RIGGING MILITARY UTILITY VEHICLE (M-GATOR)

Similar documents
Airdrop of Supplies and Equipment: Rigging Military Utility Vehicles

RIGGING AIRDROP PLATFORMS

AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING WATER PURIFICATION UNITS MAY 2005

DUAL ROW AIRDROP SYSTEMS

Headquarters, Department of the Army United States Marine Corps Department of the Navy Department of the Air Force

AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING CONTAINERS. September 2005

TECHNICAL MANUAL UNIT AND INTERMEDIATE DIRECT SUPPORT (DS) MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR

TECHNICAL MANUAL UNIT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR CONTAINER DELIVERY SYSTEM

MULTISERVICE HELICOPTER SLING LOAD: BASIC OPERATIONS AND EQUIPMENT

TECHNICAL MANUAL UNIT AND INTERMEDIATE DIRECT SUPPORT (DS) MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

APPENDIX I HELICOPTER OPERATIONS

Summary Report for Individual Task H-1509 Place 463L Pallet System Into Storage Status: Approved

CARGO SPECIALISTS' HANDBOOK

TECHNICAL BULLETIN OPERATOR'S AND UNIT MAINTENANCE FOR SEMITRAILER, TRANSPORTER, HEAVY EQUIPMENT 70 TON, M1000

TECHNICAL MANUAL TRANSPORTABILITY GUIDANCE APPLICATION OF BLOCKING, BRACING, AND TIEDOWN MATERIALS FOR RAIL TRANSPORT

GENERATOR SET, GASOLINE ENGINE DRIVEN, SKID MOUNTED, TUBULAR FRAME, 1.5 KW, SINGLE PHASE, AC, 120/240 V, 28 V DC (LESS ENGINE)

Engineering for Transportability Program

TM &P. This copy is a reprint which includes current pages from Changes 1 through 5.

PETROLEUM LABORATORY TESTING AND OPERATIONS

Engineering for Transportability Program

ORGANIZATIONAL MAINTENANCE MANUAL

Approved for public release; distribution is unlimited.

TM TECHNICAL MANUAL OPERATOR, ORGANIZATIONAL, MAINTENANCE MANUAL

SALOG Aerospace & Aviation Logistics

MILITARY SPECIFICATION SEAT, AIRCRAFT, TROOP WALL-STYLE

HEADQUARTERS, DEPARTMENT OF THE ARMY 21 AUGUST 1992 C1

This Manual Supersedes TM dated 9 January APPROVED FOR PUBLIC RELEASE DISTRIBUTION IS UNLIMITED.

UNCLASSIFIED UNCLASSIFIED ARMED SERVICES TECHNICAL INFORMATION AGENCY ARLINGTON HALL STATION ARLINGTON 12, VIRGINIA. by Ute.

MCRP A FM Mortars. U.S. Marine Corps PCN

CHAPTER 607 MOVEMENT OF INTERMODAL CONTAINERS BY AIR

TM DRILL, PNEUMATIC, DRIFTER: BOOM-TYPE; CRAWLER- MOUNTED; SELF-PROPELLED (INGERSOLL-RAND MODEL CM150A/D475A) FSN

TM &P SEMITRAILER, TACTICAL, DUAL PURPOSE, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON M871A2 (NSN )

Summary Report for Individual Task H-3508 Direct Cargo Operations (RO/RO) Status: Approved

RPlf WI'TB~rE~u us w QUARTERMASTER AERIAL SUPPLY COMPANY. Af t gl-s'tt) IC.USE OiliV. !tpaartment OF THE ARMY FIELD MANUAL

BOH FPU Systems BOH ENVIRONMENTAL LLC Avion Parkway, Suite 220 Chantilly, VA POC Jim Stokes (703)

DISTRIBUTION STATEMENT A: Approved for public release; distribution Is unlimited. DIRECT SUPPORT TROUBLESHOOTING 5-4

