CONTENTS LIST OF TABLES LIST OF FIGURES

Similar documents
Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP. Direct Testimony of Mark R. Tallman

JUVENILE SALMON MIGRATION SECTION 5. blank page

Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest

Written Testimony Submitted to the Water and Power Subcommittee Committee on Natural Resources U.S. House of Representatives

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Chapter 2. Direct Testimony of Joseph P. Hoerner and Shayleah J.

JOINT EXPLANATORY STATEMENT for the SETTLEMENT AGREEMENT DATED NOVEMBER 30, 2004

Managing Idaho Power Company s Hydro Projects During Drought Conditions The Benefits of Communication and Collaboration

Hydropower Project License Summary KERN RIVER, CA KERN CANYON HYDROELECTRIC PROJECT (P-178) This summary was produced by the

Boardman to Hemingway Transmission Line Project

123 FERC 62,258 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. PacifiCorp Project No ORDER ISSUING NEW LICENSE

Avista Dam Relicensing Factsheet Commenting on the Draft License Application

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP. Exhibit Accompanying Direct Testimony of Mark R. Tallman. FERC Order Issuing New License

Columbia River System Operations Environmental Impact Statement Newsletter

Bob Gundersen, PSNH Hydro Manager

Lake Texoma Water Management Frequently Asked Questions (FAQs)

Rocky Mountain Power Exhibit RMP (MRT-1) Docket No Witness: Mark R. Tallman BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Southeastern Colorado Water Conservancy District. Leadership Pueblo, May 11, 2017 Jim Broderick Executive Director, SECWCD

ID Farm Bureau questions on Bear River John Thompson Director of Public Relations Idaho Farm Bureau

CONTENTS LIST OF TABLES

FINAL LICENSE APPLICATION Exhibit C Construction History

Issues in Klamath River Dam Relicensing

UPPER NORTH FORK FEATHER RIVER PROJECT FERC NO

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

Pumped Storage Profile

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

For Bandon Utilities Commission

GORDON BUTTE CLOSED LOOP PUMPED STORAGE HYDRO FACILITY BRIEFING DOCUMENT

2005 Integrated Electricity Plan. Resource Options Workshop #2 Planning Criteria March 09, 2005

WEST ROSEBUD CREEK, MONTANA

INTEGRATED RESOURCE PLANNING STUDY 2012 UPDATE

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of John A. Cupparo

Klamath Hydroelectric Project Interim Measure 11 Study Activities for 2018

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION EXECUTIVE SUMMARY

Utility Scale Integration of Wind and Solar Power

Columbia River Drainage

Introduction to Bonneville Power Administration

Columbia River Treaty Frequently Asked Questions (FAQs)

Current Water Management Practices for Kerr Reservoir

Comment. Section Title/ Paragraph. Technical Report. (initials/ agency)

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

Market Design and Renewables in the U.S.

Staff summary of Issues & Recommendations Protected Areas

Canadian Entity s Preliminary View of Columbia River Treaty Post-2024 Called Upon Procedures. BC Hydro and Power Authority

CITY OF BURBANK Burbank Water and Power STAFF REPORT

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

Northwest Power and Conservation Council

Prepared by: PacifiCorp 825 NE Multnomah Street Portland, OR 97232

Draft Environmental Impact Report

Columbia River Operations Summary

Columbia River Treaty: Recommendations December 2013

Anadromous Fish Passage Program Lewis River, Washington Frank Shrier

If you have any questions on the OCMP, please do not hesitate to contact me at (425) or Keith Binkley at (425)

Northwest Power Pool Processes

Risks And Opportunities For PacifiCorp State Level Findings:

CONNECTING. Big Chino Valley Pumped Storage Project. Energy Infrastructure

2014/2024 Review Columbia River Treaty

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864)

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Exploring the Impacts of California s Renewable Portfolio Standard

AU SABLE RIVER. a. Foote (P-2436) A dam containing two existing earth fill embankment sections, a concrete

SEAPA Swan Lake License Amendment

Hydropower Project Summary SULTAN RIVER, WA HENRY M JACKSON HYDROELECTRIC PROJECT (P-2157) This summary was produced by the

Aquanova Nyzhniy Bystryi small hydropower plant project non-technical summary

Reduced Network Modeling of WECC as a Market Design Prototype

Notice of Intent to Accept Proposals, Select Lessee(s), and Contract for Pumped-Storage

APPENDIX 9.2 Description of SPLASH Model

BACKGROUND. 3. Visitor Information Center. The City requested that Douglas PUD study the feasibility of a regional Visitor Information Center.

