLON HEAVY INDUSTRIES AND CONSTRUCTION CO. LTD (CHICO)

Guidance page for practical work 15: modeling of the secondary circuit of a PWR

Design and distribution of air nozzles in the biomass boiler assembly

Performance Analysis of Cement manufacturing Industry

Performance Analysis of 210 Mw at NTPC Vindhyachal, Singrauli

Main Steam & T/G Systems, Safety

INVENTION ON SAMPLING BY YUNEL

Secondary Systems: Steam System

PUBLIC DOCUMENT TRADE SECRET DATA HAS BEEN EXCISED STATE OF MINNESOTA DEPARTMENT OF COMMERCE

St.MARTIN S ENGINEERING COLLEGE Dhulapally,Secunderabad,

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

EPRI Heat Rate Conference February The Unintended Consequences of New Source Review (NSR) Imagine What the Utility Industry Could do without NSR

Air Separation Unit for Oxy-Coal Combustion Systems

energytech.at energytech.at [ energy technology austria ] Cogeneration (CHP) TechnologyPortrait

C R. ombustion esources, Inc. Evaluation of Stratean Inc. Gasifier System. 18 March Consultants in Fuels, Combustion, and the Environment

Feasibility of Utilizing Boiler Blowdown Waste Heat for Operating an Absorption Refrigeration Chiller

Applied Thermo Fluids-II: (Autumn 2017) Section-A: Thermal Power Plants

Solutions for Wear Protection in Power Plants

Large Frame Gas Turbines, The Leading Technology of Power Generation Industries

FACILITY PROFILE. New Brunswick Power Corporation for the Belledune Thermal Generating Station

Advanced Power Plants Coal Fired Steam Power Plant

Treatment of Distillery Spent wash. Babu Alappat Professor Department of Civil Engineering I.I.T Delhi.

TransPacific Energy Advantage: Case Studies

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

OPTIMUM ECONOMY AND EFFICIENCY IN ENERGY CONSUMPTION DURING START-UP AND SHUT-DOWN OF 210MW THERMAL POWER STATIONS

Mathematical Modelling and Simulation of Power Plants and CO2 Capture

Reduction Systems and Equipment at Moss Landing Power Plant

American Municipal Power Fremont Energy Center. Mike Perry AMP Senior Vice President Generation Operations

metals temperature limits.

Fundamental Investigation Of Whole-Life Power Plant Performance For Enhanced Geothermal Systems

Newman Station Units 1, 2, and 4 Condition Assessment Report. El Paso Electric, Inc. El Paso, TX

GENERATING ELECTRICITY AT A POWER PLANT ???? Law of Conservation of Energy. Three Major Components THE SCIENCE BEHIND ENERGY TRANSFORMATIONS

Renewable Energy Sources

Understand boiler performance characteristics. Use these suggestions when buying, designing or optimizing steam generators

Biomass Gasification

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding

Pelletizing technologies for iron ore

Preservation Guidelines for CCGT & Conventional Power Plant during Short- and Long-Term Shutdowns. Final Report/ Guidelines

Transcription:

To Study of Maximum Efficiency Of Power Generation in Thermal Power Plant Md Saddam Hussain 1, M A Haque Khushroo 2 1 Department of Electrical & Electronics Engineering, 2 Department of Electronics & Communication Engineering, Dronacharya College of Engineering,Khentawas, Gurgaon, Haryana Abstract- NTPC Limited is the largest thermal power generating company of India, which is maharatan Public Sector Company. It was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. The Indian Government holds 89.5% of the total equity shares of the company and the balance of 10.5% is held by FIIs, Domestic Banks, Public and others. Within a period of 31 years, NTPC has emerged as a truly national thermal company, with power generating facilities in all the major regions of the entire country. NTPC's core business is engineering, construction and operation of power generating plants and providing consultancy topower utilities in India and abroad. The total installed capacity of the company is 41184 MW (including JVs) with 15 coal based and 7 gas based stations, located across the country.depending on the number of boilers it generate a particular MW power consumptions In addition under JVs, stations are coal based & another station uses naphtha/lng as fuel. By 2017, the power generation portfolio is expected to have a diversified fuel mix with coal based capacity of around 53000 MW, 10000 MW through gas, 9000 MW through Hydro generation, about 2000 MW from nuclear sources and around 1000 MW from Renewable Energy sources. NTPC has adopted a multi-pronged growth strategy which includes capacity addition through green field projects, expansion of existing stations, joint ventures, subsidiaries and takeover of stations. Index Terms- Component; Renewable energy source, boiler, thermal power plant. I. INTRODUCTION NTPC has been generate electricity at high efficiency levels. Although the company has 18.79% contributes of the total national capacity 28.60% of total power generation due to its focus on high efficiency. NTPC s share at 31 Mar 2001 of the total installed capacity of the country was 24.51% and it generated 29.68% of the power of the country in 2008-09. Every fourth home in India is lit by NTPC.170.88BU of electricity was produced by its stations in the financial year 2005-2006.The Net Profit after Tax on March 31, 2006 was INR 58,202 million. Net Profit after Tax for the quarter ended June 30, 2006 was INR 15528 million, which is 18.65% more than for the same quarter in the previous financial year.205). IJIRT 142657 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 65