PERFORMANCE SPECIFICATION MANUALS, TECHNICAL AND CHECKLISTS PREPARATION OF CARGO AIRCRAFT LOADING AND OFFLOADING

TM TECHNICAL MANUAL DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

Summary Report for Individual Task H-1538 Operate ATLAS Rough Terrain Forklift With a Load Status: Approved

FM MCRP A MORTARS

OPERATOR, ORGANIZATIONAL AND DIRECT SUPPORT MAINTENANCE MANUAL, GENERATOR SET, DIESEL ENGINE, TRAILER MOUNTED PU-407/M (FSN )

SEMITRAILERS, 12-TON, 4-WHEEL

C-12 (King Air 200 Series) Aerospace Resources, Inc.

M C I C. MAERSK Container Inspection Criteria. (All Lines) (For use with all DRY Containers in-service) Version 7: 2016

You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed.

TECHNICAL MANUAL TRANSPORTABILITY GUIDANCE REDEYE AIR DEFENSE GUIDED MISSILE SYSTEM

TECHNICAL MANUAL UNIT AND DIRECT SUPPORT (DS) MAINTENANCE MANUAL(INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR

Aircraft Enroute Command and Control Comms Redesign Mechanical Documentation

Design and Development of a New Cargo Parachute and Container Delivery System

TM DEPARTMENT Of THE ARMY TECHNICAL MANUAL

TM DEPARTMENT OF THE ARMY TECHNICAL MANUAL

HEADQUARTERS, DEPARTMENT OF THE ARMY

UNITIZATION PROCEDURES FOR 5.56MM OR 7.62MM CARTRIDGES PACKED IN SURE-PAK CONTAIN- ERS FOR INTRA-THEATER GROUND MOVEMENT ONLY

Headquarters, Department of the Army

DEPARTMENT OF DEFENSE TEST METHOD STANDARD USAF AIRCRAFT ARRESTING SYSTEMS

UNIT AND DIRECT SUPPORT (DS) MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR PARACHUTES, PERSONNEL TYPE:

HEADQUARTERS, DEPARTMENT OF THE ARMY

Cargo Securing ver. 2.1

CHAPTER 607 MOVEMENT OF INTERMODAL CONTAINERS BY AIR

LLW Repository Ltd. Loading Plan. Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0018/C

TECHNICAL MANUAL WATER SUPPLY FOR SPECIAL PROJECTS

BOH FPU Systems BOH ENVIRONMENTAL LLC Avion Parkway, Suite 220 Chantilly, VA POC Jim Stokes (703)

EVT DTIC FOUR UNITS HIGH MIL-STD TEST OF PA 116 WOOD PALLET WITH TOP LIFT ASSEMBLY DRAWING (Final.

Approved for public release; distribution is unlimited. *This manual supersedes TM , 14 April 1986, including all changes.

TECHNICAL MANUAL FIELD MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR

OPERATOR'S MANUAL LONG RANGE SNIPER RIFLE (LRSR), CALIBER.50, M107 (NSN )

Low Cost HALO Cargo Airdrop Systems

Summary Report for Individual Task N-1112 Prepare Manifest for Selected Mode of Transport Status: Approved

TECHNICAL MANUAL UNIT AND INTERMEDIATE DIRECT SUPPORT (DS) MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR

TECHNICAL MANUAL OPERATOR'S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS INFORMATION)

LLW Repository Ltd. Loading Plan. Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0019/C

CITY OF BATAVIA DECK CONSTRUCTION REQUIREMENTS

TECHNICAL MANUAL OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR

This publication is available on the General Dennis J. Reimer Training and Doctrine Digital Library at

John Deere RGATOR TM. Feb 18, 2009 Bob Norris. w C

WEIGHT AND BALANCE/ EQUIPMENT LIST TABLE OF CONTENTS

FM ARMY HELICOPTER INTERNAL LOAD OPERATIONS

Method Statement. Temporary Roadways. Hybrid Panel. John Trainor Site Quality and Products Manager. Date: 01 December 2014

