PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

Similar documents
PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

Himachal Pradesh Environmentally Sustainable Development DPL Region

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Integrated Safeguards Data Sheet (Initial)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN AND A PROPOSED GRANT FROM THE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

Integrated Safeguards Data Sheet (Initial)

ECUADOR CASE STUDY ENERGY

World Bank Group Renewable Energy & Energy Efficiency Performance July June2005 Q&A

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

I Managing Unit: EASRE

INTEGRATED SAFEGUARDS DATA SHEET

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA5469. Project Name. Region. Country

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC103763

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

IDA16 Results Measurement System

Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project

PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Project Name. Rio de Janeiro Sustainable Rural Development Project Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: India Energy Efficiency Scale-Up Operation (P162849) Region

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE. Parent Project ID (if any):

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Energy Security for Economic Development in Latin America and the Caribbean

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,

Distribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English

Content 1. Section I: Chile: National Circumstances 3

Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING GRANT

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name

World Bank Group Recruitment Drive (TOR for Future Vacancies)

RENEWABLE ENERGY IN GHANA: POLICY AND POTENTIAL

Green Economy: A UNEP definition

Issues in Rural Development and Agriculture

CONSTRUCCIÓN DE UN SERVICIO CIVIL ESTABLE Y PROFESIONAL EN EL PERÚ

Ing. Andrew T Barfour, FGhIE,FID Director/Project Coordinator GEDAP Ministry of Energy & Petroleum GHANA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Adapting Road Infrastructure to Climate Extremes and Change

A Quest for Relevance Matthew A. McMahon

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank

BRAZIL - GENERAL DATA

REPUBLIC OF THE UNION OF MYANMAR. Myanmar National ElectrificationProject Environmental and Social Management Framework

Development plans of Viet Nam: Achievements, challenges and orientation to successful SDGs

Independent Accountability Mechanism for IFC & MIGA, World Bank Group

INTEGRATED SAFEGUARDS DATA SHEET

Irrigation Investment. The case of Ethiopia

Water Policy and Poverty Reduction in Rural Area: A Comparative Economywide Analysis for Morocco and Tunisia

The World Bank Pernambuco Rural Economic Inclusion (P120139)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

IEF-OFID Symposium. LAC Experiences on Access to Modern Energy. Daniel Hugo Bouille

Appendix 1: Scoping Techniques

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Country Action Plan-Proposed Outline

EMPLOYMENT, GROWTH AND POVERTY REDUCTION IN THE GAMBIA

Strategy Paper. December Review of the ADB Results Framework

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA62867

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Electricity Data Collection

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTERNATIONAL CONSUMER MARKETS

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

CLIMATE FINANCE FOR GLOBAL IMPACT

Renewable Energy and Climate Change: The CIF Experience TITLE SLIDE

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Transcription:

Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America and the Caribbean Power, Renewable energy P117864 N/A N/A GOVERNMENT OF PERU Environment Category Date PID Prepared February 24, 2010 Date of Appraisal October 30, 2010 Authorization Date of Board Approval January 2011 Ministry of Energy and Mines Av. Las Artes Sur 260 San Borja Lima Peru Tel: 0051-1-475-0065 Fax: 0051-1-475-0065 [ ] A [] B [ ] C [ ] FI [ X] TBD (to be determined) Report No.: AB5524 I. Key development issues Peru, located in the west central portion of South America s Pacific coast, is the fourth largest country in the region after Brazil, Argentina and Mexico. It spans over 1.28 million square kilometers with a population of 28 million and a population density of 22 inhabitants per square kilometer. With a GNI per capita of US$3,450 in 2008, Peru has one of the best performing economies of Latin America (GDP growth at 7.7 percent, 8.9 percent and 9.8 percent in 2006, 2007 and 2008, respectively). Even during the current financial crisis, Peru remains one of the few countries whose GDP growth is not expected to contract in 2009, but to increase by approximately 1 percent. Sustained economic growth over the last six years has had a positive impact on reducing poverty and creating jobs, but poverty (52 percent nationally in 2008) and inequality still remain a major concern. 1 According to the 2005 Peru Poverty Assessment, there are several reasons for the continuation of poverty despite healthy macro-economic growth rates. First, growth has been driven principally by capital-intensive industries, particularly commodity extraction, which has a low demand for labor and hence a low direct impact on poverty. Second, growth has historically been very volatile in Peru. The volatility over the last 10 years is even more pronounced over the last 30 years; with per capita income levels only now returning to the levels of the 1970s. 1 However, the economic recovery since 2001 had a strong positive impact in reducing extreme poverty (from 24.4 percent in 2001 to 19.2 percent in 2004). 1

