2013 # J.11011/77/2002-IA.II

August 11, 2016 Unit # 02 Plot # 3405 / 3406 / 3460-A, GIDC, Ankleshwar

A SPECIFIC CONDITIONS

# J.11011/77/2002-IA.II

Sub: - Half yearly Compliance Report to conditions of Environmental Clearance (Jan to June 2014)

Ref: U2/14 July 10, 2014 Unit # 02 Plot # 3405 / 3406/3460A, GIDC, Ankleshwar

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

ANNEXURE 1 - THE DETAILS OF PRODUCTION QANTITIES

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

COMPLIANCE STATUS REPORT

Calcom Cement India Limited

J-11011/45/2009- IA II (I)

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Six Monthly Compliance Status Report

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report


Rajasthan State Pollution Control Board

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

Compliance Status Report of Environmental Clearance No. J 11011/257/2008 IA II (I) dated 23/11/2010

Environmental Clearance Compliance Half Yearly Report

NATCO PHARMA LIMITED CHEMICAL DIVISION

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

Environment protection measures / technology

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

EC COMPLIANCE REPORT

Six Monthly Compliance Status Report

Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power.

Janki Corp. Ltd., Six Monthly Compliance Report

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

INDIA: Dahej Liquefied Natural Gas Terminal Project

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

MIEL/NP/EMD/ 303/2015 Date:

Mangalam Cement Ltd. (Unit-II) Stack No.

qqfq(ui qci CA' ~< Government of India Ministry of Environment & Forests (IA Division)

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Environmental Clearance Compliance Half Yearly Report

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

Telefax: 011: Dated:10 th May, 2013

Mangalam Cement Ltd.(Unit I)

Rajasthan State Pollution Control Board

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

Environmental Clearance Compliance Half Yearly Report

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

COMPLIANCE OF EC CONDITIONS FOR REVAMPING OF AMMONIA 1 TO METHANOL PLANT. (EC No. - F No. : J-11011/901/2007-IA(II) dated 31/07/08)

(E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated ) (For the Period 1 st October 17 to 30 th March 18)

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

(Period April 2017 ~ Sept. 2017)

Compliance Report of EC : Compliance Status

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB

Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from January-June 2014

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

Pre-Feasibility Report For

For TOR New. 1. Basic Information of the Project:

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

Monitoring the Implementation of Environmental Safeguards

Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from July-December 2013

ZZJ/CLAB-KSPCB/04/ Environmental Officer,

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat)

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

PROJECT PRE-FEASIBILITY REPORT. For

1.0 EXECUTIVE SUMMARY

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Application of Low and Non Waste Technology in the production process;

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1.

Telefax: 011: Dated: 8 th March, 2013

Transcription:

3 t t J "..t,,. D ) \ f \ f \ - \! \Eftzvc'2ototrr 6 Aug, 2Ol2 United Phosphorus Limited 3l{t5tl4c. GrDG-.AEr 3fit 002, Guiaat (lndia) Ptut : (1116,5125O5ilA 2flXtdl Fax : (02646) 25143'f Dr. A Mehrotra, Director (S) Ministry of Environment and Forests Western Region Office Kendriya Paryavaran Bhavan Link Road # 3, E - 5, Ravi Shankar Nasar Bhopal - 462016 (M.P) $ Responsible Caie Unit # 2 Plot # 3405 I 3406, GIDC, Ankleshwar - 393002 V t \ f \ f IO I I b b I I :' I ro I I I Dear Sir; Sub: - Compliance to conditions of Environmental Cletrlanee Ref: - Enr-iroruuental clearance #J. 11011 /77/2002- IA-l I dat_e,d_llu-2!03 Ktndlv refer above Environmental Clearance #J.t 101117712002-lA.ll dated 77.07.2003 to our Unit#2 located at Plot no 3405/3406, GIDC Estate, Ankleshwar-393002, Dist - Bharuch, Gujarat. We are sending herewith the compliance report along with various other required ;information with respect to rrur unit #2 for your kind reference and records. The details given are withr respect to the period Jan io Jun 2012. i We would like to bring to your kind attention the following imgrovements at our Unit with respect to' environment. 1. Ambient Air monitoring as per new standard - started monitor for parameters PM10 and PM 2.5 2. Effluent Discharge Line Extended upto B-Pumping Station (app. I Km) as suggested by GPCB We hope that the above is in order. In case you need any additional information, we can provide the same on hearing from you. Sa$ ioly af Errc nprt ir alro f'ov,cld irr qd Thanking you Yours faithfully For, United Phos t.s.o DRP N PARAMES Vice Presir dent -Env l.$ar?l F(.--'"?gtl glr':l w'r: "],0,3.ratd f{3 U *rz;,*',a.'--, a I V C \'c D \ a \ - \ >, tsd : 1l!116 ]I. C n L! tttr Red, Khar (\At), Mumbai. b lld -'fgrrl.rffi.f-.: (@2126(X0.167

a { \ a Encl : a/a Copy to: The Zonal Officer Central Pollution Control Board Parivesh Bhavan Opp VMC ward Office-10 Subhanpura, Baroda-3900 23 Mr.J D Kalyani - Regional Officer Gujarat Pollution Control Board Plot No1 501, GIDC,Ankleshwar -393002 I \ a a { a a a?

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 The Ex Post Facto Environmental Clearance is granted for the following products; Phorate / Turbuphos @ 3600 MT / Year; and Complied. (2400 MT after product mix) Acephate @ 960 MT / Year (1920 MT after product mix) the product mix have been revised without increasing pollution load and after obtaining No Increase in Pollution Load certificate from GPCB. We have obtained product mix change and details attached in Annexure - A Land of project area is 65,625 m2. Project does not involve forest land and displacement of people. Water requirement is 340.1 m 3 / day. Solid waste in form of ETP Sludge (7.5 MT / Month), incinerator ash (9 MT / Month) and Inorganic Salts from Evaporation System (30 MT / Month) will be disposed off in BEIL landfill. Public Hearing was done on 16.01.2002. GPCB has granted NOC for 300 MT / Month of Phorate / Turbuphos on 17.11.1995; and 80 MT / Month of Acephate on 02.04.1996. Cost of the project is Rs 16.50 Crores. MOEF accords Environmental Clearance to the project under provisions of EIA Notification dated 27.01.1994 as amended subsequently subject to compliance of various special and general conditions; A SPECIFIC CONDITIONS 1 Gaseous emissions (SO 2, NO X, HCl, HC, NH 3, H 2 S, Cl 2 ) and PM from various process units to be conform to standards. At no time, emissions to go beyond standards. In case of failure of pollution control systems, unit should not be restarted until the systems are rectified to achieve desired efficiency Complied For all parameters monitoring is done through internally by our lab and externally trough M/s Enpro Envirotronics Pvt Ltd., Monitoring reports are attached for the period Jan to Jun 2012