Owner's Manual 3,600 Pound Keeperless Cargo Hook Kit. Eurocopter AS350B3

Health & Safety Policy and Procedures Manual SECTION 8 FALL PROTECTION PROGRAM

Sault Ste. Marie Area Public Schools Delivery Vehicle Bid Specifications. 201 inches/120 inches from rear axle to cab

MULTISERVICE HELICOPTER SLING LOAD: BASIC OPERATIONS AND EQUIPMENT

Just Makes Cents... Per Watt. Compliance Report Composition L-Foot Kit State of California September 25th SOLARACK INC.

FM (FM ) MCRP E, VOL I NTTP AFMAN (I), VOL I COMDTINST M B JULY 2006

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

REFERENCES RELATED PUBLICATIONS

HEADQUARTERS FIELD MANUAL AND THE AIR FORCE MORTARS. DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.

Summary Report for Individual Task H-3507 Direct Cargo Operations (Breakbulk) Status: Approved

Important: Before You Start

ER6-SERIES1:6 SERVICE MANUAL

Form Approved. Air Force Flight Test Center 418th Flight Test Squadron 300 North Wolfe Ave. Edwards AFB, CA AFFTC-PA-04206

DEPARTMENT OF THE ARMY TECHNICAL BULLETIN SAFETY CARBON MONOXIDE POISONING. Department of the Army, Washington 25, D.C.

Modul-Floor WHEN EVERYTHING CLICKS

TESTS OF CARGO FLOORING Nn AND T FOP AIRCRAFT

ISO INTERNATIONAL STANDARD. Air cargo equipment Air cargo pallets Utilization guidelines

ISO INTERNATIONAL STANDARD. Air cargo equipment Air cargo pallets Utilization guidelines

Quick-release pins swing the rack open from left to right to simplify installing and maintaining your equipment.

Pointers On Shipping Mechanical/ Automotive Parts

TECHNICAL MANUAL OPERATOR S, ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS)

Aerial/Ground Recovery Equipment

Transcription:

ARMY FM 4-20.108 (FM 10-508) AIR FORCE TO 13C7-2-491 AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING MILITARY UTILITY VEHICLE (M-GATOR) DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. HEADQUARTERS DEPARTMENT OF THE ARMY DEPARTMENT OF THE AIR FORCE

*FM 4-20.108/TO 13C7-2-491 Field Manual No 4-20.108 Tecnical Order No 13C7-2-491 Headquarters Department of the Army and the Air Force Washington, DC, 29 June 2001 Airdrop of Supplies and Equipment: Rigging Military Utility Vehicle (M-Gator) Contents Page Preface... iv Introduction Description of Items... v Special Considerations... v Chapter 1 Rigging One Military Utility Vehicle (M-Gator) on an 8-Foot Platform for Low- Velocity Airdrop Description of Load... 1-1 Preparing Platform... 1-1 Building and Placing Honeycomb Stack... 1-3 Preparing the M-Gator... 1-5 Positioning Load... 1-8 Lashing M-Gator... 1-9 Building M-Gator Box... 1-12 Positioning M-Gator Box... 1-15 Lashing M-Gator Box... 1-16 Installing Suspension Slings... 1-18 Stowing Cargo Parachute... 1-19 Installing Extraction System... 1-20 Installing Parachute Release... 1-21 Positioning Extraction Parachute... 1-22 Distribution Restrictions: Approved for public release; distribution is unlimited. *This publication supercedes FM 10-508/TO13C7-2-491, 16 August 1985. i

