Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

Similar documents
Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

A New Fish Habitat Management Regime for Yukon Placer Mining

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Fisheries Protection Program: an overview. WaterTech 2016, April 6-8, 2016, Banff

Fish Habitat Protection Development Permit Area

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan

Fish Passage Culvert Inspection (FPCI)

FISHERIES AND OCEANS CANADA

Fish Habitat Management System. for Yukon Placer Mining

Pêches et Océans Canada. October 11, 2017 Our file Notre référence 16-HCAA Your file Votre reference EA

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

Guidebook of Mitigation Measures for Placer Mining in the Yukon

Changes / Updates to DFO Regulations. September 16, 2014

DFO Fisheries Protection Program

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

Temporary Watercourse Crossing: Culverts

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

RIPARIAN AREAS REGULATION

Temporary Watercourse Crossing: Fords

CLOCA Rural & Agricultural Guide to Permits

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION

Form B Farm dairy wastewater discharge

Biological Opinion. Morse Brothers Habitat Restoration Project. Endangered Species Act - Section 7 Consultation

APPENDIX B DFO OPERATIONAL STATEMENTS

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25

Atlantic Salmon ESA Listing Workshop

Terms and Conditions for Water Sustainability Act

Department of the Army Permit Application

Guidelines for Erosion & Sediment Control (ESC) Bylaw

MINISTRY OF TRANSPORTATION BEST MANAGEMENT PRACTICES MANUAL FOR FISHERIES DRAFT

Funding Guidelines State Fiscal Year 2016

DFO s Fish Habitat Management Program

Appendix D. Fisheries and Oceans Canada (DFO) Letter of Advice

UNDERGROUND UTILITY CROSSING (TRENCHLESS) General Submission Requirements

Fish Habitat Management System for Yukon Placer Mining. Adaptive Management Framework

quality criteria and any limit set under this chapter may be exceeded. The applicant shall provide

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

FAQ Ballot Measure 1 17FSH2

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

CCSD#1 Stormwater Standards

Holly Swartz and Jason Shirey

Appendix E : Guidelines for Riparian Buffer Areas

to Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1 st Floor Quebec, Quebec G1K 3X2

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP

Sustainable Natural Environment Fish Habitat

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017

AGRICULTURAL IRRIGATION POLICY

Temporary Stream Crossing

Temporary Stream Crossing

Yakima River Basin Environmental & Salmon Restoration Act

Labrador Iron Mines Holdings Limited

FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED

The Clean Water Act. Clarifies protection under the Clean Water Act for streams and wetlands

Projects must fall under one of the nine categories listed in Table 1.

Riparian Buffer Requirements. Department of Environmental Protection Bureau of Watershed Management

U.S. Army Corps of Engineers, Sacramento District 1325 J Street, Room Sacramento, California

4. Present Activities and Roles

ATTACHMENT 7. Assisted Assessment of Serious Harm

Oregon Administrative Rules Oregon Department of Fish and Wildlife

IMPORTANT INFORMATION:

FAQ Ballot Measure 1 17FSH2

COTTON CREEK CULVERT REPLACMENT

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

Model Riparian Buffer Ordinance.

Ongoing and Completed Studies

Background. AEM Tier 2 Worksheet Stream & Floodplain Management. Glossary

Appendix A. Form 1 (section 18) Project Proposal

GUIDANCE FOR MAINTAINING AND REPAIRING MUNICIPAL DRAINS IN ONTARIO

JUVENILE SALMON MIGRATION SECTION 5. blank page

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

IDEM Wetlands and Streams Regulatory Overview. An overview of IDEM permitting for work in Waters of the State

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 5

Chapter FISH AND WILDLIFE HABITAT CONSERVATION AREAS

Subject: Conservation; water resources; Lake Champlain; total maximum 5. Statement of purpose: This bill proposes to amend requirements for 7

Anadromous Fish Reintroduction in the Upper Columbia River Basin An Overview

SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS PID: Date: 3/8/18 C-R-S: UNI-TR

Environmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region

EVALUATION OF THE POTENTIAL FOR IMPACTS ON SALMONID MIGRATION ASSOCIATED WITH CIRCULATION OF SALINE POND WATER DURING THE INITIAL STEWARDSHIP PERIOD

Whatcom County Farm Plan

Fish Passage Decision Framework for BC Hydro Facilities

COMMONWEALTH of VIRGINIA

April 10, Ms. Violet Camsell-Blondin Chair Wek èezhìi Land and Water Board #1, th Street Yellowknife, NT, CA, X1A 2P6

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Navigating Section 404 Clean Water Act Permitting

REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

WHATCOM COUNTY STANDARD FARM CONSERVATION PLAN PLANNING WORKBOOK: Checklist and Action Plan

Resource Access Roads Framework

APPENDIX P EL DORADO COUNTY GENERAL PLAN: APPLICABLE SECTIONS FROM CONSERVATION AND OPEN SPACE ELEMENT

Chehalis Basin Strategy Programmatic SEPA Draft EIS

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT

Transcription:

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Version 1.5 2016 This document is available online at: www.yukonplacersecretariat.ca/howto_prepare_project_proposal.html Or in hard copy format from: Yukon Placer Secretariat, 206B Lowe Street, Whitehorse, Yukon, Y1A 1W5 Yukon Water Board Office, 106-419 Range Road, Whitehorse, Yukon, Y1A 3V1

Disclaimer The Fish Habitat Design, Operation and Reclamation Workbook is designed to support the Watershed Authorizations for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory; in the event of an inconsistency between the workbook and these Fisheries Act authorizations, the authorizations will prevail.