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 2 Fugitive emissions in workplace environment, product, raw material storage areas, to be monitored. Fugitive emissions containing solvent from process and storage tank vents and accidental leakage of EM and TBM to be subjected to thermal destruction in fume incinerator. Flue gas emissions from incinerator to conform to the standards prescribed by GPCB Complied Fugitive emission monitoring at various locations are being carried out by our Quality Assurance Department and data being maintained. Please refer enclosed details for fugitive emissions. Fume incinerator is in operation 3 Process emissions (H 2 S, NH 3, MeCl2, and VOC) to be scrubbed through venturi and packed column scrubbers and conform to prescribed standards. The efficiency of scrubber to be improved and maintained as per best practicable technology. VOC data to be monitored and submitted to the Ministry Complied VOC Monitoring is done and monitoring reports are attached

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 4 As reflected in EIA / EMP Report, effluent generation not to exceed 218 m 3 / day. To reduce organic load, various effluent streams to be segregated and following treatment system to be followed; Organic waste water streams generated from process, low boilers and distillation residues generated from process, which are organic in nature, to be collected separately and incinerated Effluent stream containing high dissolved solids before discharging in solar evaporation pond having an area of 4000 sq m, to be treated suitably. Solvents from effluent to be recovered before discharging in solar evaporation pond. Besides, as reflected in EIA / EMP Report, aqueous stream containing high dissolved solid to be evaporated by installation of forced evaporation system with the help of steam Streams with high organic load (high COD and BOD) to be treated chemically with Hydrogen Peroxide and sent to ETP for treatment Dilute waste streams generated from process, utilities including blow downs of cooling towers and boilers, and waste water from softening plant and domestic waste water to be given primary, secondary and tertiary treatment. Treated effluent after conforming the standards, to be discharged in GIDC drain. The effluent quality before disposal to Amla Khadi, to be as follows; PH @ 5.5 to 8.5 BOD @ 30 mg / l COD @ 100 mg / l SS @ 100 mg / l Complied Summarized data of effluent generation and quantity discharged is attached herewith for the period Jan to Jun 2012 Complied.Organic waste and Aqueous waste is being sent to common Incinerator, BEIL, Ankleshwar for incineration. Complied Four Reactors of forced evaporator are in operation. About 40 kl / day can be evaporated in this system. Details of quantity treated during Jan to Jun 2012 is attached herewith Complied In the chemical treatment section, effluent having high COD is treated with Hydrogen Peroxide. The treated effluent is further treated at ETP. Details of quantity treated during Jan to Jun 2012 is attached herewith Complied Primary, secondary and tertiary treatment facilities are in operation Company is sending treated effluent through GIDC drain to FETP, NCTL (BEAIL), and Ankleshwar for further treatment and disposal to deep sea. ETP has been expanded from 300 KLD capacity to 550 KLD capacity. In the new ETP System, we have utilized Membrane Bio Reactor (MBR), an advanced technology.

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 Oil and Grease @ 10 mg / l Phenol @ 1 mg / l Sulphide @ 0.5 mg / l 5 Company to recover MECL (CH 3 CL) by installation of CH3CL recovery plant. Further, solvent recovery to be improved and attempts to be made to achieve at least 90 % recovery wherever possible. Rest solvent which can t be recovered, to be incinerated. Action plan to be submitted to Ministry within 3 months 6 Company to upgrade existing incinerator for incineration of hazardous waste. Organic aqueous and solid waste generated should be collected and incinerated for total destruction. As reflected in EIA / EMP Report, solid waste and ash to be stored in the plant premises in a pit with impervious flooring and leachate collection system. The ash and sludge from ETP to be finally disposed in BEIL landfill. Leachate to be sent to ETP for treatment 7 As per commitment given to Ministry, existing incineration system to be up graded by 31.03.2004. Company to also take membership of Common Incineration System of BEIL Complied. The Company has not manufactured Dichlorovos (one of products) at the site, which is major generator of MECL. Complied. Our Incinerator is dismantled. Company is utilizing Common Incinerator facility of BEIL, Ankleshwar. ETP sludge is being disposed to BEIL for landfilling. Leachate is taken to ETP for further treatment. Hazardous waste storage area constructed as per CPCB, Guideline. Complied. The Company has taken membership of the Common Incineration System being set up at BEIL. The company is sending incinerable material to BEIL, Ankleshwar for Incineration. Details are attached for the period Jan to Jun 2012

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 8 Destruction efficiency of incinerator to be assessed by agency like CPCB and report submitted. Company to monitor VOC s and data submitted to Ministry / CPCB / GPCB regularly. 9 As per CREP, bio assay test method to be replaced by Toxicity Factor test method developed by CPCB. T f =4 to be achieved by December 2003 and T f =2 by July 2006. Action plan to be submitted within 3 months to Ministry 10 As per action plan submitted to Ministry, Company to adopt waste minimization and cleaner production techniques to reduce solvent, raw material, water and energy consumption. Company to install modified P 2 S 5 handling system with tote bins to prevent spillages. To reduce decontamination and disposal, company to re cycle the drums Complied. The Company has taken membership of the Common Incineration System set up at BEIL, Ankleshwar. The company has started sending incinerable material to BEIL, Ankleshwar for Incineration. Details are attached for the period Jan to Jun 2012 Complied. Reports of monitoring done are attached herewith for the period Jan to Jun 2012 Complied. This is an on going activity. Drums recycling for FG packing in Plants. Steam condensate is recycled in to Boilers. We have reduced the raw material consumption norms. We have increased Solvent recovery upto 96%. Vent scrubber provided for hazardous chemical storage tanks vents. Additional vent condenser provided and improved solvent recovery.

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 11 Company to undertake rain water harvesting as per action plan submitted to this Ministry 12 Company to comply with environmental protection measures and safeguards recommended in EIA / EMP / RRA Reports as well as recommendations of Public Hearing Panel 13 Green belt of adequate width and density in project area of 1200 sq m in addition to 7642 sq m to be provided to mitigate effect of fugitive emissions all around plant. Development of green belt along boundary wall, open space and avenue roads, to be improved in consultation with local DFO as per CPCB guidelines Complied. The rain water harvesting system consists of collection of rain water from the total surface area of approximately 1400 m 2. The total rain water collection (considering 24 rain fall) comes to 840 kl in a year. The collected rain water is used in cooling tower make up. Also, part of the rain water collected is taken to storage tanks. The storage tank capacity is 650 kl. Complied. Complied. This is an ongoing activity. During Jan to Jun 2012, about 600 nos saplings have been planted

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 14 As per policy decision taken by this Ministry, Company to earmark a separate fund @ 1 % of project cost (Rs 16.50 Crores) for eco development measures including community welfare measures in project area. Amount to be deposited within 2 months in a separate account to be maintained by GPCB. Plans to be submitted to Ministry and GPCB within 3 months. After approval of action plan by GPCB, amount deposited may be released in two installments based on progress of implementation Complied. We have submitted details to GPCB as we have already spent more than Rs 16.50 Lacs for eco development and other community welfare schemes. B GENERAL CONDITIONS 1 Company to adhere to stipulations made by GPCB Complied. 2 No further expansion / modifications in the plant to be carried out without prior approval of MOEF. In case of deviations / alterations in the project proposals from those submitted, a fresh reference to be made to Ministry to assess adequacy of conditions imposed and add additional environmental protection measures required, if any Complied. We have obtained Environmental Clearance # F. No. J-11011/1281/2007- IA(II) dated 15.04. 2008 for proposed expansion of pesticide and Intermediate Products. Applied for consent to establish (NOC).We have obtained Consent to Establish (CTE) # 42403 issued by GPCB letter # GPCB/BRCH/CTE- 144(6)/ID-15832/84970 dated 24.06.2011 and received provisional Consent to operate for product mix change from GPCB details are attached in Annexure A