Fig. 1: Growth of NTPC: Installed & Generation capacity. NTPC has set new benchmarks for the power industry both in the area of power plant construction and operations. Its providing power at the cheapest lowest average tariff in the country. NTPC is committed to the environment, generating power at minimum environmental cost and preserving the ecology in the vicinity of the plants. NTPC has undertaken massive a forestation in the vicinity of its plants. Plantations have increased forest area and reduced barren land. The massive a forestation by NTPC in and around its Ramagundam Power station (2600 MW) have contributed reducing the temperature in the areas by about 3Â c. NTPC has also taken proactive steps for ash utilization. In 1991, it set up Ash Utilization Division. II. TECHNOLOGICAL INITIATIVES ntroduction of 800 MW size of steam generators (boilers). Introduction Integrated Gasification Combined Cycle (IGCC) Technology. -A new initiative for development of technologies with focus on fundamental R&D. % of the profits for R&D. Development. Reduction. IJIRT 142657 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 66

Fig. 2: NTPC contribution in power generation. III. ENVIRONMENT MANAGEMENT ciency & Environment Protection. in the country after the Forest department. Table 1: Specification of Badarpur NTPC. Installed Capacity 720 MW De rated Capacity 705 MW Location New Delhi Coal Source Jharia Coal Fields Water Source Agra Canal Beneficiary States Delhi Unit Sizes 3X95 MW 2X210 MW Units Commissioned Unit I- 95 MW - July 1973 Unit II- 95 MW August 1974 Unit III- 95 MW March 1975 Unit IV - 210 MW December 1978 Unit V - 210 MW - December 1981 IJIRT 142657 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 67

Transfer of BTPS to NTPC Ownership of BTPS was transferred to NTPC with effect from 01.06.2006 through GOI s Gazette Notification IV. BASIC STEPS OF ELECTRICITY GENERATION The basic steps in the generation of coal to electricity are shown below: Fig. 3: Flow chart of electricity generation. 4.1 Coal combustion for steam generation Coal from the coal wagons is unloaded in the coal handling plant. This Coal is transported up to the raw coal bunkers with the help of belt conveyors. Coal is transported to Bowl mills by Coal Feeders. The coal is pulverized in the Bowl Mill, where it is ground to powder form. The mill consists of a round metallic table on which coal particles fall. The help of a motor table is rotated. There are three large steel rollers, which are spaced 120. When the col is mixed other substance, these rollers do not rotate. but when the coal is fed to the table it packs up between roller and the table and the forces the rollers to rotate. Coal is fracture by the action between the rollers and the rotating table and it is devided into small part. This coal is taken away to the furnace through coal pipes with the help of hot and cold air mixture from P.A. Fan. P.A. Fan takes atmospheric air, a part of which is sent to Air Pre-heaters for heating while a part goes directly to the mill for temperature control. Atmospheric air from F.D. Fan is heated in the air heaters and sent to the furnace as combustion air. Water passes through the boiler feed pump economizer and reaches to the boiler drum. Water from the drum passes through down comers and goes to the bottom ring header. Water from the bottom ring header is divided to all the four sides of the furnace. Due to heat and density difference, the water rises up in the water wall tubes. Water is partly converted to steam as it rises up in the furnace. This steam and water mixture is again taken to the boiler drum where the steam is separated from water. Water IJIRT 142657 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 68

