ARCHITECTURAL DRAWINGS

Similar documents
REHABILITATION OF LUUQ LOCAL ADMINISTRATION OFFICES GRANT NO.: - KIS062

PROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT.

REHABILITATION OF DOLOW ORIENTATION CENTRE

PROJECT: PROPOSED SCHOOL - AWDINLE - IMPLEMENTED BY: SOMALI STABILIZATION INITIATIVES CLIENT. AWDINLE SCHOOL

PROPOSED YONTOY PREFAB OFFICES PROPOSED PREFAB INSTALLATION -YONTOY- JUBBALAND STATE OF SOMALIA PROJECT: IMPLMENTED BY: GOVERNMENT.

Somali Stabilization Initiative (SSI)

Description Unit Quantity Rate Kshs. Amount Kshs.

REHABILITATION OF DOLOW ADMINISTRATION AND COMMUNITY CENTRE

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

NOTICE TO BIDDERS. TO: All Bidders FROM: Alvin Kumar DATE: 20 th July 2017 DESIGNATION: Deputy Manager Project

United Nations Development Programme

United Nations Development Programme

Good Construction Practices Part I

Estimate FOR THE SEPTIC TANK

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School

300 SM 285 SM 256 CM 70 CM 63 CM 210 SM 241 SM 3 CM

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT

Child Friendly Schools in Rwanda

Architectural & Structural Design

Appendix 4. Bills of Quantities

CONSTRUCTION OF ELEVATED WATER TANK & WATER WELL VAULT INTERNATIONAL CAMPUS AUGUST 2018

PROPOSED CONSTRUCTION OF TWIN ECD CLASSROOM AND THREE DOOR PIT LATRINE BILLS OF QUANTITIES PROPOSED TWIN ECD CLASSROOM FINANCIAL YEAR

Carried to collection

General Technical Specification

CATCHMENT STRUCTURE 13M X 15M

PROPOSED ERECTION AND COMPLETION OF CEREAL STORE.

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

The International Committee of the Red Cross

RCC PRECAST TOILET UNITS

Confined masonry. An illustrated guide for masons. This manual explains this technique. Confined masonry. RC frames. Columns first, walls after

SDCS-02 CONSTRUCTION STANDARD FOR

BUILDING SKILLS. Building Skills : Basic Painting. Building Skills : Plaster & Tiler. Course Content : Course Content : Duration : 10 Days

SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY

MANDATORY TENDER INSTRUCTIONS

Mason s Training Programme on Onsite Treatment Systems

Item Description Qty Unit Rate Total x 1500 mm with one fixed light and two hanging lights 18 No 9, ,000

Central Power Research Institute Prof Sir C V Raman Road, Sadashivnagar Post Office Post Box No: 8066, Bangalore

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

BRIAN FELIX LUKORITO PORTFOLIO

MILESTONES : JAIPUR PROJECT

5.3.1 Water seal Positioning the toilet pan 12

Description Qty Unit Rate (US$) 1.00

Scanned by CamScanner

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes

CHILDREN CHILDREN PLAY AREA REST AREA EXAMINATION SPACE PRIVATE MEDICAL CHECK-UP IOM IMPLEMENTATION PARTNER IMPLEMENTATION PARTNER OFFICE 02

LORD'S VIEW INDUSTRIAL PARK

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

1 Site Preparation & marking L.S 1, brickwork in basement in cm 1: cft 19,975.00

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

SECTION FACILITY SANITARY SEWERS

CORRIGENDUM No: 1. to the. Volume 3: Technical Specifications. Publication Ref: BAM/ADMP/GPF/WRK/VC

TERRACE FACTORY - TYPE A1

Garage Conversions. Technical Issues

ACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

BRICKWORK 3.5 BRICKWORK 1 GENERAL

New Raised Courtyard Terrace Pavers and Retaining Walls. Line of Steps Above. New Wood Framed Stair

Denis Creedon, B.E., MIEI. CONSULTING ENGINEER

Tender form along with drawings for executing Rainwater Harvesting Resource Center works at Utthan, Allahabad, Uttar Pradesh.

TOWER-1A: TERRACE FLOOR SLAB

BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

Concrete Slab-on-Ground

PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238

GRAAD 12 NATIONAL SENIOR CERTIFICATE GRADE 12

Section 02 SUBSTRUCTURE

PRELIMINARY INSPECTION FRAMEWORK

Mono County Health Department Construction Guide for Residential and Commercial On-Site Sewage Treatment & Disposal System I.