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 3 Company to comply with MSIHC Rules 2000. Prior approvals of Chief Inspector of Factories, Chief Inspector of Explosives, Fire Safety Inspectorate etc, to be obtained 4 Company to comply with HWM Rules and authorization from GPCB to be obtained 5 Overall noise levels in and around plant area to be kept within the standards (85 dba) by providing noise control measures including acoustic hoods, silencers, enclosures etc, on all sources of noise generation. Ambient noise levels to conform to standards i.e. 75 dba (day time) and 70 dba (night time) Complied. The company is having various statutory licenses and approvals Complied. The unit was granted CCA vide no. 32225 dated 13.05.2009 & dated 13.10.2010 which was valid up to 01.09.2013. Complied. Being monitored and found to be within limits Monitoring is done internally & Reports are attached herewith for the period Jan to Jun 2012

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 6 Occupational health surveillance program to be undertaken as regular exercise for all employees, specifically for those engaged in handling hazardous substances. First aid facilities in OHC to be strengthened and medical records of each employee to be maintained. Complied. The company is having full time medical doctor and also OHC. Pre employment and routine medical examinations are being carried out. Regular BCA test for employees is also being carried out. All medical records are being maintained. Every two years, complete medical examination is carried out. The frequency of check up is as follows; Blood Cholinesterase Activity (BCA) Test is carried out every 15 days Brief Medical examination is done half yearly for blood, urine etc Full medical examination is done every alternate year including Physical examination, Hemoglobin,Complete Blood Count, ESR, Complete Urine Examination, Lever Function, Kidney Function, Creatinine, Blood Sugar, Electro Cardiogram, X Ray for chest and Sonography etc During the period Jan to Jun 2012 Medical check up done for 126 No s employees.

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 7 A separate Environment Management Cell with full fledged laboratory to be set up to carry out the environmental management and monitoring functions 8 Company to provide adequate funds for recurring and non-recurring expenses to implement the conditions stipulated by MOEF as well as state government along with implementation schedule for all conditions stipulated. The funds should not be diverted for any other purposes 9 Implementation of the project and Environmental Action Plan to be monitored by MOEF, Regional Office at Bhopal, GPCB / CPCB. A six monthly compliance report to be submitted to monitoring agencies 10 Company to inform that public that project has been accorded Environmental Clearance by Ministry and copies are available with GPCB and may be seen at MOEF s web site. This should be advertised within 7 days in two local news papers and copies to be submitted to RO Complied. Environmental Cell is in operation. VP (Env) from Corporate Level supports the units in environmental compliances. The various environmental protection measures are coordinated by a Sr. Manager. Waste water analysis, bio assay test, ambient air monitoring, stack monitoring, solid waste analysis, noise level monitoring, VOC Monitoring are carried out. Also, environmental audit is being carried out Complied. The funds are already provided as a part of manufacturing activities and operation of ETP / Incinerator. Separate Cost Codes are also available Being complied. Half yearly reports is being sent during first week of February and August every year Complied. Advertisements were given in two news papers and copy submitted to MOEF

No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 11 Company to inform RO as well as Ministry, date of financial closure and final approval of the project by concerned authorities and date of commencing the land development work, if any - Ministry may revoke or suspend the clearance, if implementation of any of the conditions is not satisfactory - Ministry reserves the right to stipulate additional conditions if required. Company, in a time bound manner, will implement the same - The above conditions will be enforced inter-alia under provisions of various acts and rules Complied. Since this is an ex post-facto Environmental Clearance for an existing unit, this conditions is not applicable. Noted Noted Noted PRODUCTION DETAILS (QUANTITY IN MT) MONTH ACEPHATE PHORATE TERBUPHOS DETA DEVRINOL METAMITRON JAN 12 135.000 113.259 86.741 0.000 0.000 24.000 FEB 12 148.000 152.317 45.627 0.000 0.000 12.000 MAR 12 148.000 95.340 104.647 0.000 0.000 12.000 APR 12 147.000 140.059 54.934 26.775 140.000 12.000 MAY 12 136.000 199.987 0.000 22.725 134.415 24.000 JUN 12 147.000 159.808 0.000 79.204 140.000 12.000

MONTH SURFLAN MT/M JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 ZnDTP MT/M ETHOFUMISATE MT/M METASYSTOX RVL MT/M 40.000 302.450 43.500-38.400 303.410 0.000-38.400 269.730 0.000-37.920 417.260 0.000 0.000 40.000 305.150 0.000 0.000 38.400 265.340 0.000 40.040 FORMULATION PRODUCTS (QUANTITY IN MT) Solid Formulation products MONTH ACEPHATE 97 % JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 ACEPHATE 75 % PHORATE 10 % DEVRINOL 50 % DF SURFLAN 85 % 205.000 0.000 7.015 0.000 30.000 300.000 74.500 0.000 0.000 0.000 286.800 0.000 20.430 150.000 0.000 300.000 27.350 0.000 150.000 0.000 300.000 100.000 0.000 150.000 17.600 300.000 100.000 148.917 150.000 0.000 Liquid formulation products MONTH JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 MONOCROTOPHOS (MCP 36 %) PQDC FORMULATION PD 50% METAMITRON 70 % WP 100.000 0.000 0.000 0.000 17.065 37.284 5.85 0.000 100.000 0.000 100.00 0.000 51.750 0.000 100.000 0.000 100.000 0.000 0.000 0.000 100.000 4.400 35.650 0.000

DETAILS OF WATER CONSUMPTION AND TREATED EFFLUENT DISCHARGE TO FETP, NCTL, ANKLESHWAR MONTH WATER CONSUMPTION ALL QUANTITIES IN KL TREATED EFFLUENT DISCHARGE QUANTITY ( INDUSTRIAL+ DOMESTIC) TO FETP, (NCTL, ANKLESHWAR JAN 12 10002 5072 FEB 12 10002 4854 MAR 12 10658 5179 APR 12 15066 5473 MAY 12 7270 6181 JUN 12 7270 6691 HIGH TDS EFFLUENT TREATMENT AT EVAPORATION SYSTEM MONTH Evaporation QTY KL/ MONTH JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 190 257 893 1296 1333 1676

DETAILS OF HIGH COD EFFLUENT TREATMENT: CHEMICAL TREATMENT BY H 2 O 2 MONTH HIGH COD EFFLUENT CHEMICAL TREATMENT (H 2 O 2 TREATMENT) - QTY KL/MONTH JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 504 432 568 488 552 688 INCINERATION WASTE DETAILS GENERATION DISPOSAL MONTH OP. STOCK ORGANIC PROCESS WASTE AQ PROCESS WASTE TOTAL (ORGANIC+ AQ PROCESS ) WASTE SENT TO BEIL, ANKLESHWAR FOR INCINERATION CL. STOCK ALL QTY IN MT JAN 12 8.193 141.000 288.000 437.193 431.370 5.823 FEB 12 5.823 139.000 403.000 547.823 539.560 8.263 MAR 12 8.263 138.500 362.000 508.763 501.180 7.583 APR 12 7.083 138.000 385.000 530.083 520.650 9.433 MAY 12 9.433 139.500 452.000 600.933 593.520 7.413 JUN 12 7.413 140.000 702.000 849.413 840.170 9.243