follows the same path while the steam is sent to super-heaters for superheating. The super-heaters are used inside the furnace and the steam is superheated (540C) and finally it goes to the turbine. Flue gases from the furnace are extracted by induced draft fan, which maintains balance draft in the furnace (-5 to 10 mm of wcl) with forced draft fan. These flue gases emit their heat energy to various super heaters in the pent house and finally pass through air pre-heaters and goes to electrostatic precipitators where the ash particles are extracted. Electrostatic Precipitator consists of metal plates, which are electrically charged. Ash particles are attracted on to these plates, so that they do not pass through the chimney to pollute the atmosphere. Regular mechanical hammer blows cause the accumulation of ash to fall to the bottom of the precipitator where they are collected in a hopper for disposal. 4.2 Application of produce mechanical power Super heated steam turbine From the boiler, a steam pipe conveys steam to the turbine through a stop valve (which can be used to shut-off the steam in case of emergency) and through control valves that automatically regulate the supply of steam to the turbine. Stop valve and control valves are located in a steam chest and a governor, driven from the main turbine shaft, operates the control valves to regulate the amount of steam used. (This depends upon the speed of the turbine and the amount of electricity required from the generator). Steam from the control valves enters the high pressure cylinder of the turbine, where it passes through a ring of stationary blades fixed to the cylinder wall. These act as nozzles and direct the steam into a second ring of moving blades mounted on a disc secured to the turbine shaft. The second ring turns the shafts as a result of the force of steam. The stationary and moving blades together constitute a stage of turbine and in practice many stages are necessary, so that the cylinder contains a number of rings of stationary blades with rings of moving blades arranged between them. The steam passes through each stage in turn until it reaches the end of the highpressure cylinder and in its passage some of its heat energy is changed into mechanical energy. The steam leaving the high pressure cylinder goes back to the boiler for reheating and returns by a further pipe to the intermediate pressure cylinder. Here it passes through another series of stationary and moving blades. Finally, the steam is taken to the low-pressure cylinders, each of which enters at the centre flowing outwards in opposite directions through the rows of turbine blades through an arrangement called the double flow - to the extremities of the cylinder. As the steam gives up its heat energy to drive the turbine, its temperature and pressure fall and it expands. Because of this expansion the blades are much larger and longer towards the low pressure ends of the turbine. 4.3 Conversion of Mechanical power into electrical power by Generator As the blades of turbine rotate, the shaft of the generator, which is coupled to the turbine, also rotates. It results in rotation of the coil of the generator, which causes induced electricity to be produced. IJIRT 142657 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 69

. Fig. 4: A Simplified Diagram of a Thermal Power Plant. The thermal (steam) power plant uses a dual (vapour+ liquid) phase cycle. It is a close cycle to enable the working fluid (water) to be used again and again. The cycle used is Rankine Cycle modified to include superheating of steam, regenerative feed water heating and reheating of steam. IJIRT 142657 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 70

Fig. 5: Modified Rankine cycle used in power plant for steam On large turbines, it becomes economical to increase the cycle efficiency by using reheat, which is a way of partially overcoming temperature limitations. By returning partially expanded steam, to a reheat, the average temperature at which the heat is added, is increased and, by expanding this reheated steam to the remaining stages of the turbine, the exhaust wetness is considerably less than it would otherwise be conversely, if the maximum tolerable wetness is allowed, the initial pressure of the steam can be appreciably increased. Bleed Steam Extraction: For regenerative system, nos. of non-regulated extractions is taken from HP, IP turbine. Regenerative heating of the boiler feed water is widely used in modern power plants; the effect being to increase the average temperature at which heat is added to the cycle, thus improving the cycle efficiency. generation. V. FACTORS AFFECTING THERMAL CYCLE EFFICIENCY Thermal cycle efficiency is affected by following: nitial Steam Pressure. Whether reheat is used or not,if used it gives reheat pressure and temperature. REFERENCES [1] http://www.ntpc.co.in/index.php?option=com_conten t&view=article &id=56& Itemid=66&lang=en [2] http://en.wikipedia.org/wiki/nashik_thermal_power _Station [3] http://en.wikipedia.org/wiki/thermal_power_station [4] http://indianpowersector.com/home/powerstation/thermal-power-plant/ IJIRT 142657 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 71