With a Permian Well, They Cried More, More, More

Similar documents
With a Permian Well, They Cried More, More, More Part 2

Copyright 2018 RBN Energy. Permian Global Access Pipeline (PGAP) Natural Gas Market Analysis

North American Crude Oil and Natural Gas Too Much Too Soon!

2018 Industry Outlook. Pipeliners Association of Houston

I Saw Miles and Miles of Texas

Rocky Mountain High? A Report on the Niobrara Production Rising, Infrastructure Expansions Under Way

I Saw Miles and Miles of Texas

Oklahoma Swing The Cushing Crude Hub

Deep Water The Race to Build VLCC-Ready Terminals

North America Crude Markets and Storage Summit. Cost Effective Transportation Methods for Moving High Gravity Crude to Markets.

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season

Light Crudes and Condensates in Turmoil: Production, Exports, Splitters and Blending

Vaquero Midstream Permian DUG 2016 Capturing Economic Value of Mexico s Natural Gas Demand Through Midstream Reliability

The RIO System Creating Value Through Transportation

Whiplash: 2019 s Changing Fortunes

The GOOD, the BAD and the UGLY

Crude Quality Impacts on Midstream. in the DJ and Permian Basins

ENERGY TRANSFER PARTNERS, L.P. Bakken Pipeline System Overview & Quality Update February 22, 2018

U.S. Natural Gas Markets Where Is It All Going to Go?

Wells Fargo Energy Symposium

ENERGY TRANSFER PARTNERS HEADING SOUTH OF THE BORDER. US-Mexico Natural Gas Forum August 15, 2017

HGAP. Haynesville Global Access Pipeline. Tellurian Midstream Group April 2018

Scotia Howard Weil Energy Conference

IHS LATIN AMERICA LPG SEMINAR

August 20 th, 2018 Notice of Non-Binding Open Season. CJ Express Pipeline. Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC

Platts NGLs Conference. September 24, 2013

North American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011

Update on Energy, Projects, & Infrastructure Investments Jarl Pedersen Chief Commercial Officer

Charting Your Course for Midstream Solutions. Bernie Thomas Co-Founder and Vice President, Commercial

Western Oklahoma Residue Takeaway Impact of Growing SCOOP/STACK Supply

Texas Freight Mobility Plan. Chapter 1: Introduction

NOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018

We ve Seen This Movie Before

New Crudes for New U.S. & Export Demand

As seen in the January/February 2011 issue of

BTU Analytics: Finding the Premium Markets for

NORTH AMERICAN NATURAL GASOLINE

The Permian Basin Produces Gas,Too

MEDALLION PIPELINE COMPANY, LLC CRUDE PETROLEUM

fewer working drill rigs, which reduced drilling activity, and less drilling resulted in lower production volumes due to the natural volumetric

Developments in North American Oil, Gas, and LNG

C9-19. Slide 1. markets later in the presentation.

By Bob Hugman and Harry Vidas

Natural Gas Market Update

141 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Northeast Drives US Basis Trends

Independent expert to conduct sweeping safety review of natural gas networks in Mass. Natural gas pipeline will cross county

March Renewed! Restructured! Rebuilt! The Houstonian 111 North Post Oak Lane Houston, Texas Tues, March 27 8am 5pm (Cocktail reception)

March Renewed! Restructured! Rebuilt! The Houstonian 111 North Post Oak Lane Houston, Texas Tues, March 27 8am 5pm (Cocktail reception)

151 FERC 61,140 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Merging Logistics and Engineering Williston Basin Symposium

NORTHEAST GAS MIDSTREAM

Energy and Economic Update for Louisiana and the Gulf Coast Region

Natural Gas Outlook and Drivers

Energy Macro Review. 3 rd Quarter 2013

TESORO CREATES FULL-SERVICE LOGISTICS COMPANY TLLP ACQUIRES QEP FIELD SERVICES ASSETS

Wyoming Pipelines The Territory Ahead Cheyenne, Wyoming October 31, Brian Jeffries Executive Director Wyoming Pipeline Authority

Pat McGannon Vice President, Business Development rangelandenergy.com

Report to NASEO: Propane Supply and Infrastructure Study

OIL AND GAS OUTLOOK: HOW ARE THE ENERGY MARKET AFFECTING METALS? Nicole Leonard, Project Manager, Oil & Gas Consulting Services November 2015

NGLs Conference & Petrochemical Seminar October Jarl Pedersen Chief Commercial Officer

Utica Midstream 2015 Canton Regional Chamber of Commerce

Utica Midstream 2016 Canton Regional Chamber of Commerce Aaron Fleming, Director of Crude Supply

El Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha

North America Midstream Infrastructure through 2035: Capitalizing on Our Energy Abundance

Shock and Aftershock: A Look at this Last Winter and the Outlook for Future Supply Disruptions

Crude Oil Price Differentials and Pipeline Infrastructure

API Industry Outlook. Third Quarter R. Dean Foreman, Ph.D. Great Plains and EmPower ND Energy Conference October 8, 2018.