MONTH OP STOCK ETP SOLID WASTE DETAILS GENERATION EVAPORATION SALT ALL QTY IN MT TOTAL SOLID(* )DISPOSAL TO BEIL MONTHLY CL. STOCK JAN 12 9.664 120.000 215.000 344.664 336.78 8.634 FEB 12 7.859 104.000 81.500 193.359 186.15 7.209 MAR 12 7.290 25.600 223.000 255.89 247.370 8.52 APR 12 8.439 38.000 491.000 537.439 531.45 8.479 MAY 12 8.479 29.850 518.000 556.329 549.79 7.669 JUN 12 7.669 26.000 731.000 764.669 759.61 8.659 TOTAL DISPOSAL QTY TO BEIL MT/M- LANDFILLING MONTH SOLIDS(*) PLASTIC WASTE INSULATION WASTE CONSTRUCTION DEBRIS*SENT TO BEIL FOR LANDFILLING TOTAL WASTE SENT TO BEIL FOR LANDFILLING ALL QTY IN MT JAN 12 336.030 0.0 0.75 102.42 439.2 FEB 12 186.15 0.0 0.0 530.04 716.19 MAR 12 247.37 0.0 0.0 0.0 247.37 APR 12 528.960 0.0 2.490 0.0 531.45 MAY 12 548.66 0.0 1.13 0.0 549.79 JUN 12 756.01 0.0 3.6 0.0 759.61 * Construction debris is generated from ETP expansion project activity and other construction work..

AMBIENT AIR ANALYSIS REPORT (INTERNAL LAB)

AMBIENT AIR ANALYSIS REPORT: SCRAP YARD MONTH JAN -2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION 500 µgm/m3 80 µgm/m3 80 µgm/m3 400 µgm/m3 200 µgm/m3 100 µgm/m3 SCRAP YARD 01/01/12 255 28 18 70... Nil SCRAP YARD 03/01/12 200 25 17 13 Nil... SCRAP YARD 05/01/12 222 26 21 39... Nil SCRAP YARD 07/01/12 252 45 22 15 Nil... SCRAP YARD 09/01/12 246 21 21 43... Nil SCRAP YARD 11/01/12 186 25 25 24 Nil... SCRAP YARD 13/01/12 209 16 15 6... Nil SCRAP YARD 15/01/12 204 23 15 17 Nil... SCRAP YARD 17/01/12 269 31 30 18... Nil SCRAP YARD 19/01/12 225 53 16 15 Nil... SCRAP YARD 21/01/12 224 21 10 7... Nil SCRAP YARD 23/01/12 211 36 19 16 Nil... SCRAP YARD 25/01/12 193 21 18 14... Nil SCRAP YARD 27/01/12 224 34 16 17 Nil... SCRAP YARD 29/01/12... Nil 30/01/12 211 21 17 19 Nil... Maximum 269 53 30 70 0 0 Minimum 186 16 10 6 0 0 Average JAN -12 222 28 18 22 0 0 %Deviation Nil Nil Nil Nil Nil Nil

MONTH FEB -2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION 500 80 80 400 200 100 SCRAP YARD 02/02/12 238 29 18 70... Nil SCRAP YARD 04/02/12 212 30 18 13 Nil... SCRAP YARD 06/02/12 215 27 18 39... Nil SCRAP YARD 08/02/12 197 37 21 15 Nil... SCRAP YARD 10/02/12 215 26 20 43... Nil SCRAP YARD 12/02/12 193 43 23 24 Nil... SCRAP YARD 14/02/12 204 23 15 6... Nil SCRAP YARD 16/02/12 232 21 12 17 Nil... SCRAP YARD 18/02/12 209 23 12 18... Nil SCRAP YARD 20/02/12 215 22 14 15 Nil... SCRAP YARD 22/02/12 247 27 19 7... Nil SCRAP YARD 24/02/12 239 24 21 16 Nil... SCRAP YARD 26/02/12 193 25 24 14... Nil SCRAP YARD 28/02/12 224 26 22 17 Nil... Maximum 247 43 24 70 0 0 Minimum 193 21 12 6 0 0 Average FEB- 12 217 27 18 22 0 0 %Deviation Nil Nil Nil Nil Nil Nil

MONTH MARCH -2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION 500 80 80 400 200 100 SCRAP YARD 01/03/12 191 21 16 15 Nil... SCRAP YARD 03/03/12 193 25 18 27... Nil SCRAP YARD 05/03/12 272 25 17 40 Nil... SCRAP YARD 07/03/12 195 23 15 6... Nil SCRAP YARD 09/03/12 241 27 27 10 Nil... SCRAP YARD 11/03/12 239 30 20 23... Nil SCRAP YARD 13/03/12 161 23 18 17 Nil... SCRAP YARD 15/03/12 246 21 21 43... Nil SCRAP YARD 17/03/12 244 24 21 36 Nil... SCRAP YARD 19/03/12 244 27 19 14... Nil SCRAP YARD 21/03/12 233 41 21 28 Nil... SCRAP YARD 23/03/12 244 24 21 9... Nil SCRAP YARD 25/03/12 238 23 13 8 Nil... SCRAP YARD 27/03/12 224 31 16 17... Nil SCRAP YARD 29/03/12 234 10 9 5 Nil... SCRAP YARD 31/03/12 221 19 6 15... Nil Maximum 272 41 27 43 0 0 Minimum 161 10 6 5 0 0 Average MAR -12 226 25 17 20 0 0 %Deviation Nil Nil Nil Nil Nil Nil

MONTH APRIL-2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION 500 80 80 400 200 100 SCRAP YARD 02/04/12 235 27 18 17 Nil... SCRAP YARD 04/04/12 228 26 21 3... Nil SCRAP YARD 06/04/12 258 25 20 4 Nil... SCRAP YARD 08/04/12 240 30 19 13... Nil SCRAP YARD 10/04/12 229 22 19 8 Nil... SCRAP YARD 12/04/12 259 25 20 13... Nil SCRAP YARD 14/04/12 245 24 21 36 Nil... SCRAP YARD 16/04/12 237 19 21 7... Nil SCRAP YARD 18/04/12 218 34 13 17 Nil... SCRAP YARD 20/04/12 243 30 15 9... Nil SCRAP YARD 22/04/12 238 29 34 23 Nil... SCRAP YARD 24/04/12 244 24 21 9... Nil SCRAP YARD 26/04/12 224 34 16 17 Nil... SCRAP YARD 28/04/12 239 30 15 17... Nil SCRAP YARD 30/04/12 248 35 23 13 Nil... Maximum 259 35 34 36 0 0 Minimum 218 19 13 3 0 0 Average APR -12 239 28 20 14 0 0 %Deviation Nil Nil Nil Nil Nil Nil