Before You Begin This workbook and associated worksheets are provided to assist with compiling information to support project proposals for submission to the Yukon Environmental and the Socio-economic Assessment Board (YESAB) and the Yukon Water Board (YWB). Once completed, the worksheets must be submitted for review as a component of both the YESAB and Yukon Water Board applications. The guidance provided focuses on the requirements of the Authorizations for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory (Federal Fisheries Act) for watersheds in the Yukon (herein referred to as Watershed Authorizations). Please note that this workbook and associated worksheets may undergo revisions in the future, and users are encouraged to ensure that they use the current version. In order to achieve compliance with the Watershed Authorizations, the placer mining proposal must meet the requirements outlined in this workbook for the watershed type and specific habitat suitability type at the location where the activities are to occur (see Yukon Placer Fish Habitat Suitability Maps). In addition to this workbook and worksheets, the following documents provide the required information to support the development and submission of proposals for placer mining activities. All supporting documents are available online through the Yukon Placer Secretariat web page, www.yukonplacersecretariat.ca/howto_prepare_project_proposal. html or through the web addresses given for the specific documents. 1. Authorization for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory www.yukonplacersecretariat.ca/placer_authorizations.html Provides the legal authority, with respect to placer mining, to carry on a work, undertaking or activity that results in the permanent alteration and destruction of fish habitat. Also specifies sediment discharge standards for placer mine effluent and the sensitivity category of the watershed (i.e. Category A or B). Please note that the death of fish is not authorized. 2. Yukon Placer Fish Habitat Suitability Maps www.yukonplacersecretariat.ca/maps.html Identifies the watershed sensitivity and habitat suitability of the watercourse where placer mining activities are proposed to occur. 3. Guidebook of Mitigation Measures for Placer Mining in the Yukon www.yukonplacersecretariat.ca/infocentre.html Provides technical information related to best management practices, mitigation measures, and design considerations to achieve compliance with the Watershed Authorizations and to assist with proposal development. Note: Complete and submit only the worksheets that are relevant to your operation. Note: There are no Watershed Authorizations in place for the Liard and Alsek watersheds. Applications for review, forms and process to apply for a placer mine in the Liard or Alsek watershed can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www.yukonplacersecretariat.ca/index.html. For assistance completing the worksheets please contact the Yukon Placer Secretariat (contact information is available at, www.yukonplacersecretariat.ca/index.html) or the Yukon Government Client Services & Inspections office in your mining district (contact information is available at, www.emr.gov.yk.ca/cmi/cmi_district_offices.html). 5

If Your Project Does Not Comply With The Requirements Placer mine operators are encouraged to design proposals that comply with the requirements described in this workbook. However, if the proposal is not able to achieve these requirements and the operator would like to proceed with the regulatory review process, an application for site-specific review should be submitted to Fisheries and Oceans Canada (DFO) for consideration prior to the submission of the proposal to the YESAB and the YWB. When a proposal is submitted for site-specific review, DFO will review the information to determine whether a site-specific authorization is required. In some cases, DFO may recommend measures to avoid or mitigate the harm to fish and fish habitat to allow the application to proceed under the Watershed Authorization. Applications for site-specific review, forms and process to apply can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www. yukonplacersecretariat.ca/index.html. Should it be determined that a site-specific authorization is required, a more detailed application, including a fish habitat offsetting plan and a letter of credit, will have to be submitted to DFO. Information on the site-specific authorization application process, offsetting plans, and letters of credit can be found on DFO s Projects Near Water website, www.dfo-mpo.gc.ca/pnw-ppe/reviews-revues/ application-eng.html. 6

Quick Reference Table The quick reference table provides the page number of the specific section of the workbook that applies to fish habitat design, operation and reclamation requirements for placer mining works or undertakings proposed for a particular habitat suitability type. For additional information operators are encouraged to refer to the Guidebook of Mitigation Measures for Placer Mining in the Yukon. 9 High Habitat Suitability Watercourses (Chinook Salmon Production) 19 Areas of Special Consideration 29 Moderate High Habitat Suitability Watercourses 45 Moderate Moderate Habitat Suitability Watercourses (Includes Tributaries to Small Lakes) 67 Moderate Low Habitat Suitability Watercourses (Includes Tributaries to Large Lakes) 95 Low Habitat Suitability Watercourses (Including Tributaries to Lake Trout Lakes) 121 Water Quality Zone Watercourses 141 Appendices 7

8

High Habitat Suitability Watercourses (Chinook Salmon Production) High Habitat Suitability Watercourses (Chinook Salmon Production) 9