The national poverty rate masks important differences across urban and rural areas and across regions. Poverty levels are significantly higher in rural areas, particularly the Sierra region 67.7 percent vs. 19.4 percent in Lima in 2007. The World Bank s Country Partnership Strategy (CPS) for 2007-2011 with Peru is designed to support the country s efforts to increase economic growth and make headway in the fight against poverty. It backs up the government reform plan that seeks to strengthen fiscal management and ensure a favorable environment for the development of Peru s private sector, focusing on two main areas: efficiency and quality of public spending, as well as improved competitiveness. The rural electrification activities proposed in this operation are consistent with one of the main pillars of the CPS, social development. The 2007 census indicated that approximately 74 percent of all households in Peru had access to electricity. However, there are wide disparities among different regions. The Census indicated that only 29.5 percent of all rural households had electricity access, one of the lowest levels among Latin American countries and particularly low for a middle-income country. There is also a wide disparity in electrification by regions, for example, poorer, more isolated, rural areas, such as Cajamarca, have about 40 percent overall electrification rates while more affluent, urban areas, like Lima, have nearly 100 percent coverage. Finally, there has been limited progress in addressing the electricity demand of isolated areas (off-grid), and developing renewable energy technologies. This is an especially important gap because MEM estimates that more than 300,000 isolated and dispersed rural households in Peru can only be reached with renewable energy, mainly PV systems. Lack of electricity in rural areas together with lack of access to other infrastructure results in a lower quality of life, poor medical care and education, and limited opportunities for economic development. Rationale for Bank Involvement The Bank and GEF-assisted Rural Electrification (RE) Project (US$144 million of which US$50 million is IBRD, and US$10 million GEF), currently being implemented by MEM, is contributing significantly to meeting the Government s goal of reducing the electrification gap. The Project was approved in February 2006 and became effective in August 2006. While the Project was first implemented by an independent Project Executing Unit within the Ministry, in December 2007, its management unit became the Directorate of Competitive Funds (DFC), operating in parallel with the Directorate of Projects under the General Directorate of Rural Electrification (DGER/MEM). Given that more than sixty percent of the IBRD funds for the RE Project already have been disbursed, seventy percent of all the funds are committed, and the rest are expected to be committed by early 2010, the Government of Peru has requested an additional US$50 million of IBRD financing for the proposed Second Rural Electrification Project, which would continue and expand the activities of the Rural Electrification Project. II. Proposed Objectives The development objective of the proposed Second Rural Electrification Project would be the same as for the first operation, to increase access to efficient and sustainable electricity in rural Peru. This would be done through: (a) investments in sub-projects to provide electricity services 2

to rural households, businesses and public facilities that currently do not have any electricity, including schools and health clinics, through the use of conventional grid extension and renewable energy sources; and (b) technical assistance to support rural electrification and renewable energy. III. Preliminary Description Lending Instrument. The Second RE Project would be a Specific Investment Loan (SIL) in the amount of a US$50 million loan from IBRD. Components. The Second Rural Electrification Project would be structured around the following three major components: (a) investment in rural electrification sub-projects by electric distribution companies, supported by central government subsidies, to provide new electricity connections using both conventional grid electricity or renewable energy systems that would serve dispersed or remote populations; (b) technical assistance to build capacity for rural electrification, as well as promotion of renewable energy; and (c) project management. Component 1: Rural Electrification Sub-projects. This component would provide electricity services to households, health centers, schools and community centers throughout Peru, using grid extension or renewable energy. The same financing mechanisms would be used as in the first project. Incentives would be provided to partially finance the capital costs of electricity access projects implemented by service providers, which are usually electricity distribution companies. Component 2: Technical Assistance for Rural Electrification and Renewable Energy. This component would focus on TA for renewable energy for rural electrification and supply to the grid, especially using small hydropower, including activities such as: development of appropriate policies, regulations and incentives; support for the development of MEM s capacity to promote and manage rural electrification and renewable energy; cost-sharing preparation of proposals and feasibility studies for renewable energy investment projects; and resource assessments. Component 3: Project Management. This component would support the overall management of the proposed Project. It comprises three sub-components: a. Project management and administration (procurement and financial management); b. Technical unit to evaluate investment sub-projects; and c. Monitoring and evaluation (M&E) including safeguards. Implementation Arrangements. The project will be developed and implemented by the Directorate of Competitive Funds within the Directorate General of Rural Electrification MEM. The activities proposed for this second project are essentially the same as two of the original Project s components and can thus be implemented within the same organizational, technical and administrative structure as the current operational Project. 3

IV. Safeguard Policies that Might Apply Safeguard Policies Triggered by the Project Yes No Environmental Assessment (OP/BP/GP 4.01) [X] [ ] Natural Habitats (OP/BP 4.04) [X] [] Pest Management (OP 4.09) [X] [] Cultural Property (OPN 11.03, being revised as OP 4.11) [X] [] Involuntary Resettlement (OP/BP 4.12) [X] [ ] Indigenous Peoples (OD 4.20, being revised as OP 4.10) [X] [ ] Forests (OP/BP 4.36) [ ] [X] Safety of Dams (OP/BP 4.37) [X] [ ] Projects in Disputed Areas (OP/BP/GP 7.60) * [ ] [X] Projects on International Waterways (OP/BP/GP 7.50) [ ] [X] V. Tentative Financing Source: ($m.) BORROWER/RECIPIENT 50.00 INTERNATIONAL BANK FOR RECONSTRUCTION AND 50.00 DEVELOPMENT Total 100.00 VI. Contact Points Contact: Susan V. Bogach Title: Sr Energy Econ. Tel: (202) 458-2689 Fax: (202) 676-1821 Email: Sbogach@worldbank.org * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas 4

5