1. Remove worn-out old plaster (or any other finishing).

CIVIL WORKS Mahesh G. Nair

AFRICAN DEVELOPMENT BANK, NIGERIA FIELD OFFICE, ABUJA NIGERIA ARCHITECTURAL DRAWINGS FOR TENDER

THIMPHU CITY CORPORATION BUILDING APPLICATION SECTION

A/E Design Deliverable Checklist

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

CHAPTER 8. Concrete Work

1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

Sl No. Sqm Sqm Sqm Cum Cum 0.73

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI

SECTION PLUMBING DRAINAGE AND CONTAINMENT. Copyright Specialloy Industries Inc. dba Slot Drain Systems - All rights reserved

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

PROPOSED HOUSING PROJECT FOR RICHY PROJECTS (PVT) LTD IN SRI LANKA HOUSE TYPE - 01 PRICED BILL OF QUANTITIES

Toilet Construction Handbook for Masons

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

THE SPENCER RESIDENCE J&S ARCHITECT

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

Transcription:

PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS

SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05 06 07 08-13 14 15 16 17 18 3D-01 to 3D-05 GPS COORDINATES SITE PLAN SET OUT PLAN OFFICE BLOCK PLANS OFFICE BLOCK ELEVATIONS OFFICE BLOCK ELECTRICALS OFFICE BLOCK MECHANICAL OFFICE BLOCK ANALYSIS SHEETS HALL FLOOR PLAN, ROOF PLAN & SECTION HALL ELEVATIONS HALL ELECTRICALS SEPTIC TANK BOUNDARY WALL DETAILS 3 DIMENSIONAL PROJECTIONS PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS

3.79361N, 42.54477E INDEX SHEET

OFFICES & TOILETS Compacted walkways & Parking MAIN ENTRY HALL Proposed Septic Tank Location SITE PLAN 01 1:125

29,000 4,000 4,000 4,000 4,800 4,000 4,000 4,000 37,000 4,000 4,000 4,000 4,000 700 15, 900 4,000 4,000 1,680 16,000 3,120 4,000 4,000 4,000 37,000 15,020 1,940 OFFICES & TOILETS 21,000 4,000 4,000 4,000 1,300 3,506 4,000 4,000 4,000 12,250 1,000 300 3, 12,250 29,000 7,650 5,580 12,600 Compacted walkways & Parking MAIN ENTRY HALL Proposed Septic Tank Location SET OUT PLAN 02 1:125

3,775 3,500 3,775 450 450 450 E-02 22,000 4,900 2,700 2,250 3,601 1,299 2,850 3,950 2,220 900 4,030 900 4,030 900 2,220 2,850 2,220 900 3,110 700 1,620 700 600 1,700 950 600 950 4,000 4,850 2,700 2,300 3,601 1,299 2,850 22,000 E-04 A B C D E 21,150 4,900 6,400 4,900 4,500 2,223 900 2,226 E-03 395 395 1,000 1,060 900 1, 1,000 2,220 900 1,780 4,950 1 2 Room 3 Room 2 Room 2 3 3,000 Toilet 250 1, 1,450 Store 250 2,750 Toilet 4 5 open arch on top 6 Room 1 Room 2 7 Porch 8 2,230 900 1,770 965 1,600 345 1, 345 1,600 795 1,780 900 2,220 4,500 4,900 6,400 4,900 4,500 21,150 E-01 OFFICE BLOCK FLOOR PLAN 03 1:120

450 3,600 450 3,600 450 3,600 450 3,600 A B C D E New 1600mm (W) X 2300mm (H) steel casement windows to fabricators details New 1600mm (W) X 2400mm (H) steel double door to fabricators details mm thick R.C. Slab roof New 900mm (W) X 2300mm (H) steel casement windows to fabricators details Roof Level +4,050 1 2 3 4 5 6 7 8 Floor Level +450 G.L 450mm thick masonry walls, plastered and painted to approval mm thick R.C. Slab roof New 900mm (W) X 2300mm (H) steel casement windows to fabricators details ELEVATION E-01 4,899 6,400 4,900 4,500 Roof Level +4,050 E D C B A Floor Level +450 G.L mm thick R.C. Slab roof New 900mm (W) X 2400mm (H) steel swing door to fabricators details New 900mm (W) X 2300mm (H) steel casement windows to fabricators details ELEVATION E-02 Roof Level +4,050 8 7 6 5 4 3 2 1 Floor Level +450 G.L ELEVATION E-03 4,500 4,900 6,400 4,899 Roof Level +4,050 Floor Level +450 G.L 450 4,850 2,700 2,300 3,601 1,299 2,850 ELEVATION E-04 OFFICE BLOCK ELEVATIONS 04 1:120