High Habitat Suitability Watercourses (Chinook Salmon Production) 10

High Habitat Suitability Watercourses (Chinook Salmon Production) Before You Begin This workbook and associated worksheets are provided to assist with compiling information to support project proposals for submission to the Yukon Environmental and the Socio-economic Assessment Board (YESAB) and the Yukon Water Board (YWB). Once completed, the worksheets must be submitted for review as a component of both the YESAB and Yukon Water Board applications. The guidance provided focuses on the requirements of the Authorizations for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory (Federal Fisheries Act) for watersheds in the Yukon (herein referred to as Watershed Authorizations). Please note that this workbook and associated worksheets may undergo revisions in the future, and users are encouraged to ensure that they use the current version. In order to achieve compliance with the Watershed Authorizations, the placer mining proposal must meet the requirements outlined in this workbook for the watershed type and specific habitat suitability type at the location where the activities are to occur (see Yukon Placer Fish Habitat Suitability Maps). In addition to this workbook and worksheets, the following documents provide the required information to support the development and submission of proposals for placer mining activities. All supporting documents are available online through the Yukon Placer Secretariat web page, www.yukonplacersecretariat.ca/howto_prepare_project_proposal. html or through the web addresses given for the specific documents. 1. Authorization for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory www.yukonplacersecretariat.ca/placer_authorizations.html Provides the legal authority, with respect to placer mining, to carry on a work, undertaking or activity that results in the permanent alteration and destruction of fish habitat. Also specifies sediment discharge standards for placer mine effluent and the sensitivity category of the watershed (i.e. Category A or B). Please note that the death of fish is not authorized. 2. Yukon Placer Fish Habitat Suitability Maps www.yukonplacersecretariat.ca/maps.html Identifies the watershed sensitivity and habitat suitability of the watercourse where placer mining activities are proposed to occur. 3. Guidebook of Mitigation Measures for Placer Mining in the Yukon www.yukonplacersecretariat.ca/infocentre.html Provides technical information related to best management practices, mitigation measures, and design considerations to achieve compliance with the Watershed Authorizations and to assist with proposal development. Note: Complete and submit only the worksheets that are relevant to your operation. Note: There are no Watershed Authorizations in place for the Liard and Alsek watersheds. Applications for review, forms and process to apply for a placer mine in the Liard or Alsek watershed can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www.yukonplacersecretariat.ca/index.html. For assistance completing the worksheets please contact the Yukon Placer Secretariat (contact information is available at, www.yukonplacersecretariat.ca/index.html) or the Yukon Government Client Services & Inspections office in your mining district (contact information is available at, www.emr.gov.yk.ca/cmi/cmi_district_offices.html). 11

High Habitat Suitability Watercourses (Chinook Salmon Production) If Your Project Does Not Comply With The Requirements Placer mine operators are encouraged to design proposals that comply with the requirements described in this workbook. However, if the proposal is not able to achieve these requirements and the operator would like to proceed with the regulatory review process, an application for site-specific review should be submitted to Fisheries and Oceans Canada (DFO) for consideration prior to the submission of the proposal to the YESAB and the YWB. When a proposal is submitted for site-specific review, DFO will review the information to determine whether a site-specific authorization is required. In some cases, DFO may recommend measures to avoid or mitigate the harm to fish and fish habitat to allow the application to proceed under the Watershed Authorization. Applications for site-specific review, forms and process to apply can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www. yukonplacersecretariat.ca/index.html. Should it be determined that a site-specific authorization is required, a more detailed application, including a fish habitat offsetting plan and a letter of credit, will have to be submitted to DFO. Information on the site-specific authorization application process, offsetting plans, and letters of credit can be found on DFO s Projects Near Water website, www.dfo-mpo.gc.ca/pnw-ppe/reviews-revues/ application-eng.html. 12

High Habitat Suitability Watercourses (Chinook Salmon Production) Fish Habitat Design, Operation and Reclamation Requirements for High Habitat Suitability Watercourses (Chinook Salmon Production) High habitat suitability watercourses are defined as watercourses that provide spawning habitat for salmon or critical migratory corridors required to access salmon spawning habitat. Typically, the distribution of this habitat type is the most limited in watersheds. High habitat suitability watercourses require effective management of mining activities to provide protection from potentially harmful effects resulting from development activities and to achieve conservation and protection of habitats. As such, placer mining works, undertakings or activities will be highly restricted in this habitat type. In all cases, any placer mining works, undertakings or activities (other than those listed in the following operational requirements) that are likely to result in the permanent alteration or destruction of, High habitat suitability watercourses require a site-specific review. If the proposed activity is deemed to be acceptable, a site-specific authorization will be issued by Fisheries and Oceans Canada. All applications for a site-specific authorization must include a fish habitat offsetting plan and letter of credit (see If your project does not comply with the requirements section at the beginning of this document). SUMMARY OF GENERAL RESTRICTIONS IN HIGH HABITAT SUITABILITY WATERCOURSES Activity Type / Operation Effluent Discharge Riparian Zone Fords Diversion Channels In-stream Works Restrictions in High Habitat Suitability Watercourses Discharge of sediment concentrations above background levels not authorized Work within 30 metres from the high water mark not authorized. Construction of new Fords not authorized. Construction of diversion channels not authorized. In-stream works are not authorized. Note: The table above summarizes those placer mining activities which are not authorized by the Watershed Authorizations and will require a site-specific review (see If your project does not comply with the requirements section at the beginning of this document). To determine how to proceed, please answer the following questions regarding a work, undertaking or activity in or around High habitat suitability watercourses. Do you propose to undertake placer mining activities in, or within, 30 metres of a watercourse? Activities may include discharging effluent, constructing stream crossings, clearing riparian vegetation, constructing channel diversions, or withdrawing water. NO: No further review pursuant to the Fisheries Act is required. YES: Proceed to Step A, Project Information. 13

