Telecommunication Expansion Project (II)

Similar documents
Thailand Fourth Bangkok Water Supply Improvement Project (II) and Fifth Project Networks System Improvement Project

Metro Manila Flood Control Project (II)

Wengfu Fertilizer Plant Construction Project (1)(2)

Krueng Aceh Irrigation Project

1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH).

Rural Water Supply Project (IV)

India Kothagudem A Thermal Power Station Rehabilitation Project. Field Survey: July Project Profile and Japan s ODA Loan

Shisanling Pumped Storage Power Station Project

Mexico. The Mexico City Sulfur Dioxide Emission Reduction Project. Salamanca

Jakarta Water Supply Development Project (Immediate Project of 2nd Stage,

Chittagong Caustic Soda Plant Rehabilitation Project

Equipment Supply for Pre and Post Harvest Services Project

Indonesia Ujung Pandang Port Urgent Rehabilitation Project Report Date June, 2002 Field Survey July, Project Profile and Japan s ODA Loan

China Dalian Water Supply System Rehabilitation Project

Indonesia North Java Line Track Rehabilitation Project Report Date August, 2002 Field Survey July, Project Profile and Japan s ODA Loan

Lianyungang Port Xugou Area First Phase Construction Project

Reversing the Economic Decline, and Enhancing Growth and Prosperity: The Ghanaian Example

Mongolia Baganuur and Shivee-Ovoo Coal Mine Development Project (1) (2)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Malaysia Ex-Post Evaluation of Japanese ODA Loan Project Port Dickson Power Station Rehabilitation Project (2)

Republic of Kazakhstan Ex-Post Evaluation of Japanese ODA Loan Astana Water Supply and Sewerage Project External Evaluator: Nobuyuki Kobayashi, OPMAC

Philippines: Electricity Market and Transmission Development Project

Ex-Ante Evaluation (for Japanese ODA Loan)

Plant Project, Muara Tawar Gas Fired Power Plant Extension Project and South Sumatra-West Java Gas Pipeline Project.

Cost-based and demand- based tariffs

Indonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2)

Thailand Dao Kanong - Klong Toey Port Expressway Project (Stage I) (Construction of bridge section of the Chao Phya River Crossing)

Financial Report for FY (April 2016 March 2017)

1. Project Profile and Japan's ODA loan

Ex-ante Evaluation (for Japanese ODA Loan)

Mongolia: Ulaanbaatar Heat Efficiency Project

Ex-ante Evaluation - 1 -

1. Name of the Project

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan)

Mid-Term Review Report of Japanese ODA Loan Project for FY2012

LIST OF DIRECTIVES AND MEMORANDA

Ex-Ante Evaluation (for Japanese ODA Loan)

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi

Minipe and Nagadeepa Irrigation Rehabilitation Project

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan)

FINAL REPORT SUMMARY. November Prepared for: The Ministry of Economy, Trade and Industry. Prepared by:

Ex-Ante Evaluation (for Japanese ODA Loan)

SUMMARY OF PROJECT PERFORMANCE

Document of. The World Bank

Kingdom of Morocco. Distribution lines constructed under the project (Essaouira Province) Project Location. 0. Summary. 1. Project Description

CHANGING DYNAMICS WITHIN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

PROGRAM PREPARATORY TECHNICAL ASSISTANCE. 1. The program preparatory technical assistance (TA) is required to:

Ex-Ante Evaluation (for Japanese ODA Loan)

WEST BENGAL INSTITUTIONAL STRENGTHENING OF GRAM PANCHAYATS PROJECT PROCUREMENT PLAN FOR ONE YEAR (1 APRIL MARCH 2014)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619)

A Comparison of Turnkey and Co-Management Performance- Based Non-Revenue Water Reduction Contracts. Paul Fanner

Ex-Ante Evaluation (for Japanese ODA Loan)

Implementation Status & Results Vietnam Customs Modernization Project (P085071)

Ghana Water Sector Rehabilitation Project

Public Disclosure Copy

BANGLADESH INDIA INDIA. 1 Based on the number of electrified households (as of 1996) DHAKA KHULNA CHITTAGONG. Project Site

POWER INDABA CONFERENCE

STATE OF THE CITIES IN AFRICA (SOCA) PROJECT: THE ROLE OF THE DEPARTMENT OF PLANNING- KNUST GHANA URBAN FORUM

1. Project Description. 1.1 Background

Jiujiang Fertilizer Plant Construction Project (1)(2)(3)