LAND 2 Multiple Use Opportunity Assessment

Vegetation Cover Type Mapping Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D. C November 27, 2013

ST. LAWRENCE RIVER, NEW YORK

Low Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206)

Applying Recreation Survey Results to Recreation Planning for Water-Based Recreation Areas in California

INTRODUCTION BACKGROUND

Notice of Intent to Prepare a Draft Environmental Impact Statement for the

Low Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206)

Watt About Energy in the Northwest

CLEAN WATER ACT 401 WATER QUALITY CERTIFICATION APPLICATION FORM

CAISO s Plan for Integration of Renewable Resources

Washington Conservation and Respect Report 2016

AGENDA ITEM SUMMARY February 21, 2017 City Council

If any questions arise concerning this application, please contact us.

January 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND:

California Conservation and Respect Report 2016

PLUMAS COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT UPPER FEATHER RIVER INTEGRATED REGIONAL WATER MANAGEMENT MEMORANDUM OF UNDERSTANDING

Appendix B. Operations on the Columbia River - Relationship between Columbia River Treaty, Non Treaty Storage Agreement, and Water Use Plans

SRP RESOURCES AND STEWARDSHIP FOR A SUSTAINABLE FUTURE FISCAL YEAR 2010

Energy and Natural Resources

I. INTRODUCTION PURPOSE BASIN DESCRIPTION WATER RESOURCES DEVELOPMENT TYPES OF RESERVOIR PROJECTS ANNUAL REGULATION CYCLE

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Relicensing Planning for Hydroelectric Watersheds

2005 Integrated Electricity Plan. Provincial IEP Committee Meeting #2 Planning Criteria February 22/23, 2005

CHAPTER 3: RESOURCE STRATEGY

Table 10.1 DRAFT IRP Action Plan

Takatz Lake Project - Alaska

The Colorado River Cooperative Agreement 1

Transcription:

CONTENTS 1.0 PURPOSE OF ACTION AND NEED FOR POWER... 1-1 1.1 PURPOSE OF THE ACTION... 1-1 1.2 NEED FOR PROJECTS... 1-3 1.2.1 PacifiCorp Operations... 1-3 1.2.2 Cowlitz PUD Operations... 1-5 1.2.3 Regional Demand... 1-6 1.2.4 Need For Flood Management... 1-6 1.3 SCOPING PROCESS... 1-7 1.4 CONSULTATION... 1-7 LIST OF TABLES Table 1.1-1. The....1-1 LIST OF FIGURES Figure 1.1-1. Project area map...1-2 April 2004 Preliminary Draft EA / Page 1-i

