OUTSTANDING RESULTS FROM ILMENITE UPGRADE TESTWORK

Similar documents
SHEFFIELD ORE RESERVE FOR DAMPIER PROJECT AT 01 OCTOBER 2018 (in-situ assemblage) HiTi Leuc (%) Zircon (%)

For personal use only

For personal use only

PRE-FEASIBILITY STUDY UPDATE CONFIRMS THUNDERBIRD AS THE WORLD S BEST UNDEVELOPED MINERAL SANDS PROJECT

For personal use only

For personal use only

VANADIUM CONCEPT STUDY PROGRESS UPDAT E

A Successful Upstream Integration in the Heavy Mineral Sands Industry JM FOURCADE CEO, TIZIR LIMITED

For personal use only

1Q 2018 OPERATIONS REVIEW

Titanium mining and processing. INVESTOR PRESENTATION September 2013

March 2015 Quarterly Report

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate

WA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER

For personal use only

3Q 2017 OPERATIONS REVIEW

DALGARANGA PRE-FEASIBILITY UPDATE

For personal use only

Excellent Results from Conceptual Mine Study Ondjou Prospect, Namibia

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

For personal use only

Maiden Ore Reserve for Camel Creek JV

DEVELOPING A HIGH GRADE ILMENITE DEPOSIT TIO 2 WORLD SUMMIT 3-5 OCTOBER 2017 ALICANTE, SPAIN

For personal use only

WIM150 Mineral Sands Project 15 th Anniversary Mineral Sands Conference

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

Australia s leading explorer in Mexico

For personal use only

Thalanga Operations Ore Reserve and Mineral Resource Statement

For personal use only

IRON-NICKEL SCOPING STUDY COMMENCES ON KALGOORLIE NICKEL PROJECT

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT

QUARTERLY REPORT SEPTEMBER 2018

Australia s leading explorer in Mexico

For personal use only

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Austpac Resources N.L (APG)

For personal use only

Transitioning from Explorer to Miner

5 th Asian Bauxite & Alumina Conference

For personal use only

CORPORATE PRESENTATION. February 2016

Shaw River Completes Acquisition of 75.5% Interest in Namibian Manganese Project

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

For personal use only

121 MINING INVESTMENT CONFERENCE HONG KONG

For personal use only

FIRST GOLD ORE DISPATCHED FROM ULYSSES

CAPITAL DOWN AT TALA HAMZA

KOGI REPORTS BARGING STUDY COMPLETED

COMMENCEMENT OF DFS AND DRILLING AT GABANINTHA

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

Australia s leading magnetite producer. Southdown Magnetite Project

PILGANGOORA LITHIUM PROJECT: TEST WORK CONFIRMS POTENTIAL TO PRODUCE HIGH-QUALITY, HIGH-VALUE PRODUCTS

Grange Resources Australia s leading magnetite producer

Mozambique Real Opportunity. Benchmark World Tour Sydney 21 st September

MOU signed with steel and alloy product company

For personal use only

For personal use only

For personal use only

For personal use only

UPDATED FEASIBILITY STUDY AND FINANCIAL MODEL CONFIRMS ROBUST BUSINESS CASE FOR DEVELOPMENT OF MOUNT PEAKE VANADIUM-TITANIUM-IRON PROJECT

PILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING

Pelletising tests confirm Hawsons Supergrade a standout material for iron making

PILOT SOLAR EVAPORATION PONDS COMMISSIONED AT LAKE WELLS POTASH PROJECT, WA

Bald Hill Delivers Excellent Metallurgical Test Work Results

For personal use only

For personal use only

For personal use only

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES

For personal use only

For personal use only

Pilot Pond Update and Harvest Trials. Large Scale Pilot Harvesting Trials March 2018

For personal use only

For personal use only

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

SCOPING STUDY UNDERWAY

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

TZMI CONGRESS 2014, SHANGHAI CHINA NOVEMBER 2014

NEW HIGH GRADE IRON ORE DISCOVERY AT WOGGAGINNA

AUSTRALIAN POTASH COMPLETES FINAL BRINE TRANSFER

For personal use only

FENIX RESOURCES LIMITED

Successful Production of Premium Quality Boric Acid

BC IRON COMMITS TO FEASIBILITY STUDY ON NULLAGINE IRON ORE PROJECT POSITIVE SCOPING STUDY UNDERPINS MOVE TO FAST-TRACK DEVELOPMENT