MONTH MAY-2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION 500 80 80 400 200 100 SCRAP YARD 02/05/12 271 21 19 13... Nil SCRAP YARD 04/05/12 221 24 19 17 Nil... SCRAP YARD 06/05/12 213 19 18 17... Nil SCRAP YARD 08/05/12 246 34 24 15 Nil... SCRAP YARD 10/05/12 280 38 17 9... Nil SCRAP YARD 12/05/12 258 44 29 28 Nil... SCRAP YARD 14/05/12 226 31 19 22... Nil SCRAP YARD 16/05/12 236 23 15 23 Nil... SCRAP YARD 18/05/12 255 28 18 11... Nil SCRAP YARD 20/05/12 244 29 23 17 Nil... SCRAP YARD 22/05/12 234 28 17 17... Nil SCRAP YARD 24/05/12 230 38 27 19 Nil... SCRAP YARD 26/05/12 229 25 20 17... Nil SCRAP YARD 28/05/12 245 24 21 36 Nil... SCRAP YARD 30/05/12 248 28 22 17... Nil Maximum 280 44 29 36 0 0 Minimum 213 19 15 9 0 0 Average MAY -12 242 29 20 19 0 0 %Deviation Nil Nil Nil Nil Nil Nil

MONTH JUNE-2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION 500 80 80 400 200 100 SCRAP YARD 01/06/12 227 38 19 10... Nil SCRAP YARD 03/06/12 197 32 21 19 Nil... SCRAP YARD 05/06/12 220 28 24 22... Nil SCRAP YARD 07/06/12 233 24 19 18 Nil... SCRAP YARD 09/06/12 248 30 14 19... Nil SCRAP YARD 11/06/12 266 14 23 7 Nil... SCRAP YARD 13/06/12 257 18 17 12... Nil SCRAP YARD 15/06/12 247 25 28 17 Nil... SCRAP YARD 17/06/12 258 35 20 15... Nil SCRAP YARD 19/09/12 237 43 21 25 Nil... SCRAP YARD 21/06/12 197 37 21 22... Nil SCRAP YARD 23/06/12 221 13 18 11 Nil... SCRAP YARD 25/06/12 218 25 23 14... Nil SCRAP YARD 17/06/12 233 24 23 12 Nil... SCRAP YARD 29/06/12 246 34 24 21... Nil Maximum 266 43 28 25 0 0 Minimum 197 13 14 7 0 0 Average JUNE -12 234 28 21 16 0 0 %Deviation Nil Nil Nil Nil Nil Nil

AMBIENT AIR ANALYSIS REPORT: ETP SIDE MONTH JAN -2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION 500 100 200 100 80 80 400 ETP SIDE 01/01/12 235 44 20 18 145... Nil ETP SIDE 03/01/12 223 66 21 13 22 Nil... ETP SIDE 05/01/12 243 90 21 12 32... Nil ETP SIDE 07/01/12 220 38 15 13 29 Nil... ETP SIDE 09/01/12 230 28 32 21 117... Nil ETP SIDE 11/01/12 225 67 20 13 7 Nil... ETP SIDE 13/01/12 244 46 21 14 18... Nil ETP SIDE 15/01/12 211 51 21 18 44 Nil... ETP SIDE 17/01/12 237 48 28 23 69... Nil ETP SIDE 19/01/12 219 56 18 11 7 Nil... ETP SIDE 21/01/12 269 61 17 20 72... Nil ETP SIDE 23/01/12 223 37 23 19 14 Nil... ETP SIDE 25/01/12 206 37 18 10 10... Nil ETP SIDE 27/01/12 199 35 11 10 6 Nil... ETP SIDE 29/01/12 244 75 27 23 23... Nil 31/01/12 242 89 20 13 35 Nil... Maximum 269 90 32 23 145 0 0 Minimum 199 28 11 10 6 0 0 Average JAN - 12 229 54 21 16 41 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH FEB -2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION 500 100 80 80 400 200 100 ETP SIDE 02/02/12 216 68 15 12 6... ETP SIDE 04/02/12 194 33 21 12 11 Nil ETP SIDE 06/02/12 209 46 46.5 21 12 14... ETP SIDE 08/02/12 224 68 20 14 3 Nil ETP SIDE 10/02/12 224 88 13 19 22... ETP SIDE 12/02/12 177 52 17 20 10 Nil ETP SIDE 14/02/12 224 88 52 13 19 22... ETP SIDE 16/02/12 219 65 19 11 5 Nil ETP SIDE 18/02/12 236 71 18 11 5... ETP SIDE 20/02/12 249 65 40 20 17 17 Nil ETP SIDE 22/02/12 238 64 17 9 8... ETP SIDE 24/02/12 224 65 20 18 11 Nil ETP SIDE 26/02/12 239 49 44.5 21 22 14... ETP SIDE 28/02/12 220 64 16 17 8 Nil Maximum 249 88 52 21 22 22 0 Minimum 177 33 40 13 9 3 0 Average FEB- 12 225 67 46 17 16 12 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH MARCH -2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION 500 100 80 80 400 200 100 ETP SIDE 01/03/12 207 49 22 17 40 Nil... ETP SIDE 03/03/12 206 53 21 19 75... Nil ETP SIDE 05/03/12 289 78 30 17 177 Nil... ETP SIDE 07/03/12 250 57 27 19 206... Nil ETP SIDE 09/03/12 225 67 20 13 7 Nil... ETP SIDE 11/03/12 250 57 39 27 227... Nil ETP SIDE 13/03/12 234 48 25 16 70 Nil... ETP SIDE 15/03/12 237 53 20 16 74... Nil ETP SIDE 17/03/12 280 78 36 28 67 Nil... ETP SIDE 19/03/12 224 55 21 16 77... Nil ETP SIDE 21/03/12 243 49 40 24 20 Nil... ETP SIDE 23/03/12 287 48 34 19 37... Nil ETP SIDE 25/03/12 251 55 19 24 24 Nil... ETP SIDE 27/03/12 262 57 37 22 79... Nil ETP SIDE 29/03/12 219 39 32 20 118 Nil... ETP SIDE 31/03/12 249 54 19 21 19... Nil Maximum 289 78 40 28 227 0 0 Minimum 206 39 19 13 7 0 0 Average MAR -12 245 56 28 20 82 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH APRIL-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 80 80 LOCATION 500 100 400 200 100 ETP SIDE 02/04/12 241 58 25 16 57 Nil... ETP SIDE 04/04/12 255 67 32 19 14... Nil ETP SIDE 06/04/12 268 69 31 17 13 Nil... ETP SIDE 08/04/12 243 61 24 17 63... Nil ETP SIDE 10/04/12 244 49 28 15 10 Nil... ETP SIDE 12/04/12 285 57 29 17 15... Nil ETP SIDE 14/04/12 248 65 30 17 13 Nil... ETP SIDE 16/04/12 230 56 17 20 73... Nil ETP SIDE 18/04/12 223 60 35 17 104 Nil... ETP SIDE 20/04/12 239 63 19 21 32... Nil ETP SIDE 22/04/12 244 70 30 19 78 Nil... ETP SIDE 24/04/12 287 48 34 19 37... Nil ETP SIDE 26/04/12 251 55 32 19 24 Nil... ETP SIDE 28/04/12 230 47 28 12 70... Nil ETP SIDE 30/04/12 211 67 20 12 92 Nil... Maximum 287 70 35 21 104 0 0 Minimum 211 47 17 12 10 0 0 Average APR - 12 246 59 28 17 46 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH MAY-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 500 100 80 80 400 200 100 LOCATION ETP SIDE 02/05/12 244 49 30 21 92... Nil ETP SIDE 04/05/12 218 52 21 18 63 Nil... ETP SIDE 06/05/12 221 58 16 16 70... Nil ETP SIDE 08/05/12 233 65 27 23 70 Nil... ETP SIDE 10/05/12 272 54 30 21 149... Nil ETP SIDE 12/52012 307 88 44 18 122 Nil... ETP SIDE 14/05/12 234 31 51 21 85... Nil ETP SIDE 16/05/12 244 46 46 17 72 Nil... ETP SIDE 18/05/12 184 41 21 14 14... Nil ETP SIDE 20/05/12 224 50 24 21 70 Nil... ETP SIDE 22/05/12 222 59 25 13 89... Nil ETP SIDE 24/05/12 224 58 30 23 76 Nil... ETP SIDE 26/05/12 226 62 21 18 69... Nil ETP SIDE 28/05/12 285 57 29 17 15 Nil... ETP SIDE 30/05/12 234 52 24 18 89... Nil Maximum 307 88 51 23 149 0 0 Minimum 184 31 16 13 14 0 0 Average MAY -12 238 55 29 19 76 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH JUNE-2012 AREA/ LOCATION DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 500 100 80 80 400 200 100 ETP SIDE 01/06/12 231 26 20 27 109... Nil ETP SIDE 03/06/12 228 57 20 19 76 Nil... ETP SIDE 05/06/12 237 52 21 17 81... Nil ETP SIDE 07/06/12 241 62 22 21 70 Nil... ETP SIDE 09/06/12 227 80 49 28 78... Nil ETP SIDE 11/06/12 264 54 27 22 69 Nil... ETP SIDE 13/06/12 282 67 22 26 90... Nil ETP SIDE 15/06/12 221 59 22 23 64 Nil... ETP SIDE 17/06/12 294 100 31 25 96... Nil ETP SIDE 19/09/12 244 70 30 19 78 Nil... ETP SIDE 21/06/12 214 39 35 17 92... Nil ETP SIDE 23/06/12 268 69 24 21 57 Nil... ETP SIDE 25/06/12 211 58 23 19 64... Nil ETP SIDE 17/06/12 221 53 19 20 70 Nil... ETP SIDE 29/06/12 223 63 28 20 64... Nil Maximum 294 100 49 28 109 0 0 Minimum 211 26 19 17 57 0 0 Average JUNE -12 241 60 26 22 77 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