PROCUREMENT PLAN. Date of First Procurement Plan: 22 October 2009 Date of this Procurement Plan: 13 December 2018, Version 12 Advance Contracting: No

Jakarta Water Supply Distribution Pipeline Project

Mactan (Cebu) International Airport Development Project. Project Summary

Bangkok Chonburi Highway Construction Project (1)

LAWSON, Inc. Fiscal 2004 Earnings Presentation

Japanese ODA Loan. Ex-Ante evaluation

Ex-Ante Evaluation (for Japanese ODA Loan)

CHINA Project of Construction of Hydroelectric Power Plant in Wuqiangxi(I) ( )

Ex-Ante Evaluation (for Japanese ODA Loan)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321)

Ex-Ante Evaluation (for Japanese ODA Loan)

Indonesian Logistics Overview

Vietnam Ex-Post Evaluation of Japanese ODA Loan Project Da Nhim Power System Rehabilitation Project

Public Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201)

Japanese ODA loan. Ex-ante Evaluation

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-ante Evaluation. (1) Current Status and Issues of the Agriculture and Irrigation Sector in Kenya

Ex-Post Evaluation of Japanese ODA Loan

Japan s Assistance for the Reconstruction of Iraq

Cape Town Water Outlook Updated 21 February 2018 Department of Water and Sanitation City of Cape Town

U.S. Trade Deficit and the Impact of Rising Oil Prices

Pakistan Bin Qasim Thermal Power Station Unit 6 Project. Report date: March 2001 Field survey: August Project Profile and Japan s ODA Loan

THIRD UNITED NATIONS CONFERENCE ON THE LEAST DEVELOPED COUNTRIES BHUTAN. THE FIRST DRAFT OF THE NATIONAL PROGRAMME OF ACTION Summary of Chapters I III

Project Site. China. Hanoi. Myanmar Laos. Thailand Vietnam. Cambodia Ho Chi Minh. Malaysia

Public Disclosure Copy

Précis. Building a Stronger Transportation System

Japanese ODA Loan. Ex-Ante Evaluation

Ex-Ante evaluation 1. Name of the Project 2. Background and Necessity of the Project

Design Division Project Management & Engineering Department Anchorage: Performance. Value. Results.

Thailand - Improvement of Power Transmission and Distribution

1. Project Description. Welezo Reservoir developed in the project

Manufacturing technology orders continue growth trajectory

Pamarayan Ciujung Irrigation System Rehabilitation Project

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations

Ex-Ante Evaluation (for Japanese ODA Loan)

Transcription:

Ghana Telecommunication Expansion Project (II) Report Date: October, 2002 Field Survey: July, 2001 1. Project Profile and Japan s ODA Loan Project Site Switchboard System (Accra Station) 1.1 Background In 1985, Ghana had only 0.29 telephone lines for every 100 inhabitants, lower than the African average of 0.4. After the economic crisis of the 1970s, the operation and maintenance of Ghana s telecommunication services had deteriorated. In addition, rapid technological advancement in the telecommunication sector in the world made the existing technology in Ghana obsolete; consequently, it became difficult to obtain spare parts in the market. In 1985, roughly 20% of 55,000 DEL 1 (communication capacity) was operated manually, and 60% of the remainder went through an outdated and obsolete step-by-step switchboard system. And deterioration of urban telecom cables was severe, causing various disruptions. In fact, it was estimated that, in light of the deteriorated condition of the lines, the actual figure of telephone density in Ghana was 0.2 per 100 inhabitants. On the other hand, the demand for telephones far exceeded supply; in 1985, 80% of applicants were on the waiting list, and as the country was on the track of economic recovery and growth, this demand was expected to grow by 7% per year in the 10 years. In order to cope with the above situation, international donors assisted Ghana s telecommunications development. For example, the World Bank extended funding for Telecommunication Projects (I), which was co-financed by ODA loans from Japan in 1985. This project, Telecommunication Expansion Project (II), was an integral part of the Second Telecommunications Project coordinated by the World Bank and co-financed by France and the 1 Direct Exchange Line System 1

