HPS ECO ² Chamber Sections

Similar documents
PIPELINE & DRAINAGE SYSTEMS LTD. One-piece manhole chambers

ACO QMAX SYSTEM. The most advanced drainage system of its kind. ACO Qmax

Uniclass L L2123 EPIC J3413. CI/SfB (52.5) Next generation of surface drainage ACO ParkDrain

Skeletank. Rainwater Storage Unit PRODUCT SPECIFICATION SHEET. Product Code: SELH01001

Complete Sewer Systems

ACO Civicline CL. Line drainage. ACO product catalogue ACO Civicline CL

Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual

DrainFlex Coils Tee Pieces Y-Pieces

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

Redi Rock Specification and Installation Manual

Slab formwork that combines safety with ecology. French design

CI/SfB (52.5) X June 2008 CH301. Domestic Channel Drainage Systems. Product Guide

Basement Board High Performance (HP) 70 and 100

ACO Water Management: Urban + Landscape

PUBLIC WORKS DEPARTMENT GENERAL NOTES

Modular Plastic Chambers

Jablite Board 250, 300, 350, 400 and 500

Applications. 5 reasons why you should choose Hebden X Grid cellular paving

EnviroModule TM 2 installation guide

Drexus Pave Drain. Linear Channel. Water Management. Water Linear Management Drainage Design Guide Drexus Pave Drain Linear Drainage Channel

Technical Data Sheet NEC/GRAN/95:01

Concrete Solutions. Utilities

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

premium products proven solutions CI/SfB (52) x March 2010 Alumasc Harmer Shower Drains Design and Performance in premium drainage systems

Harmer Shower Drains. Alumasc. Design and Performance in premium drainage systems. premium products proven solutions

Installation Instructions for Perfect Manhole System DN 1200 DN PD 71 rev B 31/01/12

Weholite LIGHTWEIGHT PIPE SYSTEM

Installation Guide DURABLE, VERSATILE, ECONOMICAL

Trench lining systems: STEEL

BGZ-S Heavy-duty channel

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

Ridgidrain NBS Specification

Special Provision No. 599S22 March 2001

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

CI/SfB Oct 12 (52.5) Uniclass L7314

LAND-MARKTM LANDSCAPING SYSTEMS GROUND REINFORCEMENT SYSTEM

CI/SfB Oct 12 (52.5) Uniclass L7314

Khalid SINCE 1997 TECHNICAL MANUAL 2017 GRP MANHOLE LINER & ACCESSORIES

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

WAVIN ROAD GULLIES. Date of First issue: 16 April 2014 Brian Chamberlain Claire Curtis-Thomas

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications.

Estimate FOR THE SEPTIC TANK

Main Roads Standard Specification

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

BIRCOsir. Installation Instructions. A number of details must be observed when installing BIRCOsir. For a comprehensive description please read here.

Recycled Plastic Tree Grates

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

INSTALLATION GUIDELINES

Polysewer Gravity Sewer System SPECIFICATION

Access Chambers Systems

WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT

DRAINAGE SOLUTIONS SINCE 1908 SURFACE DRAINAGE. Installation Guide ARMTEC.COM

Drexus XL. Concrete Drainage System. Water Linear Management Drainage Design Guide Drexus XL Linear Drainage Channel

Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

The Passive Fire Protection Handbook

Villawood Properties Pty Ltd Lakeview Estate - Stage 2

Tunnel waterproofing seamless waterproofing to create watertight tunnels

YW Wholesale Policy on the installation, repair and replacement of a Non-Household Water Meter 14/03/2017

DE-SPAN Design Guideline. Manufactured 100% indoors. Under 100% controlled conditions.

TABLE OF CONTENTS

DRAFT. Draft Bill of Quantities. Drainage

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

DRAINAGE SYSTEMS FOR BELOW GROUND

GL0025P Washdown & Silt Separator Installation & Operation Guidelines

Flexible Tanks PERFECT STORAGE SOLUTIONS FOR MOBILE USE AND TEMPORARY APPLICATIONS FLEXIBLE RESERVOIRS FOR THE STORAGE OF LIQUIDS

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE

26 Visqueen 100% Recycled Ecomembrane 28 Visqueen DPM To Pifa Standard PROOF. membranes

Section 02 SUBSTRUCTURE

Shallow Dig Cess Pools & Silage Installation & Maintenance Guidelines

Introduction to X-Grid Ground Reinforcement Grids.

TECHNICAL INFORMATION SCREED

PERFECT PIPE THE REVOLUTION CONTINUES

MasterSeal 940. Centrally and externally placed PVC Waterstops

50.20 Drainage Structure Design

Only by learning from the past, we can meet the demands of the future. Rhepanol fk

Underground Dry Utilities Civil Engineering 2014 Edition

Althon slot channels Althon

ENVIROKERB KERB DRAINAGE MADE FROM 100% RECYCLED MATERIAL FULLY INTEGRATES WITH OTHER HAURATON SURFACE WATER DRAINAGE SYSTEMS

Landscaping and Fencing

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

PRACTICAL TASK MANUAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

PRODUCT DATA SHEET SikaProof Bentonite

Mini Beany. Combined Kerb and Drainage System. Water Linear Management Drainage Design Guide Mini Beany Linear Drainage Channel

Adoptable and Non-Adoptable Assemblies.