AMBIENT AIR ANALYSIS REPORT: MAIN GATE MONTH JAN -2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 80 200 100 LOCATION 500 100 80 400 MAIN GATE 01/01/12 255 69 18 6 28...... MAIN GATE 03/01/12 201 65 33 24 7 Nil Nil MAIN GATE 05/01/12 226 33 10 18 19...... MAIN GATE 07/01/12 219 35 11 12 6 Nil Nil MAIN GATE 09/01/12 247 48 31 20 13...... MAIN GATE 11/01/12 274 78 29 10 24 Nil Nil MAIN GATE 13/01/12 224 37 20 6 6...... MAIN GATE 15/01/12 203 69 18 13 7 Nil Nil MAIN GATE 17/01/12 174 28 18 16 18...... MAIN GATE 19/01/12 219 56 18 11 7 Nil Nil MAIN GATE 21/01/12 200 27 26 14 11...... MAIN GATE 23/01/12 188 21 15 4 6 Nil Nil MAIN GATE 25/01/12 206 37 18 10 10...... MAIN GATE 27/01/12 199 35 11 10 6 Nil Nil MAIN GATE 29/01/12 245 75 27 23 23...... 31/01/12 22 85 13 9 9 Nil Nil Maximum 274 85 33 24 28 0 0 Minimum 22 21 10 4 6 0 0 Average JAN -12 200 50 20 12 12 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH FEB -2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 100 400 200 100 LOCATION 500 80 80 MAIN GATE 02/02/12 216 68 15 12 6... Nil MAIN GATE 04/02/12 194 33 21 12 11 Nil... MAIN GATE 06/02/12 209 46 21 12 14... Nil MAIN GATE 08/02/12 224 68 20 14 3 Nil... MAIN GATE 10/02/12 224 88 13 19 22... Nil MAIN GATE 12/02/12 177 52 17 20 10 Nil... MAIN GATE 14/02/12 224 88 13 19 22... Nil MAIN GATE 16/02/12 219 65 19 11 5 Nil... MAIN GATE 18/02/12 236 71 18 11 5... Nil MAIN GATE 20/02/12 249 65 20 17 17 Nil... MAIN GATE 22/02/12 238 64 17 9 8... Nil MAIN GATE 24/02/12 224 65 20 18 11 Nil... MAIN GATE 26/02/12 239 49 21 22 14... Nil MAIN GATE 28/02/12 220 64 16 17 8 Nil... Maximum 249 88 21 22 22 0 0 Minimum 177 33 13 9 3 0 0 Average FEB- 12 225 67 17 16 12 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH MARCH -2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION 500 100 80 80 400 200 100 MAIN GATE 01/03/12 245 54 10 13 3 Nil... MAIN GATE 03/03/12 212 56 15 19 12... Nil MAIN GATE 05/03/12 215 61 30 19 18 Nil... MAIN GATE 07/03/12 242 66 15 14 2... Nil MAIN GATE 09/03/12 274 78 29 10 24 Nil... MAIN GATE 11/03/12 242 66 30 20 10... Nil MAIN GATE 13/03/12 228 43 21 12 15 Nil... MAIN GATE 15/03/12 203 29 16 13 14... Nil MAIN GATE 17/03/12 265 54 22 22 26 Nil... MAIN GATE 19/03/12 232 57 17 15 9... Nil MAIN GATE 21/03/12 237 37 20 14 18 Nil... MAIN GATE 23/03/12 247 67 14 21 8... Nil MAIN GATE 25/03/12 268 94 15 16 15 Nil... MAIN GATE 27/03/12 262 57 37 22 79... Nil MAIN GATE 29/03/12 222 87 14 21 10 Nil... MAIN GATE 31/03/12 231 61 13 18 36... Nil Maximum 274 94 37 22 79 0 0 Minimum 203 29 10 10 2 0 0 Average MAR -12 243 61 21 17 22 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH APRIL-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 80 80 LOCATION 500 100 400 200 100 MAIN GATE 02/04/12 240 60 17 15 11 Nil... MAIN GATE 04/04/12 246 51 13 15 5... Nil MAIN GATE 06/04/12 240 67 11 15 2 Nil... MAIN GATE 08/04/12 229 62 21 14 9... Nil MAIN GATE 10/04/12 203 47 13 14 6 Nil... MAIN GATE 12/04/12 230 56 15 15 9... Nil MAIN GATE 14/04/12 236 67 15 20 9 Nil... MAIN GATE 16/04/12 227 63 20 19 13... Nil MAIN GATE 18/04/12 213 65 21 18 10 Nil... MAIN GATE 20/04/12 227 58 13 17 16... Nil MAIN GATE 22/04/12 216 39 15 17 3 Nil... MAIN GATE 24/04/12 247 67 14 21 8... Nil MAIN GATE 26/04/12 261 87 15 16 15 Nil... MAIN GATE 28/04/12 219 45 25 10 11... Nil MAIN GATE 30/04/12 247 69 24 15 9 Nil... Maximum 261 87 25 21 16 0 0 Minimum 203 39 11 10 2 0 0 Average APR - 12 230 60 17 17 10 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH MAY-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 80 200 100 LOCATION 500 100 80 400 MAIN GATE 02/05/12 230 58 24 15 11... Nil MAIN GATE 04/05/12 231 54 17 16 11 Nil... MAIN GATE 06/05/12 210 52 13 13 13... Nil MAIN GATE 08/05/12 225 66 22 17 11 Nil... MAIN GATE 10/05/12 269 61 21 15 10... Nil MAIN GATE 12/52012 220 84 27 17 26 Nil... MAIN GATE 14/05/12 216 39 10 21 19... Nil MAIN GATE 16/05/12 224 49 12 5 19 Nil... MAIN GATE 18/05/12 247 65 18 21 15... Nil MAIN GATE 20/05/12 216 58 18 20 13 Nil... MAIN GATE 22/05/12 228 61 22 9 14... Nil MAIN GATE 24/05/12 224 58 30 23 76 Nil... MAIN GATE 26/05/12 220 58 17 16 18... Nil MAIN GATE 28/05/12 224 37 20 6 6 Nil... MAIN GATE 30/05/12 209 57 17 16 7... Nil Maximum 269 84 30 23 76 0 0 Minimum 209 37 10 5 6 0 0 Average MAY -12 227 57 19 15 20 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