This page intentionally blank. Page 1-ii / Preliminary Draft EA April 2004

1.0 PURPOSE OF ACTION AND NEED FOR POWER 1.1 PURPOSE OF THE ACTION PacifiCorp is seeking new federal licenses for the continued operation of its Merwin (FERC No. 935), Yale (FERC No. 2071), and Swift No. 1 (FERC No. 2111) hydroelectric projects located on the North Fork Lewis River near Woodland, Washington (Figure 1.1-1). A fourth project, known as Swift No. 2 (FERC No. 2213), is located between Swift No. 1 and the Yale projects and is owned by Public Utility District No. 1 of Cowlitz County (Cowlitz PUD). Cowlitz PUD is seeking a new federal license to continue to operate and maintain the Swift No. 2 Project. 1. PacifiCorp previously submitted the license application for the Yale Project in April 1999. Prior to that submission, the Federal Energy Regulation Commission (FERC) had approved the use of the alternative licensing process and a coordinated environmental analysis of the four Lewis River Projects. With its Yale application, PacifiCorp proposed interim measures to protect and enhance the environment, pending the coordinated environmental analysis of all four projects. This Preliminary Draft Environmental Assessment (PDEA) presents PacifiCorp s and Cowlitz PUD s preferred alternative, Alternative B, which includes protection, enhancement and mitigation measures for all four coordinated projects, including Yale. As required by NEPA, it also analyzes a No Action Alternative (A). Alternative C analyzes another combination of protection and enhancement measures. The PDEA also includes discussion of two options that were considered but rejected for further analysis. The existing licenses for these facilities expire between 2001 and 2006 (Table 1.1-1). The FERC must determine whether to grant new licenses for the continued operation and maintenance of the four Lewis River hydroelectric projects and related facilities in compliance with Federal Power Act requirements and other laws and, if so, what conditions should be included in those licenses. Issuing new licenses would allow PacifiCorp and Cowlitz PUD to continue to generate electric power from a renewable source for the benefit of their customers for terms of up to 50 years. These facilities have provided a reliable source of renewable power and environmental and recreation benefits for over 70 years. Table 1.1-1. The. Project Name Owner FERC No. Year Constructed Year License Expires Generation (mw) Merwin PacifiCorp 935 1932 May 1, 2006 136 Yale PacifiCorp 2071 1953 May 1, 2001 134 Swift No. 1 PacifiCorp 2111 1958 May 1, 2006 240 Swift No. 2 Cowlitz PUD 2213 1958 May 1, 2006 70 1 PacifiCorp and Cowlitz PUD have jointly prepared an environmental analysis of the proposed operations and measures for the projects that is presented in Sections 2 and 3 of this PDEA. Each applicant has prepared its own Executive Summary, Purpose and Need (Section 1), and Economic Analysis (Section 4). April 2004 Preliminary Draft EA / Page 1-1

PacifiCorp and Cowlitz PUD have prepared this PDEA pursuant to the National Environmental Policy Act (NEPA) and the FERC regulations to describe and evaluate the potentially significant environmental effects of the proposed relicensing of the four Lewis River Projects and alternative suites of mitigation measures for relicensing. In deciding whether to issue licenses to PacifiCorp and Cowlitz PUD, the FERC must determine that each project will be best adapted to a comprehensive plan for improving or developing the waterway. In addition to the power and developmental purposes for which licenses are issued (e.g., flood control, irrigation and water supply), the FERC must give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality. This PDEA closely follows the level of detail and format of an Environmental Impact Statement. PacifiCorp and Cowlitz PUD have also engaged in settlement negotiations with interested parties and hope to reach a settlement agreement setting forth terms and conditions which the parties agree are appropriate for relicensing of the Projects. If and when such a settlement is reached, the Applicants anticipate submitting amended license applications and, if appropriate, a supplemental environmental assessment analyzing the impacts of the settlement proposal insofar as they may differ from the PacifiCorp and Cowlitz PUD proposal or the alternatives analyzed in this PDEA. 1.2 NEED FOR PROJECTS 1.2.1 PacifiCorp Operations The Lewis River Projects are used to maximize the value of all of PacifiCorp s generation assets and power purchases to provide customer benefits. The operational flexibility of the projects enhances PacifiCorp s ability to reliably perform its function as control area operator. Over 1.5 million retail customers in a service area covering more than 136,000 square miles in portions of six Western states (Utah, Wyoming, Idaho, Washington, Oregon and California) rely on PacifiCorp for their energy needs. Residential customers account for about 85 percent of PacifiCorp s retail customers, 11 percent are commercial businesses, and 4 percent are industrial users. PacifiCorp has more than 8,300 megawatts (MW) of generation capacity. Roughly 68 percent of this generation is produced by PacifiCorp's thermal and hydroelectric resources with 32 percent being purchased generation. PacifiCorp undertakes a least cost planning approach to integrated resource planning. The primary goal of PacifiCorp s planning is the reliable and least cost electric service to its retail customers as well as maintain shareholder value. PacifiCorp operates two control areas that it designates as east and west. In its 2003 Integrated Resource Plan (IRP), PacifiCorp forecasts load on its system to grow by 2.2 percent in the east (Utah, Wyoming and Idaho) and 2.0 percent in the west (Washington, April 2004 Preliminary Draft EA / Page 1-3