For personal use only

For personal use only

For personal use only

Updated Epanko Scoping Study

SUCCESSFUL INFILL DRILLING CAMPAIGN COMPLETED

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

For personal use only

For personal use only

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

Hill End makes rapid progress toward becoming a significant producer of high purity alumina at its Yendon Project in Victoria

Transcription:

ASX and Media Release 9 September, 2015 KEY POINTS OUTSTANDING RESULTS FROM ILMENITE UPGRADE TESTWORK Breakthrough result for Thunderbird, with testwork confirming that the primary ilmenite can be substantially upgraded using a simple low temperature roast ( LTR ) process The LTR process is a low capital addition to processing that substantially increases the TiO2 grade of ilmenite by 22 to 56.1 96 solubility in sulphuric acid confirms LTR ilmenite as ideal feedstock for sulphate process pigment manufacturing LTR ilmenite from Thunderbird will be one of the highest grade sulphate ilmenites globally and should be a preferred feedstock Smelter testwork confirms LTR ilmenite is suitable feed for producing high quality TiO2 slag (89.8 TiO2) and pig iron Work to substantially reduce initial project capital costs is well advanced and the PFS is on track for completion during Q4 2015 Mineral sands developer Sheffield Resources Limited ( Sheffield the Company ) (ASX:SFX) today announced results from metallurgical testwork conducted on ilmenite from its 100 owned Thunderbird mineral sands project, located near Derby in Western Australia (Figure 2). The testwork focused on reducing the Fe2O3 levels and increasing the TiO2 content of the ilmenite to obtain a product that will command a higher selling price and be sold into a broader market. This was achieved by a simple, low temperature (450 0 C) reduction roast, and subsequent magnetic separation stage, which upgraded TiO2 in the primary ilmenite by 22 to 56.1 TiO2 and increased the FeO to Fe2O3 ratio. The LTR process proved extremely efficient at reducing Fe2O3 within the ilmenite, resulting in a significant increase in both TiO2 grade and acid solubility. Figure 1: TiO2 solubility vs grade, Sheffield LTR ilmenite product (red) benchmarked against known sulphate ilmenites (blue) Sheffield Resources Ltd ACN 125 811 083 Level 2, 41 Colin Street West Perth WA 6005 PO Box 205 West Perth WA 6872 T: +61(0) 8 6424 8440 F: +61(0) 8 9321 1710

- 2 - The results of the sulphuric acid solubility testwork show that the TiO2 solubility for the 450 0 C LTR ilmenite product is very high at 96.2 using an acid-to-ore ratio of 1.67. The TiO2 solubility of the Thunderbird LTR ilmenite was benchmarked against several known commercial ilmenites that are suitable for existing sulphate plants (Figure 1). The LTR ilmenite is in the highest bracket of solubility, and has a higher TiO2 grade than all the ilmenites tested in the benchmarking exercise. Sheffield s Managing Director Bruce McQuitty said the testwork has delivered a high grade sulphate ilmenite with specifications well suited as feedstock for both the sulphate pigment market and for TiO2 slag manufacture. This is a breakthrough result for the Thunderbird project. It confirms that the primary ilmenite can be substantially upgraded using a simple LTR process. The LTR process and magnetic separation acts as a homogenising process, reducing variability in the ilmenite product. It is essential in a competitive market to deliver a consistently high quality product. These results confirm that the LTR ilmenite from Thunderbird will be one of the highest grade sulphate ilmenites globally and should be a preferred feedstock that is likely to displace poorer quality ilmenites. Background The Thunderbird deposit is located on the Dampier Peninsula about 60km west of Derby, and 25km north of the sealed Great Northern Hwy joining Derby and Broome (Figure 2). The May 2015 prefeasibility study ( PFS ) (see ASX release dated 14 May, 2015) confirmed Thunderbird as a long life zircon rich project that is anticipated to deliver strong margins over an initial 32 year mine life. The PFS outlined an average annual production of 114,000 tonnes zircon, 439,000 tonnes ilmenite, and 30,000 tonnes of HiTi84 leucoxene (representing approximately 8 of global zircon and 4 of global TiO2 feedstock markets). Industry experts TZMI completed an assessment of the marketability of final products and concluded that; Primary zircon product (66.4 ZrO2) is suitable for the ceramics market; Primary ilmenite product (49.1 TiO2) is suitable feedstock for the sulphate-route TiO2 pigment processing; and HiTi84 product (87.7 TiO2) has specifications suited to the welding electrode market The Thunderbird primary ilmenite has many favourable characteristics, including low levels of key contaminants such as chromium and alkalis. The PFS indicated a life of mine in excess of 32 years which would potentially deliver a long term stable supply of high quality sulphate ilmenite and zircon into global markets. Planned ilmenite output could underpin a large pigment plant or titanium smelter. During the PFS it was identified that an upgraded LTR ilmenite would deliver significant upside potential through increased product pricing and greater market diversity.