MONTH JUNE 2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE 500 100 80 80 400 200 100 LOCATION MAIN GATE 01/06/12 265 36 36 22 17... Nil MAIN GATE 03/06/12 225 19 19 18 15 Nil... MAIN GATE 05/06/12 220 19 19 17 19... Nil MAIN GATE 07/06/12 213 19 19 16 15 Nil... MAIN GATE 09/06/12 227 25 25 17 28... Nil MAIN GATE 11/06/12 257 10 10 17 3 Nil... MAIN GATE 13/06/12 227 20 20 20 15... Nil MAIN GATE 15/06/12 269 21 21 15 10 Nil... MAIN GATE 17/06/12 270 15 15 19 11... Nil MAIN GATE 19/09/12 265 10 10 17 3 Nil... MAIN GATE 21/06/12 232 23 23 25 38... Nil MAIN GATE 23/06/12 222 19 19 19 8 Nil... MAIN GATE 25/06/12 236 21 21 13 7... Nil MAIN GATE 17/06/12 230 18 18 18 13 Nil... MAIN GATE 29/06/12 216 25 25 16 13... Nil Maximum 270 36 36 25 38 0 0 Minimum 213 10 10 13 3 0 0 Average JUNE - 12 241 19 19 18 14 0 0 %Deviation Nil Nil Nil Nil Nil Nil Nil

Month LOCATION DATE OF PM2.5 January Near Boiler area SAMPLIN G UNITED PHOSPHORUS LTD,UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR AMBIENT AIR ANALYSIS REPORT Jan-June 2012 (By Mahabal Enviro Engineers Pvt. Ltd) Jan-Mar 2012 (By Enpro Enviro Tech & Engineers Pvt. Ltd) Apr-Jun 2012 60 µg /m 3 RSPM (PM10) 100 µg /m 3 SOx NOx HCL NH3 H2S H.C. 80 µg /m 3 80 µg /m 3 200 µg /m 3 400 µg /m 3 500 µg /m 3 160 µg /m 3 CHLORI NE 100 µg /m 3 06.01.2012-72.8 16.4 20.5 26.7 23.9 BDL BDL BDL BDL HF 60 µg /m 3 Feburary Near Boiler area 18.02.2012-78.5 19.8 23.7 28.2 24.1 BDL BDL BDL BDL March Near Boiler area 14.03.2012-71.1 17.4 18.8 18.6 21.9 BDL BDL BDL BDL April Near Boiler area 20.04.2012 42.2 79.6 26.9 28.4 39.6 19.7 BDL BDL BDL BDL May Near Boiler area 19.05.2012 45.6 82.3 27.8 29.5 43.7 21.2 BDL BDL BDL BDL June Near Boiler area 16.06.2012 39.4 75.2 23.6 25.9 46.5 24.7 BDL BDL BDL BDL