High Habitat Suitability Watercourses (Chinook Salmon Production) A. Project Information The first step in compiling a project proposal that involves activities proposed to occur in or around fish habitat areas is the completion of the Project Location Worksheet (Appendix A). Note: The Project Location Worksheet (Appendix A) is required for all applications. A1. On the Project Location Worksheet enter the stream name, the watershed name (as per Yukon Placer Fish Habitat Suitability Maps), identify the watershed sensitivity and habitat suitability classification for the reaches you proposed to work in, provide a short description of the location, describe the proposed duration of activities and include a copy of a map of the specific location of the site. Once the sections noted above are completed on the Project Location Worksheet, proceed to the next question. Do you propose to discharge effluent from your mine site? NO: Proceed to Step C, Riparian Zones. YES: Proceed to Step B, Settling Pond Discharge. Note: Discharge of sediment concentrations above background levels is not authorized in High habitat suitability watercourses. B. Settling Pond Discharge (effluent concentration) Point source sediment discharges from gold recovery processes are typically managed through the use of settling facilities. Typically only total recirculation systems will be considered as discharge of sediment concentrations above background levels is not authorized in High habitat suitability watercourses. For more information on settling pond design and operation, recirculation systems, and settling pond reclamation refer to the Guidebook of Mitigation Measures for Placer Mining in the Yukon (herein referred to as the Guidebook). Water quality objectives and sediment discharge standards for High habitat suitability watercourses are identified in the Watershed Authorizations for the specific watershed you propose to work in. Please verify your specific discharge standard in the respective watershed you plan to work in (specifically if any exemptions exist) prior to proceeding with your application. B1. Record the Compliance Level on the Project Location Worksheet (Appendix A). Once the effluent discharge standards are recorded on the Project Location Worksheet proceed to the next question. Do you propose to construct works other than diversion channels within the Riparian Zone (see Step C for the definition of the Riparian Zone) this could include stripping, construction of reservoirs, construction of settling ponds, etc.? NO: Proceed to Step D, Diversion Channels YES: Proceed to Step C, Riparian Zone C. Riparian Zones The Riparian Zone is defined as the portion of the stream bank (either vegetated or not) immediately adjacent to the stream channel. Riparian Zones are measured from the high 14

High Habitat Suitability Watercourses (Chinook Salmon Production) water mark on each bank of the watercourse and follow the pattern/morphology of the channel. The designated Riparian Zone in High habitat suitability watercourses is 30 metres. The Riparian Zone designation applies to all High habitat suitability watercourses. The only activity permitted within the Riparian Zone is the clearing of surface vegetation to create a corridor to provide access to the stream (typically for water acquisition purposes). The maximum width of the corridor is to be no more than 3 metres. Riparian Zones must be staked out by the operator prior to development. Do you propose clearing of surface vegetation or subsurface works in the Riparian Zone? (this could include stripping, construction of reservoirs, construction of settling ponds, etc.) NO: Proceed to Step D, Diversion Channels. YES: Not authorized by the Watershed Authorizations, see If your project does not comply with the requirements section at the beginning of this document. Proceed to next question. Do you propose to construct a new stream crossing (Ford)? NO: Proceed to next question. YES: Not authorized by the Watershed Authorizations, see If your project does not comply with the requirements section at the beginning of this document. Proceed to next question. Do you propose to clear surface vegetation only? NO: Proceed to next question. YES: Not authorized by the Watershed Authorizations, see If your project does not comply with the requirements section at the beginning of this document. Proceed to next question. D. Diversion Channels It is unlikely that the construction of a diversion channel will be permitted in High habitat suitability watercourses. Operators wishing to propose construction of a diversion channel in High habitats must first prepare a detailed design of the diversion channel and, if required, a detailed fish habitat offsetting plan. Ultimately, the proposal will need to clearly demonstrate how harm to fish and fish habitat will be avoided mitigated and offset in a manner that will maintain or improve the productivity of fisheries. (see If your project does not comply with the requirements section at the beginning of this document). Do you propose to use an Existing Ford? NO: Proceed to next question. YES: Proceed to Step E, Watercourse Crossings, then E1, Use of Existing Ford. Do you propose to construct a New Ford? NO: Proceed to Step F, Water Acquisition. YES: Not authorized by the Watershed Authorizations, see If your project does not comply with the requirements section at the beginning of this document. Proceed to next question. 15

High Habitat Suitability Watercourses (Chinook Salmon Production) E. Watercourse Crossings (Fords) Fording is defined as the crossing of creeks, streams and / or rivers at locations where a bridge, causeway or elevated embankment does not exist or is not utilized by a vehicle or equipment. Fording typically involves driving directly through a watercourse, across the banks and bed. In some instances, Fording locations (Fords) have been improved or constructed through watercourses by way of adding materials such as rocks or gravel, the modification of approaches, or the modification of the bed of a watercourse. E1. Use of Existing Ford Use of existing Fords is often the least preferred option for crossing watercourses however it is recognized that there are instances where it is the only viable option. Refer to the Guidebook for additional information on Fords. The following measures should be adhered to when utilizing existing Fords. NOTE: Use of existing Fords in High habitat suitability watercourses is only permitted within the timing window of reduced risk of any given year. Please refer to, www.dfo-mpo.gc.ca/pnw-ppe/measuresmesures/measures-mesures-eng.html for timing windows specific to your location. Identify if you intend to use existing Fords on the Project Location Worksheet (Appendix A). Ensure water depth is sufficiently shallow to allow passage of vehicle / equipment. Plan your activities in advance to minimize the number of crossings required. Avoid crossing during extreme rain or flood events. Access approaches at 90 to the bank, when entering or exiting the Ford. Maintain speed at a very slow and steady pace throughout the crossing. Avoid rapid acceleration while on approaches or while in the water. Do you propose to withdraw water from a High habitat suitability watercourse? NO: Proceed to Step G, In-stream Works. YES: Proceed to Step F, Water Acquisition. F. Water Acquisition Acquisition of water is required for processing materials during placer mining. Effective water management is a key consideration at all placer mine sites. The following requirements must be achieved to meet compliance with the respective Watershed Authorizations. F1. Water Intake Screens In order to meet the requirement of the Fisheries Act, all water intakes must be screened. A general summary of screening requirements are provided in the Guidebook. NOTE: The objective behind the installation of intake screens is to prevent the death of fish caused by the acquisition of water. If screens of the correct mesh size are deployed between a watercourse and the intake to a water reservoir or gravity feed ditch, it is not necessary to screen the pump intake that removes water from within these structures provided these structures do not already contain fish. In the case of total recirculation systems, the operator shall ensure that any areas where fish could enter the system have barriers to prevent the entry of fish. 16