- 3 - Figure 2: Location of Thunderbird project LTR & Solubility Testwork The recently completed metallurgical testwork programme was designed with the following objectives: 1. To determine LTR process conditions required to produce a high grade sulphate ilmenite; 2. To assess the acid solubility of LTR ilmenite and benchmark against commercial sulphate ilmenites; and 3. To assess the suitability of upgraded ilmenite as a smelter feedstock. The low temperature roast process conditions the primary ilmenite and iron bearing minerals by partial reduction to increase the magnetic susceptibility of iron oxides, while keeping the ilmenite in a temperature range that avoids the solubility of TiO2 being affected by rutilisation (conversion to less soluble rutile). For Thunderbird, the upgrade of TiO2 in the ilmenite concentrate is achieved by the removal of iron oxide minerals. These minerals have similar properties to ilmenite before roasting, but after roasting have a much higher magnetic susceptibility, making them easier to separate from the ilmenite fraction using standard low-intensity magnetic separators, resulting in high product yield. Primary ilmenite products with between 46 and 49 TiO2 content have been produced from metallurgical testwork on three bulk samples from Thunderbird during the Scoping and Prefeasibility studies. Sub-samples of the primary ilmenite derived from the PFS metallurgical testwork program were provided to Round Hill Engineering Pty Ltd who undertook LTR testwork and sulphuric acid solubility testwork under supervision of Robbins Metallurgical Pty Ltd. Smelter Testwork Test work completed by Outotec on pre-reduced primary ilmenite product derived from the Prefeasibility study test work and modelling completed on LTR ilmenite indicate that high grade TiO2 slag and pig iron can be produced. The high grade slag product (89.8 TiO2) compares well with competing slag products from Western and Asian smelters. The testwork showed that the LTR ilmenite is capable of producing both a high quality sulphate and chloride grade slag suitable for pigment plants, further broadening potential markets.

- 4 - Figure 3: LTR ilmenite product Next Steps A larger sample of the LTR ilmenite will be produced during the next stage of work for optimising product specification and yield. This will be used for marketing and offtake discussions. The current testwork will form the basis of assessing the capital and operating costs associated with the LTR ilmenite upgrade plant for inclusion in the PFS Update. This highly successful ilmenite upgrade testwork follows the recently announced Thunderbird resource update in which the Measured category of the high grade component of resource tripled to 110 million tonnes (Mt) @ 14.9 heavy mineral (see ASX release dated 31 July, 2015). The updated mineral resource of 3.240Bt @ 6.9 HM, includes a coherent high grade zone of 1.09Bt @ 11.9 HM at 7.5 HM cut-off (Measured, Indicated and Inferred, Appendix 1). This completes two key components highlighted as potential upside for the PFS update. The remaining work comprises optimising engineering and reducing initial throughputs to deliver substantially reduced initial project capital costs. This work is well advanced and the PFS is on track for completion during Q4 2015. ENDS For further information please contact: Bruce McQuitty Managing Director Tel: 08 6424 8440 bmcquitty@sheffieldresources.com.au Media: Luke Forrestal Cannings Purple Tel: 08 6314 6300 lforrestal@canningspurple.com.au Website: www.sheffieldresources.com.au

- 5 - COMPLIANCE STATEMENTS PREVIOUSLY REPORTED INFORMATION This report also includes information that relates to Exploration Targets, Exploration Results and Mineral Resources which were prepared and first disclosed under the JORC Code 2004. The information has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported. The information was extracted from the Company s previous ASX announcements as follows: Thunderbird High Grade Resource Update: THUNDERBIRD HIGH GRADE RESOURCE UPDATE 31 July 2015 Thunderbird PFS Update progress: QUARTERLY REPORT FOR PERIOD ENDING 30 JUNE 2015 27 July 2015 Thunderbird pre-feasibility study: PRE-FEASIBILITY STUDY CONFIRMS THUNDERBIRD AS NEXT MAJOR MINERAL SANDS PROJECT IN GLOBAL DEVELOPMENT PIPELINE 14 May 2015 These announcements are available on Sheffield Resources Ltd s web site www.sheffieldresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of reporting of Exploration Results, estimates of Mineral Resources or results of Scoping Studies, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which any Competent Person s findings are presented have not been materially modified from the original market announcement. FORWARD LOOKING STATEMENTS Some statements in this report regarding estimates or future events are forward-looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forward-looking statements include, but are not limited to, statements concerning the Company s exploration programme, outlook, target sizes and mineralised material estimates. They include statements preceded by words such as anticipated, expected, target, scheduled, intends, potential, prospective and similar expressions.