140 FERC 61,098 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON PETITION FOR DECLARATORY ORDER. (Issued August 1, 2012)

Energy Prospectus Group

Mastio & Company s. Midstream Services Customer Value & Loyalty Benchmarking Study. Metrics to Manage the Midstream Customer Experience

Challenges For Produced Water Optimization In The Permian: An Analysis Of SWD Supply and Demand

OCCIDENTAL PETROLEUM OVERVIEW. TIPRO Annual Summer Conference Jody Elliott August 18, 2016

The impact of LNG exports on US markets

Permian to Katy Pipeline. Non-Binding Open Season

The title of this presentation is NGLs versus LPGs, or Gas Plants vs. Refineries. We talk a lot about NGLs from gas plants and what is happening to

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

US LNG Export Growth and the Benefits to Midstream

LEADERS IN DATA, ANALYTICS, AND FORECASTING ACROSS THE ENERGY INDUSTRY

OECD Non-OECD Total

North American Natural Gas: A Crisis Ahead Or Is Chicken Little Running Around Again?

OPEC Statement to the Spring Meetings of the IMF/World Bank, April Copyright 2019 OPEC

Spectra Energy: Moving Ahead, Gaining Momentum

Crestwood Overview Nationwide Footprint / Diverse Product Mix

Bridger Acquisition Overview June 1, 2015

Crestwood Midstream Partners

Texas Natural Gas Prices Plunge To All-Time Low Column: U.S. natural gas prices unmoved by colder winter, low

Natural Gas Issues and Emerging Trends for the Upcoming Winter and Beyond

Roadrunner Gas Transmission Pipeline. Frequently Asked Questions Summer 2015

2005 North American Natural Gas Outlook Client Presentation

Rangeland Energy, LLC

The Impact of Recent Hurricanes on the U.S. Gas Markets for the Upcoming Winter

IMGA Annual Meeting- NG Fundamentals Update. March 28, 2017

October U.S. Energy Information Administration Winter Fuels Outlook October

NASEO WINTER ENERGY OUTLOOK

Major Challenges for Gas: What Can be Expected for Mexico?

Forward Looking Statements This presentation contains certain statements that are, or may be deemed to be, forward looking statements within the meani

Howard Energy Partners. Howard Energy México. March 2016

Major Changes in Natural Gas Transportation Capacity,

Transcription:

A RBN Energy Drill Down Report Copyright 2017 RBN Energy With a Permian Well, They Cried More, More, More Capacity Constraints Loom Large for Permian Crude Oil, Natural Gas and NGLs 1. Introduction Over the past four years, pipeline takeaway projects have added 1.2 MMb/d of crude oil capacity out of the Permian, as well as 3.2 Bcf/d of natural gas takeaway capacity and 660 Mb/d of NGL capacity. Responding to attractive producer economics and robust drilling programs, Permian production for all three commodity groups is growing rapidly, renewing the possibility of takeaway constraints and wide negative differentials for local commodity prices. Several pipeline projects are being developed to relieve pending capacity constraints; the questions are whether they will be enough and if they will be completed in time. In the crude oil sector, projects could add 1.8 to 2.0 MMb/d; they include BridgeTex Expansion, Cactus Expansion, Permian Express II Expansion, Enterprise Midland-to- Sealy Pipeline, Basin Expansion, EPIC and South Texas Gateway -- likely more than enough to provide adequate takeaway capacity for the next five years. The quandary for individual producers is whether to make firm and expensive commitments to projects such as these, or leave that to other producers, then sit back and benefit from the constraint-clearing and de minimis price differentials that will come with the incremental takeaway capacity that other producers go out on a limb to commit to. The Permian is back, bigger and badder than ever. Producer economics are the best in the U.S. Half of all rigs drilling for crude oil in the U.S. are in the Permian. It is the fastest growing basin from an output perspective and already contributes 2.2 MMb/d to the nation s oil production, or about 25% of Lower 48 crude volumes. It is not just crude oil. Natural gas production in the Permian is up 35% over the past three years, with most of that production classified as associated gas that comes along with crude oil. It is a similar story for natural gas liquids NGLs with the Permian now churning out about 750 Mb/d of NGLs from gas processing, or more than 20% of the nation s total. But there are potential problems looming on the Permian horizon. There is simply not enough midstream infrastructure to accommodate this astronomical growth. Even though almost 100 years of oil and gas production have supported the development of thousands of miles of crude, gas and NGL pipelines that crisscross the region, midstream developers are having a hard time keeping up with today s incredible rate of production increases. Copyright 2017 RBN Energy, LLC - 1 -