Netherlands. 1.2 Objectives To improve telecommunication services by establishing and rehabilitating the telecommunication network, and to achieve a partial fulfillment of unsatisfied telephone demand in Ghana (Accra, Cape Coast, Kumasi, and other areas). 1.3 Project Scope The project consists of: (1) establishing and replacing telephone switching systems (39 stations: 40,100 lines) and constructing one regional office, (2) establishing local transmission systems with digital microwave (11 sections), (3) establishing and rehabilitating long distance transmission system with microwave (13 sections) and UHF transmission links (15 sections), (4) rehabilitating 2 radio stations, (5) establishing and rehabilitating 13 local cable stations, and (6) providing consulting services. Local transmission systems serve the Accra North, Central, Kumasi and Takoradi areas, while the long-distance systems serve across the entire country (i.e., South, Central and North regions). 1.4 Borrower / Executing Agency The Government of the Republic of Ghana / Ghana Telecommunications Company Ltd. (former Posts and Telecommunications Corporation) 1.5 Outline of Loan Agreement Loan Amount / Loan Disbursed 10,508 million yen / 10,384 million yen Amount Exchange of Notes / Loan Agreement September, 1988 / December, 1988 Terms and Conditions Interest Rate 2.5 % p.a. Repayment Period (Grace Period) 30 years (10 years) Procurement Partially Untied Final Disbursement Date September, 1996 2

2. Results and Evaluation 2.1 Relevance The project s objective was consistent with the Government s policy and its priorities at the time of appraisal. Under the Second Economic Recovery Program (1986-88) of the Ghanaian Government, the transportation and telecommunications sectors were given priority for the public investment, as the absence of an efficient telecommunications service had long been identified as one of the major constraints on economic and social development. The Project also constituted an integral part of the Second Telecommunications Project, which was coordinated by the other international donors. At the time of appraisal, privatization of the telecommunication sector was not a common practice in Sub-Sahara African countries. The situation changed in the mid-1990s, when structural adjustment programs reviewed the state-owned enterprises. In an effort to achieve rapid expansion and to improve the quality of service through increased private-sector participation, Posts and Telecommunications Corporation was privatized in 1997 as Ghana Telecommunications Ltd.. Ghana Telecommunication has earned a reputation for improving service quality 2, and it can be said that the relevance of the Project still remains even after the privatization of Ghana Telecommunications. 2.2 Efficiency 2.2.1 Project Scope All project components were implemented as planned, although switch capacity was increased in some cases, partly with Ghana Telecommunications own funding. These revisions were made by the difference in the demand for telecommunication services between the time of initial survey and of implementation. The executing agency reported that the performance of the consultant and contractors was reported satisfactory overall, especially in terms of staff qualifications, expertise, schedule adherence, and quality controls. 2.2.2 Implementation Schedule The project was completed in 1996, with delays totaling three years, which was mainly attributed to the long, complex approval system on the procurement within the Ghanaian government before privatization. This caused delays in the procurement of equipment and in recruiting consultants. 2 See, for example, World Bank (1998), World Development Report Knowledge for Development. (p. 68, Box 4.7 Competition before privatization in Ghana s telecommunications services. ) 3

2.2.3 Project Cost The total actual cost was almost same as originally planned: 10,441 million yen as compared to 10,508 million yen at the time of appraisal. There was a slight increase in the foreign currency portion, from 9,430 million yen to 10,075 million yen, due to the increase in project scope. The local currency has depreciated sharply since the appraisal, causing a nominal increase of the local portion of the project from the original 1,389 million cedis to an actual 40,613 million cedis. However, when the local currency expenditure is evaluated in terms of Japanese yen, it is decreased to 366 million yen from 1,078 million yen. 2.3 Effectiveness 2.3.1. Improvement of Telephone Access Between 1994 and 1996, the Project delivered 53,750 DEL, out of which 11,300 were replaced for obsolete switching facilities, resulting in a net increase of 42,450 in DEL capacity. Together with other sources, at end of 1996 when the Project was completed, Ghana had attained a DEL capacity of 103,726, rising the number of telephone lines per 100 inhabitants from 0.290 in 1985 to 0.430 in 1996. (Figure 1) Since only aggregated figures for the whole country are available, it is impossible to evaluate project achievement regionally. However, as the Project covers almost the entire telecommunication network in the country, it is safe to assume that this improved telephone access was partly attributable to the Project. Since 1996, there has been a further improvement in telephone access for the Ghanaian population. The number of telephone lines per 100 inhabitants became 1.170 in 2000. Deregulation and privatization implemented in 1997 may have contributed to enhancing the efficiency of the sector and to facilitating a flow of private investment to the sector, resulting in further improvement in telephone access. Figure 1: Telephone lines per 100 inhabitants in Ghana Project completion Source: ITU Statistical Yearbook 4