USE DUCE CYCLE ATLANTIC. High performance TPE membrane Delivering your design

Transcription:

HPS ECO ² Chamber Sections

At HPS we develop and source innovative products from across the UK and Europe to provide cutting edge, cost effective, environmentally friendly solutions for access and drainage chamber requirements in highways and pavements. Our aim is to enable designers and contractors who build our roads or install or maintain pipework and drainage infrastructure to have fast, effective access to the most advanced and practical access and drainage solutions anywhere in the market. By combining your continuous feedback on the problems and challenges you face with our knowledge and expertise, we ensure our ever expanding portfolio of products always delivers what you are looking for. By linking different manufacturers unique products we can devise individual solutions to every issue you face. In short, you need look no further than HPS for all your roadway access and drainage chamber needs.

HPS have designed our ECO 2 Chamber range of products to be an environmentally friendly, robust system, compatible with existing concrete chamber sections used throughout the Water Utility market. A comprehensive range of Hydrant, Service Valve, Metering and Access and accessories, that offers significant advantages over conventional concrete sections. Environmentally friendly manufactured from multi-component recycled plastic usually destined for landfill (PVC, PP, HDPE AND LDPE) 100% recyclable Strong, robust construction gives improved whole life cost due to increased life span of product and less wastage due to breakages during transport or installation Health and safety friendly lightweight, easy to handle, no sharp or rough edges, all but one of our chamber sections conform to Manual Handling Regulations (heavy lifting equipment not required) Frost proof to 30 C Resistant to acids, alkalis, fats and oils All chamber sections are compliant with BS 5834 compatible with conventional concrete chamber sections and can be installed with or retrofitted to them as repair sections if required meet the requirements laid down by BS EN 124 class D400 regarding loading 02 03

Standard Chamber Sections The standard chamber sections available are detailed in the table below and cover all common access chamber sizes. Due to the strength, light weight and ease of installation of the ECO 2 chamber sections our 25mm and 75mm sections cover all requirements when stacked, making it unnecessary to provide 100mm or 150mm sections. This gives the contractor the advantage of reduced stocking or ordering requirements whilst retaining the means of fine adjustment to establish the required levels. Product code mailing list Nominal Weight Eco ² 1515.25 150mm x 150mm x 25mm 1.1kg Eco ² 1515.75 150mm x 150mm x 75mm 2.6kg Eco ² 1818.25 180mm x 180mm x 25mm 2.7kg Eco ² 1818.75 180mm x 180mm x 75mm 6.4kg Eco ² 2323.25 230mm x 230mm x 25mm 3.2kg Eco ² 2323.75 230mm x 230mm x 75mm 7.7kg Eco ² 4328.25 430mm x 280mm x 25mm 4.5kg Eco ² 4328.75 430mm x 280mm x 75mm 10.8kg Eco ² 6145.25 610mm x 455mm x 25mm 8.9kg Eco ² 6145.75 610mm x 455mm x 75mm 20.5kg Eco ² 6161.25 610mm x 610mm x 25mm 9.9kg Eco ² 6161.75 610mm x 610mm x 75mm 23kg Eco ² 9161.25 915mm x 610mm x 25mm 12.1kg Eco ² 9161.75 915mm x 610mm x 75mm 27.9kg Eco ² 4328 BH Eco ² 4328 BV 430mm x 280mm x 40mm base slab with 230mm offset opening 430mm x 280mm x 40mm base slab with 230mm central opening 11.8kg 11.8kg Weights can vary slightly as we are using 100% recycled material.

Hydrant chamber Stop tap chamber Access cover Metal surface box Valve chamber Meter chamber Access cover Access cover Chamber base sections HPS Eco 2 Base Sections for 430mm x 280mm chambers are available for valve and hydrant installations. Base sections are manufactured in two piece sections as illustrated. 430mm 580mm 580mm 580mm 580mm 75mm 40mm 25mm 04 05

Guidance on installation of chamber sections Adequate space should be left around the chamber section to allow backfilling with suitable materials (we recommend a minimum of 150mm). The sections should be installed upon a pre made or in situ concrete base with the ground under the base compacted to a minimum depth of 100mm. Base levels should be checked to ensure clearance for installation of valve and pipework fittings etc. It is recommended that 75mm sections are used to build up the main height of the chamber with 25mm sections used for final adjustment to meet finished levels. The chambers should be capped off in the usual manner using a concrete haunching before installing the frame and cover. HPS Eco ² Chamber Sections can also be made watertight by using a suitable sealing compound. Manhole cover Minimum 150mm gap

HPS your road-building and drainage partner HPS ECO² 06 07

Highway and Pavement Solutions Ltd Apex Works Llanbrynmair Powys SY19 7DU United Kingdom Telephone +44 (0) 1650 521 806 Email sales@handpsolutions.com 13789 stillsdesign.com Disclaimer The information in this brochure is to the best of our knowledge true and accurate but all instructions, recommendations or suggestions are made without guarantee. Since the conditions of use are beyond our control, we disclaim any liability for loss or damage suffered from the use of these products.