It s not for lack of trying. Over the past four years, pipeline takeaway projects have added 1.2 MMb/d of crude oil capacity out of the Permian, as well as 3.2 Bcf/d of natural gas takeaway capacity much of it in the first four months of 2017 and 660 Mb/d of NGL capacity. In fact, there is more than enough takeaway capacity for all three hydrocarbon product groups today. But not for long. Crude oil could run into pipeline capacity constraints early next year, depending on the pace of production growth. Fortunately, several new pipeline projects are coming online, including planned expansions of the BridgeTex and Cactus pipelines and a likely expansion of Permian Express II, plus Enterprise Products Partners big new Midland-to-Sealy project. But if Permian crude production continues to ramp up toward 3.7 MMb/d in 2022, as predicted by RBN s Growth Scenario production forecast, crude takeaway capacity will be maxed out again by mid-2020 unless additional projects are developed. There are a number of other projects on the drawing boards, such as a possible expansion of the Plains Basin pipeline system and proposed greenfield projects like the EPIC Pipeline and the South Texas Gateway Pipeline, but final investment decisions are still pending and the timing of the projects remains uncertain. Similar problems could hit the market even sooner for natural gas. Like crude, there is enough takeaway capacity today, but production is growing rapidly. Currently, Permian dry gas production is about 6.1 Bcf/d and there is almost 8.0 Bcf/d of pipeline takeaway capacity, including ONEOK Partners Roadrunner Pipeline to Mexico that was expanded to 570 MMcf/d in October 2016. RBN s Growth Scenario forecast has Permian production hitting that 8.0 Bcf/d of capacity next year, which could be an issue unless two other new Energy Transfer Partners pipelines to Mexico that have just come online take up the slack: the 1.4-Bcf/d Trans-Pecos pipe from Waha to Presidio and the 1.1-Bcf/d Comanche Trail pipe from Waha to San Elizario (near El Paso). That should be more than enough capacity to take care of the Permian natural gas takeaway problem if the capacity gets used. But that is far from a certainty. Almost all of the incremental capacity into Mexico is targeting new gas-fired power generation demand south of the border, much of which has been delayed or is highly uncertain, at least in the near to medium term. If all that new pipeline capacity to Mexico does not get used, it will not do the market much good. In other words, the effect of a demand constraint is no different from a transportation capacity constraint. The incremental Permian production growth would have to find another home. Fortunately, midstream companies have been stepping up to the plate to address that possibility. NAmerico Partners, for example, is planning the 1.85-Bcf/d Pecos Trail Pipeline from the Permian s Delaware and Midland basins to the Agua Dulce gas hub near Corpus Christi. Kinder Morgan is planning the ~1.7-Bcf/d Gulf Coast Express along a similar route, and Enterprise is eyeing another Permian-to-Corpus project. The remaining concern is that the capacity from these projects will not be online until 2019. So there is the distinct possibility that the market could experience a period of constrained takeaway capacity. The natural gas liquids market is facing similar issues, although the timeframe for capacity constraints is likely further out. Over the next five years, RBN s Growth Scenario indicates that Permian NGL production will double, from 750 Mb/d to almost 1,500 Mb/d by 2012. At that growth rate, overall Permian pipeline capacity constraints would hit in late 2020 or early 2021. However, for any specific geographic part of the Permian (such as Reeves County in the epicenter of Delaware Basin production) the problem could come much sooner. In April 2017, Enterprise announced plans for the 571-mile, 24-inch-diameter Shin Oak Pipeline, which initially will move up to 250 Mb/d from the Permian to Enterprise s NGL storage and fractionation complex in Mont Belvieu, TX, when it comes online in the second quarter of 2019, and which later could be expanded to transport up to 600 Mb/d. One consequence of unrelieved takeaway capacity constraints is the same, regardless of the hydrocarbon market: downward pressure for local prices. Producers without access to pipeline capacity are forced to discount their hydrocarbons to the point that holders of pipeline capacity Copyright 2017 RBN Energy, LLC - 2 -