Oregon and California) per year, on average, although load growth could vary between 1.4 percent and 3.4 percent. At the same time, resources available to serve this demand will diminish over time due to expiration of supply contracts, potential restrictions due to hydroelectric re-licensing requirements, and as thermal plants comply with more stringent emissions requirements. PacifiCorp expects it will require an additional 4,000 MW of new resources through 2013. Hydroelectric generation is especially important to meeting customers energy demand requirements as it is an extremely flexible resource. Of the 4,000 MW of new resources PacifiCorp needs, 1,200 MW are to be additions of flexible capacity 2 to provide the necessary operational characteristics to manage system reliability requirements. PacifiCorp s hydroelectric portfolio consists of 51 generating plants, with a capacity of over 1,000 MW. Hydroelectric generation makes up a very large percentage of the PacifiCorp portfolio of generation in the west. When this output is reduced due to poor hydrologic conditions, PacifiCorp has limited additional flexible capacity to serve customer needs and must turn to higher-cost market resources. The Lewis River Projects 510 MW capacity comprises almost 50 percent of PacifiCorp s total hydroelectric resources. As discussed further below, power produced by the Lewis River Projects is used to meet customer "peak" energy demand, meet load following requirements, allow for the most efficient use of thermal generation resources, provide for spinning reserves 3 and other important ancillary benefits, and displace the need for additional energy production facilities that burn fossil fuels and generate greenhouse gases such as carbon dioxide (see Section 4.4). Flexible resources such as the Lewis River Projects are essential to ensure system reliability and to meet fluctuating power requirements. With the exception of the Merwin Project, which is used to regulate downstream flows in the Lewis River, the Lewis River Projects are operated primarily as flexible resources that also provide an important contribution with respect to system reliability. This means that the resource not only operates at high levels during the day when demand is typically highest, but it is also used to maintain the operational integrity of the regional system during shifts in the load/resource balance. In short, because of the high degree of interconnectivity in the Western United States, this highly flexible and diverse resource helps improve the overall reliability and safety of the regional power grid. The inherent generation flexibility of these projects allows PacifiCorp to provide valuable and needed benefits to the grid since there are a limited number of such resources that reside west of the Cascade Mountains along the Interstate 5 corridor. In addition, the cascading design of the Lewis River projects, in which outflow from the upstream projects is discharged directly to the downstream reservoir, mitigates flow impacts as compared to other hydro resources providing this benefit. 2 Flexible capacity is used to serve peak demand as opposed to resources that are used to serve a constant level of customer demand. Since electricity cannot be stored, generation must be raised and lowered as demand varies. The regulation of the electric system generation to follow changes in customer demand is known as load following. Flexible capacity is required for load following. 3 Spinning reserves are generation capacity that is on-line and available to serve customer demand immediately should a contingency occur. Page 1-4 / Preliminary Draft EA April 2004