High Habitat Suitability Watercourses (Chinook Salmon Production) G. In-stream Works In-stream works are defined as works that occur within the high water mark of a watercourse, but do not include diversion channels or Fords. Some in-stream works can lead to effects on fish and fish habitat such as erosion/scouring, sediment inputs, loss of habitat area, changes in channel morphology, blockages to passage, and reduced productivity. No physical works are permitted within a watercourse under the auspices of a Watershed Authorization in habitats of High suitability. Should in-stream works be contemplated in these areas, operators must apply to Fisheries and Oceans Canada for a site-specific review of proposed in-stream works prior to proceeding (see If your project does not comply with the requirements section at the beginning of this document). 17

High Habitat Suitability Watercourses (Chinook Salmon Production) 18

Areas of Special Consideration Areas of Special Consideration 19

Areas of Special Consideration 20

Areas of Special Consideration Before You Begin This workbook and associated worksheets are provided to assist with compiling information to support project proposals for submission to the Yukon Environmental and the Socio-economic Assessment Board (YESAB) and the Yukon Water Board (YWB). Once completed, the worksheets must be submitted for review as a component of both the YESAB and Yukon Water Board applications. The guidance provided focuses on the requirements of the Authorizations for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory (Federal Fisheries Act) for watersheds in the Yukon (herein referred to as Watershed Authorizations). Please note that this workbook and associated worksheets may undergo revisions in the future, and users are encouraged to ensure that they use the current version. In order to achieve compliance with the Watershed Authorizations, the placer mining proposal must meet the requirements outlined in this workbook for the watershed type and specific habitat suitability type at the location where the activities are to occur (see Yukon Placer Fish Habitat Suitability Maps). In addition to this workbook and worksheets, the following documents provide the required information to support the development and submission of proposals for placer mining activities. All supporting documents are available online through the Yukon Placer Secretariat web page, www.yukonplacersecretariat.ca/howto_prepare_project_proposal. html or through the web addresses given for the specific documents. 1. Authorization for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory www.yukonplacersecretariat.ca/placer_authorizations.html Provides the legal authority, with respect to placer mining, to carry on a work, undertaking or activity that results in the permanent alteration and destruction of fish habitat. Also specifies sediment discharge standards for placer mine effluent and the sensitivity category of the watershed (i.e. Category A or B). Please note that the death of fish is not authorized. 2. Yukon Placer Fish Habitat Suitability Maps www.yukonplacersecretariat.ca/maps.html Identifies the watershed sensitivity and habitat suitability of the watercourse where placer mining activities are proposed to occur. 3. Guidebook of Mitigation Measures for Placer Mining in the Yukon www.yukonplacersecretariat.ca/infocentre.html Provides technical information related to best management practices, mitigation measures, and design considerations to achieve compliance with the Watershed Authorizations and to assist with proposal development. Note: Complete and submit only the worksheets that are relevant to your operation. Note: There are no Watershed Authorizations in place for the Liard and Alsek watersheds. Applications for review, forms and process to apply for a placer mine in the Liard or Alsek watershed can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www.yukonplacersecretariat.ca/index.html. For assistance completing the worksheets please contact the Yukon Placer Secretariat (contact information is available at, www.yukonplacersecretariat.ca/index.html) or the Yukon Government Client Services & Inspections office in your mining district (contact information is available at, www.emr.gov.yk.ca/cmi/cmi_district_offices.html). 21

Areas of Special Consideration If Your Project Does Not Comply With The Requirements Placer mine operators are encouraged to design proposals that comply with the requirements described in this workbook. However, if the proposal is not able to achieve these requirements and the operator would like to proceed with the regulatory review process, an application for site-specific review should be submitted to Fisheries and Oceans Canada (DFO) for consideration prior to the submission of the proposal to the YESAB and the YWB. When a proposal is submitted for site-specific review, DFO will review the information to determine whether a site-specific authorization is required. In some cases, DFO may recommend measures to avoid or mitigate the harm to fish and fish habitat to allow the application to proceed under the Watershed Authorization. Applications for site-specific review, forms and process to apply can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www. yukonplacersecretariat.ca/index.html. Should it be determined that a site-specific authorization is required, a more detailed application, including a fish habitat offsetting plan and a letter of credit, will have to be submitted to DFO. Information on the site-specific authorization application process, offsetting plans, and letters of credit can be found on DFO s Projects Near Water website, www.dfo-mpo.gc.ca/pnw-ppe/reviews-revues/ application-eng.html. 22