will purchase their product locally and move it to markets outside the constrained area. But if the constraint is severe enough, the problem can be much worse, forcing transportation by more expensive means rail and truck to move crude and NGLs to market. Natural gas constraints can result in the ultimate penalty: the need to curtail drilling or even shut in production if there is no pipeline to move that gas to market, resulting in production cuts not only for the natural gas, but also for the crude and NGLs that are produced along with that gas. That is a scenario that producers will invest a lot of their budget dollars to avoid. How bad could Permian takeaway capacity constraints become over the next few years? Will projects that have been announced take care of the problems before they happen? What happens if crude oil prices increase to levels that stimulate even more drilling and consequently result in even faster production growth? To fully answer these questions for each of the three energy commodity groups crude oil, natural gas and NGLs it is important to develop a comprehensive understanding of the infrastructure that is in place today, the current utilization rates of that infrastructure, the expected rate of production growth and the potential impact of proposed new takeaway capacity projects in the region. This RBN Drill Down Report is the first in a series of Permian assessments. We start with crude oil pipeline capacity and utilization. In it, we examine each of the nine pipelines currently providing crude oil pipeline takeaway out of the Permian: Basin, Centurion, West Texas Gulf, Amdel, Longhorn, BridgeTex, Cactus, Permian Express II and PELA. Our analysis includes a dossier on the owner, origin, destination, capacity, tariff rate and other details about each system; a map of each pipeline; our assessment of current pipeline capacity utilization; and our projection of future capacity utilization of each pipe. With this analysis as a foundation, we then review potential capacity additions from seven expansion and greenfield projects: BridgeTex Expansion, Cactus Expansion, Permian Express II Expansion, Midland-to-Sealy, Basin Expansion, EPIC and South Texas Gateway. As with existing pipes, we provide details on each project and a map of the project s route. Based on our analysis, there is the distinct possibility of a brief period of crude oil pipeline takeaway capacity constraints during the latter months of 2017 into early 2018. During this period, much depends on the ramp-up pace for the 450-Mb/d Midland-to-Sealy pipeline, which is expected to enter service in the fourth quarter of 2017, then increase throughput volumes through early 2018. If initial volumes come on strong, the market will most likely avoid a significant widening of the Cushing-Midland basis. However, if the pipeline is delayed or comes on slowly, widening of the basis can be expected. Either way, new capacity will resolve these near-term constraints in relatively short order. However, over the longer term it is likely that significant capacity constraints will develop if several new pipeline projects are not built. Copyright 2017 RBN Energy, LLC - 3 -

This RBN Energy Drill-Down Report is available for individual purchase or as part of RBN s Backstage Pass premium content service at rbnenergy.com. For more information on group subscriptions, send an email to info@rbnenergy.com or call 888-613-8874. The Table of Contents for With a Permian Well, They Cried More, More, More: Capacity Constraints Loom Large for Permian Crude Oil, Natural Gas and NGLs is included on the following page. Copyright 2017 RBN Energy, LLC - 4 -

Table of Contents 1. Introduction... - 1-2. Permian: The Engine Propelling U.S. Crude Oil Production... - 6-2.1 Decline and Revival... - 6-2.2 Geography and Production Profile... - 7-2.3 Logistics and Markets for Permian Crude... - 9-2.4 Permian Crude Oil Utilization and Pricing... - 10-3. Existing Permian Crude Oil Pipelines: Dossier, Map, Capacity Utilization... - 11-3.1 Plains Basin... - 12-3.2 Centurion Pipeline... - 14-3.3 West Texas Gulf Pipeline... - 15-3.4 Amdel Pipeline... - 16-3.5 Longhorn Pipeline... - 17-3.6 BridgeTex Pipeline... - 18-3.7 Cactus Pipeline... - 20-3.8 Permian Express II... - 21-3.9 PELA Pipeline... - 22-3.10 Regional Refinery Demand... - 23-4. Permian Production Forecast and Potential Takeaway Constraints... - 24-5. New Crude Oil Pipeline Projects... - 25-5.1 BridgeTex Expansion... - 25-5.2 Cactus Expansion... - 26-5.3 Midland-to-Sealy Pipeline... - 26-5.4 Permian Express II Expansion... - 26-5.5 EPIC Pipeline... - 26-5.6 South Texas Gateway Pipeline... - 27-5.7 Basin Pipeline Expansion... - 27-6. Conclusions... - 28 - Copyright 2017 RBN Energy, LLC - 5 -