Sr. No. 1 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Jan-2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm 3 5.0 mg/nm 3 FUME INCINERATOR 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm 3 5.0 mg/nm 3 06.01.2012 BDL BDL BDL 9.2 BDL 7.4 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) Plant not in operation 3 ALKALI SCRUBBER ( H2S VENT) 06.01.2012 3.1 4 P2S5 CHARGING HOOPER 06.01.2012 Plant not in operation 5 LOCAL VENT CARBON FILTER 06.01.2012 Plant not in operation 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 06.01.2012 7 IN POSHPOMIDON PLANT STACK WATER SCRUBBER 06.01.2012 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 06.01.2012 AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm 3 100 ppm 50 ppm 9 BOILER GT-3507 06.01.2012 NOT IN OPERATION 10 BOILER GT-3201 06.01.2012 BDL BDL 13.7 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Feb-2012 Sr. No. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm 3 5.0 mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm 3 5.0 mg/nm 3 1 FUME INCINERATOR 14/02/12 BDL BDL BDL 16.7 BDL 9.3 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 14/02/12 Plant not in operation 3 ALKALI SCRUBBER ( H2S VENT) 14/02/12 2.8 4 P2S5 CHARGING HOOPER 14/02/12 Plant not in operation 5 LOCAL VENT CARBON FILTER 14/02/12 Plant not in operation 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 14/02/12 20.4 7 IN POSHPOMIDON PLANT STACK WATER SCRUBBER 14/02/12 Plant not in operation 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 14/02/12 11.8 AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm 3 100 ppm 50 ppm 9 BOILER GT-3507 14/02/12 NOT IN OPERATION 10 BOILER GT-3201 14/02/12 BDL BDL 25.9 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Mar-2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm 3 5.0 mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm 3 5.0 mg/nm 3 1 FUME INCINERATOR 14/03/12 BDL BDL BDL 14.3 BDL 10.3 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 14/03/12 Plant not in operation 3 ALKALI SCRUBBER ( H2S VENT) 14/03/12 3.7 4 P2S5 CHARGING HOOPER 14/03/12 Plant not in operation 5 LOCAL VENT CARBON FILTER 14/03/12 Plant not in operation 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 14/03/12 25.2 7 IN POSHPOMIDON PLANT STACK WATER SCRUBBER 14/03/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 14/03/12 NOT IN OPERATION AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm 3 100 ppm 50 ppm 9 BOILER GT-3507 14/03/12 BDL BDL 9.6 10 BOILER GT-3201 14/03/12 NOT IN OPERATION 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): Apr 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm 3 5.0 mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm 3 5.0 mg/nm 3 1 FUME INCINERATOR 20/04/12 BDL BDL BDL 11.8 BDL 8.2 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) NOT IN OPERATION 3 ALKALI SCRUBBER ( H2S VENT) 20/04/12 5 4 P2S5 CHARGING HOOPER 20/04/12 NOT IN OPERATION 5 LOCAL VENT CARBON FILTER NOT IN OPERATION 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 20/04/12 16.2 7 IN POSHPOMIDON PLANT STACK WATER SCRUBBER 20/04/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 20/04/12 10 AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm 3 100 ppm 50 ppm 9 BOILER GT-3507 20/04/12 BDL BDL 9.4 10 BOILER GT-3201 20/04/12 BDL BDL 8.8 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): May 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm 3 5.0 mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm 3 5.0 mg/nm 3 1 FUME INCINERATOR 19/05/12 BDL BDL BDL 8.9 BDL 5.2 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 19/05/12 NOT IN OPERATION 3 ALKALI SCRUBBER ( H2S VENT) 19/05/12 4.3 4 P2S5 CHARGING HOOPER 19/05/12 NOT IN OPERATION 5 LOCAL VENT CARBON FILTER 19/05/12 NOT IN OPERATION 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 19/05/12 17.4 7 IN POSHPOMIDON PLANT STACK WATER SCRUBBER 19/05/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 19/05/12 10.8 AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm 3 100 ppm 50 ppm 9 BOILER GT-3507 19/05/12 BDL BDL 10.7 10 BOILER GT-3201 19/05/12 BDL BDL 9.6 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): Jun 12 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm 3 5.0 mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm 3 5.0 mg/nm 3 1 FUME INCINERATOR 16/06/12 BDL BDL BDL 10.3 BDL 6.7-2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 16/06/12 NOT IN OPERATION 3 ALKALI SCRUBBER ( H2S VENT) 16/06/12 3.7 4 P2S5 CHARGING HOOPER 16/06/12 NOT IN OPERATION 5 LOCAL VENT CARBON FILTER 16/06/12 NOT IN OPERATION 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 16/06/12 18.2 7 IN POSHPOMIDON PLANT STACK WATER SCRUBBER 16/06/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 16/06/12 11.3 AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm 3 100 ppm 50 ppm 9 BOILER GT-3507 16/06/12 BDL BDL 10 10 BOILER GT-3201 16/06/12 BDL BDL 9.1 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

Sr. No. 1 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Our Internal Lab.): Jan 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm3 FUME INCINERATOR 5.0 mg/nm3 30 mg/nm3 50 mg/nm3 20 mg/nm3 40 mg/nm3 5.0 mg/nm3 05/01/12 NIL NIL NIL 9.6 19 29.5 NIL 20/01/12 NIL NIL NIL 7.5 18 26.5 NIL 2 3 4 5 6 7 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) ALKALI SCRUBBER ( H2S VENT) P2S5 CHARGING HOPPER LOCAL VENT CARBON FILTER IN ACEPHATE PLANT STACK NH3 SCRUBBER IN POSHPOMIDON PLANT STACK WATER SCRUBBER 05/01/12 Plant not in operation 20/01/12 05/01/12 1 20/01/12 2 05/01/12 5 20/01/12 5 05/01/12 NIL 20/01/12 NIL 05/01/12 26 20/01/12 05/01/12 20/01/12 Plant not in operation Plant not in operation 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 05/01/12 20/01/12 Plant not in operation AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm3 100 ppm 50 ppm 9 BOILER GT-3507 04/01/12 50.2 14.0 8.7 07/01/12 50.5 7.7 6.1 10 BOILER GT-3201 16/01/12 56.9 16.5 4.0 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR PREPARED BY : JAYESH R. PATIL 22/01/12 62.5 13.4 3.7 Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN. HOD ( Q.A.)

Sr. No. 1 2 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Our Internal Lab): Feb 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm3 FUME INCINERATOR IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 5.0 mg/nm3 30 mg/nm3 50 mg/nm3 20 mg/nm3 40 mg/nm3 5.0 mg/nm3 05/02/12 NIL NIL NIL 5.6 20 30.1 NIL 20/02/12 NIL NIL NIL 9.1 19 36.0 NIL 05/02/12 20/02/12 Plant not in operation 3 4 5 6 ALKALI SCRUBBER ( H2S VENT) P2S5 CHARGING HOOPER LOCAL VENT CARBON FILTER IN ACEPHATE PLANT STACK NH3 SCRUBBER 05/02/12 2 20/02/12 1 05/02/12 3 20/02/12 3 05/02/12 NIL 20/02/12 NIL 05/02/12 26 20/02/12 8.0 7 8 IN POSHPOMIDON PLANT STACK WATER SCRUBBER IN DEVRINOL PLANT STACK CPC SCRUBBER 05/02/12 20/02/12 05/02/12 20/02/12 Plant not in operation Plant not in operation Plant not in operation AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm3 100 ppm 50 ppm 9 BOILER GT-3507 04/02/12 29.7 5.8 2.4 10/02/12 39.2 8.7 1.0 10 BOILER GT-3201 15/02/12 19.5 16.3 1.5 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR PREPARED BY : JAYESH R. PATIL 22/02/12 29.2 6.2 2.0 Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN. HOD ( Q.A.)

Sr. No. 1 2 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Our Internal Lab): MARCH 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm3 FUME INCINERATOR IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 5.0 mg/nm3 30 mg/nm3 50 mg/nm3 20 mg/nm3 40 mg/nm3 5.0 mg/nm3 05/03/12 NIL NIL NIL 6.7 20 32.6 NIL 20/03/12 NIL NIL NIL 3.3 18 31.6 NIL 05/03/12 20/03/12 Plant not in operation 3 4 5 6 ALKALI SCRUBBER ( H2S VENT) P2S5 CHARGING HOOPER LOCAL VENT CARBON FILTER IN ACEPHATE PLANT STACK NH3 SCRUBBER 05/03/12 2 20/03/12 1 05/03/12 4 20/03/12 3 05/03/12 NIL 20/03/12 NIL 05/03/12 12 20/03/12 18 7 IN POSHPOMIDON PLANT STACK WATER SCRUBBER 05/03/12 20/03/12 PLANT NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 05/03/12 20/03/12 Plant not in operation AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm3 100 ppm 50 ppm 9 BOILER GT-3507 04/03/12 43.2 8.4 0.9 22/03/12 59.9 10.4 0.6 10 BOILER GT-3201 08/03/12 41.5 11.4 1.0 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR PREPARED BY : JAYESH R. PATIL 25/03/12 19.4 10.2 0.7 Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN. HOD ( Q.A.)