As operator of two control areas within the Western Electricity Coordinating Council (WECC), PacifiCorp is required to provide ancillary services for reliability and safety. The Lewis River Projects play a crucial role in providing these operational benefits, including flexible capacity, automatic generation control 4, spinning reserves and voltage control. 5 The WECC requires its members to maintain the following operating reserve: sufficient spinning reserve to provide regulating margin, plus an additional amount of operating reserve equal to the sum of 5 percent of committed hydroelectric generation and 7 percent of committed thermal generation (at least half of which must be spinning reserve). The North American Electric Reliability Council s Control Performance Standard also requires regulation and spinning reserves for system reliability. Because hydroelectric facilities can ramp up and down at 10 to 50 percent of rated capacity per minute, compared to coal units at 1 to 2 percent per minute, hydroelectric generators are ideal for providing regulation and spinning reserves. In summary, PacifiCorp relies heavily on the Lewis River Projects generation flexibility to meet the above requirements as well as its primary goal of reliable, least-cost energy for its customers. Benefits of the Lewis River Projects include: Meeting moment-to-moment changes in load demand within two control areas of the WECC; Providing generating reserve capacity to maintain electric grid voltage and frequency in the event of the loss of a major generating unit elsewhere on the grid; Minimizing inadvertent generation interchange with other control area operators; Minimizing the exposure of its customers to financial impacts of power price volatility; Maximizing its ability to dispatch fossil fuel plant units at maximum economy to its customers and to minimize fossil fuel consumption by running thermal units at maximum efficiency loadings; and Firming up and making useful the generation from intermittent resources such as wind turbines. 1.2.2 Cowlitz PUD Operations Cowlitz PUD is a not-for-profit customer-owned utility providing reliable low-cost electricity to over 45,100 residential, commercial, industrial, and street-lighting customers in Cowlitz County, Washington. 4 Automatic generation control is the ability to automatically adjust the generation within a control area to maintain power flow between entities and to maintain a given frequency. 5 Voltage control is the control of voltage on transmission lines through adjusting generator output and transformer operations. April 2004 Preliminary Draft EA / Page 1-5

Cowlitz PUD allocates the majority (about 90 percent) of its Swift No. 2 power to its approximately 40,000 residential customers, with the remaining 10 percent going to its approximately 5,000 commercial and small industrial customers. Swift No. 2 meets 10 to 15 percent of the energy load and up to 30 percent of the peak load of these three customer classes. Load from these customers is expected to grow about 1.25 percent annually while power from Swift No. 2 is expected to remain relatively constant. The result will be an everincreasing distance between Swift No. 2 s assured capability and the demand from the customers it serves. Cowlitz PUD has prepared its own Purpose and Need section that provides more detailed information on the purpose and value of the Swift No. 2 project. 1.2.3 Regional Demand The projected future energy needs of the Pacific Northwest are significantly higher than the available supply from existing resources. As was seen in 2001, a shortage in energy supplies leads to significant increases in cost and creates a severe hardship on lowincome and fixed-income residential customers, as well as businesses that are essential to a healthy economy. Many businesses require reliable and affordable energy supplies to continue to stimulate economic growth by generating jobs, goods, and services. PacifiCorp s projects are integral to meeting consumer demand for reliable and renewable power. Without licenses to continue operating these facilities, other generating facilities would be required to replace the lost generation capacity. Replacement costs are likely to be significantly higher than current production costs for the Lewis River Projects. Thus, there is a strong need to relicense the Company s Lewis River Projects for the benefit of the PacifiCorp customers and communities. 1.2.4 Need For Flood Management In addition to power generation, PacifiCorp s projects serve an important flood management function. Under current operating policies, and in accordance with both a contract between PacifiCorp and the Federal Emergency Management Agency (FEMA) and with the conditions of the current FERC licenses, the three project reservoirs (Lake Merwin, Yale Lake, and Swift Creek Reservoir) provide a combined 70,000 acre feet of dependable or dedicated flood control storage during the months of highest flood risk from November through March. The effect of this storage is to significantly reduce flood discharges throughout the lower Lewis River valley with corresponding benefits to the local community. The 70,000 acre feet of dependable flood management storage is sufficient to control most project releases from Merwin Dam to 60,000 cubic feet per second (cfs) or less. The 100-year peak discharge, which provides the regulatory basis for FEMA s floodplain delineation, is also reduced from an estimated 128,000 cfs at Woodland in the absence of flood control storage to 102,000 cfs, with a corresponding reduction in the area within the regulatory 100-year floodplain subject to development restrictions. Page 1-6 / Preliminary Draft EA April 2004