Page Installing Provisions for Emergency Restraints... 1-22 Marking Rigged Load... 1-23 Equipment Required... 1-23 Chapter 2 Chapter 3 Rigging Two Military Utility Vehicles (M-Gator) and Equipment Box on a 20-Foot Platform for Low-Velocity Airdrop Description of Load... 2-1 Preparing Platform... 2-1 Building M-Gator Boxes... 2-1 Building Honeycomb Stacks... 2-3 Positioning Honeycomb Stack 2... 2-3 Preparing the M-Gators... 2-4 Building Equipment Box... 2-5 Positioning and Lashing the Equipment Box... 2-6 Positioning M-Gator Honeycomb Stacks... 2-9 Positioning Load...2-10 Lashing M-Gators...2-11 Positioning M-Gator Boxes...2-18 Lashing M-Gator Boxes...2-19 Installing Suspension Slings...2-23 Stowing Cargo Parachutes...2-24 Installing Extraction System...2-25 Installing Parachute Release... 2-26 Positioning Extraction Parachute...2-27 Installing Provisions for Emergency Restraints...2-27 Marking Rigged Load...2-28 Equipment Required...2-28 Rigging One Military Utility Vehicle (M-Gator) and an A-22 Cargo Bag on a 12-Foot Platform for Low-Velocity Airdrop Description of Load... 3-1 Preparing Platform... 3-1 Building M-Gator Box... 3-1 Preparing M-Gator... 3-1 Building Honeycomb Stacks... 3-3 Positioning Honeycomb Stack 1... 3-3 Positioning Load... 3-4 Positioning Honeycomb Stack 2... 3-5 Rigging and Positioning the A-22 Cargo Bag... 3-6 Lashing the A-22 Cargo Bag... 3-7 Lashing M-Gator......3-9 Positioning M-Gator Box...3-12 Lashing M-Gator Box...3-13 Installing Suspension Slings...3-15 Stowing Cargo Parachute...3-16 Installing Extraction System...3-17 Installing Parachute Release... 3-18 Positioning Extraction Parachute...3-19 ii

Page Installing Provisions for Emergency Restraints...3-20 Marking Rigged Load...3-21 Equipment Required...3-21 Glossary... Glossary-1 References...References-1 iii

Preface This manual tells and shows how to prepare and rig the following configurations of the Military Utility Vehicle (M-Gator) for low-velocity airdrop from a C-130, C-141, C-17, and C-5 aircraft: User Information a. One M-Gator on an 8-foot platform. b. Two M-Gators and equipment box on a 20-foot platform. c. One M-Gator and A-22 Cargo Bag on a 12-foot platform. The proponent of this publication is HQ TRADOC. You are encouraged to report any errors or omissions and to suggest ways of making this a better manual. Army personnel, send your comments on DA Form 2028 directly to: Director Aerial Delivery and Field Services Department USA Quartermaster Center and School 1010 Shop Road Fort Lee, Virginia 23801-1502 Air Force personnel, send your reports on AFTO Form 22 through: Headquarters Air Mobility Command (AMC/DOKT) 402 Scott Drive Scott AFB, Illinois 62225-5302 Air Force personnel in Special Operations Command, send your reports on AFTO Form 22 through: to: HQ AFSOC/DOXT 100 Bartley Street, Suite 260 Hurlburt Field, Florida 32544-5273 Director Aerial Delivery and Field Services Department USA Quartermaster Center and School 1010 Shop Road Fort Lee, Virginia 23801-1502 Also send information copy of AFTO Form 22 to: WR-ALC/LKCB 460 Richard Ray Blvd. Robins AFB, Georgia 31098-1640 iv

Introduction Description of Items The description of the items rigged in this manual is given below: Special Considerations a. Military Utility Vehicle (M-Gator): The M-Gator is 108 inches long, 60 inches wide and 43.6 inches high. The weight of the M-Gator is 1,450 pounds, including fuel and fluids. Maximum payload for the M-Gator is 1,400 pounds to include passengers. b. A-22 Cargo Bag Assembly: The A-22 cargo bag assembly is an adjustable cotton duck cloth/nylon and nylon webbing container. For this application, the A-22 bag assembly will not exceed a maximum rigged weight of 1,000 pounds due to the M-Gator payload restrictions. The minimum rigged weight is 800 pounds. Maximum height for the rigged A-22 is 83 inches. CAUTION Only ammunition listed in FM 10-500-53/MCRP 4-3.8/ TO 13C7-18-41 may be airdropped. The loads covered in this manual may include hazardous materials as defined in AFJMAN 24-204/TM 38-250. If included, the hazardous material must be packaged, marked, and labeled as required by AFJ MAN 24-204/TM 38-250. A copy of this manual must be available to the joint airdrop inspectors during the before- and afterloading inspections. v