2.3.2. Improved Quality of Service Table 1 shows telephone access and service quality indicators in Ghana before and after the Project. The completion rates for both domestic and international calls improved significantly. For example, from 21% for international incoming calls in 1992 to 50% in 1998, and from 49% for domestic long-distance calls in 1990 to 83.3% in1998. On the other hand, the increase in the number of telephone lines did not keep pace with the increasing telephone demand, so the telephone line waiting list continued to grow. Table 1: Telephone access and service qulaity indicators in Ghana (before and after the Project) 1990 1995 1996 1998 2000 Public pay phones in Ghana n.a. 30 453 1,815 3,180 Telephone lines in operation 44,243 63,067 77,886 144,218 237,178 Telephone lines per 100 inhabitants 0.290 0.360 0.430 0.750 1.170 % of automatic main lines 96 100 100 100 100 % of digital microwave** main lines n.a. 90 91 95 100 % of residential main lines 40 n.a. 42 42 42 Connection capacity of local exchanges 60,025 106,249 112,899 161,886 288,646 International telephone circuits 238 541 822 1,019 n.a. Waiting list for main lines 11,900 28,349 66,638 109,037 113,065 Completion Rate International (%) 21/47* 20.4/47.6 30.5/64.5 50/60 n.a. Long distance (%) 49 57 68.9 83.3 n.a. Local (%) 58 75 75.5 83.2 n.a. Telephone Traffic (in thousand minutes) International (in) 4,772 16,758 20,767 28,900 43,820 International (out) 16,178 35,000 64,000 100,800 166,361 Long distance n.a. n.a. n.a. n.a. n.a. Local n.a. n.a. n.a. n.a. n.a. Source: GT and ITU Statistical Yearbook Note: (*) 1992 figures international completion rates report both incoming (left)/outgoing (right); (**) digital microwave is technically different from ISDN network, although the ISDN network is rapidly expanding in Ghana 2.3.3. Financial Internal Rate of Return (FIRR) The project brought Ghana Telecommunication additional revenue. The re-calculated FIRR was 12.3%, slightly lower than the 13.2% calculated at the time of appraisal. The following assumptions have been applied in re-calculating FIRR: Costs: Investment costs of the Project and incremental operation and maintenance costs for the project facilities (all expressed in 1995 constant prices). Benefits: Incremental revenues produced from the Project (in 1995 price setting), and it is 5

assumed that the Project attained its full capacity level in 1997. Project life: 20 years 2.4 Impact 2.4.1 Improved Access to Information Improved access to information, facilitated by expansion of the telephone system, brought about both tangible and intangible socio-economic benefits to the country. The executing agency reported at this evaluation that, in particular, the expansion of telecommunication networks among and between producers, retailers, exporters and consumers reduced transportation costs in timber and agricultural industries, and that many lives have been saved, reportedly, because villages now have access to telephones to call doctors. More recently, modernized transmission systems have facilitated an expansion of email and internet services in the country. According to ITU s estimation, the number of internet users in Ghana increased more than 15 times between 1995 and 1996, when the Project was completed. 2.4.2 Environmental Impacts According to Ghana Telecommunication, no negative environment impact has been reported for the Project. There was no involuntary relocation or resettlement of local residents. 2.5 Sustainability 2.5.1. Organizational Structure Ghana Telecommunication Ltd. is the leading provider of telecommunications services in the country. It was privatized on February 20, 1997, through the sale of 30% of its shares to G-Com Ltd. There are two shareholders: the Government of Ghana, with 70%, and G-Com Ltd., which is a consortium led by Telekom Malaysia. 2.5.2. Operation and Maintenance Ghana Telecommunication has branches in all 10 regional capitals and in most of the 110 district capitals in the country and employs 3,521 people; the number of telephone lines per employee is 44.06 lines (January 31, 1999). Day-to-day administration of the company is conducted by a Management Committee, which is headed by the Managing Director. Ghana Telecommunication has a 7-member board; 3 are representatives appointed by the Government of Ghana (including the board Chairman) and the other 4 represent G-Com Ltd. 6