Room 2 Room 2 Room 3 Room 2 Room 3 Room 2 3,000 250 1, Store 3,000 250 1, Store Toilet 250 2,750 Toilet Toilet 250 2,750 Toilet open arch on top open arch on top Room 1 Room 2 Room 1 Room 2 OFFICE BLOCK LIGHTING LAYOUT Porch LEGEND 1 gang 1 way switch 4 gang 1 way switch Twin Socket with switch 4 way conumer unit Lighting mains Lighting circuits Power circuits Porch OFFICE BLOCK POWER LAYOUT OFFICE BLOCK ELECTRICALS 06 1:120

750mm x 650mm MANHOLE 750mm x 650mm MANHOLE Room 2 Room 2 Room 3 Room 2 Room 3 Room 2 Gate Valve Toilet Ball Valve open arch on top Store Toilet 32mm Ø pvc piping Gate Valve Ball Valve INSPECTION CHAMBER Toilet open arch on top Store Toilet INSPECTION CHAMBER 750mm x 650mm MANHOLE Room 1 Room 2 Room 1 Room 2 Porch Porch OFFICE BLOCK PLUMBING LAYOUT OFFICE BLOCK DRAINAGE LAYOUT OFFICE BLOCK MECHANICALS 07 1:120

R.C. SLAB ROOF Cut off the tree branches extending onto the R.C. slab roof of the building. Clear all accumulated leafs and other material from the roof, scrub all loose material until clean. Fill chipped off areas with approved Concrete mix to structural engineers approval. Hack and remove all eroded plaster, Providing 25mm thick protective cement and sand screed, laid to fall towards drains. OFFICE BLOCK ANALYSIS SHEET 01 08

R.C. SLAB ROOF Cut off the tree branches extending onto the R.C. slab roof of the building. Clear all accumulated leafs and other material from the roof, scrub all loose material until clean. Fill chipped off areas with approved Concrete mix to structural engineers approval. Hack and remove all eroded plaster, provide 15mm thick cement plaster and approved waterprofing to minimize deteroriation. OFFICE BLOCK ANALYSIS SHEET 02 09

INTERNAL WALLS The following is the scope of works to be carried out on walls: Hacking and removing all eroded plaster, provide 15mm thick cement plaster for external and 12mm thick cement plaster for internal, after that painting to approval. The plinth at the base of the building to be cleaned, filled with approved cement, plastered and painted to approval OFFICE BLOCK ANALYSIS SHEET 03 10

TOILETS Hack and remove all eroded plaster, clean and scrub off debri and fix 150mm x 150mm wall tile up to 1800mm height from floor finish. Install m ceramic tiles on the floor. Provide and fix all sanitary wares as indicated on drawings OFFICE BLOCK ANALYSIS SHEET 04 11

FLOORING Hack existing floor finish off. Clean and clear debri on the floor ready for floor tiles installation Fix ceramic floor tiles on the floor. OFFICE BLOCK ANALYSIS SHEET 05 12

DOORS & WINDOWS Demolish and remove all existing doors and windows while maintaining the size of the opening. Where the opening edges have chipped off or are eroded, fix with approoved material as per Structural Engineer's advice. Provide and fit Steel casement windows as per schedule. Provide and fit all external and internal doors as per the schedule provided OFFICE BLOCK ANALYSIS SHEET 06 13

E-02 16,000 1,450 1, 1,600 1,600 1,150 1,600 1,150 1,600 1,600 1, 1,450 4,000 3,900 3,900 4,000 16,000 E-04 150mm x 150mm G.I. Sheet Gutter FALL 16,000 A E-03 B A B 800 7,800 6,600 1 7,800 1 mm thick Hollow blocks wall HALL 28 gauge Box profile G.I. Sheet Roof +450 800 6,600 7,800 2 2 E-01 HALL FLOOR & ROOF PLAN 14 1:100

450 3,700 2,360 1,000 2,300 2,400 2,300 2,300 340 300 600 600 B A 1 New 1600mm (W) X New 1600mm (W) X 2300mm 2 28 gauge box profile G.I. 2400mm (H) steel double (H) steel casement windows to sheet roof on sawn timber door to fabricators details fabricators details truss at 15 degrees roof pitch Roof Level +4,150 1, 1,600 1,600 1,600 1, Roof Level +4,150 6,800 ELEVATION E-01 Floor Level G.L +450 ELEVATION E-02 15,800 Floor Level G.L +450 A B 2 1 mm thick hollow block masonry mm thick hollow wall, plastered and painted to block masonry wall, architect's approval plastered and painted to architect's approval Roof Level +4,150 Floor Level G.L +450 6,800 15,800 ELEVATION E-03 ELEVATION E-04 HALL ELEVATIONS 15 1:100