Areas of Special Consideration Fish Habitat Design, Operation and Reclamation Requirements for Areas of Special Consideration Areas of Special Consideration (ASC) are defined as watercourses that contain ecologically or culturally important fisheries or aquatic resources. Watercourses assigned this designation may include habitats for rare or locally significant species or areas which directly support subsistence, traditional, commercial or recreational fisheries. Areas of Special Consideration (ASC) may be established for either anadromous or nonanadromous species of fish. In all cases, any placer mining works, undertakings or activities (other than those listed in the following operational requirements) that are likely to result in the permanent alteration or destruction of ASC habitat require a site-specific review. If the proposed activity is deemed to be acceptable, a site-specific authorization will be issued by Fisheries and Oceans Canada. Sediment discharge standards for ASC vary and are listed by watercourse in the relevant Authorization. An application for a site-specific authorization must include a fish habitat offsetting plan and letter of credit (see If your project does not comply with the requirements section at the beginning of this document). SUMMARY OF GENERAL RESTRICTIONS ON IN ASC Activity Type / Operation Effluent Discharge Riparian Zone Fords Diversion Channels In-stream Works Restrictions in Areas of Special Consideration Sediment discharge standards for ASC vary and are listed by watercourse in the relevant Authorization Work within 30 metres from the high water mark not authorized. Construction of new Fords not authorized. Construction of diversion channels not authorized. In-stream works not authorized. Note: The table above summarizes those placer mining activities which are not authorized by the Watershed Authorizations and will require a site-specific review (see If your project does not comply with the requirements section at the beginning of this document). To determine how to proceed, please answer the following questions regarding a work, undertaking or activity in or around ASC. Do you propose to undertake placer mining activities in, or within, 30 metres of a watercourse? Activities may include discharging effluent, constructing stream crossings, clearing riparian vegetation, constructing channel diversions, or withdrawing water. NO: No further review pursuant to the Fisheries Act is required. YES: Proceed to Step A, Project Information. 23

Areas of Special Consideration A. Project Information The first step in compiling a project proposal that involves activities proposed to occur in or around fish habitat areas is the completion of the Project Location Worksheet (Appendix A). Note: The Project Location Worksheet (Appendix A) is required for all applications. A1. On the Project Location Worksheet enter the stream name, the watershed name (as per Yukon Placer Fish Habitat Suitability Maps), identify the watershed sensitivity and habitat suitability classification for the reaches you proposed to work in, determine if any reaches are designated as previous/prior development, provide a short description of the location, describe the proposed duration of activities and include a copy of a map of the specific location of the site. Once the sections noted above are completed on the Project Location Worksheet, proceed to the next question. Do you propose to discharge effluent from your mine site? NO: Proceed to Step C, Riparian Zones. YES: Proceed to Step B, Settling Pond Discharge. B. Settling Pond Discharge (effluent concentration) Point source sediment discharges from gold recovery processes are typically managed through the use of settling facilities. The action level approach is a key element of the riskbased approach to sediment management for Yukon placer mining. For more information on the action level approach or settling pond design, operation, recirculation systems, and settling pond reclamation refer to the Guidebook of Mitigation Measures for Placer Mining in the Yukon (herein referred to as the Guidebook). Water quality objectives and sediment discharge standards for ASC are identified in the Watershed Authorizations for the specific watershed you propose to work in. Please verify your specific discharge standard in the respective watershed you plan to work in prior to proceeding with your application. B1. Record the Design Target, Action Level and Compliance Level on the Project Location Worksheet (Appendix A). Once the effluent discharge standards are recorded on the Project Location Worksheet proceed to the next question. Do you propose to construct works other than diversion channels within the Riparian Zone (see Step C for the definition of the Riparian Zone) this could include stripping, construction of reservoirs, construction of settling ponds, etc.? NO: Proceed to Step D, Diversion Channels YES: Proceed to Step C, Riparian Zone 24

Areas of Special Consideration C. Riparian Zones The Riparian Zone is defined as the portion of the stream bank (either vegetated or not) immediately adjacent to the stream channel. The designated Riparian Zone in ASC is 30 metres, measured from the ordinary high water mark on each bank of the watercourse and following the pattern/morphology of the channel. The Riparian Zone designation applies to all ASC. The only activity permitted within the Riparian Zone, under the Watershed Authorizations, is the clearing of surface vegetation to create a corridor to provide access to the stream (typically for water acquisition purposes). The maximum width of the corridor is to be no more than 3 metres. Riparian Zones must be staked out by the operator prior to development. Do you propose to conduct surface or subsurface works in the Riparian Zone? (this could include stripping, construction of reservoirs, construction of settling ponds, etc.) NO: Proceed to Step D, Diversion Channels. YES: Not authorized by a Watershed Authorization, please refer to If your project does not comply with the requirements section at the beginning of this document. Proceed to next question. Do you propose to clear surface vegetation only? NO: Proceed to next question. YES: Not authorized by a Watershed Authorization, please refer to If your project does not comply with the requirements section at the beginning of this document. Proceed to next question. D. Diversion Channels Construction of a diversion channel will be considered in ASC on a case-by-case basis and will require a site-specific review by Fisheries and Oceans Canada. It is likely that stringent operating restrictions will be required in these areas. Operators wishing to propose construction of a diversion channel in ASC must first prepare a detailed design of the diversion channel and, if required, a detailed fish habitat offsetting plan. Ultimately, the proposal will need to clearly demonstrate how harm to fish and fish habitat will be avoided, mitigated and offset in a manner will maintain or improve the productivity of fisheries. (see If your project does not comply with the requirements section at the beginning of this document). Do you propose to use an Existing Ford? NO: Proceed to next question. YES: Proceed to Step E, Watercourse Crossings, then E1, Use of Existing Ford. Do you propose to construct a new stream crossing (Ford)? No: Proceed to Step F, Water Acquisition. YES: Not authorized by the Watershed Authorizations, please refer to If your project does not comply with the requirements section at the beginning of this document. Proceed to next question. 25