FM 4-20.108/TO 13C7-2-491 CHAPTER 1 Rigging One Military Utility Vehicle (M-Gator) on an 8-Foot Platform for Low-Velocity Airdrop DESCRIPTION OF LOAD PREPARING PLATFORM 1-1. This load consists of one John Deere Diesel, which has been named the Military Utility Vehicle (M-Gator)(Figure1-1). It is rigged on an 8-foot platform. The load shown has a rigged weight of 3120 pounds. It has a length of 125 inches, width of 108 inches, and height of 78 inches, with a center of balance of 49 inches. The load is rigged with one G-11 cargo parachute. 1-2. Inspect, or assemble and inspect, an 8-foot platform as outlined in TM 10-1670- 268-20&P/TO 13C7-52-22. Prepare an 8-foot platform using 14 tiedown clevises as shown in Figure1-2. Figure 1-1. Military Utility Vehicle (M-Gator) 1-1

FM 4-20.108/TO 13C7-2-491 CLEVISES 7A THROUGH 1A LEFT REAR FRONT RIGHT CLEVISES 7 THROUGH 1 Step: 1. Install a tandem link to the front of each platform side rail using holes 1,2, and 3. 2. Install a tandem link to the rear of each platform side rail using holes 14, 15, and 16. 3. Install a clevis on bushing 1 of each front tandem link. 4. Install a clevis on bushing 2 of each rear tandem link. 5. Starting at the front of each platform side rail, install clevises on the bushings bolted on holes 7, 9, 10, 11, and 12. 6. Starting at the front of the platform, number the clevises 1 through 7 on the right side and 1A through 7A on the left side. 7. Label the tie-down rings according to FM 10-500-2/TO 13C7-1-5. Figure 1-2. Platform Prepared 1-2

FM 4-20.108/TO 13C7-2-491 BUILDING AND PLACING HONEYCOMB STACK 1.3. Prepare the honeycomb stack for the M-Gator as shown in Figure1-3. Position the honeycomb stack as shown in Figure1-4. REAR FRONT 40 14 Stac tack Number Piece ieces Widt idth (inches) Lengt ength (inches) M aterial Instruction s 1 3 72 12 Honeycomb Position on floor with the second piece 14 inches from the first and the third piece 40 inches from the second. Cut a 6-inch by 6-inch hole in each piece of honeycomb 6 inches from the sides and centered. 1 9 9 Honeycomb Centered and 16 inches from the the second piece of honeycomb. rear of 1 12 90 Honeycomb 6 30 12 Honeycomb 3 72 12 Honeycomb 6 12 12 Honeycomb 2 9 9 Honeycomb 3 9 9 3/4-inch Plywood 1 9 9 Honeycomb Center and glue honeycomb. across first four pieces of Cut 6-inch by 6-inch holes, 6 inches from one side, in the center of each piece. Line holes up on base and glue in place. Cut 6-inch by 6-inch holes on each side of honeycomb, 6 inches from the side and centered. Line holes up on base and glue in place. Center and glue three and second sections. pieces on the first Center and glue on the third sections rear edge. Glue on the 9-inch by 9-inch honeycomb stack. Glue on the 9-inch by and plywood stack. 9-inch honeycomb Figure1-3. Honeycomb Stack Prepared 1-3

FM 4-20.108/TO 13C7-2-491 Stac tack Number Position of Stack on Platform Place stack: 1 Centered on platform and even with front edge of platform. Figure1-4. Honeycomb Stack Positioned on Platform 1-4