1.3 SCOPING PROCESS PacifiCorp and Cowlitz PUD ( Applicant s ) undertook the NEPA Scoping Process and formally initiated public scoping on May 17, 2000 with the release of Scoping Document 1 (SD1) (PacifiCorp and Cowlitz PUD 2000b). SD1 invited the public to provide comments on the projects either through written or oral testimony. Two public meetings were held in Woodland, WA on June 22, 2000, and a site tour was offered the following day. In addition to comments offered at these scoping meetings, the following entities provided written comments: Commenting Entity Conservation Groups (American Rivers, Trout Unlimited, Native Fish Society, Washington Council Trout Unlimited, Clark-Skamania Fly- Fishers, Friends of the Earth, and Federation of Fly Fishers) Date of Letter or E-mail July 14, 2000 Clark County Board of Commissioners July 17, 2000 James Malinowski, Fish First July 14, 2000 U.S. Fish and Wildlife Service July 14, 2000 Washington Department of Fish and Wildlife July 14, 2000 John Clapp July 13 and August 12, 2000 Mariah Stoll Reese July 13, 2000 U.S. Department of Agriculture, Forest Service (USFS), Gifford Pinchot National Forest August 11, 2000 Heidi Cobbs July 10, 2000 Gerrie Caines July 17, 2000 James Wooldridge July 13, 2000 Written and oral comments were summarized and addressed in Scoping Document 2 (PacifiCorp and Cowlitz PUD 2001) (SD2), issued on January 10, 2001. SD2 presented an expanded list of resource issues to be examined in this NEPA analysis. In particular, the preliminary list of alternatives was expanded to include project removal and settlement alternatives. However, removal of one or more project dams would not satisfy the purpose and need which compel the proposed action. Therefore, project removal/retirement has not been analyzed in this environmental assessment. The Applicants will analyze the impacts of any settlement proposal, as appropriate, when settlement terms are final. 1.4 CONSULTATION In addition to the formal NEPA consultation described in the previous section, significant opportunities for public involvement were integrated into the Lewis River relicensing process. Opportunities began in 1999 with the Watershed Studies Scoping Process. Interested parties were invited to participate in the identification of key watershed questions that would guide study plan development for the three Lewis River Projects. To accommodate this basin-wide study approach, FERC agreed to delay its processing of the Yale license application (PacifiCorp 1999a) (filed in April 1999) and approved April 2004 Preliminary Draft EA / Page 1-7

PacifiCorp s request to accelerate the expiration date of the Merwin license application from 2009 to 2006. These actions enabled the concurrent environmental analysis of all three projects reflected in this PDEA. Also in 1999, PacifiCorp and Cowlitz PUD applied for and received FERC approval to initiate an Alternative Licensing Process (ALP). With the initiation of this collaborative process in April 1999, a Steering Committee and six resource workgroups were established. Meetings of the Aquatics, Terrestrial, Recreation, Cultural, Socioeconomics, and Flood Management workgroups and the Steering Committee have occurred at varying frequencies over a three-year period, as documented in the Applicant s six month reports to FERC, on PacifiCorp s Lewis River website, and in Cowlitz PUD s and PacifiCorp s public files. These meetings gave interested members of the public the opportunity to provide input on what resource studies were conducted, the scope of these studies, and to comment on the results of the studies. Another extensive consultation process was undertaken by the Applicants and a relicensing Collaborative Team, designed to identify environmental enhancement measures that could be made part of relicensing alternatives. Called the Resource Enhancement Alternatives Document (READ) (PacifiCorp and Cowlitz PUD 2002a) process, many relicensing participants identified potential enhancement measures in a series of meetings and workshops throughout 2001. The product of this effort, released in March 2002, was a lengthy list of potential enhancement measures and effects for use in refining the preliminary alternatives identified in SD2. The stakeholders also collaborated on the preparation of a companion document titled the Resource Interaction Document (PacifiCorp and Cowlitz PUD 2002b) that identified the potential positive and negative interactions of each of the proposed enhancement measures with one another. These collaborative discussions and work products helped the participants to focus on and understand the measures of most importance, and interactions between and within each resource area to be carried forward into alternative development. Following the READ process, consultation efforts focused on settlement talks. Public and agency participants selected representatives for a Negotiating Group, which met at least monthly throughout 2002 and continue to meet. Their goal, to reach settlement terms on resource issues, is ongoing at the time of publication of the PDEA. If formal settlement can be reached, the work of this group will be reflected in a Settlement Alternative to be analyzed in a supplemental environmental analysis that would be filed with FERC in 2004. Page 1-8 / Preliminary Draft EA April 2004