Areas of Special Consideration E. Watercourse Crossings (Fords) Fording is defined as the crossing of creeks, streams and / or rivers at locations where a bridge, causeway or elevated embankment does not exist or is not utilized by a vehicle or equipment. Fording typically involves driving directly through a watercourse, across the banks and bed. In some instances, Fording locations (Fords) have been improved or constructed through watercourses by way of adding materials such as rocks or gravel, the modification of approaches, or the modification of the bed of a watercourse. E1. Use of Existing Ford Use of existing Fords is often the least preferred option for crossing watercourses however it is recognized that there are instances where it is the only viable option. Refer to the Guidebook for additional information on Fords. The following measures should be adhered to when utilizing existing Fords. Note: Use of existing Fords in ASC may be restricted to a timing window of reduced risk. Please refer to, www.dfo-mpo.gc.ca/pnw-ppe/measures-mesures/measures-mesures-eng.html for timing windows specific to your location and fish species present. Identify if you intend to use existing Fords on the Project Location Worksheet (Appendix A). Ensure water depth is sufficiently shallow to allow passage of vehicle / equipment. Plan your activities in advance to minimize the number of crossings required. Avoid crossing during extreme rain or flood events. Access approaches at 90 to the bank, when entering or exiting the Ford. Maintain speed at a very slow and steady pace throughout the crossing. Avoid rapid acceleration while on approaches or while in the water. Do you propose to withdraw water from a watercourse designated as an ASC? NO: Proceed to Step G, In-stream Works. YES: Proceed to Step F, Water Acquisition. F. Water Acquisition Acquisition of water is required for processing materials during placer mining. Effective water management is a key consideration at all placer mine sites. The following requirements must be achieved to meet compliance with the respective Watershed Authorization. F1. Water Intake Screens In order to meet the requirement of the Fisheries Act, all water intakes must be screened. A general summary of the screening requirements are provided in the Guidebook. Note: The objective behind the installation of intake screens is to prevent the death of fish caused by the acquisition of water. If screens of the correct mesh size are deployed between a watercourse and the intake to a water reservoir or gravity feed ditch, it is not necessary to screen the pump intake that removes water from within these structures provided these structures do not already contain fish. In the case of total recirculation systems, the operator shall ensure that any areas where fish could enter the system have barriers to prevent the entry of fish. 26

Areas of Special Consideration G. In-stream Works In-stream works are defined as works that occur within the high water mark of a watercourse, but do not include diversion channels or Fords. Some in-stream works can lead to effects on fish and fish habitat such as erosion/scouring, sediment inputs, loss of habitat area, changes in channel morphology, blockages to passage, and reduced productivity. No physical works are permitted within a watercourse under the auspices of a Watershed Authorization in ASC. Should in-stream works be contemplated in these areas, operators must apply to Fisheries and Oceans Canada for a site-specific review of proposed in-stream works prior to proceeding (see If your project does not comply with the requirements section at the beginning of this document). 27

Areas of Special Consideration 28

Moderate High Habitat Suitability Watercourses Moderate High Habitat Suitability Watercourses 29

Moderate High Habitat Suitability Watercourses 30

Moderate High Habitat Suitability Watercourses Before You Begin This workbook and associated worksheets are provided to assist with compiling information to support project proposals for submission to the Yukon Environmental and the Socio-economic Assessment Board (YESAB) and the Yukon Water Board (YWB). Once completed, the worksheets must be submitted for review as a component of both the YESAB and Yukon Water Board applications. The guidance provided focuses on the requirements of the Authorizations for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory (Federal Fisheries Act) for watersheds in the Yukon (herein referred to as Watershed Authorizations). Please note that this workbook and associated worksheets may undergo revisions in the future, and users are encouraged to ensure that they use the current version. In order to achieve compliance with the Watershed Authorizations, the placer mining proposal must meet the requirements outlined in this workbook for the watershed type and specific habitat suitability type at the location where the activities are to occur (see Yukon Placer Fish Habitat Suitability Maps). In addition to this workbook and worksheets, the following documents provide the required information to support the development and submission of proposals for placer mining activities. All supporting documents are available online through the Yukon Placer Secretariat web page, www.yukonplacersecretariat.ca/howto_prepare_project_proposal. html or through the web addresses given for the specific documents. 1. Authorization for Works or Undertakings affecting Fish Habitat for Specified Streams in the Yukon Territory www.yukonplacersecretariat.ca/placer_authorizations.html Provides the legal authority, with respect to placer mining, to carry on a work, undertaking or activity that results in the permanent alteration and destruction of fish habitat. Also specifies sediment discharge standards for placer mine effluent and the sensitivity category of the watershed (i.e. Category A or B). Please note that the death of fish is not authorized. 2. Yukon Placer Fish Habitat Suitability Maps www.yukonplacersecretariat.ca/maps.html Identifies the watershed sensitivity and habitat suitability of the watercourse where placer mining activities are proposed to occur. 3. Guidebook of Mitigation Measures for Placer Mining in the Yukon www.yukonplacersecretariat.ca/infocentre.html Provides technical information related to best management practices, mitigation measures, and design considerations to achieve compliance with the Watershed Authorizations and to assist with proposal development. Note: Complete and submit only the worksheets that are relevant to your operation. Note: There are no Watershed Authorizations in place for the Liard and Alsek watersheds. Applications for review, forms and process to apply for a placer mine in the Liard or Alsek watershed can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www.yukonplacersecretariat.ca/index.html. For assistance completing the worksheets please contact the Yukon Placer Secretariat (contact information is available at, www.yukonplacersecretariat.ca/index.html) or the Yukon Government Client Services & Inspections office in your mining district (contact information is available at, www.emr.gov.yk.ca/cmi/cmi_district_offices.html). 31