16,000 1,450 1, 1,600 1,600 1,150 1,600 1,150 1,600 1,600 1, 1,450 4,000 3,900 3,900 4,000 16,000 16,000 1,450 1, 1,600 1,600 1,150 1,600 1,150 1,600 1,600 1, 1,450 4,000 3,900 3,900 4,000 16,000 A B A B 800 7,800 6,600 1 800 7,800 6,600 1 800 6,600 7,800 2 800 6,600 7,800 2 HALL LIGHTING HALL POWER HALL ELECTRICALS 16 1:100

'H' Varries 150 450 150 E 150 1,400 150 150 F2 150 550 250 100 150 450 500 250 600 350 120 120 8mm DISTR. BARS AT mm CENTRES 12mm MAIN BARS AT 300mm CENTRES GL 450X600mm MANHOLE COVER AND FRAME 8mm MAIN BAR AT 300mm C/C GL GL 450X600mm MANHOLE COVER AND FRAME GL GL LIGHTLY COMPACTED SUITABLE SPORT FILLINGS GL INLET MANHOLE C1 4 INLET PIPE 10mm MAIN BAR C1 4 OUTLET PIPE OUTLET MANHOLE 150mm THK BLOCK WORK E 1,000 COMPACTED MURRAM IL TWL TO SOAK PIT WATER LEVEL POLYTHENE SHEET OR ANY OTHER APPROVED MATERIAL CRUSHED STONES mm th BLOCK WORK A 100 B C 100mm th. CONCRETE FOUNDATION MIX 1:3:6 mm th. BLOCK WORK 12mm WATER PROOF CEMENT -SAND RENDERING mm THK BLOCK WORK FRENCH DRAIN DETAIL 6" PERFORATED CLAY OR PITCH FIBRE PIPES 600mm LONG WITH 50mm OPEN JOINTS 12mm WATER PROOF CEMENT- SAND PLASTER 12mm WATER PROOF CEMENT-SAND PLASTER 400 150 mm CONCRETE 1:2:4-3/4 GRADED 400 SECTION X-X SECTION Y-Y Y-Y 3, 12mm MAIN BARS AT 300mm CENTRES GL GL 8mm MAIN BAR AT mm C/C 450X600mm MANHOLE COVER 12mm BARS AT 150mm CENTRES BOTH WAYS 150mm THK CONC. BLOCKS X-X X-X A B C TO FRENCH DRAIN OR SOAK PIT AS SPECIFIED 1000 C/C 12mm MAIN BARS AT mm CENTRES 150mm THK STONE BLOCKS TO DRAIN INVERT 'H' DEPTH OF SOAK PIT AS SPECIFIED OR DIRECTED BY DRAWING 150 600 Y-Y D SOAK PIT DETAIL PLAN WITH COVER SLAB REINFORCEMENT CAPACITY GALLONS 300 600 900 1 1500 6800 LITRES 1360 2720 4080 NUMBER OF PERSONS UPTO TO 10 11-20 21-30 5440 31-40 A 400 750 900 900 41-50 1000 DIMENSIONS IN MILLIMETRES B C D E F 300 1300 2 700 900 600 750 850 950 1350 1350 1350 1350 2900 3 3300 3500 900 1100 1300 1400 1100 1 1300 1400 F2 1360 2720 4080 5440 6800 NOTES 1. CONCRETE TO BE 1:2;3 3/4" GRADED AND TO BE ACCORDING TO GENERAL SPECIFICATION. 2. REINFORCEMENT TO BE MILD STEEL TO BS 785. 3. MINIMUM COVER TO BARS SHALL BE 25mm. 4. 1:2 CEMENT SAND RENDERING ON WALLS AND SCUM BAFFLES. SEPTIC TANK 17 1:100

mm thick concrete hollow blocks walling A 4,000 4,000 B 300X300x2800mm R.C columns A B BOUNDARY WALL - FOOTING LAYOUT 2,500 D.O.S 2,700 G.L SECTION A-A mm thick concrete hollow block walling with 50mm thick coping Rubble stone G.L 600xmm deep R.C strip foundation to S.E details ` D.O.S 2,800 2,600 1000x2700mm high steel gate 3600x2700 mm high steel gate ACCESS GATE 300x300x2800mm High R.C Boundary wall with 50mm thick coping 2,700mm high masonry block wall with 50mm thick coping plastered and painted to approval 4,000 4,000 4,000 4,000 BOUNDARY WALL - ELEVATION G.L SECTION B-B mm thick concrete hollow block walling with 50mm thick coping Rubble stone G.L 600xmm deep R.C strip foundation to S.E details ` BOUNDARY WALL DETAILS 18 1:100

3 DIMENSIONAL PROJECTION 3D-01 N/A

3 DIMENSIONAL PROJECTION 3D-02 N/A

3 DIMENSIONAL PROJECTION 3D-03 N/A

3 DIMENSIONAL PROJECTION 3D-04 N/A

3 DIMENSIONAL PROJECTION 3D-05 N/A