Ghana Telecom, Ltd Chief Network Officer / Network Services General Manager / Training Integrated Network Planning Network Implementation Domestic (local and long distance) International Mobile Figure 2: O&M Organization Chart According to Ghana Telecommunication, privatization enhanced the efficiency of their operation and maintenance of the project by emphasizing cost-effectiveness and bringing about a clearer division of the functional responsibilities shared by all O&M staff. The Chief Network Officer at Network Services is directly responsible for the operation and maintenance of facilities and transmission services. The Network Services Section is sub-divided into an Integrated Network Planning and an Network Implementation unit. The training division provides training to help staff keep up-to-date with advancements in telecommunications technology. There are also company-awarded scholarships, given to 62 students to pursue higher education in Ghana, and 6 students have been sent to Malaysia for engineering courses. 2.5.3. Present Condition of Project Facilities According to Ghana Telecommunication officials, all facilities and equipment established under the Project, including the switchboard and transmission systems, are appropriately maintained. 2.5.4. Financial Statements In 2000, the revenue of Ghana Telecommunication increased by almost 50% over the previous year, although there was an increase in operational expenses arising from the installation of ISDN networks, which led to a drop in net profit in the short run. Accordingly, the Return On Assets (ROA) was 14.92% for 1999 and 7.01% for 2000. However, the increase 7

in the number of ISDN networks is expected to increase the number of ISDN subscribers in the near future, and hence the ROA is expected to recover. One of the constraints for Ghana Telecommunication is control over the tariff structure, which is still regulated by the government. Thus, although Ghana Telecommunication has made several proposals, it has not been able to implement a single tariff increase since 1996. 8

Comparison of Original and Actual Scope Items Original Actual 1. Project Scope (1) Switching System Switchboard Regional Office 39 stations: 40,100 lines * Including replacement of 2,500 lines 1 building (Cape Coast) 6 offices As planned: 53,750 lines of which 18 stations: 52,000 lines (Urban) 21 stations: 1,750 lines (Rural) * Including replacement of 11,300 lines 1 regional office building, 5 telephone exchange buildings and 1 building extension (2) Local Transmission System Digital Microwave 140 Mb/s 3 hops 43 Mb/s 8 hops 140 Mb/s 6 hops 34 Mb/s 4 hops (3)Long Distance Transmission System Microwave UHF Sub Base Bank Digital MAS (Kumasi) VFT Power Source Improvement 140 MB/S 13 hops 17 MB/S 11 hops 8 MB/S 4 hops 12 stations 2 ch for each 300 channel, 1 master station 12 stations 15 solar hybrid system 140 MB/S 19 hops 34 MB/S 9 hops 8 MB/S 10 hops 7 stations 2 ch each As planned As planned As planned (4) Coast Radio Station (rehabilitation) 2 stations (Takoradi, Tema) (5) Local Cable 13 stations Cable 22,800 pairs / 79,800 p-km 1 station (Tema) + 8 VHF Transceiver stations along Coast of Ghana As planned 37,700 pairs (6) Consulting Service Survey, supervision; assistance for bidding, evaluation, D/D, supervision, testing and experiments 250 m/m 329 m/m 9

2. Implementation Schedule Selection of Consultant Prep. of Tender Documents Tender Evaluation Contract Negotiation Civil Work Manufacturing Shipment Installation Training O&M 3. Project Cost Foreign currency Local currency Total ODA loan portion Exchange Rate July 1988-Jan 1989 Feb 1989-June 1989 July 1989-Sept 1989 Oct 1989-Dec 1989 Jan 1990-Feb 1990 Aug 1990-Sept 1991 March 1990-Dec 1990 May 1990-March 1991 Aug 1990-March 1992 Jan-March 1991, March 1992 April 1992-March 1993 9,430 million yen 1,078 million yen (1,389 million cedi) 10,508 million yen 10,508 million yen 1 cedi = 0.776 yen (Dec. 1987) Aug 1989 Nov 1990 -Apr 1992 June 1992-Aug 1992 Sep 1992-Mar 1993 April 1993-July 1993 Sep 1994-Dec 1995 Jan 1994-Mar 1995 Apr 1994-June 1995 June 1994-Sept 1995 Mar 1994-June 1995 Apr 1994-Mar 1996 10,075 million yen 366 million yen (40,613 million cedi) 10,441 million yen 10,384 million yen 1 cedi = 0.009yen (Dec. 1995) 10