Moderate High Habitat Suitability Watercourses If Your Project Does Not Comply With The Requirements Placer mine operators are encouraged to design proposals that comply with the requirements described in this workbook. However, if the proposal is not able to achieve these requirements and the operator would like to proceed with the regulatory review process, an application for site-specific review should be submitted to Fisheries and Oceans Canada (DFO) for consideration prior to the submission of the proposal to the YESAB and the YWB. When a proposal is submitted for site-specific review, DFO will review the information to determine whether a site-specific authorization is required. In some cases, DFO may recommend measures to avoid or mitigate the harm to fish and fish habitat to allow the application to proceed under the Watershed Authorization. Applications for site-specific review, forms and process to apply can be obtained from the Yukon Placer Secretariat, contact information can be found online at, www. yukonplacersecretariat.ca/index.html. Should it be determined that a site-specific authorization is required, a more detailed application, including a fish habitat offsetting plan and a letter of credit, will have to be submitted to DFO. Information on the site-specific authorization application process, offsetting plans, and letters of credit can be found on DFO s Projects Near Water website, www.dfo-mpo.gc.ca/pnw-ppe/reviews-revues/ application-eng.html. 32

Moderate High Habitat Suitability Watercourses Fish Habitat Design, Operation and Reclamation Requirements for Moderate High Habitat Suitability Watercourses Moderate High habitat suitability watercourses are defined as watercourses that are highly suitable for rearing juvenile Chinook salmon. Typically these watercourses provide locally desirably conditions for feeding, growth and development. These watercourses also provide habitats that are highly suitable for a broad range of adult and juvenile resident fish species. Please use the following instructions and information to complete the worksheets relevant to your proposal (located in Appendix A to H). The completed worksheets will be submitted as part of your project description to the Yukon Environmental and Socio Economic Assessment Board (YESAB) and your application to the Yukon Water Board (YWB) SUMMARY OF GENERAL RESTRICTIONS IN MODERATE HIGH HABITAT SUITABILITY WATERCOURSES Activity Type / Operation Riparian Zone Fords Diversion Channels In-stream Works Restrictions in Moderate High Habitat Suitability Watercourses Designated Riparian Zone is 20 metres from the high water mark. Conditions and reclamation requirements apply to clearing surface vegetation within the Designated Riparian Zone. Subsurface works not authorized. Construction of new Fords not authorized. Mitigative measures should be applied to use of existing Fords. Construction of Seasonal and Temporary diversion channels not authorized. Construction of Permanent diversion channels subject to design restrictions and construction and reclamation requirements. In-stream settling facilities, in-stream reservoirs, stream as a conduit not authorized. Note: The table above summarizes those placer mining activities which are not authorized by the Watershed Authorizations and will require a site-specific review (see If your project does not comply with the requirements section at the beginning of this document). To determine how to proceed, please answer the following questions regarding a work, undertaking or activity in or around Moderate High habitat suitability watercourses. Do you propose to undertake placer mining activities in, or within, 30 m of a watercourse? Activities may include discharging effluent, constructing stream crossings, clearing riparian vegetation, constructing channel diversions, or withdrawing water. NO: No further review pursuant to the Fisheries Act is required. YES: Proceed to Step A, Project Information. 33

Moderate High Habitat Suitability Watercourses A. Project Information The first step in compiling a project proposal that involves activities proposed to occur in or around fish habitat areas is the completion of the Project Location Worksheet (Appendix A). Note: The Project Location Worksheet (Appendix A) is required for all applications. A1. On the Project Location Worksheet enter the stream name, the watershed name (as per Yukon Placer Fish Habitat Suitability Maps), identify the watershed sensitivity and habitat suitability classification for the reaches you proposed to work in, if any reaches are designated as previous/prior development, a short description of the location, the proposed duration of activities and a copy of a map of the specific location of the site. Does the Previous Development designation apply to your project? NO: Proceed to the next question. YES: See below. Historical Development If your project falls within a Historical Development zone, the requirements for settling pond discharge, riparian zones, seasonal or temporary diversions, watercourse crossings, water acquisition and in-stream works that normally apply to Moderate Moderate habitat suitability watercourses will apply to your operation. Note: Permanent diversion channels and all reclamation work must conform to the requirements for Moderate High habitat suitability watercourses. Current Development or Extensive Development If your project falls within a Current Development or Extensive Development zone, the requirements for settling pond discharge, riparian zones, seasonal or temporary diversions, watercourse crossings, water acquisition and in-stream works that normally apply to Moderate Low habitat suitability watercourses will apply to your operation. Note: Permanent diversion channels and all reclamation work must conform to the requirements for Moderate High habitat suitability watercourses. A2. Based on the previous development type, please select the appropriate Operation and Restoration standard on the Project Location Worksheet. Once the sections noted above are completed on the Project Location Worksheet, proceed to the next question. Do you propose to discharge effluent from your mine site? NO: Proceed to Step C, Riparian Zones. YES: Proceed to Step B, Settling Pond Discharge. B. Settling Pond Discharge (effluent concentration) Point source sediment discharges from gold recovery processes are typically managed through the use of settling facilities. The action level approach is a key element of the riskbased approach to sediment management for Yukon placer mining. For more information on the action level approach or settling pond design, operation, recirculation systems, and settling pond reclamation refer to the Guidebook. 34