- 6 - ABOUT SHEFFIELD RESOURCES Sheffield Resources Limited (Sheffield) is a rapidly emerging heavy mineral sands (HMS) company. ASX Code: SFX Market Cap @ 44cps $59.1m Issued shares: 134.4m Cash: $5.1m (at 30 June 2015) Sheffield s projects are all situated within the state of Western Australia and are 100 owned by the Company. HEAVY MINERAL SANDS The Dampier project, located near Derby in WA s northwest, contains the large, high grade zircon-rich Thunderbird HMS deposit. Sheffield s pre-feasibility study shows Thunderbird can generate strong cash margins from globally significant levels of production over a 32 year mine life. The Eneabba project comprises multiple HMS deposits and is located near Eneabba approximately 140km south of the port of Geraldton in WA s Mid-West region. Sheffield is also evaluating the large McCalls chloride ilmenite project, located 110km to the north of Perth. NICKEL-COPPER Sheffield has over 2,000km 2 of tenure in the Fraser Range region, including the Red Bull project which is within 20km of Sirius Resources NL s (ASX:SIR) Nova Ni-Cu deposit.

- 7 - Appendix 1: Thunderbird Deposit Mineral Resource 31 July 2015 Resource Category Cut off (HM) Material (Mt) Table 2: Thunderbird Deposit Mineral Resource 1 Mineral Resources Mineral Assemblage 2 Bulk Density HM Slime s Osize In-situ HM (Mt) Zircon HiTi Leuc Measured 3.0 230 2.1 9.4 19 10 21 7.9 2.2 2.1 27 Indicated 3.0 2,410 2.0 6.9 16 8 167 8.4 2.7 3.1 28 Inferred 3.0 600 2.0 5.6 16 9 33 8.4 2.8 3.5 28 Total 3.0 3,240 2.1 6.9 16 9 222 8.3 2.7 3.1 28 Measured 7.5 110 2.2 14.9 17 13 16 7.3 2.1 1.9 27 Indicated 7.5 850 2.1 11.8 15 10 100 7.6 2.4 2.2 28 Inferred 7.5 130 2.0 10.7 14 9 14 7.6 2.3 2.2 28 Total 7.5 1,090 2.1 11.9 15 10 131 7.6 2.3 2.1 28 Leuc Ilmenite Table 3: Thunderbird Deposit contained Valuable HM (VHM) Resource Inventory 1 Resource Category Cut off (HM) Zircon HiTi Leucoxene Leucoxene Ilmenite Total VHM Measured 3.0 1,700 500 500 5,800 8,400 Indicated 3.0 14,000 4,500 5,300 46,700 70,500 Inferred 3.0 2,800 900 1,200 9,300 14,200 Total 3.0 18,500 5,900 6,900 61,800 93,100 Measured 7.5 1,200 300 300 4,300 6,100 Indicated 7.5 7,700 2,400 2,200 27,800 40,000 Inferred 7.5 1,100 300 300 3,900 5,700 Total 7.5 9,900 3,000 2,800 36,000 51,700 1 All tonnages and grades have been rounded to reflect the relative uncertainty of the estimate, thus sum of columns may not equal. 2 Estimates of Mineral Assemblage are presented as percentages of the Heavy Mineral (HM) component of the deposit, as determined by magnetic separation, QEMSCAN and XRF. Magnetic fractions were analysed by QEMSCAN for mineral determination as follows: Ilmenite: 40-70 TiO2 >90 Liberation; Leucoxene: 70-94 TiO2 >90 Liberation; High Titanium Leucoxene (HiTi Leucoxene): >94 TiO2 >90 Liberation; and Zircon: 66.7 ZrO2+HfO2 >90 Liberation. The nonmagnetic fraction was submitted for XRF analysis and minerals determined as follows: Zircon: ZrO2+HfO2/0.667 and High Titanium Leucoxene (HiTi Leucoxene): TiO2/0.94.